PREPARING ROW
|
STA
|
17.200
|
$1,500.000
|
$5,000.000
|
$11,500.000
|
$5,565.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
6,154.000
|
$5.000
|
$2.500
|
$3.000
|
$13.320
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,801.000
|
$5.000
|
$12.000
|
$18.000
|
$39.420
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,265.000
|
$7.000
|
$18.000
|
$22.000
|
$39.420
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
10,179.000
|
$0.500
|
$4.000
|
$1.500
|
$2.760
|
|
|
BLOCK SODDING
|
SY
|
1,332.000
|
$4.000
|
$4.300
|
$4.750
|
$5.940
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
8,847.000
|
$0.250
|
$0.510
|
$0.250
|
$0.330
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
4,424.000
|
$0.150
|
$0.510
|
$0.300
|
$0.400
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
4,423.000
|
$0.150
|
$0.510
|
$0.300
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
320.000
|
$15.000
|
$20.000
|
$20.000
|
$36.630
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
2,171.000
|
$60.000
|
$84.000
|
$75.000
|
$97.010
|
|
|
CEMENT
|
TON
|
143.000
|
$150.000
|
$165.000
|
$155.000
|
$183.750
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
6,510.000
|
$2.500
|
$2.500
|
$2.500
|
$4.560
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
6,510.000
|
$4.000
|
$2.500
|
$2.500
|
$4.560
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,237.000
|
$3.500
|
$5.370
|
$5.500
|
$8.760
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
5,249.000
|
$3.000
|
$4.030
|
$4.000
|
$9.900
|
|
|
AGGR (MULTI OPTION)
|
CY
|
122.000
|
$65.000
|
$145.120
|
$275.000
|
$216.810
|
|
|
CEM STABIL BKFL
|
CY
|
40.000
|
$80.000
|
$150.000
|
$250.000
|
$180.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,815.000
|
$10.000
|
$17.500
|
$32.000
|
$50.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,218.000
|
$175.000
|
$160.000
|
$225.000
|
$248.040
|
|
|
CL C CONC (ABUT)
|
CY
|
44.000
|
$750.000
|
$1,100.000
|
$1,400.000
|
$1,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
99.500
|
$1,000.000
|
$1,200.000
|
$1,200.000
|
$900.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
71.000
|
$750.000
|
$1,100.000
|
$830.000
|
$900.000
|
|
|
REINF CONC SLAB
|
SF
|
23,920.000
|
$20.000
|
$16.000
|
$17.000
|
$20.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
7,709.000
|
$40.000
|
$75.000
|
$61.000
|
$40.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
3,102.000
|
$140.000
|
$135.000
|
$135.500
|
$150.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
156.000
|
$100.000
|
$150.000
|
$175.000
|
$175.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.800
|
$450.000
|
$425.000
|
$520.000
|
$500.000
|
|
|
RAIL (TY T223)
|
LF
|
1,956.600
|
$100.000
|
$65.000
|
$85.000
|
$135.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
135.000
|
$75.000
|
$65.000
|
$95.000
|
$80.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
232.000
|
$200.000
|
$185.000
|
$225.000
|
$195.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
40.000
|
$60.000
|
$60.000
|
$140.000
|
$100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,250.000
|
$2,400.000
|
$1,800.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$1,200.000
|
$250.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$50,000.000
|
$120,000.000
|
$102,000.000
|
$400,000.000
|
|
|
REMOVE STR (GABION)
|
LF
|
696.000
|
$60.000
|
$20.000
|
$60.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$200,000.000
|
$300,000.000
|
$380,000.000
|
$456,999.650
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$3,000.000
|
$4,850.000
|
$1,600.000
|
$1,835.260
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$30.000
|
$66.000
|
$35.000
|
$29.300
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$10.000
|
$11.000
|
$18.000
|
$8.300
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
54.000
|
$20.000
|
$20.350
|
$45.000
|
$18.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
54.000
|
$6.000
|
$11.000
|
$20.000
|
$6.700
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
20.000
|
$75.000
|
$27.500
|
$65.000
|
$102.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,659.000
|
$2.500
|
$3.570
|
$3.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,659.000
|
$1.000
|
$1.100
|
$0.750
|
$0.500
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,860.000
|
$25.000
|
$18.000
|
$22.000
|
$25.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,860.000
|
$4.500
|
$10.000
|
$4.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,860.000
|
$10.000
|
$15.000
|
$11.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$2,100.000
|
$2,100.000
|
$2,193.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$4.000
|
$3.000
|
$3.250
|
$3.100
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$2,600.000
|
$2,800.000
|
$2,790.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$400.000
|
$275.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$15,000.000
|
$7,800.000
|
$5,500.000
|
$9,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,300.000
|
$900.000
|
$850.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$600.000
|
$500.000
|
$850.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
200.000
|
$10.000
|
$15.000
|
$19.000
|
$20.000
|
|
|
TEMP RD IL (RD IL ASM)
|
MO
|
16.000
|
$1,500.000
|
$4,500.000
|
$6,800.000
|
$6,700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$530.000
|
$250.000
|
$567.000
|
$567.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$600.000
|
$250.000
|
$771.000
|
$771.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$60.000
|
$50.000
|
$125.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
4.000
|
$60.000
|
$25.000
|
$45.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$25.000
|
$22.000
|
$13.000
|
$13.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$60.000
|
$150.000
|
$45.000
|
$45.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$10.000
|
$30.000
|
$20.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,607.000
|
$0.600
|
$0.600
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
141.000
|
$1.000
|
$1.650
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
18.000
|
$10.000
|
$6.600
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
10,570.000
|
$0.600
|
$0.660
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
11.000
|
$5.000
|
$6.600
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,610.000
|
$0.600
|
$0.770
|
$0.700
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
16.000
|
$5.000
|
$5.500
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
175.000
|
$5.000
|
$4.400
|
$4.000
|
$4.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
12,899.000
|
$0.150
|
$0.240
|
$0.220
|
$0.220
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
3,610.000
|
$0.250
|
$0.440
|
$0.400
|
$0.400
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
16.000
|
$2.500
|
$2.750
|
$2.500
|
$2.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
12,796.000
|
$0.150
|
$0.270
|
$0.250
|
$0.250
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
175.000
|
$2.500
|
$2.200
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,899.000
|
$0.250
|
$0.410
|
$0.380
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,796.000
|
$0.250
|
$0.410
|
$0.380
|
$0.380
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
302.000
|
$2.500
|
$3.850
|
$3.500
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
21,997.000
|
$0.750
|
$1.000
|
$0.600
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
464.000
|
$0.750
|
$1.000
|
$2.000
|
$1.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$30,000.000
|
$16,000.000
|
$35,000.000
|
$38,140.500
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
6,510.000
|
$1.000
|
$2.000
|
$2.400
|
$4.380
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
245.000
|
$55.000
|
$100.000
|
$115.000
|
$125.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$5,000.000
|
$25,000.000
|
$14,000.000
|
$7,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$40.000
|
$200.000
|
$40.000
|
$275.000
|
|
Totals: |
$2,949,650.250
|
$3,587,103.150
|
$3,884,569.030
|
$4,626,268.340
|