Show Job Controls
Bid Cobra

GRAYSON US 75 (0047-18-089)

Items: 349

County: GRAYSON
Length: N/A
Highway: US 75
District: PARIS
Control Number: 0047-18-089
DBE Goal: N/A
Project: F 2B23(048)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $172,021,664.81
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
AARON BLOOM
MELESE NORCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$172,021,664.81
$196,535,604.84
Over/Under Est: 14.25% $24,513,940.03
Over/Under Est: 23.87% $41,062,078.38
Amt Left: 8.42% $16,548,138.35
Over/Under Est: 26.87% $46,221,461.41
Amt Left: 11.05% $21,707,521.38
Delta: -2.42% -$5,159,383.03
$225,300,604.42
Over/Under Est: 30.97% $53,278,939.61
Amt Left: 14.64% $28,764,999.58
Delta: -3.23% -$7,057,478.20
Subcontractor Percentage Amount
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 10.00% $19,094,794.56
REINHOLD ELECTRIC, INC 4.03% $7,695,202.21
TORO BRAVO CONSTRUCTION, LLC 3.43% $6,549,514.54
RED TOP TRUCKING LLC 2.97% $5,671,153.99
GROVECREST CONSTRUCTION LLC 1.92% $3,666,200.56
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.69% $3,227,020.28
OSCAR ORDUNO, INC. 1.52% $2,902,408.77
TEXAS SHAFTS, INC. 1.43% $2,730,555.62
A R DANIEL CONSTRUCTION SERVICES, INCORPORATED 1.22% $2,329,564.94
INSITUFORM TECHNOLOGIES, LLC 0.38% $725,602.19
LINDAMOOD, INC. 0.36% $687,412.60
MCRYAN HAULING, INC. 0.33% $630,128.22
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.32% $611,033.43
JE CASEY, LLC 0.28% $534,654.25
TEX OP CONSTRUCTION, LP 0.25% $477,369.86
RAMBO CONTRACTING, INC. 0.18% $343,706.30
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.15% $286,421.92
ACT SAW CUTTING & REMOVAL 0.13% $248,232.33
ANTIGO CONSTRUCTION, INC. 0.11% $210,042.74
MOBILE ENTERPRISES, INC. 0.08% $152,758.36
BUYERS BARRICADES, INC. 0.05% $95,473.97
ALLIANCE GEOTECHNICAL GROUP, INC. 0.05% $95,473.97
SCOTT DERR PAINTING CO, LLC 0.04% $76,379.18
SOUTHEAST GRINDING AND GROOVING LLC 0.02% $38,189.59
SOUTHERN CROSS CONTRACTORS, LLC 0.01% $19,094.79
GANT CONTRACTORS, INC. 0.01% $19,094.79
E.P. DRILLING, INC. 0.00% $0.00
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
CHIEF SOLUTIONS, INC. 0.00% $0.00
Total: 30.96% $59,117,483.96

Bid Items & Bid Tabulations

349 Total 0 of 349
GRAYSON  |  US 75  |  PARIS  |  0047-18-089  |  08/03/2023  |  $172,021,664.81  |  F 2B23(048)  |  WIDEN ROAD - ADD LANES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
ZACHRY CONSTRUCTION CORPORATION
WEBBER, LLC
PREPARING ROW
STA 226.000 $500.000 $74,504.000 $86,196.440 $60,966.400 $92,035.390
REMOVING CONC (PAV)
SY 213,334.000 $8.000 $4.420 $6.940 $7.000 $6.250
REMOVING CONC (RIPRAP)
SY 6,995.000 $10.000 $7.230 $4.110 $7.500 $10.500
REMOVING CONC (DRIVEWAYS)
SY 1,371.000 $18.000 $7.970 $11.730 $13.000 $12.400
REMOVING CONC (CURB)
LF 1,510.000 $10.000 $8.100 $6.970 $8.000 $4.050
REMOVING CONC (CURB AND GUTTER)
LF 235.000 $20.000 $20.270 $9.340 $20.000 $5.200
REMOVING CONC (CTB)
LF 1,587.000 $12.000 $8.750 $17.530 $27.000 $41.750
REMOVING CONC (SIDEWALK OR RAMP)
SY 86.000 $30.000 $7.470 $9.520 $70.000 $53.000
REMOVING CONC (PAVERS)
SY 118.000 $10.000 $9.240 $38.700 $27.000 $39.250
REMOVING CONCRETE(MOW STRIP)
LF 4,900.000 $10.000 $3.390 $2.810 $6.000 $3.900
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 1,364.000 $8.000 $5.840 $5.450 $8.000 $6.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 130,841.000 $6.000 $4.040 $2.560 $5.500 $10.200
EXCAVATION (ROADWAY)
CY 937,429.000 $8.000 $6.650 $10.800 $11.720 $9.350
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 572,962.000 $8.500 $3.200 $5.170 $5.760 $9.500
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 64,411.000 $5.700 $11.440 $5.650 $10.000 $3.600
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 373,706.000 $13.000 $11.790 $28.200 $25.000 $16.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 12,216.000 $40.000 $50.720 $4.440 $60.000 $59.250
FURNISHING AND PLACING TOPSOIL (4")
SY 905,671.000 $0.850 $1.780 $1.370 $1.350 $1.250
BLOCK SODDING
SY 905,671.000 $1.500 $3.470 $3.400 $3.400 $3.400
BROADCAST SEED (TEMP) (WARM)
SY 98,764.000 $0.150 $0.140 $0.140 $0.140 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 98,764.000 $0.150 $0.140 $0.140 $0.140 $0.150
VEGETATIVE WATERING
MG 3,310.000 $20.000 $60.330 $59.000 $35.000 $25.200
PROOF ROLLING
