|
|
PREPARING ROW
|
STA
|
118.150
|
$1,550.000
|
$3,858.730
|
$775.690
|
$8,920.000
|
$772.750
|
$24,000.000
|
$3,321.560
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,830.000
|
$17.300
|
$9.770
|
$10.000
|
$8.000
|
$38.970
|
$8.500
|
$16.790
|
|
|
REMOVING CONC (CURB)
|
LF
|
21.000
|
$8.300
|
$15.020
|
$20.000
|
$4.000
|
$96.720
|
$12.000
|
$5.260
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
966.000
|
$7.300
|
$3.270
|
$5.000
|
$4.000
|
$26.600
|
$6.000
|
$7.700
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
78,723.000
|
$6.300
|
$0.910
|
$3.000
|
$2.600
|
$3.430
|
$4.000
|
$4.930
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
67,740.000
|
$11.400
|
$10.620
|
$11.000
|
$10.000
|
$2.710
|
$20.000
|
$11.130
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
111,009.000
|
$10.000
|
$18.220
|
$20.000
|
$10.000
|
$23.990
|
$10.000
|
$18.610
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
82,141.000
|
$0.200
|
$0.130
|
$0.150
|
$0.290
|
$0.130
|
$0.120
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
49,291.000
|
$0.800
|
$0.130
|
$0.150
|
$1.000
|
$0.130
|
$0.120
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
32,860.000
|
$0.800
|
$0.130
|
$0.150
|
$1.000
|
$0.130
|
$0.120
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
1,377.000
|
$12.300
|
$14.720
|
$20.000
|
$24.000
|
$73.300
|
$10.000
|
$40.630
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
82,151.000
|
$1.100
|
$1.300
|
$0.630
|
$1.000
|
$1.260
|
$1.190
|
$1.290
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
49,070.000
|
$43.400
|
$29.660
|
$40.000
|
$37.000
|
$40.200
|
$45.000
|
$56.590
|
|
|
PRIME COAT (MC-30)
|
GAL
|
23,654.000
|
$3.800
|
$4.940
|
$4.000
|
$4.000
|
$5.120
|
$3.000
|
$4.590
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
548.000
|
$6.700
|
$6.460
|
$4.500
|
$4.000
|
$8.440
|
$4.000
|
$13.690
|
|
|
FOG SEAL (SS-1H OR CSS-1H)
|
GAL
|
5,001.000
|
$6.700
|
$2.030
|
$3.750
|
$4.000
|
$4.040
|
$3.000
|
$5.100
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
63,814.000
|
$3.200
|
$4.230
|
$3.000
|
$3.500
|
$3.360
|
$3.000
|
$4.080
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,657.000
|
$70.000
|
$139.690
|
$129.460
|
$70.000
|
$193.220
|
$125.000
|
$158.190
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
12,358.000
|
$117.000
|
$153.430
|
$164.690
|
$145.000
|
$123.520
|
$141.000
|
$148.730
|
|
|
TACK COAT
|
GAL
|
22,782.000
|
$4.000
|
$2.180
|
$3.000
|
$4.000
|
$3.710
|
$3.500
|
$5.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,490.000
|
$8.000
|
$6.580
|
$5.300
|
$2.500
|
$12.140
|
$3.220
|
$5.060
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
18,615.000
|
$60.000
|
$140.190
|
$107.050
|
$145.000
|
$131.520
|
$90.000
|
$97.640
|
|
|
CURB (TYPE II - A)
|
LF
|
4,899.000
|
$25.200
|
$13.770
|
$19.660
|
$30.000
|
$29.680
|
$12.000
|
$17.500
|
|
|
CURB (TYPE II - B)
|
LF
|
1,477.000
|
$25.200
|
$11.960
|
$20.250
|
$52.000
|
$233.200
|
$12.000
|
$22.320
|
|
|
CONC PVMT (JC) (TRANSITION SLAB)
|
SY
|
459.000
|
$165.000
|
$155.320
|
$148.330
|
$140.000
|
$158.150
|
$150.000
|
$175.160
|
|
|
CEM STABIL BKFL
|
CY
|
281.000
|
$180.000
|
$111.050
|
$105.320
|
$340.000
|
$291.760
|
$300.000
|
$168.210
|
|
|
FLOWABLE BACKFILL
|
CY
|
440.000
|
$230.000
|
$117.070
|
$169.170
|
$340.000
|
$318.000
|
$100.000
|
$176.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
896.000
|
$3.300
|
$24.050
|
$6.360
|
$5.000
|
$26.500
|
$1.000
|
$11.970
|
