|
|
PREPARING ROW
|
STA
|
131.000
|
$5,000.000
|
$4,667.380
|
$27,582.340
|
$1,221.000
|
$12,210.000
|
$2,000.000
|
$39,885.410
|
|
|
REMOV CONC (PAV)
|
SY
|
2,143.000
|
$21.000
|
$17.000
|
$12.280
|
$19.800
|
$44.000
|
$25.000
|
$9.250
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
1,542.000
|
$15.000
|
$7.000
|
$10.820
|
$13.200
|
$4.500
|
$12.000
|
$8.330
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
352.000
|
$20.000
|
$25.000
|
$24.000
|
$16.500
|
$19.500
|
$26.000
|
$9.250
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
554.000
|
$22.000
|
$15.000
|
$19.220
|
$16.500
|
$13.000
|
$26.000
|
$9.250
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
4,349.000
|
$23.000
|
$25.000
|
$16.790
|
$16.500
|
$12.000
|
$28.000
|
$9.250
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
1,507.000
|
$22.000
|
$10.000
|
$15.340
|
$16.500
|
$17.000
|
$26.000
|
$9.250
|
|
|
REMOV CONC (CURB)
|
LF
|
1,729.000
|
$11.000
|
$1.000
|
$5.450
|
$9.900
|
$9.000
|
$8.000
|
$9.250
|
|
|
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,846.000
|
$20.000
|
$20.450
|
$5.700
|
$3.300
|
$3.000
|
$7.000
|
$7.450
|
|
|
RMV(12"-24") TRT/UNTRT BASE & ASPH PAV
|
SY
|
84,794.000
|
$22.000
|
$8.500
|
$6.870
|
$12.100
|
$3.000
|
$9.000
|
$12.640
|
|
|
EXCAV (ROADWAY)
|
CY
|
57,959.000
|
$12.000
|
$13.500
|
$18.390
|
$13.200
|
$11.000
|
$20.000
|
$11.550
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
47,194.000
|
$15.000
|
$25.500
|
$10.070
|
$19.930
|
$21.000
|
$38.000
|
$26.480
|
|
|
EMBANK (FNL)(OC)(TY C2)
|
CY
|
27,740.000
|
$15.000
|
$23.500
|
$8.650
|
$19.630
|
$7.000
|
$38.000
|
$10.450
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
97,238.000
|
$2.000
|
$2.000
|
$1.040
|
$1.320
|
$3.000
|
$1.000
|
$1.500
|
|
|
BLOCK SODDING
|
SY
|
97,238.000
|
$6.000
|
$4.000
|
$3.960
|
$4.410
|
$4.000
|
$4.000
|
$3.370
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
119,791.000
|
$0.250
|
$0.100
|
$0.100
|
$0.150
|
$0.100
|
$0.250
|
$0.220
|
|
|
FERTILIZER
|
TON
|
11.100
|
$1,275.000
|
$680.000
|
$661.350
|
$1,417.790
|
$661.000
|
$750.000
|
$750.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
3,645.600
|
$10.000
|
$25.000
|
$24.430
|
$23.100
|
$38.000
|
$5.000
|
$36.000
|
|
|
PROOF ROLLING
|
HR
|
286.000
|
$85.000
|
$103.000
|
$79.610
|
$66.000
|
$146.000
|
$20.000
|
$95.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
30,452.000
|
$60.000
|
$60.000
|
$50.290
|
$53.130
|
$67.000
|
$35.000
|
$74.440
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
3,639.000
|
$400.000
|
$302.000
|
$151.470
|
$341.000
|
$564.000
|
$145.000
|
$351.950
|
|
|
LIME TRT (SUBGRADE)(10")
|
SY
|
121,310.000
|
$5.000
|
$3.000
|
$2.580
|
$4.400
|
$5.000
|
$8.000
|
$6.260
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
23,216.000
|
$4.500
|
$2.850
|
$2.830
|
$4.950
|
$3.000
|
$3.000
|
$2.800
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
60,514.000
|
$80.000
|
$80.000
|
$76.890
|
$87.450
|
$72.000
|
$85.000
|
$78.500
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
13,576.000
|
$105.000
|
$102.000
|
$98.130
|
$101.750
|
$88.000
|
$108.000
|
$99.500
|
|
|
TACK COAT
|
GAL
|
43,319.000
|
$3.500
|
$1.000
|
$1.010
|
$3.190
|
$1.000
|
$1.000
|
$1.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
17,380.000
|
$100.000
|
$92.000
|
$88.520
|
$100.650
|
$91.000
|
$98.000
|
$90.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,766.000
|
$3.250
|
$3.050
|
$6.280
|
$3.520
|
$4.000
|
$3.500
|
$3.000
|
|
|
CONC PVMT (CRCP)(HES) (11")
|
SY
|
2,179.000
|
$180.000
|
$126.000
|
$119.790
|
$120.000
|
$96.000
|
$130.000
|
$110.000
|
|
|
STRUCT EXCAV
|
CY
|
7,500.000
|
$25.000
|
$15.000
|
$3.000
|
$10.500
|
$2.000
|
$1.000
|
$13.550
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
168.000
|
$300.000
|
$105.000
|
$292.360
|
$95.000
|
$194.000
|
$145.000
|
$161.504
|
|
|
CEM STABIL BKFL
|
CY
|
4,798.000
|
$110.000
|
$161.000
|
$156.270
|
$194.250
|
$142.000
|
$140.000
|
$176.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
929.000
|
$30.000
|
$3.000
|
$12.400
|
$26.250
|
$3.000
|
$3.000
|
$50.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
809.000
|
$28.000
|
$33.000
|
$46.000
|
$36.750
|
$27.000
|
$85.000
|
$45.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
104.000
|
$450.000
|
$370.000
|
$305.000
|
$320.250
|
$309.000
|
$540.000
|
$305.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$750.000
|
$550.000
|
$415.000
|
$435.750
|
$421.000
|
$675.000
|
