Show Job Controls
Bid Cobra

HARDIN SH0326 (6363-89-001)

Items: 30

County: HARDIN
Length: N/A
Highway: SH0326
District: BEAUMONT
Control Number: 6363-89-001
DBE Goal: N/A
Project: RMC - 636389001
Guaranty: N/A
Time: 30 W
Engineer's Estimate: $1,040,022.83
Date: 12/03/2020 (5 years ago)
Contract Number: N/A
Type: OVERLAY ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,040,022.83
$893,784.70
Over/Under Est: -14.06% -$146,238.13
Over/Under Est: -10.92% -$113,619.83
Amt Left: 3.65% $32,618.30
Over/Under Est: 0.65% $6,773.82
Amt Left: 17.12% $153,011.95
Delta: -13.00% -$120,393.65

Bid Items & Bid Tabulations

30 Total 0 of 30
HARDIN  |  SH0326  |  BEAUMONT  |  6363-89-001  |  12/03/2020  |  $1,040,022.83  |  RMC - 636389001  |  OVERLAY ROADWAY  |  30 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN CONSTRUCTION
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION LLC
REMOVING CONC (PAV)
SY 36.000 $15.000 $406.000 $84.300 $450.000
D-GR HMA(SQ) TY-B PG64-22
TON 17.000 $185.000 $850.000 $247.000 $600.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 3,326.000 $90.000 $78.000 $80.800 $94.700
TACK COAT
GAL 3,628.000 $3.500 $3.300 $4.600 $2.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 617.000 $75.000 $86.300 $73.780 $88.000
PLANE ASPH CONC PAV(0" TO 1")
SY 217.000 $5.000 $21.700 $23.460 $4.000
PLANE ASPH CONC PAV(0" TO 3")
SY 1,664.000 $7.000 $3.350 $9.180 $4.000
MOBILIZATION
LS 1.000 $94,547.530 $50,000.000 $49,000.000 $40,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,000.000 $5,000.000 $1,500.000 $1,500.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 19,438.000 $0.300 $0.950 $0.420 $1.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 9,532.000 $0.300 $1.350 $0.580 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 430.000 $1.750 $1.350 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,552.000 $1.750 $0.800 $0.980 $1.000
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 62.000 $2.500 $2.700 $2.050 $2.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 46.000 $2.500 $4.800 $4.050 $2.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 635.000 $1.000 $1.600 $1.280 $1.150
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 24,350.000 $0.350 $0.550 $0.460 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,590.000 $0.350 $0.550 $0.510 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 9,938.000 $0.350 $0.550 $0.490 $0.400
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 18.000 $12.000 $8.550 $15.100 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $200.000 $268.000 $255.000 $185.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $294.000 $326.000 $223.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 11.000 $40.000 $26.800 $51.000 $25.000
REFL PAV MRKR TY I-C
EA 46.000 $3.500 $5.350 $6.100 $4.000
REFL PAV MRKR TY II-A-A
EA 468.000 $3.500 $5.350 $5.050 $4.000
SP MIXES SP-C SAC-A PG76-22
TON 4,757.000 $105.000 $81.900 $94.000 $110.000
TACK COAT
GAL 2,595.000 $3.500 $3.900 $4.600 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 58.000 $250.000 $53.500 $107.000 $100.000
TMA (STATIONARY)
DAY 25.000 $300.000 $200.000 $390.000 $100.000
TMA (MOBILE OPERATION)
DAY 10.000 $300.000 $200.000 $102.000 $100.000
Totals: $1,040,022.830 $893,784.700 $926,403.000 $1,046,796.650