HR 100.000 $143.590 $241.310 $441.620 $180.000 $98.250
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 72,638.000 $55.000 $30.170 $53.000 $70.000 $53.250
LIME (HYDRATED LIME (DRY))
TON 48.000 $281.500 $753.330 $400.000 $375.000 $425.000
LIME TRT (EXST MATL)(8")
SY 2,671.000 $5.500 $10.930 $33.210 $9.000 $9.000
PRIME COAT (MC-30)
GAL 96,225.000 $6.000 $7.990 $5.100 $7.500 $7.550
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 7,242.000 $3.170 $2.690 $3.490 $3.000 $2.700
PLANE ASPH CONC PAV (2")
SY 272.000 $2.570 $23.860 $5.030 $9.000 $22.900
CONC PVMT (CONT REINF - CRCP) (9")
SY 28,378.000 $80.000 $73.290 $77.160 $88.000 $78.250
CONC PVMT (CONT REINF - CRCP) (13")
SY 274,030.000 $85.000 $85.850 $87.660 $105.000 $88.750
FULL - DEPTH REPAIR CRCP (10")
SY 12,000.000 $215.000 $170.760 $257.000 $350.000 $275.000
CEM STABIL BKFL
CY 20,696.000 $180.000 $136.150 $136.280 $160.000 $155.000
CUT & RESTORING PAV
SY 1,750.000 $100.000 $137.220 $140.400 $150.000 $67.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 1,541.000 $80.000 $138.130 $120.590 $165.000 $156.000
TRENCH EXCAVATION PROTECTION
LF 26,284.000 $5.500 $6.580 $4.120 $2.000 $10.000
TEMPORARY SPL SHORING
SF 105,771.000 $33.000 $35.000 $25.000 $35.000 $39.250
DRILL SHAFT (18 IN)
LF 1,192.000 $160.000 $179.220 $159.060 $160.780 $151.000
DRILL SHAFT (24 IN)
LF 90.000 $250.000 $270.750 $169.200 $230.630 $244.000
DRILL SHAFT (36 IN)
LF 10,941.000 $185.000 $267.400 $253.650 $259.980 $179.000
DRILL SHAFT (42 IN)
LF 2,478.000 $335.000 $336.070 $326.990 $328.640 $252.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 56.000 $235.000 $147.480 $175.200 $220.380 $215.000
DRILL SHAFT (SIGN MTS) (30 IN)
LF 326.000 $325.000 $231.760 $262.000 $363.870 $355.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 17.000 $375.000 $316.040 $344.400 $486.880 $475.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 18.000 $435.000 $421.380 $525.600 $563.750 $550.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 104.000 $600.000 $465.760 $591.600 $599.630 $585.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 82.000 $650.000 $571.610 $638.000 $820.000 $800.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 864.000 $868.600 $656.290 $778.800 $978.880 $955.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 110.000 $280.000 $186.300 $274.000 $363.870 $355.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 12.000 $320.000 $210.690 $308.400 $388.480 $379.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 93.000 $485.000 $274.810 $390.800 $488.930 $477.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $550.000 $446.720 $597.600 $706.230 $689.000
CL A CONC (PLUG)
EA 10.000 $2,576.000 $653.320 $1,291.410 $1,200.000 $1,110.000
CL C CONC (ABUT)
CY 706.600 $1,340.000 $1,116.740 $1,321.920 $1,200.000 $1,320.000
CL C CONC (CAP)
CY 584.500 $1,380.000 $1,323.220 $1,329.780 $1,500.000 $1,630.000
CL C CONC (COLUMN)
CY 571.400 $1,300.000 $880.890 $1,179.970 $1,300.000 $1,180.000
CL C CONC (RAIL FOUNDATION)
CY 582.300 $912.500 $386.760 $567.880 $650.000 $409.000
CL C CONC (COLLAR)
EA 3.000 $1,500.000 $3,769.140 $3,351.980 $1,000.000 $1,520.000
REINF CONC SLAB
SF 136,134.000 $23.000 $22.260 $24.330 $28.000 $25.700
BRIDGE MEDIAN
SF 4,021.000 $15.000 $14.220 $10.090 $16.000 $16.300
APPROACH SLAB
CY 1,526.100 $750.000 $705.460 $707.260 $700.000 $600.000
RETAINING WALL (MSE)
SF 127,243.000 $55.000 $60.850 $93.390 $100.000 $103.000
PRESTR CONC GIRDER (TX40)
LF 4,520.240 $190.000 $192.630 $184.940 $180.000 $197.000
PRESTR CONC GIRDER (TX46)
LF 5,717.880 $205.000 $197.670 $200.430 $175.000 $189.000
PRESTR CONC GIRDER (TX54)
LF 8,599.840 $225.000 $203.520 $228.410 $185.000 $207.000
SILICONE RESIN PAINT FINISH
SF 23,133.000 $2.000 $3.420 $3.400 $3.400 $3.400
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 1,000.000 $165.000 $147.580 $145.000 $300.000 $100.000
RIPRAP (CONC)(4 IN)
CY 2,363.440 $550.000 $540.700 $650.000 $550.000 $382.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 1,183.000 $650.000 $540.700 $710.540 $600.000 $400.000
RIPRAP (CONC) (CL B) (4")
