HALE IH 27 (0067-04-055)

Items: 81

County: HALE
Length: N/A
Highway: IH 27
District: LUBBOCK
Control Number: 0067-04-055
DBE Goal: N/A
Project: STP 1902(148)HES
Guaranty: N/A
Time: 353 WORKING DAYS
Engineer's Estimate: $36,184,960.60
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$36,184,960.60
1
$34,365,849.95
Over/Under Est: -5.03% -$1,819,110.65
$37,288,983.50
Over/Under Est: 3.05% $1,104,022.90
Amt Left: 8.51% $2,923,133.55
$41,832,065.06
Over/Under Est: 15.61% $5,647,104.46
Amt Left: 21.73% $7,466,215.11
Delta: -12.18% -$4,543,081.56

Bid Items & Bid Tabulations

81 Total 0 of 81
HALE  |  IH 27  |  LUBBOCK  |  0067-04-055  |  07/10/2019  |  $36,184,960.60  |  STP 1902(148)HES  |  SAFETY  |  353 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
A. L. HELMCAMP, INC.
FNF CONSTRUCTION, INC.
REMOVING CONC (RIPRAP)
SY 43,700.500 $30.000 $10.000 $10.500 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 26,854.000 $20.000 $30.000 $29.000 $30.000
BLADING
STA 705.700 $150.000 $140.000 $300.000 $230.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 54,275.000 $4.000 $4.000 $3.900 $4.000
CEM STABIL BKFL
CY 263.640 $200.000 $100.000 $360.000 $214.000
TRENCH EXCAVATION PROTECTION
LF 495.000 $10.000 $5.200 $20.000 $14.000
DRILL SHAFT (42 IN)
LF 20.000 $1,000.000 $387.000 $400.000 $528.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 664.000 $200.000 $134.000 $140.000 $185.000
CL C CONC (MISC)
CY 50.000 $1,000.000 $663.000 $900.000 $1,600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $200.000 $177.000 $140.000 $240.000
CONC STR REPAIR (STANDARD)
SF 100.000 $200.000 $56.750 $140.000 $180.000
RIPRAP (CONC)(6 IN)
CY 26,797.000 $600.000 $291.000 $430.000 $470.000
RC PIPE (CL III)(24 IN)
LF 90.240 $200.000 $250.000 $300.000 $490.000
RC PIPE (CL III)(30 IN)
LF 8.000 $250.000 $500.000 $350.000 $390.000
RC PIPE (CL III)(36 IN)
LF 7.000 $300.000 $600.000 $430.000 $460.000
INLET (COMPL) (DROP) (SPL)
EA 34.000 $20,000.000 $7,586.000 $13,000.000 $14,000.000
CLEAN EXIST CULVERTS
EA 32.000 $2,000.000 $1,640.000 $2,000.000 $712.000
MOBILIZATION
LS 1.000 $3,289,000.000 $3,436,500.000 $3,600,000.000 $4,150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $20,000.000 $25,000.000 $30,000.000 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 666.000 $30.000 $30.000 $35.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 666.000 $10.000 $10.000 $11.000 $10.000
SANDBAGS FOR EROSION CONTROL
EA 1,590.000 $8.000 $5.000 $13.000 $7.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 69,300.000 $30.000 $70.000 $88.000 $30.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 69,300.000 $15.000 $8.000 $11.000 $5.000
PERM CTB (F-SHAPE) (TY 1)
LF 58,859.000 $55.000 $94.300 $72.100 $88.000
PERM CTB (F-SHAPE) (TY 2)
LF 1,670.000 $150.000 $300.000 $250.000 $160.000
PERM CTB (F-SHAPE) (TY 3)
LF 1,543.000 $250.000 $309.000 $250.000 $270.000
PERM CTB (F-SHAPE) (TY 4)
LF 10,961.000 $200.000 $450.000 $300.000 $870.000
MTL W-BEAM GD FEN (STEEL POST)
LF 600.000 $25.000 $27.400 $30.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $2,220.000 $2,400.000 $2,600.000
REMOVE METAL BEAM GUARD FENCE
LF 14,934.500 $7.000 $3.000 $3.200 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 41.000 $350.000 $350.000 $380.000 $360.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $350.000 $350.000 $380.000 $360.000
RM MTL BM GD FEN TRANS (T101)
EA 28.000 $350.000 $350.000 $380.000 $360.000
GUARDRAIL END TREATMENT (REMOVE)
EA 51.000 $350.000 $350.000 $380.000 $360.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 3.000 $2,600.000 $2,810.000 $3,000.000 $2,900.000
CRASH CUSH ATTEN (REMOVE)