$415.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
21.000
|
$540.000
|
$650.000
|
$832.090
|
$500.000
|
$1,121.000
|
$940.000
|
$1,200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,990.000
|
$580.000
|
$440.000
|
$437.100
|
$435.280
|
$260.000
|
$365.000
|
$510.000
|
|
|
RAIL (TY C221)
|
LF
|
693.000
|
$165.000
|
$160.000
|
$176.850
|
$170.000
|
$200.000
|
$145.000
|
$85.450
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
7,646.000
|
$155.000
|
$145.000
|
$142.880
|
$150.020
|
$108.000
|
$170.000
|
$184.550
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
98.000
|
$475.000
|
$310.000
|
$269.880
|
$383.250
|
$454.000
|
$350.000
|
$547.125
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
1,224.000
|
$600.000
|
$440.000
|
$371.340
|
$551.250
|
$700.000
|
$515.000
|
$556.087
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,078.000
|
$560.000
|
$530.000
|
$443.420
|
$598.500
|
$811.000
|
$575.000
|
$747.325
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
813.000
|
$600.000
|
$590.000
|
$591.990
|
$727.650
|
$1,032.000
|
$695.000
|
$849.075
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
203.000
|
$620.000
|
$690.000
|
$661.110
|
$826.350
|
$1,093.000
|
$775.000
|
$920.575
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
520.000
|
$700.000
|
$690.000
|
$686.780
|
$882.000
|
$1,192.000
|
$550.000
|
$960.175
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
160.000
|
$80.000
|
$100.000
|
$110.510
|
$68.250
|
$115.000
|
$90.000
|
$107.275
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,333.000
|
$110.000
|
$110.000
|
$105.610
|
$89.250
|
$131.000
|
$110.000
|
$119.925
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
100.000
|
$225.000
|
$180.000
|
$304.050
|
$304.500
|
$251.000
|
$180.000
|
$197.475
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
3.000
|
$9,000.000
|
$9,500.000
|
$9,071.790
|
$5,927.230
|
$10,138.000
|
$4,000.000
|
$8,310.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$6,200.000
|
$10,000.000
|
$8,597.230
|
$5,879.980
|
$11,521.000
|
$5,000.000
|
$9,530.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
1.000
|
$15,000.000
|
$14,000.000
|
$10,236.010
|
$11,812.460
|
$19,541.000
|
$8,250.000
|
$10,500.000
|
|
|
INLET (COMPL)(WALL)
|
EA
|
2.000
|
$14,000.000
|
$14,100.000
|
$10,500.000
|
$8,399.970
|
$42,924.000
|
$22,500.000
|
$12,700.000
|
|
|
INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD)
|
EA
|
98.000
|
$21,000.000
|
$15,600.000
|
$11,500.000
|
$15,000.000
|
$15,750.000
|
$1,000.000
|
$16,500.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$20,500.000
|
$27,000.000
|
$22,742.190
|
$18,413.790
|
$37,214.000
|
$22,500.000
|
$47,320.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$35,400.000
|
$31,000.000
|
$24,742.190
|
$23,926.270
|
$48,616.000
|
$31,250.000
|
$47,320.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
4.000
|
$30,000.000
|
$44,000.000
|
$38,903.630
|
$34,868.280
|
$63,711.000
|
$48,000.000
|
$48,320.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$40,000.000
|
$44,000.000
|
$40,903.640
|
$46,252.340
|
$79,975.000
|
$61,000.000
|
$49,320.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
2.000
|
$10,000.000
|
$13,000.000
|
$14,258.480
|
$4,724.980
|
$16,816.000
|
$7,500.000
|
$9,860.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
5.000
|
$13,000.000
|
$13,500.000
|
$13,471.160
|
$6,824.980
|
$19,233.000
|
$9,000.000
|
$12,195.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
26.000
|
$17,000.000
|
$14,000.000
|
$16,390.090
|
$8,294.970
|
$21,050.000
|
$13,500.000
|
$15,637.500
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,350.000
|
$2,200.000
|
$2,663.110
|
$3,044.990
|
$2,815.000
|
$4,000.000
|
$3,456.000
|
|
|
SET (TY II)(18 IN)(RCP)(3:1)(P)
|
EA
|
4.000
|
$1,800.000
|
$2,000.000
|
$2,257.960
|
$1,574.990
|
$2,407.000
|
$2,000.000
|
$1,902.566
|
|
|
SET(TY II)(24 IN)(RCP)(4:1)(P)
|
EA
|
68.000
|
$1,400.000
|
$1,670.000
|
$1,941.690
|
$1,984.490
|
$2,815.000
|
$2,500.000
|
$2,620.866
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$5,000.000
|
$8,000.000
|
$2,888.010
|
$2,519.990
|
$711.000
|
$3,500.000
|
$4,451.000
|
|
|
REMOV STR (SET)
|
EA
|
54.000
|
$257.000
|
$830.000
|
$670.200
|
$525.000
|
$607.000
|
$750.000
|
$1,129.500
|
|
|
REMOV STR (WINGWALL)
|
EA
|
7.000
|
$1,500.000
|
$2,800.000
|
$1,492.850
|
$1,312.500
|
$2,061.000
|
$2,250.000
|
$4,453.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,100.000
|
$2,500.000
|
$1,492.850
|
$1,312.500
|
