Show Job Controls
Bid Cobra

GRAYSON US 75 (0047-18-081)

Items: 41

County: GRAYSON
Length: N/A
Highway: US 75
District: PARIS
Control Number: 0047-18-081
DBE Goal: N/A
Project: NH 2017(244)
Guaranty: N/A
Time: 213 WORKING DAYS
Engineer's Estimate: $1,795,652.60
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: REPAIR SLOPE FAILURE AND ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$1,795,652.60
$1,629,373.40
Over/Under Est: -9.26% -$166,279.20
Over/Under Est: -0.84% -$15,155.01
Amt Left: 9.27% $151,124.19
Over/Under Est: 23.63% $424,268.75
Amt Left: 36.24% $590,547.95
Delta: -24.68% -$439,423.76
Over/Under Est: 23.76% $426,567.40
Amt Left: 36.38% $592,846.60
Delta: -0.10% -$2,298.65
$2,433,054.00
Over/Under Est: 35.5% $637,401.40
Amt Left: 49.32% $803,680.60
Delta: -9.49% -$210,834.00
$2,657,920.30
Over/Under Est: 48.02% $862,267.70
Amt Left: 63.13% $1,028,546.90
Delta: -9.24% -$224,866.30
Over/Under Est: 71.96% $1,292,088.00
Amt Left: 89.5% $1,458,367.20
Delta: -16.17% -$429,820.30

