Show Job Controls
Bid Cobra

GREGG IH 20 (0495-07-087)

Items: 67

County: GREGG
Length: 0.0000 MILES
Highway: IH 20
District: TYLER
Control Number: 0495-07-087
DBE Goal: 5.0%
Project: F 2025(411)
Guaranty: $52,000.00
Time: 52 WORKING DAYS
Engineer's Estimate: $2,575,629.45
Date: 02/07/2025 (1 year ago)
Contract Number: 2253209
Type: RESURFACE ROADWAY
Project ID: A00209767
Contract Type: Federal
Project Description: 6" BASE REPAIR IN ACP, REMOVE AND REPLACE 1.5" PFC
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,575,629.45
$2,992,886.20
Over/Under Est: 16.2% $417,256.75
Over/Under Est: 18.39% $473,541.84
Amt Left: 1.88% $56,285.09
Over/Under Est: 57.15% $1,471,946.22
Amt Left: 35.24% $1,054,689.47
Delta: -32.74% -$998,404.38
Subcontractor Percentage Amount
FNH CONSTRUCTION, LLC 7.25% $216,984.25
INNOVATIVE ROADWAY SOLUTIONS, LLC 3.84% $114,926.83
DIIBS SPECIALISTS, LLC 3.03% $90,684.45
FNH CONSTRUCTION, LLC 1.30% $38,907.52
SYNERGY SIGNS & SERVICES LLC 0.36% $10,774.39
DIAMOND ELITE BARRICADES, LLC 0.19% $5,686.48
WEST TEXAS ROCK RESOURCES, LLC 0.13% $3,890.75
Total: 16.10% $481,854.67

