Show Job Controls
Bid Cobra

GRAY IH 40 (0275-11-090)

Items: 84

County: GRAY
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0275-11-090
DBE Goal: N/A
Project: BR 2024(136)
Guaranty: N/A
Time: 247 WORKING DAYS
Engineer's Estimate: $12,348,796.40
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ZACHARY MAYER
IVAN FUENTES
KENNETH PETR
LADENIA JEWITT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,348,796.40
$12,919,745.10
Over/Under Est: 4.62% $570,948.70
$13,117,209.98
Over/Under Est: 6.22% $768,413.58
Amt Left: 1.53% $197,464.88
$14,183,888.80
Over/Under Est: 14.86% $1,835,092.40
Amt Left: 9.78% $1,264,143.70
Delta: -8.13% -$1,066,678.82
Subcontractor Percentage Amount
HJC FARMS, INC. 4.21% $545,773.78
TRP CONSTRUCTION GROUP, LLC 2.79% $361,688.57
APOLLO CONSTRUCTORS, INC. 1.39% $180,196.10
PRIMATE CONSTRUCTION, LP 0.69% $89,449.86
ANTIGO CONSTRUCTION, INC. 0.36% $46,669.49
BARRICADES UNLIMITED 0.31% $40,187.62
SURFACE PREPARATION TECHNOLOGIES, LLC 0.24% $31,112.99
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.19% $24,631.12
H & F TRUCKING 0.00% $0.00
Total: 10.18% $1,319,709.53