$3,469.000
|
$2,000.000
|
$4,454.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,145.000
|
$15.000
|
$25.000
|
$26.570
|
$10.500
|
$21.000
|
$35.000
|
$47.150
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,897.000
|
$100.000
|
$44.000
|
$43.620
|
$33.600
|
$36.000
|
$50.000
|
$48.150
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,312,377.370
|
$4,010,885.000
|
$4,025,000.000
|
$3,947,921.730
|
$4,000,000.000
|
$825,000.000
|
$5,224,988.829
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
32.000
|
$10,000.000
|
$7,000.000
|
$25,000.000
|
$8,329.580
|
$14,098.000
|
$7,500.000
|
$76,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$10,000.000
|
$3,000.000
|
$9,495.510
|
$3,715.490
|
$43,638.000
|
$12,000.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
97.000
|
$475.000
|
$300.000
|
$281.000
|
$132.700
|
$275.000
|
$215.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$45.000
|
$75.000
|
$82.130
|
$79.620
|
$63.000
|
$1,125.000
|
$500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
265.000
|
$35.000
|
$39.000
|
$38.450
|
$30.380
|
$38.000
|
$45.000
|
$48.900
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
40.000
|
$81.000
|
$111.000
|
$107.790
|
$96.210
|
$107.000
|
$120.000
|
$137.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
305.000
|
$13.000
|
$19.500
|
$18.830
|
$10.130
|
$19.000
|
$20.000
|
$16.650
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,906.000
|
$30.000
|
$38.000
|
$37.310
|
$24.300
|
$37.000
|
$45.000
|
$31.540
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,786.000
|
$3.250
|
$9.450
|
$9.200
|
$7.090
|
$9.000
|
$10.000
|
$4.900
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
24,703.000
|
$3.000
|
$3.900
|
$3.790
|
$2.940
|
$3.000
|
$5.000
|
$3.960
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
24,703.000
|
$1.000
|
$0.740
|
$0.720
|
$0.300
|
$1.000
|
$1.000
|
$1.460
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,242.000
|
$6.000
|
$5.650
|
$5.520
|
$4.050
|
$5.000
|
$7.000
|
$9.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,222.000
|
$1.250
|
$0.840
|
$0.820
|
$0.710
|
$1.000
|
$1.000
|
$2.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
11,519.000
|
$95.000
|
$67.000
|
$52.000
|
$70.190
|
$59.000
|
$60.000
|
$102.220
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,840.000
|
$30.000
|
$28.000
|
$13.250
|
$20.000
|
$70.000
|
$85.000
|
$41.850
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$40.000
|
$76.000
|
$71.850
|
$25.000
|
$72.000
|
$75.000
|
$42.900
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
21,120.000
|
$5.000
|
$5.000
|
$8.690
|
$9.000
|
$11.000
|
$15.000
|
$11.850
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,440.000
|
$12.000
|
$17.000
|
$23.710
|
$10.000
|
$13.000
|
$35.000
|
$12.900
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,660.000
|
$11.000
|
$9.000
|
$9.410
|
$10.000
|
$25.000
|
$25.000
|
$11.850
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$12.000
|
$20.000
|
$13.360
|
$10.000
|
$41.000
|
$25.000
|
$12.900
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
30,894.000
|
$110.000
|
$57.000
|
$67.500
|
$73.450
|
$34.000
|
$65.000
|
$86.210
|
|
|
CONC CURB (TY F3)
|
LF
|
33.000
|
$185.000
|
$390.000
|
$300.000
|
$163.230
|
$357.000
|
$475.000
|
$255.000
|
|
|
CONC CURB (TY I) (MOD)
|
LF
|
50,147.000
|
$45.000
|
$11.750
|
$13.950
|
$14.690
|
$13.000
|
$23.000
|
$11.600
|
|
|
CONC CURB (TY II)(MOD)
|
LF
|
195.000
|
$55.000
|
$24.000
|
$22.500
|
$14.690
|
$20.000
|
$25.000
|
$24.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,729.000
|
$135.000
|
$85.000
|
$86.050
|
$81.610
|
$100.000
|
$135.000
|
$123.250
|
|
|
DRIVEWAYS (ACP) (TY 2)
|
SY
|
4,447.000
|
$55.000
|
$65.000
|
$63.090
|
$48.400
|
$69.000
|
$70.000
|
$110.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
24,858.000
|
$70.000
|
$55.000
|
$52.050
|
$51.690
|
$42.000
|
$60.000
|
$52.550
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$2,500.000
|
$2,900.000
|
$2,975.000
|
$3,155.770
|
$3,882.000
|
$2,000.000
|
$1,200.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
11.000
|
$2,800.000
|
$2,900.000
|
$2,825.000
|
$3,155.770
|
$3,890.000
|
$2,250.000
|
$3,985.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
18.000
|
$3,900.000
|
$2,900.000
|
$3,000.000
|
$3,155.770
|
$3,956.000
|
$2,500.000
|
$4,510.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
6.000
|
$3,575.000
|
$2,900.000
|
$2,905.000
|
$3,155.770
|
$3,954.000
|
$3,500.000
|
