PREPARING ROW
|
STA
|
182.390
|
$390.000
|
$390.000
|
$1,000.000
|
$2,125.000
|
$800.000
|
$885.500
|
$4,037.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
163.000
|
$15.000
|
$9.100
|
$10.000
|
$5.000
|
$53.000
|
$50.800
|
$13.980
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
23,021.570
|
$12.000
|
$12.000
|
$10.000
|
$3.000
|
$4.400
|
$11.300
|
$3.960
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
12,593.790
|
$11.000
|
$8.500
|
$10.000
|
$9.000
|
$15.000
|
$10.900
|
$10.770
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
48,785.000
|
$0.650
|
$0.500
|
$0.500
|
$0.400
|
$0.530
|
$2.100
|
$0.360
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
48,785.000
|
$0.180
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.090
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
48,785.000
|
$0.110
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
488.000
|
$12.000
|
$21.000
|
$10.000
|
$15.000
|
$26.000
|
$20.000
|
$24.660
|
|
|
WILDFLOWER SEEDING
|
AC
|
10.080
|
$200.000
|
$1,500.000
|
$1,500.000
|
$1,300.000
|
$1,356.000
|
$1,295.000
|
$1,275.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
97,382.000
|
$20.000
|
$19.500
|
$20.000
|
$21.000
|
$20.600
|
$23.000
|
$21.260
|
|
|
REWORK BS MTL (TY B)(15")(ORD COMP)
|
SY
|
54,593.000
|
$4.000
|
$3.000
|
$5.000
|
$2.150
|
$3.700
|
$8.800
|
$15.330
|
|
|
CEMENT
|
TON
|
1,275.000
|
$156.000
|
$160.000
|
$150.000
|
$150.000
|
$144.000
|
$140.500
|
$141.190
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
104,475.000
|
$4.250
|
$1.200
|
$1.500
|
$1.500
|
$0.860
|
$1.800
|
$1.120
|
|
|
CEM TRT(PLNT MX)(CL M)(TYD)(GR1-2)(10")
|
SY
|
3,000.000
|
$30.000
|
$36.000
|
$35.000
|
$25.000
|
$29.250
|
$37.500
|
$27.630
|
|
|
ASPH (HFRS-2P)
|
GAL
|
28,052.640
|
$3.200
|
$3.500
|
$3.000
|
$2.750
|
$3.150
|
$3.100
|
$3.400
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
742.000
|
$100.000
|
$98.500
|
$85.000
|
$160.000
|
$151.000
|
$86.800
|
$151.630
|
|
|
CONC PVMT (JC) (TRANSITION SLAB)
|
SY
|
77.000
|
$125.000
|
$270.000
|
$300.000
|
$175.000
|
$159.000
|
$152.500
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
112.000
|
$130.000
|
$110.000
|
$125.000
|
$56.000
|
$106.000
|
$101.500
|
$37.650
|
|
|
CUT & RESTORING PAV
|
SY
|
82.930
|
$48.000
|
$180.000
|
$50.000
|
$80.000
|
$159.000
|
$152.500
|
$89.230
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
233.000
|
$8.470
|
$1.000
|
$10.000
|
$10.000
|
$12.750
|
$12.200
|
$2.120
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,170.000
|
$242.000
|
$15.000
|
$25.000
|
$50.000
|
$53.000
|
$50.800
|
$15.640
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
136.000
|
$260.000
|
$200.000
|
$200.000
|
$180.000
|
$186.000
|
$178.000
|
$175.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
28.000
|
$284.000
|
$290.000
|
$300.000
|
$260.000
|
$265.000
|
$254.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$499.300
|
$780.000
|
$500.000
|
$525.000
|
$478.000
|
$457.000
|
$879.490
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
37.520
|
$428.820
|
$400.000
|
$500.000
|
$525.000
|
$531.000
|
$508.000
|
$476.080
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
5.950
|
$600.000
|
$640.000
|
$1,500.000
|
$525.000
|
$531.000
|
$457.000
|
$1,155.660
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
3.580
|
$138.290
|
$120.000
|
$350.000
|
$500.000
|
$106.000
|
$101.500
|
$554.830
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$460.540
|
$470.000
|
$500.000
|
$525.000
|
$600.000
|
$559.000
|
$532.290
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
54.000
|
$62.000
|
$71.000
|
$50.000
|
$60.000
|
$53.000
|
$50.800
|
$59.450
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
24.000
|
$80.000
|
$100.000
|
$70.000
|
$90.000
|
$95.000
|
$91.400
|
$110.480
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
30.000
|
$150.000
|
$110.000
|
$90.000
|
$90.000