Bid Items & Bid Tabulations

41 Total 0 of 41
GRAYSON  |  US 75  |  PARIS  |  0047-18-081  |  03/05/2019  |  $1,795,652.60  |  NH 2017(244)  |  REPAIR SLOPE FAILURE AND ROADWAY  |  213 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACCELERATED CRITICAL PATH, INC.
HARRISON, WALKER AND HARPER, LP
ED BELL CONSTRUCTION COMPANY
EAST TEXAS BRIDGE, INC.
FNH CONSTRUCTION, LLC
PAVECON LTD. CO.
D. L. LENNON INCORPORATED - CONTRACTOR
REMOVING CONC (RIPRAP)
SY 182.000 $15.000 $22.000 $25.130 $12.000 $20.000 $20.000 $30.450 $25.000
REMOVING STAB BASE AND ASPH PAV (13")
SY 1,147.000 $21.000 $14.000 $10.450 $12.000 $15.000 $20.000 $38.560 $25.000
EXCAVATION (SPECIAL)
CY 20,886.000 $12.000 $5.500 $9.270 $11.550 $15.000 $15.000 $12.830 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 20,886.000 $18.000 $9.000 $12.370 $15.750 $15.000 $25.000 $14.630 $35.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 200.000 $14.250 $15.000 $33.650 $26.250 $20.000 $30.000 $84.250 $35.000
BACKFILL (TY B)
STA 4.300 $185.000 $500.000 $1,113.220 $315.000 $400.000 $250.000 $2,591.350 $500.000
FURNISHING AND PLACING TOPSOIL (6")
SY 12,656.000 $3.000 $2.900 $3.670 $4.200 $3.000 $6.000 $7.650 $2.000
BLOCK SODDING
SY 12,656.000 $3.100 $3.000 $4.340 $4.200 $5.000 $6.000 $5.120 $2.800
VEGETATIVE WATERING
MG 35.000 $45.000 $45.000 $651.680 $168.000 $50.000 $50.000 $52.790 $100.000
FL BS (CMP IN PLC)(TY A GR 4)(10")
SY 1,194.000 $15.000 $29.000 $24.700 $21.000 $28.000 $33.000 $44.450 $35.000
LIME (HYDRATED LIME (SLURRY))
TON 2,482.000 $190.000 $190.000 $186.030 $210.000 $200.000 $171.000 $182.650 $175.000
LIME TRT (EXIST MATL)(24")
SY 29,462.000 $6.500 $9.000 $4.150 $9.450 $5.000 $8.000 $25.150 $8.000
LIME TRT (EXST MATL)(8")
SY 1,322.000 $3.000 $5.000 $3.700 $4.200 $5.000 $3.500 $14.000 $8.000
ASPH (AC-20-5TR)
GAL 550.000 $4.000 $15.000 $5.420 $9.440 $15.000 $10.000 $8.800 $35.000
ASPH (RC-250)
GAL 335.000 $5.000 $21.000 $7.400 $14.990 $15.000 $10.000 $12.750 $34.000
AGGR(TY-B GR-3 SAC-A)
CY 12.000 $200.000 $600.000 $535.780 $832.500 $400.000 $300.000 $267.400 $500.000
AGGR(TY-B GR-5 SAC-B)
CY 9.000 $100.000 $700.000 $299.720 $1,054.500 $400.000 $300.000 $329.350 $500.000
D-GR HMA(SQ) TY-C PG64-22
TON 192.000 $135.000 $115.000 $150.720 $160.950 $130.000 $200.000 $202.250 $370.000
FLOWABLE BACKFILL
CY 30.000 $150.000 $210.000 $280.560 $315.000 $500.000 $350.000 $387.250 $350.000
RIPRAP (CONC)(4 IN)
CY 21.000 $500.000 $450.000 $733.420 $840.000 $500.000 $450.000 $2,200.000 $450.000
MOBILIZATION
LS 1.000 $20,000.000 $160,000.000 $163,385.170 $212,000.000 $200,000.000 $235,000.000 $127,774.700 $99,450.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $7,500.000 $2,300.000 $4,490.880 $9,450.000 $7,000.000 $5,000.000 $5,029.000 $1,541.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 120.000 $27.500 $49.000 $34.800 $40.000 $50.000 $30.000 $20.890 $26.700
ROCK FILTER DAMS (REMOVE)
LF 120.000 $8.250 $15.000 $19.100 $20.000 $5.000 $15.000 $12.380 $6.890
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $2.350 $5.000 $4.620 $3.150 $5.000 $4.000 $1.600 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $0.650 $1.000 $2.880 $0.530 $0.400 $2.000 $0.830 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 75.000 $15.000 $11.000 $23.560 $25.000 $40.000 $30.000 $23.650 $50.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,550.000 $7.000 $6.000 $18.260 $10.000 $40.000 $30.000 $19.950 $50.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 75.000 $15.000 $9.000 $14.150 $15.000 $10.000 $30.000 $29.500 $50.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,550.000 $4.250 $4.000 $12.330 $10.000 $10.000 $30.000 $11.100 $50.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,200.000 $750.000 $1,177.380 $1,000.000 $3,000.000 $2,500.000 $5,335.000 $2,425.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $22,000.000 $29,000.000 $24,199.250 $21,000.000 $15,000.000 $12,500.000 $22,220.000 $20,200.000
PIPE UNDERDRAINS (TY 8) (6")
LF 4,960.000 $25.000 $19.500 $24.620 $26.500 $50.000 $30.000 $21.800 $50.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $450.000 $450.000 $706.430 $945.000 $1,000.000 $450.000 $577.500 $2,000.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $80.000 $150.000 $176.610 $115.000 $200.000 $1,000.000 $104.500 $2,000.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 110.000 $0.400 $11.000 $11.770 $11.250 $12.000 $5.000 $11.000 $10.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 430.000 $0.400 $6.000 $5.890 $5.630 $6.000 $5.000 $5.500 $5.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 430.000 $0.400 $6.000 $5.890 $5.630 $6.000 $5.000 $5.500 $5.000
REFL PAV MRKR TY II-C-R
EA 6.000 $4.000 $40.000 $58.870 $56.250 $60.000 $15.000 $55.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $9,000.000 $11,773.840 $13,650.000 $15,000.000 $15,000.000 $17,600.000 $25,000.000
TMA (STATIONARY)
DAY 28.000 $185.000 $190.000 $699.900 $525.000 $300.000 $550.000 $825.000 $1,000.000
Totals: $1,795,652.600 $1,629,373.400 $1,780,497.596 $2,219,921.350 $2,222,220.000 $2,433,054.000 $2,657,920.305 $3,087,740.600