$6,250.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
4.000
|
$2,500.000
|
$2,900.000
|
$2,915.000
|
$3,155.770
|
$3,957.000
|
$3,500.000
|
$3,510.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
6.000
|
$2,200.000
|
$2,900.000
|
$3,050.000
|
$3,155.770
|
$3,954.000
|
$4,500.000
|
$4,310.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
4.000
|
$3,500.000
|
$5,300.000
|
$3,100.000
|
$3,155.770
|
$4,308.000
|
$4,500.000
|
$3,250.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$3,200.000
|
$9,200.000
|
$3,900.000
|
$3,155.770
|
$4,686.000
|
$4,500.000
|
$6,825.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,537.500
|
$5.000
|
$3.150
|
$3.000
|
$3.190
|
$7.000
|
$2.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$220.000
|
$230.000
|
$300.000
|
$318.730
|
$498.000
|
$115.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$350.000
|
$350.000
|
$275.000
|
$292.170
|
$746.000
|
$175.000
|
$330.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
38.000
|
$30.000
|
$60.000
|
$75.000
|
$61.090
|
$130.000
|
$65.000
|
$57.500
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$460.000
|
$250.000
|
$467.470
|
$995.000
|
$2,000.000
|
$440.000
|
|
|
GATE (INSTALL)(6'X24')
|
EA
|
1.000
|
$10,000.000
|
$2,900.000
|
$15,000.000
|
$2,958.870
|
$6,300.000
|
$4,000.000
|
$2,785.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
10.000
|
$250.000
|
$410.000
|
$249.000
|
$225.000
|
$388.000
|
$500.000
|
$320.080
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,325.000
|
$20.000
|
$14.500
|
$12.000
|
$12.000
|
$12.000
|
$22.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
4,135.000
|
$30.000
|
$22.000
|
$15.000
|
$15.000
|
$15.000
|
$28.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,320.000
|
$30.000
|
$17.500
|
$13.000
|
$13.000
|
$13.000
|
$30.000
|
$13.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
4,710.000
|
$35.000
|
$24.000
|
$20.000
|
$20.000
|
$20.000
|
$34.000
|
$20.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
12,490.000
|
$2.500
|
$2.400
|
$1.900
|
$1.900
|
$2.000
|
$3.000
|
$1.900
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
650.000
|
$3.000
|
$2.750
|
$2.150
|
$2.150
|
$2.000
|
$3.500
|
$2.150
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
3,275.000
|
$3.500
|
$3.500
|
$3.200
|
$3.200
|
$3.000
|
$3.500
|
$3.200
|
|
|
GROUND BOX TY D (162922)
|
EA
|
22.000
|
$1,500.000
|
$1,320.000
|
$1,000.000
|
$1,000.000
|
$1,014.000
|
$1,500.000
|
$1,000.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,800.000
|
$1,760.000
|
$1,100.000
|
$1,100.000
|
$1,115.000
|
$2,000.000
|
$1,100.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$600.000
|
$450.000
|
$545.000
|
$545.000
|
$553.000
|
$415.000
|
$545.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
3.000
|
$8,000.000
|
$8,200.000
|
$6,500.000
|
$6,500.000
|
$6,591.000
|
$10,650.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
265.250
|
$35.000
|
$45.000
|
$30.000
|
$30.000
|
$30.000
|
$50.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$700.000
|
$730.000
|
$700.000
|
$650.000
|
$781.000
|
$845.000
|
$645.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$900.000
|
$780.000
|
$750.000
|
$700.000
|
$963.000
|
$1,025.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
79.000
|
$900.000
|
$800.000
|
$775.000
|
$750.000
|
$963.000
|
$1,075.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
19.000
|
$900.000
|
$1,010.000
|
$975.000
|
$800.000
|
$1,211.000
|
$1,125.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$950.000
|
$730.000
|
$700.000
|
$915.000
|
$1,235.000
|
$1,250.000
|
$1,020.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
15.000
|
$975.000
|
$830.000
|
$800.000
|
$920.000
|
$1,259.000
|
$1,275.000
|
$1,040.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,200.000
|
$930.000
|
$900.000
|
$950.000
|
$1,525.000
|
$1,500.000
|
$1,260.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,200.000
|
$1,040.000
|
$1,000.000
|
$1,000.000
|
$1,501.000
|
$1,500.000
|
$1,240.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
6.000
|
$1,300.000
|
$1,140.000
|
$1,100.000
|
$1,200.000
|
$1,653.000
|
$1,575.000
|
$1,365.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
4.000
|
$1,960.000
|
$2,600.000
|
$2,500.000
|
$1,500.000
|
$2,730.000
|
$2,425.000
|
$2,255.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
77.000
|
$100.000
|
$93.000
|
$90.000
|
$100.000
|
$121.000
|
$100.000
|
$100.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$950.000
