Show Job Controls
Bid Cobra

HALE SH 194 (0439-05-026)

Items: 179

County: HALE
Length: 2.6400 MILES
Highway: SH 194
District: LUBBOCK
Control Number: 0439-05-026
DBE Goal: 0.0%
Project: C 439-5-26
Guaranty: $100,000.00
Time: 445 WORKING DAYS
Engineer's Estimate: $20,473,703.50
Date: 10/01/2024 (1 year ago)
Contract Number: 10243004
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00128019
Project Description: REHABILITATION
Mail/Deliver Bids To: N/A
HEATH BOZEMAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$20,473,703.50
$26,114,007.11
Over/Under Est: 27.55% $5,640,303.61
$26,370,834.55
Over/Under Est: 28.8% $5,897,131.05
Amt Left: 0.98% $256,827.44
Subcontractor Percentage Amount
ARTEX ELECTRIC, INC. 11.16% $2,914,323.19
ALAMO BROTHERS CONCRETE INC 6.53% $1,705,244.66
TRP CONSTRUCTION GROUP, LLC 1.03% $268,974.27
LMSE TRUCKING, LLC 0.72% $188,020.85
FUSION COMMUNICATIONS, LLC 0.65% $169,741.05
DK CONTRACTING, LLC 0.36% $94,010.43
BARRICADES UNLIMITED 0.31% $80,953.42
Total: 20.76% $5,421,267.87

Bid Items & Bid Tabulations

179 Total 0 of 179
HALE  |  SH 194  |  LUBBOCK  |  0439-05-026  |  10/01/2024  |  $20,473,703.50  |  C 439-5-26  |  SURF/ROADWAY RESTOR  |  445 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
DUININCK, INC.
REMOVING CONC (PAV)
SY 1,422.000 $35.000 $25.000 $26.500
REMOVING CONC (RIPRAP)
SY 72.000 $35.000 $25.000 $28.000
REMOVING CONC (MEDIANS)
SY 532.000 $28.000 $25.000 $28.000
REMOVING CONC (SIDEWALKS)
SY 587.000 $30.000 $25.000 $28.000
REMOVING CONC (DRIVEWAYS)
SY 2,272.000 $35.000 $25.000 $28.000
REMOVING CONC (CURB AND GUTTER)
LF 218.000 $30.000 $25.000 $10.000
REMOVE CONC (GUTTER)
LF 1,132.000 $10.000 $25.000 $12.500
REMOVING CONC (MISC)
SY 306.000 $48.000 $25.000 $37.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 6.000 $75.000 $25.000 $37.000
EXCAVATION (ROADWAY)
CY 1,559.200 $20.000 $180.000 $73.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 146.900 $20.000 $180.000 $81.500
BACKFILL (TY A)
STA 38.000 $285.000 $600.000 $885.000
BLOCK SODDING
SY 3,473.000 $7.000 $15.000 $8.150
DRILL SEEDING (PERM)(WARM OR COOL)
SY 3,035.000 $0.250 $1.500 $2.200
VEGETATIVE WATERING
MG 219.100 $50.000 $60.000 $74.500
PROOF ROLLING
HR 60.000 $160.000 $500.000 $235.000
LIME (HYDRATED LIME (SLURRY))
TON 1,156.000 $350.000 $400.000 $470.000
LIME TRT (EXST MATL)(8")
SY 102,310.000 $5.500 $5.000 $10.500
PRIME COAT (MC-30)
GAL 21,718.000 $7.000 $6.000 $5.750
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 668.000 $5.000 $5.000 $4.550
FOG SEAL (CSS-1H)
GAL 26,580.000 $5.500 $5.000 $4.850
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 1,026.000 $80.000 $100.000 $175.000
PLANE ASPH CONC PAV (8")
SY 107,921.000 $8.000 $12.000 $12.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 1,422.000 $200.000 $155.000 $250.000
CONC PVMT (CRCP)(JCT TERMINAL)(10")
SY 185.000 $220.000 $165.000 $250.000
DRILL SHAFT (36 IN)
LF 206.000 $425.000 $400.000 $495.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 1,070.000 $400.000 $200.000 $230.000
CL C CONC (RAIL FOUNDATION)
CY 5.000 $725.000 $1,100.000 $2,500.000
CONC STR REPAIR (STANDARD)
SF 27.000 $220.000 $110.000 $375.000
RIPRAP (CONC)(CL B)(5 IN)
CY 18.000 $750.000 $850.000 $1,100.000
STR STEEL (NBIS)
LB 56.000 $50.000 $50.000 $50.000
RAIL (TY T411)
LF 118.000 $190.000 $210.000 $565.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $4,000.000 $7,200.000 $10,000.000
SET (TY II) (60 IN) (CMP) (6: 1) (P)
EA 2.000 $17,500.000 $13,500.000 $15,000.000
ADJUSTING MANHOLES (SANITARY)
