PREPARING ROW
|
AC
|
0.760
|
$5,000.000
|
$20,295.000
|
$10,000.000
|
$7,500.000
|
$24,000.000
|
|
|
PREPARING ROW
|
STA
|
328.000
|
$7,500.000
|
$275.000
|
$3,000.000
|
$1,500.000
|
$2,610.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
79.000
|
$20.000
|
$16.500
|
$45.000
|
$25.000
|
$65.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
347.000
|
$20.000
|
$16.500
|
$25.000
|
$25.000
|
$13.000
|
|
|
REMOV CONC (MISC)
|
SY
|
228.000
|
$50.000
|
$16.500
|
$20.000
|
$30.000
|
$14.000
|
|
|
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
106,533.000
|
$14.000
|
$8.470
|
$5.000
|
$9.000
|
$3.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
27,494.000
|
$20.000
|
$3.300
|
$24.000
|
$33.000
|
$29.000
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
5,590.000
|
$20.000
|
$22.000
|
$8.000
|
$44.000
|
$65.000
|
|
|
EMBANK (VEH)(OC)(TY A)
|
CY
|
27.000
|
$75.000
|
$16.500
|
$25.000
|
$200.000
|
$100.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
217,083.000
|
$1.500
|
$0.360
|
$0.100
|
$2.000
|
$1.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
434,166.000
|
$1.000
|
$0.290
|
$0.280
|
$0.250
|
$0.280
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
217,083.000
|
$0.160
|
$0.150
|
$0.140
|
$0.200
|
$0.160
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
217,083.000
|
$0.200
|
$0.150
|
$0.140
|
$0.200
|
$0.160
|
|
|
VEGETATIVE WATERING
|
TGL
|
6,773.000
|
$25.000
|
$26.400
|
$32.000
|
$35.000
|
$17.000
|
|
|
PROOF ROLLING
|
HR
|
28.000
|
$120.000
|
$88.000
|
$150.000
|
$1,000.000
|
$200.000
|
|
|
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
|
CY
|
25,982.000
|
$80.000
|
$56.630
|
$80.000
|
$114.000
|
$65.000
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
119,922.000
|
$2.000
|
$1.320
|
$2.000
|
$2.500
|
$2.000
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
2,918.000
|
$250.000
|
$330.000
|
$340.000
|
$355.000
|
$400.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
121,876.000
|
$7.000
|
$2.970
|
$3.500
|
$10.000
|
$8.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
23,578.000
|
$4.500
|
$4.950
|
$4.000
|
$4.500
|
$4.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,132.000
|
$85.000
|
$92.400
|
$100.000
|
$110.000
|
$130.000
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
343.000
|
$120.000
|
$110.000
|
$104.000
|
$114.000
|
$220.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
9,894.000
|
$100.000
|
$102.300
|
$101.000
|
$112.000
|
$120.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
339.000
|
$95.000
|
$112.200
|
$107.000
|
$117.000
|
$107.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
6,538.000
|
$125.000
|
$127.600
|
$142.000
|
$155.000
|
$142.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
322.000
|
$50.000
|
$63.600
|
$170.000
|
$85.000
|
$200.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
235.000
|
$150.000
|
$163.330
|
$50.000
|
$195.000
|
$85.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
288.000
|
$250.000
|
$322.980
|
$200.000
|
$365.000
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
32.000
|
$10.000
|
$28.840
|
$1.000
|
$10.000
|
$16.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,624.000
|
$15.000
|
$11.530
|
$17.000
|
$36.000
|
$200.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
8.000
|
$1,300.000
|
$1,268.840
|
$1,300.000
|
$2,750.000
|
$2,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
80.000
|
$575.000
|
$636.600
|
$630.000
|
$650.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
114.000
|
$620.000
|
$694.480
|
$760.000
|
$750.000
|
$650.000
|
|
|
GABION MATTRESSES (GALV)(6 IN)
|
SY
|
17.000
|
$100.000
|
$169.680
|
$105.000
|
$550.000
|
$200.000
|
|
|
GABION MATTRESSES (GALV)(9 IN)
|
SY
|
37.000
|
$150.000
|
$166.430
|
$120.000
|
$625.000
|
$150.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
73.000
|
$170.000
|
$175.040
|
