HARRIS IH0610 (6329-88-001)

Items: 43

County: HARRIS
Length: N/A
Highway: IH0610
District: HOUSTON
Control Number: 6329-88-001
DBE Goal: N/A
Project: RMC - 632988001
Guaranty: N/A
Time: 240 CALENDAR DAYS
Engineer's Estimate: $1,337,008.78
Date: 11/07/2018 (7 years ago)
Contract Number: N/A
Type: COMM CBL REP AND/OR REPL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,337,008.78
Over/Under Est: -26.42% -$353,182.08
Over/Under Est: -19.94% -$266,612.78
Amt Left: 8.8% $86,569.30

Bid Items & Bid Tabulations

43 Total 0 of 43
HARRIS  |  IH0610  |  HOUSTON  |  6329-88-001  |  11/07/2018  |  $1,337,008.78  |  RMC - 632988001  |  COMM CBL REP AND/OR REPL  |  240 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FLORIDA TRAFFIC CONTROL DEVICES, INC.
THIRD COAST SERVICES LLC
MOBILIZATION (CALLOUT)
EA 9.000 $1,481.680 $2,848.700 $2,000.000
MOBILIZATION (EMERGENCY)
EA 4.000 $1,109.880 $4,604.170 $200.000
CONDT (PVC) (SCH 80) (2")
LF 2,000.000 $9.920 $9.340 $8.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,000.000 $14.720 $19.010 $10.000
CONDT (PVC) (SCH 80) (3")
LF 500.000 $12.340 $12.290 $9.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 500.000 $24.820 $24.350 $11.000
CONDT (PVC) (SCH 80) (4")
LF 200.000 $25.000 $13.470 $10.700
CONDT (PVC) (SCH 80) (4") (BORE)
LF 200.000 $27.350 $25.540 $12.950
CONDT (RM) (1 1/2") (BORE)
LF 100.000 $15.100 $24.400 $12.340
CONDT (RM) (2") (BORE)
LF 200.000 $16.270 $25.470 $19.770
CONDT (RM) (3")
LF 100.000 $25.200 $46.020 $43.230
CONDT (RM) (3") (BORE)
LF 100.000 $32.840 $44.200 $31.910
ELEC CONDR (NO.6) BARE
LF 30,000.000 $1.800 $1.140 $3.000
GROUND BOX TY D (162922)W/APRON
EA 15.000 $635.280 $881.780 $550.000
REMOVE GROUND BOX
EA 15.000 $219.200 $194.970 $100.000
INSTALL UNDERGROUND CONDUIT
LF 3,000.000 $10.480 $12.230 $2.000
COMM CABLE (AERIAL)(22 AWG)(6 PAIR)
LF 10,000.000 $2.390 $1.990 $2.000
COMM CABLE (UNDRGRND)(19 AWG)(6 PAIR)
LF 10,000.000 $1.770 $1.650 $2.000
ITS COM CBL (ETHERNET)
LF 5,000.000 $4.230 $1.690 $2.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 2,000.000 $4.370 $2.570 $9.000
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 30,000.000 $4.660 $2.630 $9.200
FIBER OPTIC PIGTAIL (12 FIBER)
LF 300.000 $47.970 $3.390 $75.000
FIBER OPTIC SPLICE ENCLOSURE
EA 25.000 $1,912.340 $655.380 $987.240
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 15.000 $1,134.670 $507.600 $2,000.000
FIBER OPTIC FUSION SPLICE
EA 1,000.000 $66.610 $72.540 $12.070
RADAR PRESENCE DETECTOR
EA 4.000 $6,094.640 $6,464.440 $9,500.000
CONDUIT (PREPARE)
LF 5,000.000 $2.370 $9.870 $3.900
RADAR ADVANCED DETECTION DEVICE
EA 2.000 $6,440.320 $7,117.430 $9,500.000
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 25.000 $3,888.000 $3,456.890 $5,500.000
ITS RADIO (INSTALL ONLY)
EA 100.000 $1,200.000 $1,020.240 $150.000
VIVDS MULTI CON COM CAX CBL(3COND16AWG)
LF 1,000.000 $1.370 $2.180 $2.830
WIRELESS ETHERNET RADIO (LOCAL) LINK
EA 5.000 $4,516.670 $6,615.420 $5,500.000
WIRE SPLICES
EA 20.000 $30.470 $138.190 $20.000
OVERHEAD CABLE PLACEMENT
LF 1,000.000 $3.280 $1.850 $3.700
JACKING AND BORING
LF 2,000.000 $15.140 $30.620 $7.500
TRENCHING AND INSTALLATION OF CONDUIT
LF 3,000.000 $11.750 $12.100 $2.000
ETHERNET SWITCH (INSTALL ONLY)
EA 200.000 $1,085.520 $82.800 $90.630
REMOVE EXISTING CABLES (FIBER)
LF 1,000.000 $0.980 $0.700 $2.000
REMOVE EXISTING CABLES (POWER)
LF 1,000.000 $0.830 $0.700 $2.000
REMOVE EXISTING CABLES (COMMUNICATION)
LF 27,000.000 $1.010 $0.700 $3.000
TMA (STATIONARY)
DAY 48.000 $217.280 $640.950 $500.000
TMA (MOBILE OPERATION)
DAY 48.000 $24.250 $640.950 $500.000
INSTALL OF ETHERNET SURGE PROTECT
EA 100.000 $1,575.000 $132.160 $136.070
Totals: $1,337,008.780 $983,826.700 $1,070,396.000