Bid Items & Bid Tabulations

84 Total 0 of 84
GRAY  |  IH 40  |  AMARILLO  |  0275-11-090  |  10/05/2023  |  $12,348,796.40  |  BR 2024(136)  |  BRIDGE REPL  |  247 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
DUININCK, INC.
WEBBER, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 23.000 $300.000 $165.000 $355.000 $800.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 1.000 $2,500.000 $900.000 $3,500.000 $1,200.000
REMOVING CONC (PAV)
SY 27,464.000 $19.000 $14.300 $15.500 $23.500
REMOVING CONC (CURB)
LF 319.000 $10.000 $11.000 $20.500 $15.000
REMOVING CONC (FLUME)
SY 1,536.000 $15.000 $19.500 $13.000 $13.000
REMOVING CONCRETE(MOW STRIP)
LF 12,944.000 $10.000 $6.000 $6.050 $13.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 31,547.000 $8.000 $4.550 $4.750 $6.000
REMOVING STAB BASE AND ASPH PAV(8")
SY 6,264.000 $10.000 $12.550 $11.500 $10.000
EXCAVATION (ROADWAY)
CY 123,408.000 $13.000 $11.100 $12.750 $12.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 15,925.000 $19.000 $14.000 $18.000 $16.000
BLADING
HR 8.000 $400.000 $525.000 $615.000 $250.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 14.690 $700.000 $630.000 $700.000 $1,000.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 13.540 $550.000 $475.000 $530.000 $800.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 2,779.000 $3.000 $3.650 $4.050 $4.000
CEMENT
TON 342.000 $325.000 $265.000 $325.000 $350.000
CEMENT TREAT (SUBGRADE) (8")
SY 31,537.000 $6.500 $3.750 $5.800 $7.000
PRIME COAT (MC-30)
GAL 7,715.000 $6.000 $5.300 $5.250 $7.000
EMULS ASPH (EROSN CONT)(MS-2)
GAL 6,567.000 $6.000 $4.350 $5.000 $5.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 27,454.000 $110.000 $153.000 $155.000 $110.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 64.000 $400.000 $370.000 $410.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 338.000 $600.000 $530.000 $590.000 $640.000
RC PIPE (CL III)(24 IN)
LF 630.000 $160.000 $91.500 $260.000 $120.000
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
EA 1.000 $15,000.000 $30,000.000 $41,000.000 $28,660.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $3,000.000 $5,500.000 $4,100.000 $2,650.000
REMOV STR (INLET)
EA 1.000 $2,000.000 $3,250.000 $2,900.000 $1,000.000
REMOV STR (SET)
EA 1.000 $600.000 $2,150.000 $2,900.000 $600.000
REMOV STR (PIPE)
LF 116.000 $40.000 $60.000 $59.000 $50.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $140,000.000 $210,000.000 $170,000.000 $497,204.800
MOBILIZATION
LS 1.000 $1,050,000.000 $1,290,000.000 $1,300,000.000 $1,333,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $20,000.000 $35,000.000 $11,500.000 $74,380.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,675.000 $6.000 $7.200 $3.550 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,675.000 $2.000 $3.500 $1.200 $1.500
CONSTRUCTING DETOURS
SY 8,667.000 $145.000 $145.000 $120.000 $180.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 10,800.000 $25.000 $12.000 $9.850 $25.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 10,800.000 $15.000 $9.000 $5.750 $6.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 10,800.000 $25.000 $12.000 $8.250 $12.000
TURNOUTS (RAP)
SY 1,300.000 $20.000 $8.000 $8.250 $16.000
RUMBLE STRIPS (SHOULDER)
LF 12,250.000 $0.250 $1.550 $1.750 $1.500
MTL W-BEAM GD FEN (STEEL POST)
LF 1,025.000 $36.000 $33.300 $37.000 $31.500
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 2.000 $2,800.000 $2,850.000 $3,200.000 $2,700.000
CONNECTOR PLATE FOR THRIE BEAM
EA 1.000 $900.000 $740.000 $825.000 $700.000
REMOVE METAL BEAM GUARD FENCE
LF 4,990.000 $3.500 $3.200 $3.550 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $300.000 $320.000 $355.000 $300.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 7.000 $320.000 $320.000 $355.000 $300.000
CABLE BARRIER SYSTEM (TL-4)
LF 11,811.000 $14.000 $17.000 $19.000 $16.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 5.000 $4,000.000 $4,755.000 $5,300.000 $4,500.000
REMOVE CABLE BARRIER
LF 12,689.000 $3.500 $2.100 $2.350 $2.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 6.000 $1,000.000 $1,100.000 $1,200.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,000.000 $3,550.000 $3,900.000 $3,350.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $350.000 $320.000 $355.000 $300.000
REMOVE RD IL ASM (TRANS-BASE)
EA 8.000 $1,000.000 $1,150.000 $1,200.000 $1,089.000
IN RD IL (TY ST) 50T-12-12(400W EQ)LED
EA 8.000 $9,500.000 $6,450.000 $8,200.000 $6,091.000
CONDT (PVC) (SCH 40) (2")
LF 2,090.000 $18.000 $25.000 $23.500 $22.750
CONDT (PVC) (SCH 40) (2") (BORE)
LF 440.000 $40.000 $30.000 $47.000 $28.000
ELEC CONDR (NO.8) BARE
LF 2,650.000 $2.000 $2.150 $2.950 $2.030
ELEC CONDR (NO.8) INSULATED
LF 5,300.000 $2.500 $2.250 $2.950 $2.100
GROUND BOX TY A (122311)W/APRON
EA 4.000 $2,000.000 $1,350.000 $1,800.000 $1,275.000
REMOVE GROUND BOX
EA 2.000 $400.000 $525.000 $470.000 $495.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $1,000.000 $1,055.000 $1,200.000 $1,000.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 2.000 $9,000.000 $8,100.000 $12,000.000 $7,629.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $975.000 $1,050.000 $1,100.000 $975.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,100.000 $1,215.000 $1,400.000 $1,150.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $500.000 $770.000 $855.000 $725.000
REMOVE SM RD SN SUP&AM
EA 15.000 $200.000 $110.000 $120.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 28,633.000 $0.700 $0.500 $0.540 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 50,067.000 $0.700 $0.500 $0.540 $0.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,603.000 $3.000 $2.650 $2.950 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,572.000 $1.500 $1.600 $1.700 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,442.000 $1.500 $1.600 $1.700 $2.000
PAVEMENT SEALER 6"
LF 17,533.000 $0.400 $0.350 $0.350 $0.300
PAVEMENT SEALER 10"
LF 16,550.000 $0.600 $0.350 $0.350 $0.300
ELIM EXT PAV MRK & MRKS (6")
LF 7,835.000 $1.000 $1.350 $1.450 $1.500
PAV SURF PREP FOR MRK (6")
LF 17,533.000 $0.250 $0.650 $0.710 $0.600
PAV SURF PREP FOR MRK (10")
LF 16,550.000 $0.400 $0.750 $0.820 $0.700
D-GR HMA TY-B PG64-22
TON 5,094.000 $180.000 $150.000 $180.000 $160.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $8,500.000 $19,000.000 $12,000.000
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 16,550.000 $11.000 $15.850 $17.500 $15.000
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 6,601.000 $0.650 $1.600 $1.750 $1.500
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 10,932.000 $0.650 $1.600 $1.750 $1.500
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 5,400.000 $35.000 $25.000 $33.000 $25.000
MODULAR GLARE SCREENS (REMOVE)
LF 5,400.000 $3.000 $2.000 $3.550 $2.100
MODULAR GLARE SCREENS (MOVE)
LF 5,400.000 $3.000 $3.500 $8.850 $9.000
TMA (STATIONARY)
DAY 45.000 $250.000 $450.000 $295.000 $500.000
TMA (MOBILE OPERATION)
HR 48.000 $150.000 $85.000 $120.000 $100.000
Totals: $12,348,796.400 $12,919,745.100 $13,117,209.980 $14,183,888.800