|
$180.000
|
$172.500
|
$105.730
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
96.000
|
$320.000
|
$290.000
|
$400.000
|
$350.000
|
$638.000
|
$609.500
|
$315.660
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
18.000
|
$502.000
|
$470.000
|
$500.000
|
$850.000
|
$690.000
|
$660.500
|
$734.750
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
38.000
|
$560.000
|
$490.000
|
$600.000
|
$850.000
|
$797.000
|
$762.000
|
$914.940
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
42.000
|
$750.000
|
$530.000
|
$700.000
|
$800.000
|
$850.000
|
$812.500
|
$866.420
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
568.000
|
$90.000
|
$69.000
|
$60.000
|
$100.000
|
$59.000
|
$56.900
|
$58.370
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
283.000
|
$80.000
|
$76.000
|
$70.000
|
$125.000
|
$104.000
|
$99.600
|
$66.510
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
114.000
|
$120.000
|
$100.000
|
$80.000
|
$175.000
|
$133.000
|
$127.000
|
$101.230
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
86.000
|
$135.000
|
$210.000
|
$120.000
|
$225.000
|
$212.000
|
$203.000
|
$112.760
|
|
|
HEADWALL (CH - PW - S) (DIA= 18 IN)
|
EA
|
2.000
|
$2,000.000
|
$4,500.000
|
$4,000.000
|
$5,000.000
|
$3,722.000
|
$3,556.000
|
$6,368.510
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
1.000
|
$4,600.000
|
$6,400.000
|
$6,000.000
|
$7,500.000
|
$4,786.000
|
$4,572.000
|
$6,800.050
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$7,700.000
|
$8,700.000
|
$10,000.000
|
$10,000.000
|
$9,040.000
|
$8,635.000
|
$11,056.640
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$7,960.000
|
$10,000.000
|
$15,000.000
|
$15,000.000
|
$12,764.000
|
$12,191.000
|
$14,780.080
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
4.000
|
$12,000.000
|
$16,000.000
|
$20,000.000
|
$20,000.000
|
$19,146.000
|
$18,286.000
|
$42,752.800
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$780.000
|
$740.000
|
$700.000
|
$1,150.000
|
$797.000
|
$762.000
|
$1,067.840
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,000.000
|
$820.000
|
$800.000
|
$1,050.000
|
$850.000
|
$812.500
|
$1,166.470
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$930.000
|
$910.000
|
$900.000
|
$1,150.000
|
$900.000
|
$863.500
|
$1,197.860
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$850.000
|
$940.000
|
$1,000.000
|
$1,100.000
|
$900.000
|
$863.500
|
$1,203.070
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
$1,300.000
|
$950.000
|
$914.500
|
$1,427.890
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,190.000
|
$1,300.000
|
$1,400.000
|
$1,400.000
|
$1,060.000
|
$1,016.000
|
$1,542.870
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,500.000
|
$1,900.000
|
$2,200.000
|
$1,750.000
|
$2,659.000
|
$2,540.000
|
$2,157.630
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,650.000
|
$3,600.000
|
$2,700.000
|
$2,350.000
|
$3,722.000
|
$3,556.000
|
$4,776.490
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,350.000
|
$2,400.000
|
$1,800.000
|
$2,600.000
|
$3,190.000
|
$3,048.000
|
$3,192.890
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$2,800.000
|
$2,400.000
|
$3,600.000
|
$3,700.000
|
$3,556.000
|
$3,825.560
|
|
|
REMOV STR (SET)
|
EA
|
67.000
|
$260.000
|
$180.000
|
$350.000
|
$300.000
|
$531.000
|
$508.000
|
$281.360
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,660.000
|
$1,200.000
|
$2,500.000
|
$1,500.000
|
$1,276.000
|
$1,219.000
|
$1,681.720
|
|
|
REMOV STR (PIPE)
|
LF
|
63.000
|
$19.000
|
$15.000
|
$15.000
|
$15.000
|
$32.000
|
$30.500
|
$44.670
|
|
|
REMOV STR (PIPE)
|
EA
|
11.000
|
$370.190
|
$450.000
|
$350.000
|
$500.000
|
$900.000
|
$863.500
|
$829.120
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$228,000.000
|
$600,000.000
|
$500,000.000
|
$461,000.000
|
$500,000.000
|
$880,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$2,500.000
|
$22,000.000
|
