Show Job Controls
Bid Cobra

GOLIAD US 59 (0088-02-063)

Items: 61

County: GOLIAD
Length: 2.0800 MILES
Highway: US 59
District: CORPUS CHRISTI
Control Number: 0088-02-063
DBE Goal: 0.0%
Project: F 2026(754)
Guaranty: $55,000.00
Time: 78 WORKING DAYS
Engineer's Estimate: $2,771,410.01
Date: 1:00 PM JULY 01, 2026 (in 21 days)
Contract Number: 7263012
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00072146
Contract Type: Federal
Project Description: MILL AND OVERLAY ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NICK NOVOSAD
GOLIAD US 59 (0088-02-063)
Project Name: N/A
Project: F 2026(754)
Length: 2.0800 MILES
Project Type: CONSTRUCTION
Limits From: FORT ST
Limits To: SH 239
Project Description: MILL AND OVERLAY ROADWAY
GOLIAD US 59 (0088-03-050)
Project Name: US 59 GOLIAD FORT ST TO WRIGHT REHAB
Project: F 2026(754)
Length: 0.0000 MILES
Project Type: OVERLAY
Limits From: WRIGHT ST.
Limits To: 330 FT E OF FORT ST.
Project Description: MILL AND OVERLAY ROADWAY
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

61 Total 0 of 61
GOLIAD  |  US 59  |  CORPUS CHRISTI  |  0088-02-063  |  1:00 PM JULY 01, 2026  |  $2,771,410.01  |  F 2026(754)  |  SURF/ROADWAY RESTOR  |  78 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 50.000
BACKFILL (TY A OR B)
STA 50.000
AGGR (TY-PB, GR-3 OR 3S)(SAC-B)
CY 90.000
ASPH (MULTI OPTION)
GAL 28,105.000
D-GR HMA TY-D SAC-B PG70-22
TON 8,859.000
TACK COAT
GAL 6,445.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 6,980.000
PLAN & TEXT CONC PAV(0" TO 2")
SY 80,295.000
CONC STR REPAIR (STANDARD)
SF 50.000
RIPRAP (MOW STRIP)(4 IN)
CY 49.000
RAIL (TY T631)
LF 250.000
CLEAN EXIST CULVERTS
EA 14.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 64.000
TMA (MOBILE OPERATION)
HR 56.000
TMA (MOBILE OPERATION)
DAY 14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 460.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 460.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 800.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 800.000
DRIVEWAYS (ACP) (TY 1)
SY 214.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 10,472.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 3,720.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 7.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 16.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 6,790.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 29,005.710
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,268.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,790.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 27,630.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 697.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,361.000
RE PM TY II (W) 6" (BRK)
LF 6,878.570
RE PM TY II (W) 6" (SLD)
LF 28,884.290
RE PM TY II (W) 24" (SLD)
LF 655.000
RE PM TY II (Y) 6" (SLD)
LF 27,515.720
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 6,878.570
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 27,515.720
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 27,515.720
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 386.000
PREFAB PM TY B (W)(8")(SLD)
LF 318.000
PREFAB PM TY B (W)(24")(SLD)CONTRAST
LF 613.000
PREFAB PM TY B (Y)(6")(SLD)
LF 1,544.000
PREFAB PM TY B (Y)(6")(BRK)CONTRAST
LF 386.000
PREFAB PM TY B (W)(WORD)CONTRAST
EA 4.000
PREFAB PM TY B (W)(ARROW)CONTRAST
EA 6.000
PREFAB PM TY C (W)(24")(SLD)
LF 655.000
PREFAB PM TY C (W)(ARROW)
EA 39.000
PREFAB PM TY C (W)(WORD)
EA 6.000
REFL PAV MRKR TY I-C
EA 410.000
ELIM EXT PM & MRKS (4")
LF 863.000
ELIM EXT PM & MRKS (8")
LF 612.000
ELIM EXT PM & MRKS (24")
LF 658.000
ELIM EXT PM & MRKS (ARROW)
EA 7.000
ELIM EXT PM & MRKS (WORD)
EA 5.000
TREE TRIMMING / BRUSH REMOVAL
MI 1.300
DRAIN INLET CLEANING
EA 40.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $20,000.00