|
|
TEMPORARY SPL SHORING
|
SF
|
7,254.000
|
$204.000
|
$6.820
|
$10.600
|
$20.000
|
$10.600
|
$15.000
|
$44.390
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
360.000
|
$135.000
|
$87.150
|
$187.620
|
$90.000
|
$94.340
|
$80.000
|
$165.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
882.000
|
$350.000
|
$259.090
|
$328.600
|
$210.000
|
$269.240
|
$243.000
|
$329.480
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
320.000
|
$358.000
|
$473.670
|
$386.900
|
$440.000
|
$530.000
|
$445.000
|
$448.800
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
22.000
|
$165.000
|
$166.930
|
$187.620
|
$200.000
|
$196.100
|
$177.000
|
$210.500
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
120.000
|
$200.000
|
$300.030
|
$244.860
|
$235.000
|
$291.500
|
$231.000
|
$320.740
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
22.000
|
$225.000
|
$343.670
|
$302.100
|
$330.000
|
$333.900
|
$285.000
|
$358.820
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
26.000
|
$342.000
|
$490.960
|
$397.500
|
$380.000
|
$477.000
|
$375.000
|
$403.680
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$500.000
|
$654.620
|
$424.000
|
$410.000
|
$636.000
|
$400.000
|
$726.090
|
|
|
CL A CONC (FLUME)
|
CY
|
15.000
|
$450.000
|
$1,600.570
|
$643.090
|
$650.000
|
$815.140
|
$600.000
|
$937.620
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
88.000
|
$1,316.000
|
$1,177.350
|
$901.920
|
$900.000
|
$1,051.520
|
$1,000.000
|
$1,265.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
173.800
|
$1,198.000
|
$901.930
|
$937.180
|
$700.000
|
$876.620
|
$1,200.000
|
$1,125.580
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
60.200
|
$1,100.000
|
$915.140
|
$1,410.930
|
$950.000
|
$1,166.000
|
$1,000.000
|
$1,043.690
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
11.000
|
$1,321.000
|
$1,830.770
|
$526.190
|
$1,650.000
|
$2,120.000
|
$1,300.000
|
$2,090.000
|
|
|
CL C CONC (MISC)
|
CY
|
34.600
|
$925.000
|
$319.530
|
$594.240
|
$250.000
|
$477.000
|
$210.000
|
$3,155.900
|
|
|
CL C CONC (RAIL FOUNDATION)(HPC)
|
CY
|
38.000
|
$495.000
|
$1,064.210
|
$710.760
|
$800.000
|
$731.400
|
$700.000
|
$1,117.710
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
24,800.000
|
$27.500
|
$25.750
|
$29.140
|
$22.000
|
$22.260
|
$25.000
|
$22.570
|
|
|
APPROACH SLAB (HPC)
|
CY
|
283.000
|
$715.000
|
$696.630
|
$639.540
|
$500.000
|
$620.100
|
$650.000
|
$708.290
|
|
|
RETAINING WALL (MSE)
|
SF
|
76,543.000
|
$51.000
|
$33.500
|
$29.660
|
$60.000
|
$40.220
|
$58.000
|
$42.280
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
3,392.400
|
$130.500
|
$182.900
|
$197.540
|
$150.000
|
$180.200
|
$150.000
|
$143.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
1,180.000
|
$6.000
|
$7.120
|
$10.600
|
$11.000
|
$12.720
|
$4.770
|
$11.830
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,705.000
|
$493.000
|
$428.160
|
$456.570
|
$520.000
|
$560.740
|
$400.000
|
$465.290
|
|
|
RIPRAP(CONC)(SIGN MOUNTS)(CL B)
|
CY
|
2.000
|
$500.000
|
$1,338.060
|
$1,060.000
|
$300.000
|
$1,590.000
|
$600.000
|
$951.270
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
33.000
|
$900.000
|
$1,290.770
|
$551.240
|
$1,900.000
|
$636.000
|
$600.000
|
$566.230
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
163.000
|
$462.000
|
$712.720
|
$551.240
|
$500.000
|
$662.500
|
$525.000
|
$651.100
|
|
|
RAIL (TY SSTR)
|
LF
|
4,060.000
|
$42.000
|
$67.250
|
$82.270
|
$72.000
|
$65.190
|
$50.000
|
$109.120