EA 4.000 $1,790.000 $1,100.000 $6,300.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 44.000 $1,100.000 $1,100.000 $1,900.000
ADJUSTING MANHOLES (WATER METER)
EA 23.000 $625.000 $1,100.000 $1,900.000
REMOV STR (SET)
EA 2.000 $540.000 $4,200.000 $1,300.000
REMOV STR (HEADWALL)
EA 1.000 $1,500.000 $4,200.000 $3,100.000
MOBILIZATION
LS 1.000 $2,091,000.000 $2,600,000.000 $2,600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $15,000.000 $94,000.000 $23,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $35.000 $60.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $15.000 $20.000 $25.000
SANDBAGS FOR EROSION CONTROL
EA 154.000 $22.000 $20.000 $12.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,222.000 $6.000 $6.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,111.000 $2.000 $2.000 $2.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,564.000 $7.000 $9.000 $6.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 782.000 $1.800 $2.000 $3.750
CONSTRUCTING DETOURS
SY 153.000 $120.000 $70.000 $145.000
CONC CURB & GUTTER (TY II)
LF 452.000 $55.000 $65.000 $190.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 1,258.000 $49.000 $75.000 $220.000
DRIVEWAYS (CONC)
SY 2,834.000 $130.000 $150.000 $125.000
CONC SIDEWALKS (6")
SY 7,775.000 $103.000 $135.000 $105.000
CURB RAMPS (TY 1)
SY 7.000 $157.000 $300.000 $345.000
CURB RAMPS (TY 2)
SY 14.000 $150.000 $250.000 $280.000
CURB RAMPS (TY 5)
SY 20.000 $215.000 $210.000 $265.000
CURB RAMPS (TY 7)
SY 84.000 $180.000 $210.000 $255.000
CURB RAMPS (TY 10)
SY 103.000 $160.000 $210.000 $225.000
CONC MEDIAN
SY 532.000 $180.000 $160.000 $125.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 8.000 $320.000 $250.000 $280.000
REMOVE RD IL ASM (TRANS-BASE)
EA 10.000 $950.000 $500.000 $625.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 107.000 $7,000.000 $4,500.000 $5,400.000
CONDT (PVC) (SCH 80) (2")
LF 7,260.000 $16.000 $10.000 $12.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 15,448.000 $35.000 $21.000 $26.500
CONDT (PVC) (SCH 80) (3")
LF 270.000 $22.000 $15.000 $18.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 35.000 $41.000 $30.000 $35.000
CONDT (PVC) (SCH 80) (4")
LF 175.000 $32.000 $20.000 $22.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,570.000 $60.000 $35.000 $39.000
ELEC CONDR (NO.8) BARE
LF 1,365.000 $3.000 $1.000 $1.250
ELEC CONDR (NO.8) INSULATED
LF 2,730.000 $3.000 $1.500 $1.400
ELEC CONDR (NO.6) BARE
LF 2,385.000 $3.000 $1.500 $1.550
ELEC CONDR (NO.4) BARE
LF 21,363.000 $3.000 $2.000 $2.250
ELEC CONDR (NO.4) INSULATED
LF 42,726.000 $4.000 $3.000 $3.500
GROUND BOX TY A (122311)W/APRON
EA 12.000 $1,500.000 $1,000.000 $940.000
GROUND BOX TY BATTERY (162915)W/APRON
EA 4.000 $3,213.000 $850.000 $3,500.000
GROUND BOX TY D (162922)W/APRON
EA 25.000 $1,610.000 $950.000 $1,200.000
ELC SRV TY A 240/480 100(SS)SS(E)SP(O)
EA 4.000 $6,500.000 $8,500.000 $10,500.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 4.000 $7,903.000 $6,500.000 $8,100.000
ALUMINUM SIGNS (TY A)
SF 72.000 $31.000 $30.000 $37.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 58.000 $750.000 $760.000 $935.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $839.000 $900.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 13.000 $825.000 $900.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $895.000 $1,000.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $850.000 $1,000.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $796.000 $1,200.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,300.000 $1,200.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,300.000 $1,350.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $1,300.000 $1,500.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 1.000 $1,200.000 $1,300.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $1,300.000 $1,300.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 1.000 $1,300.000 $1,300.000 $1,600.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $627.000 $750.000 $905.000