$185.000
|
$375.000
|
$300.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
150.000
|
$350.000
|
$455.630
|
$400.000
|
$420.000
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
36.000
|
$400.000
|
$524.840
|
$470.000
|
$535.000
|
$600.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
78.000
|
$600.000
|
$605.580
|
$500.000
|
$595.000
|
$600.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
84.000
|
$1,250.000
|
$705.940
|
$640.000
|
$525.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
78.000
|
$90.000
|
$74.980
|
$150.000
|
$110.000
|
$150.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
80.000
|
$200.000
|
$113.040
|
$300.000
|
$150.000
|
$250.000
|
|
|
RC PIPE (CL V)(30 IN)
|
LF
|
112.000
|
$230.000
|
$177.640
|
$300.000
|
$235.000
|
$225.000
|
|
|
RC PIPE (CL V)(36 IN)
|
LF
|
40.000
|
$375.000
|
$266.460
|
$350.000
|
$310.000
|
$350.000
|
|
|
RC PIPE (ARCH)(CL V)(DES 1)
|
LF
|
305.000
|
$293.150
|
$321.820
|
$400.000
|
$225.000
|
$200.000
|
|
|
RC PIPE (ARCH)(CL V)(DES 3)
|
LF
|
154.000
|
$600.000
|
$426.790
|
$450.000
|
$265.000
|
$490.000
|
|
|
RC PIPE (CL V)(72 IN)
|
LF
|
10.000
|
$750.000
|
$1,903.260
|
$2,100.000
|
$1,200.000
|
$1,200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$8,000.000
|
$4,983.090
|
$6,700.000
|
$6,750.000
|
$25,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$10,500.000
|
$7,497.710
|
$9,600.000
|
$7,250.000
|
$30,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
2.000
|
$23,500.000
|
$21,085.860
|
$28,000.000
|
$9,500.000
|
$40,000.000
|
|
|
WINGWALL (PW - 2) (HW=3 FT)
|
EA
|
1.000
|
$7,500.000
|
$4,273.690
|
$8,600.000
|
$13,500.000
|
$23,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$10,000.000
|
$5,917.420
|
$11,000.000
|
$13,750.000
|
$24,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
4.000
|
$7,500.000
|
$5,190.720
|
$10,000.000
|
$7,000.000
|
$3,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
2.000
|
$7,500.000
|
$5,652.120
|
$8,000.000
|
$8,000.000
|
$2,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
12.000
|
$7,500.000
|
$3,979.550
|
$4,500.000
|
$8,500.000
|
$16,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
2.000
|
$6,500.000
|
$7,497.710
|
$7,200.000
|
$9,750.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,384.190
|
$1,500.000
|
$2,500.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$2,000.000
|
$1,672.570
|
$1,146.000
|
$2,500.000
|
$2,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$3,500.000
|
$2,076.290
|
$2,500.000
|
$3,500.000
|
$3,900.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$2,000.000
|
$2,710.710
|
$1,600.000
|
$3,000.000
|
$2,100.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$5,500.000
|
$3,702.710
|
$2,000.000
|
$4,500.000
|
$2,800.000
|
|
|
REMOV STR (SET)
|
EA
|
13.000
|
$750.000
|
$1,038.140
|
$600.000
|
$750.000
|
$730.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
27.000
|
$1,750.000
|
$1,441.870
|
$1,500.000
|
$1,000.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
487.000
|
$20.000
|
$33.450
|
$18.000
|
$15.000
|
$32.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,759,573.850
|
$1,075,010.880
|
$1,500,000.000
|
$625,000.000
|
$1,849,884.700
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$10,000.000
|
$7,026.450
|
$21,332.000
|
$7,500.000
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$4,431.260
|
$22,000.000
|
$21,000.000
|
$40,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
948.000
|
$33.000
|
$39.220
|
$37.350
|
$40.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
948.000
|
$11.000
|
$6.250
|
$5.950
|
$20.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$20.000
|
$26.930
|
$25.650
|
$50.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$5.000
|
$6.830
|
$6.500
|
$15.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
70,353.000
|
$4.000
|
$2.940
|
$5.000