CY 3.850 $610.000 $663.120 $711.010 $2,500.000 $645.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 6,783.000 $215.000 $239.870 $265.000 $135.000 $268.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 3,789.000 $200.000 $125.940 $135.000 $105.000 $161.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 554.000 $225.000 $119.100 $145.000 $125.000 $172.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 3,317.000 $270.000 $135.770 $135.000 $100.000 $208.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,153.000 $550.000 $571.300 $610.400 $750.000 $455.000
RAIL (TY SSTR)
LF 14,000.000 $75.000 $64.890 $61.450 $55.000 $53.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 767.700 $75.000 $141.540 $92.170 $62.000 $83.250
RAIL (TY T80PP)
LF 1,441.000 $180.000 $130.210 $153.830 $105.000 $128.000
RAIL (TY T80PP-TS)
LF 1,153.000 $440.000 $378.940 $360.220 $240.000 $283.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,363.700 $200.000 $192.840 $205.410 $210.000 $187.000
CONC BOX CULV (7 FT X 4 FT)
LF 275.000 $780.000 $621.370 $500.230 $600.000 $634.000
CONC BOX CULV (8 FT X 7 FT)
LF 230.000 $884.300 $822.080 $802.830 $775.000 $808.000
RC PIPE (CL III)(18 IN)
LF 157.000 $80.000 $83.050 $75.040 $70.000 $136.000
RC PIPE (CL III)(24 IN)
LF 23,303.000 $90.000 $100.080 $78.350 $110.000 $153.000
RC PIPE (CL III)(30 IN)
LF 1,856.000 $150.000 $135.340 $94.030 $135.000 $161.000
RC PIPE (CL III)(36 IN)
LF 134.000 $165.000 $163.330 $126.640 $178.000 $203.000
RC PIPE (CL III)(42 IN)
LF 91.000 $215.000 $227.010 $203.330 $250.000 $305.000
RC PIPE (CL III)(48 IN)
LF 321.000 $308.570 $283.340 $183.520 $268.000 $300.000
RC PIPE (CL IV)(42 IN)
LF 182.000 $361.600 $345.540 $193.060 $305.000 $331.000
RC PIPE (CL V)(72 IN)
LF 268.000 $1,000.000 $2,035.500 $783.720 $980.000 $901.000
MANH (COMPL)(PRM)(60IN)
EA 23.000 $6,944.400 $8,526.170 $9,376.330 $10,000.000 $10,570.000
MANH (COMPL)(PRM)(72IN)
EA 6.000 $11,550.000 $13,949.600 $7,269.600 $15,000.000 $8,190.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $20,292.000 $13,458.810 $22,579.790 $15,000.000 $12,100.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 36.000 $7,000.000 $6,856.140 $8,344.870 $9,300.000 $10,890.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 17.000 $8,450.000 $7,586.550 $8,354.870 $10,600.000 $11,140.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 12.000 $7,900.000 $7,586.550 $9,414.870 $10,853.290 $12,430.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 12.000 $8,500.000 $8,429.100 $9,174.870 $11,500.000 $12,210.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 3.000 $9,200.000 $10,314.550 $10,893.530 $13,500.000 $14,130.000
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 1.000 $8,000.000 $9,046.560 $11,248.540 $12,000.000 $14,550.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 1.000 $9,000.000 $9,394.790 $9,943.540 $12,000.000 $13,200.000
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 4.000 $8,000.000 $3,851.970 $18,133.280 $13,200.000 $8,600.000
INLET (COMPL)(PSL)(RC)(5FTX5FT)
EA 6.000 $7,400.000 $12,093.440 $13,214.850 $14,200.000 $14,060.000
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 9.000 $10,500.000 $11,538.440 $12,592.370 $13,600.000 $15,300.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 53.000 $6,000.000 $5,500.900 $8,600.460 $7,537.050 $8,170.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $7,000.000 $6,311.020 $9,637.900 $8,336.210 $9,646.000
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
EA 2.000 $13,000.000 $8,784.610 $12,766.990 $11,299.900 $13,340.000
MANH (COMPL)(RISER ONLY)
EA 2.000 $3,650.000 $20,998.970 $7,144.650 $8,069.260 $7,950.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $9,000.000 $10,843.000 $11,600.040 $17,719.920 $12,030.000
JUNCTION BOX (CIP)(25FTX10FT)
LF 20.000 $7,717.390 $10,300.480 $14,500.000 $11,694.890 $13,760.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $14,000.000 $20,334.340 $22,700.000 $21,113.860 $29,010.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $21,000.000 $37,223.730 $42,000.000 $31,816.670 $41,780.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $16,000.000 $22,188.830 $25,000.000 $20,894.940 $34,850.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $30,000.000 $52,009.070 $53,000.000 $40,531.120 $75,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 8.000 $4,322.730 $1,259.760 $1,655.970 $2,462.220 $2,150.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 10.000 $1,000.000 $2,121.790 $1,816.330 $2,585.650 $2,330.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 76.000 $1,200.000 $2,121.790 $2,331.190 $2,770.800 $2,990.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $4,652.800 $3,670.370 $1,913.970 $4,670.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 4.000 $6,000.000 $3,061.950 $2,659.910 $1,532.630 $4,680.000