REMOVE SM RD SN SUP&AM
EA 109.000 $115.000 $100.000 $155.000
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
EA 2.000 $210.000 $700.000 $805.000
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
EA 2.000 $210.000 $660.000 $805.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 8,920.000 $0.250 $0.310 $0.390
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 130.000 $3.000 $1.000 $1.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 41,040.000 $0.250 $0.290 $0.360
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,975.000 $1.000 $0.600 $0.750
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,540.000 $4.000 $3.000 $3.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,529.000 $6.000 $6.000 $7.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 8.000 $100.000 $100.000 $125.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,610.000 $0.250 $0.310 $0.390
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 169,410.000 $0.250 $0.290 $0.360
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 20.000 $1.790 $2.000 $1.900
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 40.000 $1.690 $2.000 $1.900
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 350.000 $1.800 $1.000 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,454.000 $1.500 $1.000 $1.250
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 285.000 $6.000 $12.000 $15.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 8.000 $330.000 $500.000 $625.000
PAVEMENT SEALER 6"
LF 1,200.000 $0.360 $1.000 $1.250
PAVEMENT SEALER (ARROW)
EA 2.000 $40.000 $100.000 $125.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,670.000 $0.980 $0.820 $1.050
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 4,575.000 $0.850 $0.810 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,610.000 $0.900 $0.810 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 33,276.000 $0.900 $0.810 $1.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 122.000 $10.000 $10.000 $12.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 2,000.000 $17.000 $14.000 $17.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 87.000 $285.000 $235.000 $295.000
PREFAB PAV MRK TY C (W) (WORD)
EA 29.000 $345.000 $325.000 $405.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $650.000 $800.000 $1,000.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 8.000 $73.000 $100.000 $125.000
REFL PAV MRKR TY I-C
EA 547.000 $6.000 $5.000 $6.250
REFL PAV MRKR TY II-A-A
EA 1,046.000 $6.000 $5.000 $6.250
ELIM EXT PAV MRK & MRKS (4")
LF 64,440.000 $0.750 $0.850 $1.050
ELIM EXT PAV MRK & MRKS (8")
LF 2,360.000 $1.250 $1.000 $1.250
ELIM EXT PAV MRK & MRKS (12")
LF 260.000 $2.000 $2.500 $3.150
ELIM EXT PAV MRK & MRKS (24")
LF 674.000 $5.000 $5.000 $6.250
ELIM EXT PAV MRK & MRKS (ARROW)
EA 22.000 $110.000 $100.000 $125.000
PAV SURF PREP FOR MRK (6")
LF 1,200.000 $5.000 $2.000 $2.500
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $20.000 $100.000 $125.000
INSTALL HWY TRF SIG (ISOLATED)
EA 4.000 $40,000.000 $35,000.000 $44,000.000
REMOVING TRAFFIC SIGNALS
EA 4.000 $5,000.000 $8,500.000 $10,500.000