|
$660.000
|
$1,190.510
|
$500.000
|
$890.000
|
$785.000
|
$500.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
33.000
|
$90.000
|
$104.000
|
$100.000
|
$65.000
|
$137.000
|
$80.000
|
$64.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
38.000
|
$20.000
|
$5.200
|
$5.000
|
$15.000
|
$39.000
|
$25.000
|
$18.000
|
|
|
INST DEL ASSM (D-SY)SZ 1(YFLX)SRFHH(BI)
|
EA
|
8.000
|
$80.000
|
$130.000
|
$125.000
|
$150.000
|
$343.000
|
$175.000
|
$160.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRFLL
|
EA
|
23.000
|
$100.000
|
$130.000
|
$125.000
|
$75.000
|
$193.000
|
$90.000
|
$90.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
137.000
|
$10.000
|
$52.000
|
$50.000
|
$20.000
|
$75.000
|
$35.000
|
$35.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
42.000
|
$10.000
|
$52.000
|
$50.000
|
$20.000
|
$75.000
|
$40.000
|
$35.000
|
|
|
INSTL OM SM RD SIGN (2-OM-PW)Y
|
EA
|
4.000
|
$4.000
|
$104.000
|
$100.000
|
$25.000
|
$9.000
|
$1.250
|
$41.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
4,970.000
|
$1.000
|
$1.050
|
$0.950
|
$1.000
|
$1.000
|
$2.500
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
83.000
|
$1.000
|
$2.100
|
$1.900
|
$2.000
|
$2.000
|
$2.500
|
$1.900
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
95,040.000
|
$1.000
|
$0.800
|
$0.700
|
$0.770
|
$1.000
|
$1.000
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,429.000
|
$7.000
|
$8.350
|
$4.000
|
$8.000
|
$4.000
|
$9.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(DOT)
|
LF
|
81.000
|
$2.000
|
$2.100
|
$1.900
|
$2.000
|
$2.000
|
$2.500
|
$1.900
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
61,589.000
|
$1.000
|
$0.800
|
$0.700
|
$0.770
|
$1.000
|
$1.000
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
157.000
|
$12.000
|
$8.350
|
$4.000
|
$8.000
|
$4.000
|
$9.000
|
$4.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
135.000
|
$1.200
|
$2.100
|
$1.600
|
$2.000
|
$2.000
|
$2.500
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
24.000
|
$1.500
|
$2.100
|
$1.800
|
$2.000
|
$2.000
|
$2.500
|
$1.800
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
407.000
|
$2.000
|
$2.100
|
$0.750
|
$2.000
|
$1.000
|
$2.500
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
15,226.000
|
$1.000
|
$0.940
|
$0.900
|
$0.900
|
$1.000
|
$1.000
|
$0.900
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
98.000
|
$3.250
|
$3.650
|
$3.700
|
$3.500
|
$4.000
|
$4.000
|
$3.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,734.000
|
$7.000
|
$7.050
|
$7.500
|
$6.750
|
$8.000
|
$8.000
|
$7.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
61.000
|
$150.000
|
$182.000
|
$150.000
|
$175.000
|
$150.000
|
$195.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
3.000
|
$200.000
|
$260.000
|
$190.000
|
$250.000
|
$190.000
|
$285.000
|
$190.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
4.000
|
$250.000
|
$260.000
|
$195.000
|
$250.000
|
$195.000
|
$280.000
|
$195.000
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
4.000
|
$250.000
|
$310.000
|
$200.000
|
$300.000
|
$200.000
|
$335.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
68.000
|
$175.000
|
$210.000
|
$160.000
|
$200.000
|
$160.000
|
$225.000
|
$160.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
185.000
|
$7.000
|
$7.050
|
$7.500
|
$6.750
|
$8.000
|
$8.000
|
$7.500
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$350.000
|
$570.000
|
$250.000
|
$550.000
|
$250.000
|
$625.000
|
$250.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
64,509.000
|
$0.200
|
$0.200
|
$0.200
|
$0.190
|
$0.250
|
$0.250
|
$0.200
|
|
|
PAVEMENT SLER 8"
|
LF
|
15,657.000
|
$0.250
|
$0.260
|
$0.400
|
$0.250
|
$1.000
|
$0.300
|
$0.400
|
|
|
PAVEMENT SLER 12"
|
LF
|
98.000
|
$1.000
|
$1.050
|
$1.350
|
$1.000
|
$1.000
|
$1.250
|
$1.350
|
|
|
PAVEMENT SLER 24"
|
LF
|
3,919.000
|
$1.300
|
$2.100
|
$2.650
|
$2.000
|
$3.000
|
$2.500
|
$2.650
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
61.000
|
$15.000
|
$52.000
|
$80.000
|
$50.000
|
$80.000
|
$55.000
|
$80.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
68.000
|
$15.000
|
$52.000
|
$95.000
|
$50.000
|
$95.000
|
$55.000
|
$95.000
|
|
|
PAVEMENT SLER (MED NOSE)
|
EA
|
1.000
|
$50.000
|
$52.000
|
$110.000
|
$50.000
|
$110.430
|
$55.000
|
$110.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
3.000
|
$20.000
|
$52.000
|
$80.000
|
$50.000
|
$80.000
|
$55.000
|
$80.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
4.000
|
$20.000
|
$52.000
|
$110.000