JACK BOR OR TUN PIPE(42 IN)(RC)(CL V)
LF 296.000 $1,200.000 $1,330.980 $1,316.120 $1,526.250 $2,000.000
JACK BOR TUN BOX CULV (7 FT X 4 FT)
LF 286.000 $2,000.000 $6,645.040 $6,535.220 $6,854.390 $3,330.000
ADJUSTING INLET (CAP)
EA 15.000 $2,700.000 $12,984.430 $3,467.990 $1,980.470 $1,750.000
PIPE (PVC) (SCH 40) (6 IN)
LF 150.000 $90.000 $138.020 $110.850 $135.590 $85.250
REMOV STR (INLET)
EA 25.000 $936.300 $628.760 $901.010 $906.480 $933.000
REMOV STR (WINGWALL)
EA 7.000 $1,800.000 $1,822.220 $1,767.070 $1,029.840 $2,040.000
REMOV STR (HEADWALL)
EA 6.000 $2,000.000 $1,902.330 $1,767.070 $1,005.590 $1,630.000
REMOV STR (PIPE)
LF 5,248.000 $20.000 $20.020 $23.210 $13.160 $36.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 8.000 $90,000.000 $233,333.330 $63,605.670 $35,000.000 $46,540.000
MOBILIZATION
LS 1.000 $7,650,000.000 $18,145,000.000 $19,641,000.000 $15,000,000.000 $20,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 48.000 $14,000.000 $1,000.000 $4,059.380 $65,000.000 $184,782.710
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,682.000 $30.000 $102.440 $100.380 $100.380 $100.000
ROCK FILTER DAMS (REMOVE)
LF 1,682.000 $10.000 $26.190 $25.660 $25.660 $25.700
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,143.000 $39.750 $40.630 $39.810 $39.810 $39.750
CONSTRUCTION EXITS (REMOVE)
SY 3,143.000 $8.500 $9.130 $8.950 $8.950 $8.950
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,566.000 $3.000 $3.560 $3.490 $3.490 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,566.000 $0.800 $1.000 $0.980 $0.980 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,400.000 $5.000 $5.970 $5.850 $5.850 $5.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,400.000 $1.000 $1.000 $0.980 $0.980 $1.000
CONSTRUCTING DETOURS
SY 48,511.000 $80.000 $113.030 $98.360 $80.000 $111.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 48,723.000 $48.000 $59.960 $78.000 $35.000 $33.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 13,279.000 $45.000 $70.130 $22.150 $20.000 $36.750
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 480.000 $55.000 $73.210 $64.670 $12.000 $79.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 53,292.000 $10.000 $7.200 $3.670 $3.000 $8.250
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 13,489.000 $10.000 $6.510 $7.670 $6.000 $8.400
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 340.000 $10.000 $13.420 $10.260 $7.000 $8.400
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 48,663.000 $15.000 $14.850 $5.910 $13.000 $14.900
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 13,279.000 $13.000 $19.650 $5.640 $11.000 $14.300
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 480.000 $14.240 $20.010 $6.690 $11.000 $14.700
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 17,028.700 $75.000 $73.760 $75.730 $72.000 $62.250
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 1,395.600 $195.000 $239.300 $223.490 $150.000 $229.000
COLORED TEXTURED CONC (4")
SY 170.000 $180.000 $81.490 $125.000 $125.000 $59.750
CONC CURB (MONO) (TY II)
LF 9,586.000 $5.000 $5.140 $1.930 $2.400 $5.850
CONC CURB & GUTTER (TY II)
LF 37,982.000 $40.000 $23.330 $31.320 $32.000 $22.900
DRIVEWAYS (CONC)
SY 1,717.000 $80.000 $71.290 $172.460 $110.000 $104.000
DRIVEWAYS (ACP)
SY 3,318.000 $59.200 $39.590 $29.480 $55.000 $44.750
CONC SIDEWALKS (4")
SY 738.000 $75.000 $61.080 $83.540 $68.000 $94.500
CURB RAMPS (TY 1)
EA 4.000 $1,100.000 $1,888.630 $2,668.540 $1,800.000 $2,500.000
CURB RAMPS (TY 2)
EA 1.000 $2,793.970 $1,990.670 $2,968.630 $2,200.000 $3,000.000
CURB RAMPS (TY 7)
EA 4.000 $1,300.000 $1,786.600 $2,768.540 $2,000.000 $2,800.000
CURB RAMPS (TY 22)
EA 1.000 $2,200.000 $2,602.930 $3,368.630 $2,400.000 $4,000.000
CONC MEDIAN