TEMP TRAF SIGNALS
EA 5.000 $30,000.000 $125,000.000 $125,000.000
VEH SIG SEC (12")LED(GRN)
EA 32.000 $307.000 $325.000 $405.000
VEH SIG SEC (12")LED(GRN ARW)
EA 12.000 $307.000 $325.000 $405.000
VEH SIG SEC (12")LED(YEL)
EA 32.000 $314.000 $325.000 $405.000
VEH SIG SEC (12")LED(YEL ARW)
EA 24.000 $307.000 $325.000 $405.000
VEH SIG SEC (12")LED(RED)
EA 32.000 $307.000 $325.000 $405.000
VEH SIG SEC (12")LED(RED ARW)
EA 12.000 $307.000 $325.000 $405.000
PED SIG SEC (LED)(COUNTDOWN)
EA 30.000 $750.000 $850.000 $1,100.000
VEH SIG SEC (12")(LED)(YEL)(SOLAR)
EA 12.000 $225.000 $325.000 $405.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 32.000 $280.000 $250.000 $315.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 12.000 $320.000 $300.000 $375.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 4,100.000 $3.000 $3.500 $4.400
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 736.000 $3.000 $4.000 $5.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 4,918.000 $4.000 $4.500 $5.650
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 2,225.000 $6.000 $6.500 $8.150
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 4.000 $9,000.000 $12,500.000 $15,500.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $1,000.000 $1,000.000 $1,300.000
INS TRF SIG PL AM (S)1 ARM(24')
EA 1.000 $14,000.000 $13,000.000 $16,500.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $12,606.000 $13,600.000 $17,000.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 4.000 $13,438.000 $13,850.000 $17,500.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 6.000 $20,000.000 $15,775.000 $19,500.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $18,775.000 $16,000.000 $20,000.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $16,457.000 $16,750.000 $21,000.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 1.000 $16,475.000 $16,000.000 $20,000.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $16,342.000 $18,000.000 $22,500.000
PED POLE ASSEMBLY
EA 17.000 $2,512.000 $3,000.000 $3,800.000
PED DETECT PUSH BUTTON (APS)
EA 30.000 $1,009.000 $1,500.000 $1,900.000
FULL - WIDTH MOWING
CYC 8.000 $3,523.000 $800.000 $6,300.000
LITTER REMOVAL
CYC 8.000 $3,000.000 $2,000.000 $6,300.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 28.000 $1,000.000 $6,000.000 $8,500.000
TREE REMOVAL (4" - 12" DIA)
EA 1.000 $100.000 $1,150.000 $940.000
TREE REMOVAL (24" - 30" DIA)
EA 3.000 $300.000 $1,150.000 $3,800.000
STUMP REMOVAL (GREATER THAN 12")
EA 3.000 $175.000 $1,150.000 $1,300.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 102,310.000 $7.000 $9.000 $9.350
ASPH FOR REINF FAB (PG76-28)
GAL 15,347.000 $6.000 $5.000 $4.400
TACK COAT
GAL 1,581.000 $5.000 $10.000 $4.400
D-GR HMA TY-B SAC-B PG 76-28
TON 37,467.000 $140.000 $190.000 $210.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 12,765.000 $250.000 $260.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 3,360.000 $75.000 $25.000 $40.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 4.000 $8,600.000 $7,500.000 $9,400.000
TMA (STATIONARY)
DAY 1,065.000 $100.000 $275.000 $200.000
TMA (MOBILE OPERATION)
DAY 140.000 $350.000 $275.000 $1,300.000
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 16.000 $1,100.000 $750.000 $940.000
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 10.000 $975.000 $750.000 $940.000
TEMP SPEED MONITOR SYS
EA 2.000 $15,000.000 $15,000.000 $19,000.000
CURB INLET SEDIMENT PROTECTION
LF 260.000 $10.000 $25.000 $19.000
Totals: $20,473,703.500 $26,114,007.110 $26,370,834.550