|
$50.000
|
$110.000
|
$55.000
|
$110.000
|
|
|
PAVEMENT SLER (U-L ARROW)
|
EA
|
4.000
|
$20.000
|
$52.000
|
$110.000
|
$50.000
|
$110.000
|
$55.000
|
$110.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
6,670.000
|
$0.600
|
$0.680
|
$0.700
|
$0.650
|
$1.000
|
$1.000
|
$0.700
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
27,293.000
|
$0.600
|
$0.680
|
$0.630
|
$0.650
|
$1.000
|
$1.000
|
$0.630
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
30,411.000
|
$0.600
|
$0.680
|
$0.630
|
$0.650
|
$1.000
|
$1.000
|
$0.630
|
|
REFL PAV MRKR TY I-C
|
EA
|
36.000
|
$4.000
|
$4.450
|
$4.250
|
$4.250
|
$4.000
|
$5.000
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
263.000
|
$4.000
|
$4.450
|
$4.250
|
$4.250
|
$4.000
|
$5.000
|
$4.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,094.000
|
$4.000
|
$4.450
|
$4.250
|
$4.250
|
$4.000
|
$5.000
|
$4.250
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
17,400.000
|
$0.200
|
$0.470
|
$0.600
|
$0.450
|
$1.000
|
$0.500
|
$0.600
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
2.000
|
$100.000
|
$210.000
|
$40.000
|
$200.000
|
$40.000
|
$225.000
|
$40.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
3.000
|
$40,000.000
|
$35,000.000
|
$39,600.000
|
$39,600.000
|
$40,153.000
|
$28,150.000
|
$39,600.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$6,500.000
|
$4,400.000
|
$6,700.000
|
$6,700.000
|
$6,794.000
|
$10,000.000
|
$6,700.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$60,000.000
|
$112,000.000
|
$71,725.000
|
$71,725.000
|
$72,726.000
|
$175,000.000
|
$71,725.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
33.000
|
$300.000
|
$350.000
|
$265.000
|
$265.000
|
$269.000
|
$395.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
13.000
|
$300.000
|
$350.000
|
$265.000
|
$265.000
|
$269.000
|
$395.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
33.000
|
$300.000
|
$350.000
|
$265.000
|
$265.000
|
$269.000
|
$395.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
7.000
|
$300.000
|
$350.000
|
$265.000
|
$265.000
|
$269.000
|
$395.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
33.000
|
$300.000
|
$350.000
|
$265.000
|
$265.000
|
$269.000
|
$395.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
7.000
|
$300.000
|
$350.000
|
$265.000
|
$265.000
|
$269.000
|
$395.000
|
$265.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
30.000
|
$900.000
|
$860.000
|
$660.000
|
$660.000
|
$669.000
|
$815.000
|
$660.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
34.000
|
$250.000
|
$187.000
|
$150.000
|
$150.000
|
$152.000
|
$170.000
|
$150.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
6.000
|
$300.000
|
$260.000
|
$215.000
|
$215.000
|
$218.000
|
$225.000
|
$215.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
6,540.000
|
$2.750
|
$3.300
|
$2.650
|
$2.650
|
$3.000
|
$4.000
|
$2.650
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
6,500.000
|
$3.500
|
$4.700
|
$3.800
|
$3.800
|
$4.000
|
$5.000
|
$3.800
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
6,380.000
|
$2.000
|
$1.750
|
$1.700
|
$1.700
|
$2.000
|
$2.500
|
$1.700
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
3.000
|
$700.000
|
$340.000
|
$756.000
|
$583.510
|
$335.000
|
$900.000
|
$310.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$16,000.000
|
$16,700.000
|
$14,400.000
|
$14,400.000
|
$14,601.000
|
$18,000.000
|
$14,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
7.000
|
$17,000.000
|
$17,300.000
|
$15,100.000
|
$15,100.000
|
$15,311.000
|
$18,000.000
|
$15,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
3.000
|
$38,000.000
|
$42,000.000
|
$36,900.000
|
$36,900.000
|
$37,415.000
|
$42,750.000
|
$36,900.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$42,000.000
|
$44,000.000
|
$38,500.000
|
$3,800.000
|
$39,038.000
|
$45,000.000
|
$38,500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
29.000
|
$2,600.000
|
$2,700.000
|
$2,500.000
|
$2,500.000
|
$2,535.000
|
$45,000.000
|
$2,500.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
30.000
|
$1,100.000
|
$990.000
|
$1,100.000
|
$1,100.000
|
$1,115.000
|
$2,800.000
|
$1,100.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$3,150.000
|
$3,700.000
|
$4,500.000
|
$4,500.000
|
$4,563.000
|
$1,125.000
|
$4,500.000
|
|
|
REMOVAL OF PEDESTRIAN RAMPS
|
EA
|
6.000
|
$600.000
|
$950.000
|
$1,050.000
|
$500.000
|
$953.000
|
$4,050.000
|
$1,500.000
|
|
|
INSTALL FUSED DISCONNECT
|
EA
|
1.000
|
$1,200.000
|
$3,600.000
|
$665.000
|