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
70,353.000
|
$1.000
|
$0.210
|
$0.200
|
$1.000
|
$3.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20,962.000
|
$95.000
|
$89.780
|
$55.000
|
$95.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
60.000
|
$89.000
|
$99.000
|
$85.000
|
$250.000
|
$75.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
194.000
|
$100.000
|
$99.000
|
$165.000
|
$295.000
|
$90.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
28.000
|
$7,500.000
|
$3,080.290
|
$265.000
|
$6,000.000
|
$7,000.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
5,480.000
|
$20.000
|
$44.000
|
$13.000
|
$75.000
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
260.000
|
$20.000
|
$40.000
|
$13.000
|
$75.000
|
$90.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
74,300.000
|
$7.000
|
$11.500
|
$4.000
|
$10.000
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
3,820.000
|
$20.000
|
$11.000
|
$4.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
25,420.000
|
$15.000
|
$17.000
|
$1.000
|
$10.000
|
$9.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
1,640.000
|
$15.000
|
$45.000
|
$1.000
|
$10.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
5,480.000
|
$9.000
|
$13.000
|
$11.000
|
$12.000
|
$18.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
260.000
|
$9.000
|
$20.000
|
$11.000
|
$12.000
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
319.000
|
$100.000
|
$109.960
|
$130.000
|
$250.000
|
$300.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,582.000
|
$55.000
|
$50.600
|
$100.000
|
$75.000
|
$65.000
|
|
|
CONC MEDIAN
|
SY
|
82.000
|
$125.000
|
$218.760
|
$140.000
|
$240.000
|
$115.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
925.000
|
$25.000
|
$25.730
|
$24.500
|
$30.000
|
$30.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
7.000
|
$1,250.000
|
$1,417.520
|
$1,350.000
|
$1,500.000
|
$1,300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,200.000
|
$3,360.060
|
$3,200.000
|
$4,000.000
|
$4,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$600.000
|
$536.300
|
$300.000
|
$350.000
|
$300.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
11.000
|
$300.000
|
$241.330
|
$300.000
|
$350.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$350.000
|
$294.960
|
$300.000
|
$350.000
|
$300.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
17.000
|
$400.000
|
$245.620
|
$200.000
|
$300.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
97.000
|
$700.000
|
$643.550
|
$675.000
|
$765.000
|
$675.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$800.000
|
$750.810
|
$725.000
|
$825.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
4.000
|
$900.000
|
$911.700
|
$900.000
|
$1,025.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$938.520
|
$900.000
|
$1,025.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
6.000
|
$275.000
|
$375.410
|
$150.000
|
$170.000
|
$150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
61.000
|
$110.000
|
$107.260
|
$90.000
|
$105.000
|
$90.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
6.000
|
$125.000
|
$42.900
|
$50.000
|
$55.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
|
EA
|
40.000
|
$30.000
|
$21.450
|
$20.000
|
$25.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
42.000
|
$100.000
|
$80.440
|
$95.000
|
$105.000
|
$70.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
9.000
|
$20.000
|
$16.090
|
$5.000
|
$6.000
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
64,082.000
|
$0.250
|
$0.320
|
$0.260
|
$0.250
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
16.000
|
$90.000
|
$121.550
|
$100.000
|
$115.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
8.000
|
$90.000
|
$121.550
|
$100.000
|
$115.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
60,217.000
|
$0.250
|
$0.320
|
$0.260
|
$0.250
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