SY 1,647.000 $70.000 $61.080 $112.590 $100.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 13,100.500 $35.000 $30.530 $24.500 $24.500 $24.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 32.000 $2,300.000 $1,771.020 $2,135.000 $2,135.000 $2,140.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,400.000 $1,384.250 $1,100.000 $1,100.000 $1,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 24.000 $1,500.000 $1,323.170 $1,475.000 $1,475.000 $1,480.000
REMOVE METAL BEAM GUARD FENCE
LF 3,712.500 $2.000 $3.050 $1.500 $1.500 $1.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 7.000 $250.000 $407.130 $195.000 $195.000 $195.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 20.000 $250.000 $407.130 $195.000 $195.000 $195.000
GUARDRAIL END TREATMENT (INSTALL)
EA 43.000 $3,000.000 $3,053.480 $2,775.000 $2,775.000 $2,780.000
GUARDRAIL END TREATMENT (REMOVE)
EA 19.000 $300.000 $610.700 $195.000 $195.000 $195.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 35.000 $2,200.000 $1,284.140 $1,245.000 $1,245.000 $1,250.000
CRASH CUSH ATTEN (REMOVE)
EA 29.000 $1,000.000 $1,027.310 $650.000 $650.000 $650.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $30,000.000 $25,562.280 $25,355.000 $25,355.000 $25,360.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 17.000 $11,550.000 $7,204.560 $7,185.000 $7,185.000 $7,190.000
REMOVE AND INSTALL EXISTING GATE
EA 3.000 $6,500.000 $2,564.040 $2,500.000 $2,500.000 $2,500.000
WIRE FENCE (TY C)
LF 149.000 $20.000 $76.920 $75.000 $75.000 $75.000
PIPE UNDERDRAINS (TY 9) (6")
LF 1,350.000 $195.000 $44.040 $51.390 $57.000 $195.000
REMOVE RD IL ASM (TRANS-BASE)
EA 71.000 $750.000 $407.130 $963.200 $896.880 $875.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $989.000 $1,272.280 $1,200.000 $3,741.250 $3,650.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,034.900 $1,272.280 $1,224.000 $4,346.000 $4,240.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 11.000 $7,155.000 $4,881.500 $5,262.000 $8,353.750 $8,150.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 24.000 $43,796.300 $53,944.790 $50,374.800 $39,554.750 $38,590.000
CONDT (PVC) (SCH 40) (2")
LF 21,627.000 $18.000 $8.140 $13.620 $11.020 $10.800
CONDT (PVC) (SCH 40) (2") (BORE)
LF 4,542.000 $30.000 $19.340 $25.960 $31.780 $31.000
CONDT (PVC) (SCH 40) (3")
LF 599.000 $23.500 $13.230 $16.000 $13.480 $13.200
CONDT (PVC) (SCH 40) (3") (BORE)
LF 899.000 $35.000 $26.460 $29.540 $36.570 $35.750
CONDT (PVC) (SCH 40) (4")
LF 28.000 $27.500 $16.290 $47.760 $31.810 $31.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 807.000 $40.000 $30.530 $33.850 $41.000 $40.000
CONDT (PVC) (SCH 80) (2")
LF 19,260.000 $12.000 $11.200 $13.100 $12.860 $12.600
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,290.000 $31.000 $21.370 $27.510 $32.110 $31.250
CONDT (PVC) (SCH 80) (3")
LF 19,260.000 $25.270 $18.320 $18.420 $13.330 $13.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,290.000 $35.000 $32.570 $31.030 $40.690 $39.750
CONDT (RM) (1")
LF 1,732.000 $18.670 $23.410 $23.600 $33.820 $33.000
CONDT (RM) (2")
LF 270.000 $35.000 $31.550 $45.830 $49.200 $48.000
CONDT (RM) (3")
LF 582.000 $60.440 $64.120 $76.350 $66.630 $65.000
ELEC CONDR (NO.14) INSULATED
LF 21,820.000 $1.300 $0.810 $0.970 $1.520 $1.500
ELEC CONDR (NO.8) BARE
LF 2,578.000 $1.710 $1.530 $1.350 $1.690 $1.650
ELEC CONDR (NO.8) INSULATED
LF 5,156.000 $2.000 $1.530 $1.480 $1.730 $1.700
ELEC CONDR (NO.6) BARE
LF 22,898.000 $2.000 $1.630 $1.640 $2.200 $2.150
ELEC CONDR (NO.6) INSULATED
LF 39,719.000 $2.250 $1.630 $1.820 $3.100 $3.000
ELEC CONDR (NO.4) BARE
LF 5,702.000 $2.510 $2.040 $2.210 $4.610 $4.500
ELEC CONDR (NO.4) INSULATED
LF 11,404.000 $3.000 $2.650 $2.560 $4.360 $4.250
TRAY CABLE (3 CONDR) (12 AWG)
LF 7,624.000 $2.500 $2.040 $1.920 $3.810 $3.700
GROUND BOX TY A (122311)
EA 24.000 $1,075.550 $1,292.640 $1,293.600 $1,022.950 $998.000
GROUND BOX TY A (122311)W/APRON
EA 48.000 $1,200.000 $1,449.380 $1,371.200 $1,122.380 $1,100.000
GROUND BOX TY D (162922)W/APRON
EA 25.000 $1,400.000 $1,449.380 $1,485.200 $1,235.740 $1,210.000
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 9.000 $9,254.330 $8,179.250 $8,092.800 $10,813.750 $10,550.000
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 2.000 $7,000.000 $7,189.930 $7,675.200 $10,127.000 $9,880.000
ALUMINUM SIGNS (TY A)
SF 90.000 $45.000 $22.430 $30.000 $30.000 $66.750
ALUMINUM SIGNS (TY G)
SF 336.000 $40.000 $26.200 $33.000 $33.000 $43.000
ALUMINUM SIGNS (TY O)