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
870.000
|
$74.000
|
$82.440
|
$82.270
|
$100.000
|
$95.400
|
$60.000
|
$140.700
|
|
|
RAIL (TY T222)
|
LF
|
312.000
|
$110.000
|
$126.680
|
$141.320
|
$160.000
|
$137.800
|
$150.000
|
$68.520
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
188.000
|
$115.400
|
$116.770
|
$116.850
|
$100.000
|
$132.500
|
$125.000
|
$158.980
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
896.000
|
$246.000
|
$294.570
|
$280.640
|
$450.000
|
$561.800
|
$350.000
|
$423.970
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
848.000
|
$500.000
|
$388.950
|
$388.840
|
$650.000
|
$768.500
|
$450.000
|
$509.460
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
714.000
|
$591.000
|
$548.060
|
$575.540
|
$850.000
|
$1,060.000
|
$600.000
|
$656.140
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
635.000
|
$62.000
|
$59.210
|
$62.430
|
$87.000
|
$84.800
|
$80.000
|
$81.400
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
398.000
|
$109.000
|
$76.010
|
$93.030
|
$121.000
|
$127.200
|
$95.000
|
$91.300
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
3.000
|
$5,700.000
|
$3,457.660
|
$5,286.500
|
$3,800.000
|
$4,240.000
|
$3,500.000
|
$6,400.000
|
|
|
INLET (COMPL)(PSL)(SH)(6FTX6FT-4FTX4FT)
|
EA
|
4.000
|
$7,200.000
|
$4,532.670
|
$6,995.900
|
$6,250.000
|
$6,890.000
|
$5,000.000
|
$11,110.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$4,100.000
|
$2,682.330
|
$4,707.510
|
$2,500.000
|
$2,226.000
|
$3,000.000
|
$9,720.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
3.000
|
$7,800.000
|
$19,328.800
|
$16,533.720
|
$11,800.000
|
$12,190.000
|
$10,000.000
|
$11,212.480
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$10,200.000
|
$24,905.720
|
$16,533.730
|
$19,500.000
|
$25,440.000
|
$11,459.680
|
$18,848.100
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
16.000
|
$7,170.000
|
$4,059.060
|
$9,022.770
|
$4,800.000
|
$5,300.000
|
$6,000.000
|
$9,895.550
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
6.000
|
$7,230.000
|
$8,104.010
|
$12,203.430
|
$7,800.000
|
$8,745.000
|
$8,000.000
|
$12,195.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,277.520
|
$1,929.090
|
$1,700.000
|
$1,060.000
|
$1,000.000
|
$1,104.200
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$810.000
|
$1,552.540
|
$1,929.090
|
$1,900.000
|
$1,166.000
|
$1,200.000
|
$1,137.880
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$1,560.000
|
$1,388.090
|
$1,929.080
|
$1,800.000
|
$1,060.000
|
$1,300.000
|
$1,242.560
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$7,600.000
|
$33,917.930
|
$6,160.870
|
$30,000.000
|
$26,500.000
|
$5,000.000
|
$58,069.690
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$480.000
|
$261.950
|
$513.410
|
$1,200.000
|
$1,060.000
|
$600.000
|
$528.000
|
|
|
REMOV STR (PIPE)
|
LF
|
62.000
|
$13.100
|
$21.130
|
$331.230
|
$20.000
|
$15.900
|
$20.000
|
$31.990
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,637,410.000
|
$2,206,771.640
|
$1,725,000.000
|
$2,920,000.000
|
$1,500,000.000
|
$2,900,000.000
|
$3,294,518.600
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$8,000.000
|
$3,270.860
|
$2,700.000
|
$4,300.000
|
$20,397.760
|
$40,000.000
|
$9,326.090
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
550.000
|
$33.000
|
$38.190
|
$31.800
|
$30.000
|
$45.290
|
$35.000
|
$38.830
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
480.000
|
$101.000
|
$54.550
|
$37.100
|
$68.000
|
$46.380
|