Bid Items & Bid Tabulations

67 Total 0 of 67
GREGG  |  IH 20  |  TYLER  |  0495-07-087  |  02/07/2025  |  $2,575,629.45  |  F 2025(411)  |  RESURF ROADWAY  |  52 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GREY SKY CONSTRUCTION LLC
LONGVIEW BRIDGE AND ROAD, LTD.
MADDEN CONTRACTING COMPANY, LLC.
REMOV CONC (MOWSTRIP)
LF 1,774.000 $14.300 $50.000 $15.000 $13.250
EMBANK (VEH)(OC)(TY C)
CY 63.000 $22.000 $50.000 $65.000 $85.000
BACKFILL (TY A)
STA 174.000 $260.000 $250.000 $350.000 $292.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 7,734.000 $0.750 $1.000 $0.210 $0.160
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 15,468.000 $0.600 $0.500 $0.800 $0.610
BOND FBR MTRX SEED (TEMP)(WARM)
SY 7,734.000 $0.900 $0.500 $0.750 $0.550
BOND FBR MTRX SEED (TEMP)(COOL)
SY 7,734.000 $0.600 $0.500 $0.800 $0.580
VEGETATIVE WATERING
TGL 425.000 $225.240 $15.000 $15.000 $26.000
SP MIXES SP-C SAC-A PG70-22
TON 350.000 $190.000 $180.000 $200.000 $447.750
SP MIXES SP-C SAC-A PG76-22
TON 1,595.000 $190.000 $180.000 $190.000 $312.250
TBPFC (MEMBRANE)
GAL 20,095.000 $3.950 $6.000 $6.000 $5.000
TBPFC-C PG76-22 SAC-A
TON 4,567.000 $190.000 $225.000 $220.000 $325.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,000.000 $55.000 $40.000 $65.000 $95.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,000.000 $85.000 $60.000 $85.000 $112.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,161.000 $3.750 $10.000 $6.000 $16.000
PLANE ASPH CONC PAV(2")
SY 1,021.000 $4.760 $10.000 $9.000 $19.500
PLANE ASPH CONC PAV(3")
SY 9,664.000 $6.200 $5.000 $4.000 $10.000
PLANE ASPH CONC PAV (1.5")
SY 61,061.000 $2.500 $3.500 $3.500 $6.000
RIPRAP (MOW STRIP)(4 IN)
CY 54.000 $475.000 $500.000 $800.000 $785.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,390.000 $30.000 $50.000 $50.000 $43.350
MOBILIZATION
LS 1.000 $75,000.000 $260,000.000 $300,000.000 $428,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $8,000.000 $15,000.000 $10,000.000 $7,250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $150.000 $150.000 $150.000 $100.000
TMA (STATIONARY)
DAY 60.000 $290.000 $250.000 $275.000 $300.000
TMA (MOBILE OPERATION)
DAY 60.000 $240.000 $350.000 $350.000 $0.010
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 34,804.000 $1.650 $0.300 $0.500 $0.640
MTL W-BEAM GD FEN (STEEL POST)
LF 1,774.000 $34.950 $35.000 $32.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,800.000 $1,850.000 $2,500.000 $2,143.000
TERMINAL ANCHOR SECTION
EA 2.000 $450.000 $1,850.000 $1,500.000 $1,300.000
REMOVE METAL BEAM GUARD FENCE
LF 1,774.000 $4.350 $3.000 $3.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $1,200.000 $500.000 $300.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $225.000 $500.000 $175.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,028.000 $3,250.000 $3,300.000 $2,925.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $450.000 $1,500.000 $250.000 $200.000
ALUMINUM SIGNS (TY A)
SF 21.250 $41.550 $50.000 $120.000 $38.000
ALUMINUM SIGNS (TY G)
SF 280.500 $27.700 $50.000 $40.000 $34.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 532.500 $44.000 $30.000 $40.000 $36.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $842.000 $1,500.000 $975.000 $753.290
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $995.000 $1,500.000 $1,200.000 $926.360
REMOVE SM RD SN SUP&AM
EA 10.000 $167.830 $50.000 $175.000 $132.100
INSTALL LRSS (STRUCT STEEL)
LB 1,077.500 $5.900 $20.000 $9.000 $7.750
REMOVE LRSA
EA 6.000 $825.000 $2,500.000 $1,400.000 $1,250.000
REMOVE OVERHD SIGN SUP
EA 5.000 $7,800.000 $10,000.000 $8,250.000 $7,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 23.000 $34.000 $100.000 $120.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 18.000 $55.000 $100.000 $30.000 $20.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 33,600.000 $0.720 $0.750 $0.350 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 297.000 $8.410 $0.750 $6.600 $6.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 33,600.000 $0.720 $0.500 $0.350 $0.300
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 964.000 $1.400 $0.750 $1.200 $1.850
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 186.000 $1.940 $0.750 $1.200 $1.850
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 327.000 $2.600 $6.000 $1.200 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 328.000 $1.600 $0.750 $2.200 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,537.000 $2.260 $0.750 $1.300 $1.150
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 727.000 $3.800 $5.000 $5.000 $4.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 594.000 $6.300 $20.000 $6.600 $6.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 4,351.000 $0.830 $0.750 $1.100 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 18,173.000 $0.750 $0.750 $0.900 $0.720
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 18,668.000 $0.750 $0.750 $0.900 $0.720
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 82.000 $3.070 $6.000 $5.500 $5.000
PREFAB PM TY C (W)(WORD)
EA 6.000 $280.000 $250.000 $280.000 $255.000
REFL PAV MRKR TY II-C-R
EA 651.000 $4.500 $6.000 $6.250 $5.600
ELIM EXT PM & MRKS (ENTR GORE)
EA 5.000 $300.330 $250.000 $330.000 $300.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 5.000 $592.440 $250.000 $550.000 $500.000
FULL - WIDTH MOWING
CYC 2.000 $14,000.000 $2,500.000 $7,000.000 $3,000.000
LITTER REMOVAL
CYC 2.000 $2,791.000 $2,500.000 $5,000.000 $1,000.000
FRICTIONAL ASPH SURF PRESERV TRTMT
SY 32,976.000 $2.000 $3.000 $4.600 $2.730
MEMBRANE UNDERSEAL
GAL 2,569.000 $5.750 $6.000 $6.000 $5.000
Totals: $2,575,629.448 $2,992,886.200 $3,049,171.290 $4,047,575.665