GUADALUPE FM 1150 (1269-01-023)

Items: 147

County: GUADALUPE
Length: 6.6810 MILES
Highway: FM 1150
District: SAN ANTONIO
Control Number: 1269-01-023
DBE Goal: 0.0%
Project: F 2026(628)
Guaranty: $100,000.00
Time: 504 WORKING DAYS
Engineer's Estimate: $19,746,678.83
Date: 05/07/2026 (5 weeks ago)
Contract Number: 5263206
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00187130
Contract Type: Federal
Project Description: REHAB AND WIDEN EXISTING ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DUANE HOFFERICHTER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$19,746,678.83
$14,244,557.66
Over/Under Est: -27.86% -$5,502,121.17
Over/Under Est: -22.34% -$4,411,579.36
Amt Left: 7.66% $1,090,541.81
Over/Under Est: -3.57% -$704,498.43
Amt Left: 33.68% $4,797,622.74
Delta: -24.17% -$3,707,080.93
$19,135,567.00
Over/Under Est: -3.09% -$611,111.83
Amt Left: 34.34% $4,891,009.34
Delta: -0.49% -$93,386.60

Bid Items & Bid Tabulations

147 Total 0 of 147
GUADALUPE  |  FM 1150  |  SAN ANTONIO  |  1269-01-023  |  05/07/2026  |  $19,746,678.83  |  F 2026(628)  |  REHAB EXIST ROADWAY  |  504 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
STERLING DELAWARE HOLDING COMPANY
JOE BLAND CONSTRUCTION LLC
POSILLICO CIVIL, INC.
PREPARING ROW
AC 0.760 $5,000.000 $20,295.000 $10,000.000 $7,500.000 $24,000.000
PREPARING ROW
STA 328.000 $7,500.000 $275.000 $3,000.000 $1,500.000 $2,610.000
REMOV CONC (MEDIANS)
SY 79.000 $20.000 $16.500 $45.000 $25.000 $65.000
REMOV CONC (DRIVEWAYS)
SY 347.000 $20.000 $16.500 $25.000 $25.000 $13.000
REMOV CONC (MISC)
SY 228.000 $50.000 $16.500 $20.000 $30.000 $14.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 106,533.000 $14.000 $8.470 $5.000 $9.000 $3.000
EXCAV (ROADWAY)
CY 27,494.000 $20.000 $3.300 $24.000 $33.000 $29.000
EMBANK (FNL)(DC)(TY C1)
CY 5,590.000 $20.000 $22.000 $8.000 $44.000 $65.000
EMBANK (VEH)(OC)(TY A)
CY 27.000 $75.000 $16.500 $25.000 $200.000 $100.000
FURN & PLACE TOPSOIL (4")
SY 217,083.000 $1.500 $0.360 $0.100 $2.000 $1.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 434,166.000 $1.000 $0.290 $0.280 $0.250 $0.280
BROADCAST SEED (TEMP_WARM)
SY 217,083.000 $0.160 $0.150 $0.140 $0.200 $0.160
BROADCAST SEED (TEMP_COOL)
SY 217,083.000 $0.200 $0.150 $0.140 $0.200 $0.160
VEGETATIVE WATERING
TGL 6,773.000 $25.000 $26.400 $32.000 $35.000 $17.000
PROOF ROLLING
HR 28.000 $120.000 $88.000 $150.000 $1,000.000 $200.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 25,982.000 $80.000 $56.630 $80.000 $114.000 $65.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 119,922.000 $2.000 $1.320 $2.000 $2.500 $2.000
LIME (COM OR QK)(SLURRY)
TON 2,918.000 $250.000 $330.000 $340.000 $355.000 $400.000
LIME TRT (EXIST MATL)(8")
SY 121,876.000 $7.000 $2.970 $3.500 $10.000 $8.000
PRIME COAT(MC-30 OR AE-P)
GAL 23,578.000 $4.500 $4.950 $4.000 $4.500 $4.000
D-GR HMA TY-B PG64-22
TON 2,132.000 $85.000 $92.400 $100.000 $110.000 $130.000
D-GR HMA TY-C PG76-22
TON 343.000 $120.000 $110.000 $104.000 $114.000 $220.000
D-GR HMA TY-D PG76-22
TON 9,894.000 $100.000 $102.300 $101.000 $112.000 $120.000
SP MIXES SP-C SAC-B PG76-22
TON 339.000 $95.000 $112.200 $107.000 $117.000 $107.000
TOM-C PG76-22 SAC-B
TON 6,538.000 $125.000 $127.600 $142.000 $155.000 $142.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 322.000 $50.000 $63.600 $170.000 $85.000 $200.000
CUT & RESTORE ASPH PAVING
SY 235.000 $150.000 $163.330 $50.000 $195.000 $85.000
FLOWABLE BACKFILL
CY 288.000 $250.000 $322.980 $200.000 $365.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 32.000 $10.000 $28.840 $1.000 $10.000 $16.000