$50.000
|
$53.100
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,030.000
|
$17.000
|
$16.370
|
$10.600
|
$16.000
|
$26.490
|
$15.000
|
$17.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
622.000
|
$29.100
|
$29.460
|
$21.200
|
$25.000
|
$24.040
|
$27.000
|
$28.920
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
622.000
|
$10.000
|
$10.910
|
$5.300
|
$10.000
|
$36.490
|
$10.000
|
$12.620
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,928.000
|
$2.300
|
$3.820
|
$2.650
|
$2.500
|
$6.220
|
$3.500
|
$3.950
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,928.000
|
$0.500
|
$1.090
|
$0.800
|
$1.000
|
$1.860
|
$1.000
|
$1.150
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,560.000
|
$6.300
|
$5.460
|
$4.320
|
$5.000
|
$7.110
|
$5.000
|
$6.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,560.000
|
$2.100
|
$1.090
|
$1.060
|
$1.200
|
$1.640
|
$1.000
|
$1.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
17,030.000
|
$37.000
|
$0.800
|
$57.750
|
$44.000
|
$45.650
|
$30.000
|
$40.950
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
120.000
|
$78.200
|
$95.730
|
$100.000
|
$53.000
|
$123.940
|
$80.000
|
$91.940
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,320.000
|
$59.400
|
$27.200
|
$52.000
|
$48.000
|
$81.300
|
$40.000
|
$58.820
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
11,680.000
|
$19.200
|
$2.850
|
$6.250
|
$6.000
|
$10.320
|
$8.000
|
$11.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,320.000
|
$18.200
|
$6.370
|
$5.250
|
$9.000
|
$8.170
|
$8.000
|
$24.200
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
|
LF
|
3,950.000
|
$103.100
|
$97.650
|
$118.620
|
$70.000
|
$100.310
|
$80.000
|
$110.000
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
12.000
|
$77.000
|
$168.010
|
$137.780
|
$100.000
|
$243.800
|
$50.000
|
$127.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
916.000
|
$84.000
|
$122.430
|
$96.290
|
$90.000
|
$106.540
|
$90.000
|
$111.940
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
27,398.000
|
$0.200
|
$0.310
|
$0.210
|
$0.200
|
$0.300
|
$0.200
|
$0.210
|
|
|
CONC MEDIAN
|
SY
|
832.000
|
$159.000
|
$189.930
|
$106.020
|
$120.000
|
$84.800
|
$70.000
|
$111.880
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
650.000
|
$155.000
|
$189.930
|
$106.020
|
$120.000
|
$84.800
|
$75.000
|
$166.830
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
59.000
|
$1,000.000
|
$1,545.090
|
$159.000
|
$1,000.000
|
$1,607.760
|
$15.000
|
$1,355.310
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,137.500
|
$30.900
|
$28.640
|
$26.010
|
$25.000
|
$27.830
|
$22.120
|
$35.110
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$1,870.000
|
$2,400.260
|
$1,557.140
|
$1,900.000
|
$2,332.000
|
$1,847.120
|
$3,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,370.000
|
$1,472.890
|
$1,285.780
|
$1,300.000
|
$1,431.000
|
$1,292.630
|
$1,233.300
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
3.000
|
$720.000
|
$1,091.030
|
$758.960
|
$800.000
|
$1,060.000
|
$514.690
|
$605.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
253.000
|
$68.000
|
$54.550
|
$67.380
|
$65.000
|
$53.000
|
$46.350
|
$74.480
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,600.000
|
$3.200
|
$2.730
|
$2.120
|
$2.000
|
$2.650
|
$2.430
|
$3.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
5.000
|
$260.000
|
$272.760
|
$174.900
|
$165.000
|
$265.000
|
$42.200
|
$319.550
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$200.000