$3,000.000
|
$900.000
|
$18,000.000
|
$1,000.000
|
$18,672.830
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,240.000
|
$27.000
|
$32.500
|
$30.000
|
$29.000
|
$29.780
|
$28.500
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,240.000
|
$8.000
|
$10.500
|
$3.000
|
$8.000
|
$9.570
|
$9.150
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,855.000
|
$4.000
|
$2.700
|
$3.000
|
$2.800
|
$2.500
|
$2.400
|
$2.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,855.000
|
$0.850
|
$0.900
|
$0.500
|
$0.500
|
$0.800
|
$0.750
|
$0.700
|
|
|
INTERSECTIONS (ACP)
|
SY
|
437.000
|
$30.000
|
$30.000
|
$35.000
|
$52.500
|
$47.750
|
$62.000
|
$70.980
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
3,182.000
|
$2.200
|
$6.900
|
$30.000
|
$33.500
|
$36.500
|
$6.100
|
$32.870
|
|
|
DRIVEWAYS (CONC)
|
SY
|
270.000
|
$91.000
|
$87.000
|
$75.000
|
$65.000
|
$132.000
|
$127.000
|
$81.230
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,304.000
|
$22.000
|
$35.000
|
$30.000
|
$50.000
|
$43.000
|
$35.100
|
$31.990
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
6,205.000
|
$6.000
|
$24.000
|
$25.000
|
$25.000
|
$29.000
|
$6.100
|
$35.370
|
|
|
TURNOUTS (ACP)
|
SY
|
683.000
|
$46.000
|
$34.000
|
$35.000
|
$45.000
|
$50.000
|
$18.900
|
$99.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
36,590.000
|
$0.300
|
$0.200
|
$0.220
|
$0.150
|
$0.160
|
$0.300
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
36,991.000
|
$0.500
|
$0.100
|
$0.220
|
$0.150
|
$0.160
|
$0.300
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
425.000
|
$23.280
|
$22.500
|
$30.000
|
$22.000
|
$22.340
|
$20.300
|
$19.390
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,328.330
|
$2,100.000
|
$1,200.000
|
$1,050.000
|
$1,090.000
|
$1,118.000
|
$1,810.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,627.300
|
$3,300.000
|
$2,600.000
|
$2,350.000
|
$2,600.000
|
$2,514.000
|
$2,880.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
17.000
|
$150.000
|
$310.000
|
$300.000
|
$130.000
|
$132.000
|
$127.000
|
$269.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
7.000
|
$200.000
|
$340.000
|
$350.000
|
$170.000
|
$175.000
|
$167.500
|
$295.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
10.000
|
$500.000
|
$570.000
|
$700.000
|
$475.000
|
$478.000
|
$457.000
|
$495.000
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
17.000
|
$4,000.000
|
$3,300.000
|
$3,200.000
|
$3,000.000
|
$3,084.000
|
$2,946.000
|
$2,900.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
5,755.000
|
$10.000
|
$6.900
|
$7.000
|
$6.250
|
$6.380
|
$6.100
|
$6.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,175.000
|
$22.000
|
$11.500
|
$12.000
|
$10.500
|
$10.640
|
$10.200
|
$10.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
22,100.000
|
$1.500
|
$1.500
|
$1.500
|
$1.350
|
$1.380
|
$1.300
|
$1.300
|
|
|
TRAY CABLE (4 CONDR) (8 AWG)
|
LF
|
210.000
|
$2.500
|
$2.300
|
$2.200
|
$2.100
|
$2.130
|
$2.050
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
30.000
|
$1,100.000
|
$860.000
|
$800.000
|
$800.000
|
$797.000
|
$762.000
|
$750.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
305.000
|
$5.000
|
$1.000
|
$1.000
|
$0.950
|
$0.960
|
$0.900
|
$0.900
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,500.000
|
$4,500.000
|
$4,000.000
|
$4,000.000
|
$4,148.430
|
$3,962.000
|
$3,900.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
|
EA
|
2.000
|
$5,500.000
|
$4,500.000
|
$4,000.000
|
$4,000.000
|
$4,148.430
|
$3,962.000
|
$3,900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
18.000
|
$500.000
|
$470.000
|
$350.000
|
$300.000
|
$313.790
|
$299.500
|
$407.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$560.000
|
$680.000
|
$500.000
|
$400.000
|
$420.160
|
$401.500
|
$588.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$726.740
|
$680.000
|
$650.000
|
$500.000
|
$526.530
|
$503.000
|