79,880.000
|
$0.750
|
$0.910
|
$0.750
|
$0.850
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,588.000
|
$6.000
|
$7.290
|
$6.000
|
$7.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
41,177.000
|
$0.750
|
$0.910
|
$0.750
|
$1.000
|
$0.800
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
345.000
|
$1.000
|
$1.220
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,876.000
|
$0.900
|
$1.090
|
$0.900
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
150.000
|
$7.000
|
$8.200
|
$6.750
|
$7.500
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$150.000
|
$182.320
|
$150.000
|
$170.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$170.000
|
$212.710
|
$175.000
|
$195.000
|
$175.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$50.000
|
$42.540
|
$35.000
|
$40.000
|
$35.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$250.000
|
$455.810
|
$375.000
|
$425.000
|
$375.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
70,671.000
|
$0.650
|
$0.940
|
$0.770
|
$0.900
|
$0.800
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
72,976.000
|
$0.650
|
$0.940
|
$0.770
|
$0.900
|
$0.800
|
|
|
PAVEMENT SLER 6"
|
LF
|
143,992.000
|
$0.200
|
$0.210
|
$0.170
|
$0.200
|
$0.770
|
|
|
PAVEMENT SLER 8"
|
LF
|
1,876.000
|
$0.350
|
$0.290
|
$0.240
|
$0.250
|
$0.240
|
|
|
PAVEMENT SLER 24"
|
LF
|
150.000
|
$2.000
|
$2.430
|
$2.000
|
$2.250
|
$2.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
4.000
|
$54.000
|
$91.160
|
$75.000
|
$85.000
|
$75.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
4.000
|
$55.000
|
$91.160
|
$75.000
|
$85.000
|
$75.000
|
|
|
PAVEMENT SLER (MED NOSE)
|
EA
|
1.000
|
$50.000
|
$182.320
|
$150.000
|
$170.000
|
$150.000
|
|
|
PAVEMENT SLER (LN REDUCT ARROW)
|
EA
|
2.000
|
$125.000
|
$182.320
|
$150.000
|
$170.000
|
$150.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
4.000
|
$25.000
|
$18.230
|
$15.000
|
$17.000
|
$15.000
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
2.000
|
$400.000
|
$455.810
|
$375.000
|
$425.000
|
$375.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
87.000
|
$3.500
|
$4.560
|
$3.750
|
$5.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,129.000
|
$3.500
|
$4.560
|
$3.750
|
$5.000
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
75.000
|
$3.500
|
$4.560
|
$3.750
|
$5.000
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
143,992.000
|
$0.100
|
$0.020
|
$0.020
|
$0.050
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,768.000
|
$0.150
|
$0.060
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
150.000
|
$1.500
|
$0.610
|
$0.500
|
$0.750
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$25.000
|
$6.080
|
$5.000
|
$5.500
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$20.000
|
$6.080
|
$5.000
|
$5.500
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
4.000
|
$6.000
|
$2.430
|
$2.000
|
$2.250
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
1.000
|
$70.000
|
$24.310
|
$20.000
|
$22.500
|
$20.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
31.000
|
$150.000
|
$550.000
|
$600.000
|
$140.000
|
$400.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
9.000
|
$200.000
|
$1,320.000
|
$650.000
|
$180.000
|
$1,000.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
7.000
|
$250.000
|
$1,650.000
|
$850.000
|
$305.000
|
$2,500.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
1.000
|
$300.000
|
$3,410.000
|
$2,600.000
|
$510.000
|
$3,200.000
|
|
|
TREE REMOVAL (48" - 60" DIA)
|
EA
|
1.000
|
$400.000
|
$5,060.000
|
$3,000.000
|
$1,700.000
|
$4,500.000
|
|
|
BONDING COURSE
|
GAL
|
23,933.000
|
$3.500
|
$3.520
|
$4.400
|
$4.750
|
$5.000
|
|
|
RESIDENTIAL DRIVEWAY TEMP SIGNAL SYSTEM
|
MO
|
6.000
|
$20,000.000
|
$9,340.390
|
$25,000.000
|
$9,750.000
|
$30,000.000
|
|
Totals: |
$19,746,678.830
|
$14,244,557.660
|
$15,335,099.470
|
$19,042,180.400
|
$19,135,567.000
|