TEMPORARY SPL SHORING
SF 1,624.000 $15.000 $11.530 $17.000 $36.000 $200.000
CL A CONC (COLLAR)
EA 8.000 $1,300.000 $1,268.840 $1,300.000 $2,750.000 $2,000.000
RIPRAP (CONC)(4 IN)
CY 80.000 $575.000 $636.600 $630.000 $650.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 114.000 $620.000 $694.480 $760.000 $750.000 $650.000
GABION MATTRESSES (GALV)(6 IN)
SY 17.000 $100.000 $169.680 $105.000 $550.000 $200.000
GABION MATTRESSES (GALV)(9 IN)
SY 37.000 $150.000 $166.430 $120.000 $625.000 $150.000
GABION MATTRESSES (GALV)(18 IN)
SY 73.000 $170.000 $175.040 $185.000 $375.000 $300.000
CONC BOX CULV (4 FT X 2 FT)
LF 150.000 $350.000 $455.630 $400.000 $420.000 $500.000
CONC BOX CULV (5 FT X 2 FT)
LF 36.000 $400.000 $524.840 $470.000 $535.000 $600.000
CONC BOX CULV (6 FT X 2 FT)
LF 78.000 $600.000 $605.580 $500.000 $595.000 $600.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 84.000 $1,250.000 $705.940 $640.000 $525.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 78.000 $90.000 $74.980 $150.000 $110.000 $150.000
RC PIPE (CL V)(24 IN)
LF 80.000 $200.000 $113.040 $300.000 $150.000 $250.000
RC PIPE (CL V)(30 IN)
LF 112.000 $230.000 $177.640 $300.000 $235.000 $225.000
RC PIPE (CL V)(36 IN)
LF 40.000 $375.000 $266.460 $350.000 $310.000 $350.000
RC PIPE (ARCH)(CL V)(DES 1)
LF 305.000 $293.150 $321.820 $400.000 $225.000 $200.000
RC PIPE (ARCH)(CL V)(DES 3)
LF 154.000 $600.000 $426.790 $450.000 $265.000 $490.000
RC PIPE (CL V)(72 IN)
LF 10.000 $750.000 $1,903.260 $2,100.000 $1,200.000 $1,200.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $8,000.000 $4,983.090 $6,700.000 $6,750.000 $25,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $10,500.000 $7,497.710 $9,600.000 $7,250.000 $30,000.000
HEADWALL (CH - PW - 0) (DIA= 72 IN)
EA 2.000 $23,500.000 $21,085.860 $28,000.000 $9,500.000 $40,000.000
WINGWALL (PW - 2) (HW=3 FT)
EA 1.000 $7,500.000 $4,273.690 $8,600.000 $13,500.000 $23,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $10,000.000 $5,917.420 $11,000.000 $13,750.000 $24,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1)(C)
EA 4.000 $7,500.000 $5,190.720 $10,000.000 $7,000.000 $3,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $7,500.000 $5,652.120 $8,000.000 $8,000.000 $2,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C)
EA 12.000 $7,500.000 $3,979.550 $4,500.000 $8,500.000 $16,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1)(C)
EA 2.000 $6,500.000 $7,497.710 $7,200.000 $9,750.000 $16,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $1,384.190 $1,500.000 $2,500.000 $2,200.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 8.000 $2,000.000 $1,672.570 $1,146.000 $2,500.000 $2,300.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 3.000 $3,500.000 $2,076.290 $2,500.000 $3,500.000 $3,900.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 16.000 $2,000.000 $2,710.710 $1,600.000 $3,000.000 $2,100.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 12.000 $5,500.000 $3,702.710 $2,000.000 $4,500.000 $2,800.000
REMOV STR (SET)
EA 13.000 $750.000 $1,038.140 $600.000 $750.000 $730.000
REMOV STR (WINGWALL)
EA 27.000 $1,750.000 $1,441.870 $1,500.000 $1,000.000 $3,000.000
REMOV STR (PIPE)
LF 487.000 $20.000 $33.450 $18.000 $15.000 $32.000
MOBILIZATION
LS 1.000 $1,759,573.850 $1,075,010.880 $1,500,000.000 $625,000.000 $1,849,884.700