$591.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$370.000
|
$340.000
|
$300.000
|
$185.000
|
$186.150
|
$178.000
|
$295.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
7.000
|
$456.000
|
$350.000
|
$500.000
|
$320.000
|
$319.110
|
$305.000
|
$305.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$98.000
|
$86.500
|
$100.000
|
$50.000
|
$95.730
|
$86.400
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
26.000
|
$67.000
|
$90.000
|
$100.000
|
$75.000
|
$63.820
|
$61.000
|
$78.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
26.000
|
$22.000
|
$25.000
|
$25.000
|
$5.000
|
$26.590
|
$25.400
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$40.000
|
$21.000
|
$35.000
|
$40.000
|
$31.910
|
$30.500
|
$18.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,874.000
|
$0.900
|
$0.750
|
$1.500
|
$1.000
|
$1.000
|
$2.000
|
$0.820
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
430.000
|
$1.100
|
$0.700
|
$1.500
|
$1.300
|
$1.380
|
$1.300
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
180.000
|
$1.000
|
$0.800
|
$1.250
|
$1.050
|
$1.060
|
$1.000
|
$0.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
124.000
|
$7.500
|
$12.500
|
$8.000
|
$7.250
|
$7.450
|
$7.100
|
$11.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$193.000
|
$440.000
|
$200.000
|
$170.000
|
$175.510
|
$167.500
|
$385.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
74,568.000
|
$0.450
|
$0.400
|
$0.330
|
$0.300
|
$0.320
|
$0.300
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
9,298.000
|
$0.420
|
$0.400
|
$0.330
|
$0.300
|
$0.320
|
$0.300
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
74,669.000
|
$0.450
|
$0.400
|
$0.330
|
$0.300
|
$0.320
|
$0.300
|
$0.300
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
19.000
|
$491.690
|
$550.000
|
$450.000
|
$450.000
|
$452.070
|
$432.000
|
$480.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
17.000
|
$3.200
|
$4.600
|
$5.000
|
$4.000
|
$4.040
|
$3.850
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
948.000
|
$3.800
|
$4.600
|
$5.000
|
$4.000
|
$4.040
|
$3.850
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
30.000
|
$3.500
|
$4.000
|
$3.000
|
$2.250
|
$2.290
|
$2.200
|
$3.500
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$9,400.000
|
$3,500.000
|
$4,000.000
|
$3,150.000
|
$3,191.100
|
$3,048.000
|
$3,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$150.000
|
$210.000
|
$200.000
|
$200.000
|
$191.470
|
$183.000
|
$180.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
2.000
|
$150.000
|
$210.000
|
$200.000
|
$200.000
|
$191.470
|
$183.000
|
$180.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
6.000
|
$60.000
|
$46.000
|
$50.000
|
$42.500
|
$42.550
|
$40.600
|
$40.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
305.000
|
$3.000
|
$1.400
|
$2.000
|
$1.300
|
$1.330
|
$1.250
|
$1.250
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
2.000
|
$5,700.000
|
$4,500.000
|
$4,000.000
|
$4,100.000
|
$4,148.430
|
$3,962.000
|
$3,900.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
16,275.000
|
$85.000
|
$79.000
|
$75.000
|
$77.000
|
$83.150
|
$85.200
|
$86.270
|
|
|
INSTALL LUMINAIRE 250 W EQ (LED)
|
EA
|
19.000
|
$550.000
|
$460.000
|
$500.000
|
$425.000
|
$425.480
|
$406.500
|
$400.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$150.000
|
$54.500
|
$100.000
|
$100.000
|
$127.000
|
$62.300
|
$418.280
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,400.000
|
$7,500.000
|
$7,500.000
|
$10,000.000
|
$22,000.000
|
$5,080.000
|
$7,842.800
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$200.000
|
$170.000
|
$150.000
|
$100.000
|
$190.000
|
$122.000
|
$586.090
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$600.000
|
$170.000
|
$300.000
|
$100.000
|
$500.000
|
$2,162.000
|
$869.740
|
|
Totals: |
$7,029,554.403
|
$6,403,546.095
|
$6,787,714.890
|
$6,812,110.580
|
$7,072,897.834
|
$7,366,715.036
|
$8,842,716.315
|