$698.250
|
$675.000
|
$1,400.000
|
$665.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
11.000
|
$6,500.000
|
$3,800.000
|
$2,250.000
|
$6,000.000
|
$5,310.000
|
$2,000.000
|
$4,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
66.000
|
$3,000.000
|
$1,070.000
|
$850.000
|
$850.000
|
$2,000.000
|
$7,325.000
|
$500.000
|
|
|
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
|
CYC
|
66.000
|
$1,000.000
|
$2,100.000
|
$1,000.000
|
$850.000
|
$2,000.000
|
$7,825.000
|
$500.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
33.000
|
$185.000
|
$3,200.000
|
$1,200.000
|
$1,000.000
|
$4,228.000
|
$7,825.000
|
$1,500.000
|
|
|
TIED-CONCRETE BLOCK EROSION CONTROL MAT
|
SF
|
9,328.000
|
$11.000
|
$10.000
|
$9.200
|
$18.230
|
$12.000
|
$5.000
|
$5.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
40,421.000
|
$2.000
|
$1.000
|
$1.010
|
$3.520
|
$2.000
|
$5.000
|
$1.000
|
|
|
BONDING COURSE
|
GAL
|
6,011.000
|
$3.000
|
$1.000
|
$1.010
|
$3.190
|
$1.000
|
$1.000
|
$1.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
5.000
|
$480.000
|
$440.000
|
$546.170
|
$2,000.000
|
$500.000
|
$1.000
|
$500.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
12.000
|
$9,500.000
|
$5,700.000
|
$11,405.000
|
$11,405.000
|
$11,564.000
|
$285.000
|
$11,405.000
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
9.000
|
$10,000.000
|
$5,700.000
|
$8,650.000
|
$8,650.000
|
$8,771.000
|
$12,500.000
|
$8,650.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
3.000
|
$1,500.000
|
$770.000
|
$500.000
|
$500.000
|
$507.000
|
$9,500.000
|
$500.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
960.000
|
$3.500
|
$1.450
|
$1.700
|
$1.700
|
$2.000
|
$1,500.000
|
$1.700
|
|
|
SPLIT STEEL CASING (14")
|
LF
|
204.000
|
$300.000
|
$330.000
|
$198.000
|
$306.000
|
$198.000
|
$2.500
|
$306.000
|
|
|
SPLIT STEEL CASING (24")
|
LF
|
38.000
|
$340.000
|
$440.000
|
$279.500
|
$417.000
|
$280.000
|
$260.000
|
$417.000
|
|
|
FORCE MAIN (PVC)(16")
|
LF
|
38.000
|
$120.000
|
$600.000
|
$608.000
|
$559.000
|
$608.000
|
$310.000
|
$559.000
|
|
|
TIE-IN (COMPLETE)(16")
|
EA
|
2.000
|
$2,944.000
|
$9,100.000
|
$8,671.000
|
$8,542.000
|
$8,671.000
|
$100.000
|
$8,542.000
|
|
|
SAN SWR SM DIA BYP PUMPING (FORCEMAIN)
|
LS
|
1.000
|
$40,000.000
|
$485,000.000
|
$36,485.000
|
$455,600.000
|
$72,970.000
|
$5,250.000
|
$455,600.000
|
|
|
SAN SWR (JACK, BORE, OR TUNNEL)(30")
|
LF
|
211.000
|
$400.000
|
$750.000
|
$727.500
|
$701.000
|
$728.000
|
$6,000.000
|
$701.000
|
|
|
SAN SWR REMOVAL OF 8" SEWER LINE
|
LF
|
154.000
|
$26.000
|
$32.000
|
$37.500
|
$30.000
|
$38.000
|
$1,150.000
|
$30.000
|
|
|
SAN SWR REMOVAL OF 16" SEWER LINE
|
LF
|
225.000
|
$30.000
|
$32.000
|
$39.500
|
$30.000
|
$40.000
|
$25.000
|
$30.000
|
|
|
SAN SWR REMOVAL OF 8" FORCE MAIN LINE
|
LF
|
306.000
|
$26.000
|
$32.000
|
$40.500
|
$30.000
|
$41.000
|
$30.000
|
$30.000
|
|
|
SAN SWR REMOVAL OF STEEL 24" CASING
|
LF
|
70.000
|
$30.000
|
$55.000
|
$59.000
|
$52.000
|
$59.000
|
$25.000
|
$52.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
360.000
|
$20.000
|
$11.500
|
$13.000
|
$11.000
|
$13.000
|
$25.000
|
$11.000
|
|
|
EXISTING MANHOLE ADJUSTMENT
|
EA
|
3.000
|
$1,500.000
|
$3,000.000
|
$2,544.000
|
$2,851.000
|
$2,544.000
|
$5.000
|
$2,851.000
|
|
|
RECONSTRUCTION OF EXISTING MANHOLE
|
EA
|
3.000
|
$14,000.000
|
$4,300.000
|
$12,702.000
|
$4,075.000
|
$12,702.000
|
$500.000
|
$4,075.000
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
1.000
|
$1,643.000
|
$1,590.000
|
$4,117.000
|
$1,490.000
|
$4,117.000
|
$4,000.000
|
$1,490.000
|
|
|
STEEL CASING (OPEN CUT)
|
LF
|
80.000
|
$300.000
|
$250.000
|
$292.000
|
$235.000
|
$292.000
|
$2,500.000
|
$235.000
|
|
|
STEEL CASING (JACK AND BORE)
|
LF
|
131.000
|
$100.000
|
$199.000
|
$223.500
|
$187.000
|
$224.000
|
$300.000
|
$187.000
|
|
|
FRCE MN (PVC)(16")(CARRIER)(OPEN CUT)
|
LF
|
80.000
|
$200.000
|
$192.000
|
$205.000
|
$180.000
|
$205.000
|
$1,115.000
|
$180.000
|
|
|
FRCE MN (PVC)(16")(CARRIER)(JACK&BORE)
|
LF
|
131.000
|
$300.000
|
$177.000
|
$205.000
|
$166.000
|
$205.000
|
$115.000
|
$166.000
|
|
|
WATER MAIN PIPE (PVC)(C900)(4")
|
LF
|
128.000
|
$60.000
|
$61.000
|
$85.500
|
$57.000
|
$86.000
|
$125.000
|
$57.000
|
|
|
WATER MAIN PIPE (PVC)(C900)(6")
|
LF
|
61.000
|
$75.000
|
$71.000
|
$95.500
|
$67.000
|
$96.000
|
$45.000
|
$67.000
|
|
|
WATER MAIN PIPE (PVC)(C900)(8")
|
LF
|
121.000
|
$80.000
|
$98.000
|
$107.000
|
$92.000
|
$107.000
|
$65.000
|
$92.000
|
|
|
WATER MAIN PIPE (PVC)(C900)(12")