EA 15.000 $3,000.000 $2,140.000 $1,100.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 14.000 $12,000.000 $11,840.000 $11,000.000 $6,900.000
REMOVE RD IL ASM (TRANS-BASE)
EA 204.000 $600.000 $516.000 $550.000 $520.000
REMOVE RD IL ASM (U/P)
EA 14.000 $600.000 $181.000 $200.000 $180.000
REPLACE LUMINAIRE W/LED (150W EQ)
EA 152.000 $600.000 $361.000 $380.000 $360.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 97.000 $600.000 $361.000 $380.000 $360.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 20.000 $2,000.000 $1,031.000 $1,100.000 $1,100.000
IN RD IL (TY SP) 38S-12-12(250W EQ)LED
EA 196.000 $3,500.000 $3,300.000 $3,400.000 $3,300.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 48.000 $3,500.000 $2,940.000 $3,100.000 $3,000.000
IN RD IL (TY SA) 40T-12-12(250W EQ)LED
EA 35.000 $4,000.000 $3,585.000 $3,700.000 $3,600.000
CONDT (PVC) (SCH 80) (2")
LF 66,125.000 $5.000 $6.200 $6.500 $6.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 7,750.000 $15.000 $12.400 $13.000 $12.250
CONDT (PVC) (SCH 80) (3")
LF 10.000 $20.000 $10.350 $11.000 $11.000
CONDT (RM) (2")
LF 3,340.000 $20.000 $27.850 $29.000 $28.000
ELEC CONDR (NO.4) BARE
LF 80,110.000 $1.300 $1.300 $1.400 $1.300
ELEC CONDR (NO.4) INSULATED
LF 160,190.000 $1.400 $1.400 $1.500 $1.400
GROUND BOX TY A (122311)W/APRON
EA 53.000 $700.000 $619.000 $650.000 $650.000
REMOVE ELECTRICAL SERVICES
EA 8.000 $500.000 $258.000 $270.000 $260.000
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
EA 19.000 $5,000.000 $5,155.000 $5,500.000 $5,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $800.000 $950.000 $1,100.000 $970.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 30.000 $500.000 $750.000 $800.000 $770.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 731.000 $50.000 $20.000 $22.000 $21.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 30.000 $50.000 $20.000 $22.000 $21.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 17.000 $30.000 $1.000 $10.000 $1.100
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 4,807.000 $3.000 $3.450 $3.700 $3.600
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 14,419.000 $3.000 $3.450 $3.700 $3.600
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,212.000 $2.000 $2.000 $0.600 $1.800
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 24,031.000 $8.000 $8.000 $9.000 $8.250
REFL PAV MRKR TY II-C-R
EA 1,204.000 $3.000 $6.000 $7.000 $6.500
ELIM EXT PAV MRK & MRKS (4")
LF 96,116.000 $0.500 $0.400 $0.450 $0.500
ELIM EXT PAV MRK & MRKS (6")
LF 24,031.000 $0.750 $0.400 $0.450 $0.500
PAV SURF PREP FOR MRK (4")
LF 96,116.000 $0.500 $0.250 $0.300 $0.300
PAV SURF PREP FOR MRK (10")
LF 24,031.000 $0.750 $0.300 $0.300 $0.350
FULL - WIDTH MOWING
CYC 2.000 $20,000.000 $7,500.000 $5,000.000 $30,000.000
LITTER REMOVAL
CYC 2.000 $15,000.000 $3,500.000 $5,000.000 $11,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $15,000.000 $22,000.000 $25,000.000
FO CBL (12 SMF)
LF 15.000 $20.000 $5.150 $5.500 $5.500
FO CBL (12 SMF)(PIGTAIL)
LF 10.000 $20.000 $5.160 $5.500 $5.500
RELOCATE CCTV FIELD EQUIPMENT
EA 1.000 $3,000.000 $2,062.000 $2,200.000 $2,100.000
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 96,116.000 $0.600 $0.600 $0.650 $0.700
ITS POLE (40 FT)(REL)
EA 1.000 $4,000.000 $1,547.000 $1,600.000 $1,600.000
ITS POLE MNT CAB (TY 2)(CONF 1)(REL)
EA 1.000 $3,000.000 $1,031.000 $1,100.000 $1,100.000
REPLACE LED HIGH MAST ILLUM ASSEMBBLIES
EA 27.000 $8,000.000 $9,280.000 $10,000.000 $10,000.000
TMA (STATIONARY)
DAY 1,412.000 $250.000 $200.000 $200.000 $220.000
TMA (MOBILE OPERATION)
DAY 15.000 $300.000 $300.000 $850.000 $620.000
Totals: $36,184,960.600 $34,365,849.950 $37,288,983.500 $41,832,065.060