SF 3,139.750 $30.000 $26.830 $39.200 $38.000 $38.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 104.000 $762.500 $244.280 $523.000 $523.000 $780.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 7.000 $850.000 $881.440 $752.000 $752.000 $795.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 115.000 $825.000 $709.420 $628.000 $628.000 $889.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 5.000 $725.000 $698.230 $599.000 $599.000 $954.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 1.000 $730.000 $881.440 $749.000 $749.000 $1,070.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $875.000 $766.430 $699.000 $669.000 $1,140.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 7.000 $805.000 $852.940 $786.000 $786.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $998.500 $1,067.700 $939.000 $939.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 30.000 $1,090.000 $940.060 $833.000 $833.000 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $1,400.000 $1,005.610 $1,176.000 $1,176.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $1,050.000 $962.050 $869.000 $869.000 $1,640.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 8.000 $1,825.000 $1,632.590 $1,589.000 $1,589.000 $2,550.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 6.000 $2,275.000 $1,836.160 $1,709.000 $1,709.000 $2,850.000
REMOVE SM RD SN SUP&AM
EA 282.000 $125.000 $50.890 $69.000 $69.000 $128.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 2.000 $80.500 $50.900 $20.000 $20.000 $95.000
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 1.000 $3,250.000 $6,432.660 $5,451.000 $5,451.000 $5,590.000
INSTALL LRSS (STRUCT STEEL)
LB 1,462.000 $8.750 $7.120 $6.310 $7.750 $8.950
REMOVE LRSA
EA 24.000 $1,295.000 $865.150 $2,096.000 $917.380 $895.000
INS OH SN SUP(20 FT CANT)
EA 1.000 $27,350.000 $14,046.000 $29,631.000 $44,946.250 $43,850.000
INS OH SN SUP(25 FT CANT)
EA 1.000 $30,500.000 $16,244.510 $31,632.400 $47,144.880 $46,000.000
INS OH SN SUP(30 FT CANT)
EA 6.000 $35,780.000 $17,343.760 $35,293.200 $49,763.750 $48,550.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $48,500.000 $18,361.580 $44,458.400 $50,512.000 $49,280.000
INS OH SN SUP(40 FT CANT)
EA 4.000 $57,750.000 $22,717.880 $43,596.400 $53,699.750 $52,400.000
INS OH SN SUP(75 FT BRDG)
EA 1.000 $70,185.000 $44,784.360 $63,790.800 $90,763.750 $88,600.000
INS OH SN SUP(80 FT BRDG)
EA 3.000 $75,775.000 $55,980.440 $69,882.800 $55,145.000 $53,800.000
INS OH SN SUP(85 FT BRDG)
EA 1.000 $84,250.000 $67,176.530 $75,763.600 $72,672.500 $70,900.000
REMOVE OVERHD SIGN SUP
EA 2.000 $9,870.000 $6,106.960 $2,576.000 $10,813.750 $10,550.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 32.000 $24.500 $21.370 $27.000 $27.000 $47.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 42.000 $27.750 $21.370 $26.000 $28.000 $23.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 172.000 $25.000 $21.370 $26.000 $29.000 $33.250
INSTL OM ASSM (OM-2Y)(WC)GND
EA 43.000 $102.500 $52.930 $60.000 $60.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 149.000 $27.500 $47.840 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 63.000 $36.750 $59.030 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 116.000 $115.000 $59.030 $60.000 $60.000 $60.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 63.000 $108.500 $47.630 $60.000 $60.000 $60.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 550.000 $9.890 $5.520 $5.250 $5.250 $5.250
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 3,523.000 $1.100 $2.100 $2.000 $2.000 $2.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 351.000 $0.990 $3.150 $3.000 $3.000 $3.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 66,605.000 $0.890 $1.260 $1.200 $1.200 $1.200
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,030.000 $1.230 $2.100 $2.000 $2.000 $2.000
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 155.000 $2.270 $4.990 $4.750 $4.750 $4.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,232.000 $1.000 $1.260 $1.200 $1.200 $1.200
REFL PAV MRKR TY II-A-A
EA 122.000 $5.500 $5.520 $5.250 $5.250 $5.250
REFL PAV MRKR TY II-C-R
EA 3,845.000 $5.000 $5.520 $5.250 $5.250 $5.250
ELIM EXT PAV MRK & MRKS (4")
LF 33,569.000 $3.000 $0.470 $0.450 $0.450 $0.450
ELIM EXT PAV MRK & MRKS (8")
LF 1,810.000 $4.000 $0.580 $0.550 $0.550 $0.550