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 31.000 $10,000.000 $7,026.450 $21,332.000 $7,500.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $4,431.260 $22,000.000 $21,000.000 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 948.000 $33.000 $39.220 $37.350 $40.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 948.000 $11.000 $6.250 $5.950 $20.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $20.000 $26.930 $25.650 $50.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $5.000 $6.830 $6.500 $15.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 70,353.000 $4.000 $2.940 $5.000 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 70,353.000 $1.000 $0.210 $0.200 $1.000 $3.000
CONSTRUCTING DETOURS
SY 20,962.000 $95.000 $89.780 $55.000 $95.000 $100.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 60.000 $89.000 $99.000 $85.000 $250.000 $75.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 194.000 $100.000 $99.000 $165.000 $295.000 $90.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 28.000 $7,500.000 $3,080.290 $265.000 $6,000.000 $7,000.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 5,480.000 $20.000 $44.000 $13.000 $75.000 $90.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 260.000 $20.000 $40.000 $13.000 $75.000 $90.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 74,300.000 $7.000 $11.500 $4.000 $10.000 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,820.000 $20.000 $11.000 $4.000 $10.000 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 25,420.000 $15.000 $17.000 $1.000 $10.000 $9.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 1,640.000 $15.000 $45.000 $1.000 $10.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 5,480.000 $9.000 $13.000 $11.000 $12.000 $18.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 260.000 $9.000 $20.000 $11.000 $12.000 $40.000
DRIVEWAYS (CONC)
SY 319.000 $100.000 $109.960 $130.000 $250.000 $300.000
DRIVEWAYS (ACP)
SY 3,582.000 $55.000 $50.600 $100.000 $75.000 $65.000
CONC MEDIAN
SY 82.000 $125.000 $218.760 $140.000 $240.000 $115.000
MTL W-BEAM GD FEN (TIM POST)
LF 925.000 $25.000 $25.730 $24.500 $30.000 $30.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 7.000 $1,250.000 $1,417.520 $1,350.000 $1,500.000 $1,300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,200.000 $3,360.060 $3,200.000 $4,000.000 $4,000.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $600.000 $536.300 $300.000 $350.000 $300.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 11.000 $300.000 $241.330 $300.000 $350.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 4.000 $350.000 $294.960 $300.000 $350.000 $300.000
RELOCATE EXISTING MAILBOX
EA 17.000 $400.000 $245.620 $200.000 $300.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 97.000 $700.000 $643.550 $675.000 $765.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 15.000 $800.000 $750.810 $725.000 $825.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 4.000 $900.000 $911.700 $900.000 $1,025.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $938.520 $900.000 $1,025.000 $900.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 6.000 $275.000 $375.410 $150.000 $170.000 $150.000
REMOVE SM RD SN SUP&AM
EA 61.000 $110.000 $107.260 $90.000 $105.000 $90.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 6.000 $125.000 $42.900 $50.000 $55.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 40.000 $30.000 $21.450 $20.000 $25.000 $25.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 42.000 $100.000 $80.440 $95.000 $105.000 $70.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 9.000 $20.000 $16.090 $5.000 $6.000 $5.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 64,082.000 $0.250 $0.320 $0.260 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 16.000 $90.000 $121.550 $100.000 $115.000 $100.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 8.000 $90.000 $121.550 $100.000 $115.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 60,217.000 $0.250 $0.320 $0.260 $0.250 $0.260