|
LF
|
7,289.000
|
$130.000
|
$100.000
|
$143.000
|
$94.000
|
$129.000
|
$70.000
|
$94.000
|
|
|
CASING STL (24") INSTL BY JACK & BORE
|
LF
|
1,113.000
|
$500.000
|
$149.000
|
$171.500
|
$140.000
|
$172.000
|
$85.000
|
$140.000
|
|
|
CASING STL (24") INSTL BY OPEN CUT
|
LF
|
150.000
|
$300.000
|
$200.000
|
$231.500
|
$190.000
|
$232.000
|
$865.000
|
$190.000
|
|
|
CARRIER PIPE (12") INSTL BY OPEN CUT
|
LF
|
150.000
|
$130.000
|
$114.000
|
$108.500
|
$107.000
|
$109.000
|
$195.000
|
$107.000
|
|
|
CARRIER PIPE (6") BORE OR TUNNEL
|
LF
|
38.000
|
$150.000
|
$83.000
|
$97.000
|
$78.000
|
$97.000
|
$85.000
|
$78.000
|
|
|
CARRIER PIPE (12") BORE OR TUNNEL
|
LF
|
1,075.000
|
$140.000
|
$95.000
|
$108.500
|
$89.000
|
$109.000
|
$35.000
|
$89.000
|
|
|
GATE VALVE W BOX (4")
|
EA
|
1.000
|
$1,250.000
|
$1,630.000
|
$2,772.000
|
$1,525.000
|
$2,772.000
|
$65.000
|
$1,525.000
|
|
|
GATE VALVE W BOX (6")
|
EA
|
1.000
|
$1,500.000
|
$1,740.000
|
$2,850.000
|
$1,630.000
|
$2,850.000
|
$2,150.000
|
$1,630.000
|
|
|
GATE VALVE W BOX (8")
|
EA
|
4.000
|
$2,000.000
|
$2,400.000
|
$3,884.500
|
$2,242.000
|
$3,885.000
|
$2,500.000
|
$2,242.000
|
|
|
GATE VALVE W BOX (12")
|
EA
|
12.000
|
$3,500.000
|
$4,200.000
|
$5,624.000
|
$3,973.000
|
$5,624.000
|
$3,250.000
|
$3,973.000
|
|
|
GATE VALVE W BOX (16")
|
EA
|
1.000
|
$8,000.000
|
$9,700.000
|
$11,354.500
|
$9,110.000
|
$11,354.000
|
$5,000.000
|
$9,110.000
|
|
|
GROUT ABANDONMENT WATER MAIN (4")
|
LF
|
127.000
|
$50.000
|
$37.000
|
$114.500
|
$35.000
|
$115.000
|
$40.000
|
$35.000
|
|
|
GROUT ABANDONMENT WATER MAIN (12")
|
LF
|
36.000
|
$61.000
|
$45.000
|
$138.000
|
$42.000
|
$138.000
|
$40.000
|
$42.000
|
|
|
REMOVE EXIST WATER LINE (4")
|
LF
|
486.000
|
$5.000
|
$21.000
|
$19.500
|
$20.000
|
$20.000
|
$60.000
|
$20.000
|
|
|
REMOVE EXIST WATER LINE (6")
|
LF
|
255.000
|
$5.000
|
$21.000
|
$19.500
|
$20.000
|
$20.000
|
$30.000
|
$20.000
|
|
|
REMOVE EXIST WATER LINE (8")
|
LF
|
2,162.000
|
$5.000
|
$21.000
|
$15.000
|
$20.000
|
$21.000
|
$40.000
|
$20.000
|
|
|
REMOVE EXIST WATER LINE (12")
|
LF
|
3,613.000
|
$5.000
|
$22.000
|
$15.500
|
$21.000
|
$16.000
|
$35.000
|
$21.000
|
|
|
DUCTILE IRON FITTINGS W/ RESTRAIN
|
TON
|
9.660
|
$10,000.000
|
$13,600.000
|
$651.500
|
$12,770.000
|
$652.000
|
$40.000
|
$12,770.000
|
|
|
CUT-IN TEE (COMPLETE)(6"X6")
|
EA
|
1.000
|
$10,000.000
|
$7,500.000
|
$8,282.500
|
$6,996.000
|
$8,282.000
|
$18,750.000
|
$6,996.000
|
|
|
CUT-IN TEE (COMPLETE)(8"X8")
|
EA
|
1.000
|
$12,000.000
|
$8,000.000
|
$8,892.000
|
$7,540.000
|
$8,892.000
|
$4,500.000
|
$7,540.000
|
|
|
WATER (TIE-IN)(COMPL) (4")
|
EA
|
1.000
|
$1,000.000
|
$4,100.000
|
$7,336.500
|
$3,822.000
|
$7,337.000
|
$5,000.000
|
$3,822.000
|
|
|
WATER (TIE-IN)(COMPL) (6")
|
EA
|
1.000
|
$1,000.000
|
$4,700.000
|
$7,460.000
|
$4,390.000
|
$7,460.000
|
$2,000.000
|
$4,390.000
|
|
|
WATER (TIE-IN)(COMPL) (8")
|
EA
|
4.000
|
$1,100.000
|
$6,800.000
|
$7,526.500
|
$6,376.000
|
$7,526.000
|
$3,000.000
|
$6,376.000
|
|
|
WATER (TIE-IN)(COMPL) (12")
|
EA
|
9.000
|
$1,640.000
|
$7,200.000
|
$7,891.500
|
$6,724.000
|
$7,892.000
|
$4,150.000
|
$6,724.000
|
|
|
WATER (TIE-IN)(COMPL) (16")
|
EA
|
1.000
|
$3,500.000
|
$7,900.000
|
$8,730.500
|
$7,403.000
|
$8,730.000
|
$4,750.000
|
$7,403.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
7,609.000
|
$5.000
|
$4.900
|
$2.600
|
$4.600
|
$3.000
|
$5.000
|
$4.600
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
9.000
|
$1,643.000
|
$3,000.000
|
$2,382.500
|
$2,800.000
|
$2,383.000
|
$5.000
|
$2,800.000
|
|
|
RELAY SHORT SERVICE (3/4")
|
EA
|
21.000
|
$1,535.000
|
$2,200.000
|
$4,089.000
|
$2,105.000
|
$4,089.000
|
$250.000
|
$2,105.000
|
|
|
RELAY SHORT SERVICE (1")
|
EA
|
1.000
|
$2,000.000
|
$2,500.000
|
$4,340.500
|
$2,344.000
|
$4,340.000
|
$3,500.000
|
$2,344.000
|
|
|
2" BLOW OFF VALVE
|
EA
|
4.000
|
$1,080.000
|
$3,600.000
|
$3,021.500
|
$3,358.000
|
$3,021.000
|
$3,750.000
|
$3,358.000
|
|
|
WATER (JACKING, BORING, OR TUNNELING)
|
LF
|
989.000
|
$500.000
|
$640.000
|
$668.500
|
$596.000
|
$568.000
|
$700.000
|
$596.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
13.000
|
$5,480.000
|
$8,600.000
|
$8,320.000
|
$8,078.000
|
$8,320.000
|
$700.000
|
$8,078.000
|
|
|
STRUCTURAL EXCAVATION (AC PIPE RMVL)
|
CY
|
1,369.000
|
$75.000
|
$68.000
|
$16.500
|
$64.000
|
$17.000
|
$45.000
|
$64.000
|
|
Totals: |
$47,767,491.020
|
$40,761,847.185
|
$40,931,639.553
|
$41,173,463.504
|
$41,964,087.000
|
$43,401,768.500
|
$52,249,858.016
|