ELIM EXT PAV MRK & MRKS (12")
LF 800.000 $2.000 $2.100 $2.000 $2.000 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 330.000 $5.000 $4.210 $4.000 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 11.000 $58.500 $63.090 $60.000 $60.000 $60.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $75.000 $73.600 $70.000 $70.000 $70.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 8.000 $25.000 $28.390 $27.000 $27.000 $27.000
ELIM EXT PAV MRK & MRKRS(PLOWABLE RPMS)
EA 146.000 $12.500 $3.150 $3.000 $3.000 $3.000
PAV SURF PREP FOR MRK (6")
LF 253,775.000 $0.300 $0.160 $0.150 $0.150 $0.150
PAV SURF PREP FOR MRK (8")
LF 25,862.000 $0.450 $0.250 $0.240 $0.240 $0.250
PAV SURF PREP FOR MRK (12")
LF 14,820.000 $0.650 $1.050 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (24")
LF 1,685.000 $1.750 $2.100 $2.000 $2.000 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 78.000 $25.000 $29.440 $28.000 $28.000 $28.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 16.000 $45.000 $58.880 $56.000 $56.000 $56.000
PAV SURF PREP FOR MRK (NUMBER)
EA 9.000 $25.000 $42.060 $40.000 $40.000 $40.000
PAV SURF PREP FOR MRK (WORD)
EA 70.000 $25.000 $47.320 $45.000 $45.000 $45.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 85.000 $5.000 $26.290 $25.000 $25.000 $25.000
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $35,000.000 $22,555.030 $35,200.000 $50,225.000 $49,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $15,000.000 $10,178.260 $9,632.000 $8,200.000 $8,000.000
TEMP TRAF SIGNALS
EA 1.000 $65,000.000 $111,960.890 $98,160.000 $74,825.000 $73,000.000
VEH SIG SEC (12")LED(GRN)
EA 31.000 $300.000 $305.350 $323.600 $358.750 $350.000
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $300.000 $305.350 $323.600 $353.630 $345.000
VEH SIG SEC (12")LED(YEL)
EA 31.000 $300.000 $305.350 $323.600 $358.750 $350.000
VEH SIG SEC (12")LED(YEL ARW)
EA 7.000 $300.000 $305.350 $323.600 $353.630 $345.000
VEH SIG SEC (12")LED(RED)
EA 31.000 $300.000 $305.350 $323.600 $358.750 $350.000
VEH SIG SEC (12")LED(RED ARW)
EA 5.000 $300.000 $305.350 $323.600 $353.630 $345.000
PED SIG SEC (LED)(COUNTDOWN)
EA 18.000 $750.000 $610.700 $790.800 $978.880 $955.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 33.000 $180.000 $213.740 $243.200 $189.630 $185.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 3.000 $200.000 $223.920 $264.800 $210.130 $205.000
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 7,575.000 $2.250 $2.040 $1.710 $3.020 $2.950
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 10,686.000 $2.500 $2.040 $12.210 $2.640 $2.600
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 280.000 $3.000 $3.050 $2.980 $3.640 $3.550
TRF SIG CBL (TY A)(12 AWG)(9 CONDR)
LF 5,701.000 $5.000 $4.070 $3.900 $3.980 $3.900
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $13,500.000 $12,739.120 $11,615.200 $18,327.000 $17,880.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 5.000 $20,000.000 $15,023.120 $13,124.800 $24,138.750 $23,550.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $22,500.000 $15,792.590 $13,707.600 $27,111.250 $26,450.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 3.000 $33,500.000 $28,926.620 $37,530.000 $36,900.000 $36,000.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $45,000.000 $30,685.430 $39,141.200 $42,588.750 $41,550.000
PED POLE ASSEMBLY
EA 15.000 $2,500.000 $1,905.370 $2,930.000 $2,613.750 $2,550.000
REMOVE PED POLE ASSEMBLY
EA 2.000 $1,369.540 $407.130 $825.600 $707.250 $690.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $850.000 $1,058.540 $1,192.400 $933.780 $911.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $5,000.000 $3,546.100 $4,136.000 $5,125.000 $5,000.000
FULL - WIDTH MOWING
CYC 8.000 $22,000.000 $7,538.280 $2,700.000 $3,000.000 $2,090.000
STORM SEWER CLEANING (ALL SIZES)
LF 3,624.000 $27.410 $27.640 $40.000 $23.910 $48.750
NO. OF WORKING DAYS
$/D 19,700.000 $1,007.000 $840.000 $890.000 $1,030.000 $840.000
TACK COAT
GAL 16,456.000 $4.750 $7.210 $4.600 $6.950 $6.850
SP MIXES SP-B PG64-22
TON 126,083.000 $118.000 $120.810 $106.740 $115.200 $114.000
SP MIXES SP-C SAC-A PG64-22
TON 20,319.000 $112.000 $175.760 $125.340 $167.200 $166.000
UNDERSEAL COURSE
GAL 34,222.000 $4.000 $6.330 $4.850 $6.000 $6.000
GEOFOAM FILL
CF 25,760.000 $10.000 $15.750 $11.010 $10.000 $14.800