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 79,880.000 $0.750 $0.910 $0.750 $0.850 $0.800
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,588.000 $6.000 $7.290 $6.000 $7.000 $6.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 41,177.000 $0.750 $0.910 $0.750 $1.000 $0.800
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 345.000 $1.000 $1.220 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,876.000 $0.900 $1.090 $0.900 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 150.000 $7.000 $8.200 $6.750 $7.500 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $150.000 $182.320 $150.000 $170.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $170.000 $212.710 $175.000 $195.000 $175.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 4.000 $50.000 $42.540 $35.000 $40.000 $35.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 1.000 $250.000 $455.810 $375.000 $425.000 $375.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 70,671.000 $0.650 $0.940 $0.770 $0.900 $0.800
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 72,976.000 $0.650 $0.940 $0.770 $0.900 $0.800
PAVEMENT SLER 6"
LF 143,992.000 $0.200 $0.210 $0.170 $0.200 $0.770
PAVEMENT SLER 8"
LF 1,876.000 $0.350 $0.290 $0.240 $0.250 $0.240
PAVEMENT SLER 24"
LF 150.000 $2.000 $2.430 $2.000 $2.250 $2.000
PAVEMENT SLER (ARROW)
EA 4.000 $54.000 $91.160 $75.000 $85.000 $75.000
PAVEMENT SLER (WORD)
EA 4.000 $55.000 $91.160 $75.000 $85.000 $75.000
PAVEMENT SLER (MED NOSE)
EA 1.000 $50.000 $182.320 $150.000 $170.000 $150.000
PAVEMENT SLER (LN REDUCT ARROW)
EA 2.000 $125.000 $182.320 $150.000 $170.000 $150.000
PAVEMENT SLER (YLD TRI)
EA 4.000 $25.000 $18.230 $15.000 $17.000 $15.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $400.000 $455.810 $375.000 $425.000 $375.000
REFL PAV MRKR TY I-C
EA 87.000 $3.500 $4.560 $3.750 $5.000 $4.000
REFL PAV MRKR TY II-A-A
EA 1,129.000 $3.500 $4.560 $3.750 $5.000 $4.000
REFL PAV MRKR TY II-C-R
EA 75.000 $3.500 $4.560 $3.750 $5.000 $4.000
PAV SURF PREP FOR MRK (6")
LF 143,992.000 $0.100 $0.020 $0.020 $0.050 $0.020
PAV SURF PREP FOR MRK (8")
LF 1,768.000 $0.150 $0.060 $0.050 $0.050 $0.050
PAV SURF PREP FOR MRK (24")
LF 150.000 $1.500 $0.610 $0.500 $0.750 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $25.000 $6.080 $5.000 $5.500 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $20.000 $6.080 $5.000 $5.500 $5.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 4.000 $6.000 $2.430 $2.000 $2.250 $2.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 1.000 $70.000 $24.310 $20.000 $22.500 $20.000
TREE REMOVAL (12" - 18" DIA)
EA 31.000 $150.000 $550.000 $600.000 $140.000 $400.000
TREE REMOVAL (18" - 24" DIA)
EA 9.000 $200.000 $1,320.000 $650.000 $180.000 $1,000.000
TREE REMOVAL (24" - 30" DIA)
EA 7.000 $250.000 $1,650.000 $850.000 $305.000 $2,500.000
TREE REMOVAL (30" - 36" DIA)
EA 1.000 $300.000 $3,410.000 $2,600.000 $510.000 $3,200.000
TREE REMOVAL (48" - 60" DIA)
EA 1.000 $400.000 $5,060.000 $3,000.000 $1,700.000 $4,500.000
BONDING COURSE
GAL 23,933.000 $3.500 $3.520 $4.400 $4.750 $5.000
RESIDENTIAL DRIVEWAY TEMP SIGNAL SYSTEM
MO 6.000 $20,000.000 $9,340.390 $25,000.000 $9,750.000 $30,000.000
Totals: $19,746,678.830 $14,244,557.660 $15,335,099.470 $19,042,180.400 $19,135,567.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $20,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $200,000.00