GEOGRID BASE REINFORCEMENT (TY II)
SY 436,936.000 $2.000 $2.560 $1.340 $1.250 $1.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $19,792.680 $19,485.000 $17,000.000 $24,880.000
ITS MULTI-DUCT CND (PVC-80)
LF 19,260.000 $24.370 $24.430 $26.510 $33.820 $33.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 2,290.000 $33.690 $60.050 $37.660 $44.080 $43.000
ITS MULTI-DUCT CND (RMC)
LF 270.000 $134.460 $127.230 $200.950 $182.450 $178.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 97,665.000 $1.350 $0.850 $0.810 $0.810 $0.800
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 32,400.000 $1.350 $0.890 $0.850 $0.850 $0.850
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 2,385.000 $2.750 $1.840 $1.750 $1.750 $1.750
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 24,280.000 $2.150 $1.420 $1.350 $1.350 $1.350
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 1,582.000 $6.000 $2.050 $1.950 $1.950 $1.950
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 13,310.000 $5.500 $5.050 $4.800 $4.800 $4.800
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 1,510.000 $5.000 $3.150 $3.000 $3.000 $3.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,685.000 $11.000 $10.510 $10.000 $10.000 $10.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 101,240.000 $1.500 $0.850 $0.810 $0.810 $0.800
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 20,085.000 $1.700 $0.910 $0.870 $0.870 $0.850
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 70.000 $350.000 $236.580 $225.000 $225.000 $225.000
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
EA 16.000 $375.000 $394.290 $375.000 $375.000 $375.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 70.000 $350.000 $315.440 $300.000 $300.000 $300.000
MULTIPOLYMER PAV MRK (W) 36" YLD TRI
EA 85.000 $215.000 $82.010 $78.000 $78.000 $78.000
MULTIPOLYMER PAV MRK (W) (NUMBER)
EA 9.000 $350.000 $210.290 $200.000 $200.000 $200.000
MULTIPOLYMER PAV MRK (W) (LNDP ARW)
EA 8.000 $350.000 $473.150 $450.000 $450.000 $450.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 2.000 $7,400.000 $7,902.410 $11,152.000 $8,763.750 $8,550.000
VIDEO IMAGING AND RAD VEH DETECTION SYS
EA 2.000 $42,500.000 $75,563.420 $70,368.800 $43,706.000 $42,640.000
CAT 5 ETHERNET CABLE
LF 273.000 $10.000 $2.040 $2,754.400 $4.920 $4.800
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 24.000 $34,275.000 $46,575.730 $34,666.800 $47,027.000 $45,880.000
TMA (STATIONARY)
DAY 8.000 $112.500 $12,212.160 $489.590 $200.000 $428.000
TMA (MOBILE OPERATION)
HR 110.000 $71.000 $771.700 $84.710 $100.000 $788.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 52.000 $5,150.000 $5,333.410 $5,689.000 $6,037.250 $5,890.000
SLIP LINING CULVERT PIPE 84"
LF 1,180.000 $845.000 $1,724.030 $920.000 $950.000 $836.000
MOBILIZATION AND DEMOBILIZATION
EA 1.000 $60,300.000 $19,748.070 $51,000.000 $76,000.000 $51,000.000
BONDS AND WARRANTIES
EA 1.000 $60,300.000 $349.790 $12,060.000 $12,060.000 $12,060.000
12" PVC WATERLINE
LF 583.000 $130.500 $109.420 $152.000 $152.000 $152.000
18" STEEL CASING BY BORE
LF 500.000 $913.500 $879.110 $681.000 $681.000 $681.000
ABANDON EXIST PIPE BY PRESSURE GROUT
LF 690.000 $31.500 $21.070 $34.000 $34.000 $34.000
TRENCH SAFETY
EA 1.000 $10,350.000 $10,492.840 $1,984.000 $1,984.000 $1,980.000
12" GATE VALVE
EA 2.000 $4,657.500 $6,065.890 $7,067.000 $7,067.000 $7,070.000
10" DUCTILE IRON TEE
EA 1.000 $517.500 $1,342.680 $7,611.000 $7,611.000 $7,610.000
8" DUCTILE IRON TEE
EA 1.000 $517.500 $1,191.730 $6,911.000 $6,911.000 $6,910.000
10" SOLID SLEEVE COUPLING
EA 4.000 $2,587.500 $797.950 $2,039.000 $2,039.000 $2,040.000
8" SOLID SLEEVE COUPLING
EA 2.000 $2,587.500 $737.570 $1,695.000 $1,695.000 $1,700.000
12" DUCTILE IRON 45 DEGREE FITTING
EA 3.000 $2,070.000 $1,342.660 $2,423.000 $2,423.000 $2,420.000
10" MJ CAP
EA 2.000 $1,242.000 $940.110 $1,280.000 $1,280.000 $1,280.000
12"X10" DUCTILE IRON REDUCER
EA 1.000 $2,070.000 $1,242.050 $2,242.000 $2,242.000 $2,240.000
12"X8" DUCTILE IRON REDUCER
EA 1.000 $2,070.000 $1,191.730 $2,103.000 $2,103.000 $2,100.000
INTERMEDIATE BORE PIT EXCA AND SHORING
EA 1.000 $60,750.000 $10,978.040 $1,984.000 $1,984.000 $1,980.000
Totals: $172,021,664.810 $196,535,604.922 $213,083,743.258 $218,243,126.220 $225,300,604.430