|
$272.760
|
$206.700
|
$195.000
|
$265.000
|
$125.920
|
$211.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,700.000
|
$3,273.080
|
$2,823.840
|
$2,700.000
|
$3,180.000
|
$2,571.580
|
$3,539.800
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$240.000
|
$272.760
|
$208.290
|
$200.000
|
$265.000
|
$42.200
|
$423.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
16.000
|
$1,200.000
|
$1,001.440
|
$768.500
|
$1,200.000
|
$2,334.600
|
$381.970
|
$1,694.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$870.000
|
$1,001.470
|
$651.900
|
$750.000
|
$2,334.600
|
$98.640
|
$275.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
4.000
|
$15,000.000
|
$25,482.000
|
$24,433.000
|
$22,000.000
|
$35,510.000
|
$22,627.880
|
$23,996.500
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$7,700.000
|
$8,726.930
|
$8,061.300
|
$7,500.000
|
$10,330.140
|
$7,675.920
|
$11,143.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
4.000
|
$1,360.000
|
$3,109.430
|
$1,404.500
|
$1,350.000
|
$3,021.000
|
$1,325.000
|
$1,285.190
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
4.000
|
$2,480.000
|
$3,273.090
|
$2,279.000
|
$2,200.000
|
$3,180.000
|
$2,150.000
|
$2,365.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
12.000
|
$4,300.000
|
$5,455.140
|
$3,869.000
|
$4,000.000
|
$5,300.000
|
$3,650.000
|
$3,978.500
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
66.000
|
$7.000
|
$8.730
|
$10.600
|
$10.000
|
$8.480
|
$10.000
|
$8.340
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
6,401.000
|
$13.000
|
$8.730
|
$10.600
|
$10.000
|
$8.480
|
$10.000
|
$9.900
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
95.000
|
$12.000
|
$21.820
|
$23.320
|
$22.000
|
$21.200
|
$22.000
|
$33.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
60.000
|
$30.000
|
$32.730
|
$40.280
|
$38.000
|
$31.800
|
$38.000
|
$49.900
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
90.000
|
$21.000
|
$27.280
|
$22.260
|
$21.000
|
$26.500
|
$21.000
|
$41.150
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
535.000
|
$32.000
|
$49.100
|
$53.000
|
$50.000
|
$47.700
|
$50.000
|
$74.040
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
70.000
|
$9.300
|
$9.820
|
$10.600
|
$10.000
|
$9.540
|
$10.000
|
$91.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
503.000
|
$24.200
|
$32.730
|
$23.320
|
$22.000
|
$31.800
|
$22.000
|
$60.500
|
|
|
CONDT (RM) (3/4")
|
LF
|
32.000
|
$15.000
|
$21.820
|
$15.900
|
$15.000
|
$21.200
|
$15.000
|
$31.020
|
|
|
CONDT (RM) (1")
|
LF
|
230.000
|
$50.000
|
$43.640
|
$37.100
|
$35.000
|
$42.400
|
$35.000
|
$33.830
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
328.000
|
$1.000
|
$0.550
|
$1.380
|
$1.300
|
$0.530
|
$1.300
|
$2.560
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
656.000
|
$1.100
|
$0.820
|
$1.340
|
$1.300
|
$0.800
|
$1.260
|
$2.780
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
7,003.000
|
$1.300
|
$1.360
|
$1.220
|
$1.300
|
$1.330
|
$1.150
|
$1.540
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
14,006.000
|
$1.400
|
$1.470
|
$1.380
|
$1.300
|
$1.430
|
$1.300
|
$1.790
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
820.000
|
$1.400
|
$1.640
|
$1.590
|
$1.500
|
$1.590
|
$1.500
|
$2.090
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
40.000
|
$2.000
|
$2.180
|
$1.860
|
$2.000
|
$2.120
|
$1.750
|
$3.850
|
|
|
TRAY CABLE (3 CONDR) (8 AWG)
|
LF
|
905.000
|
$7.000
|
$6.550
|
$8.900
|
$9.000
|
$6.360
|
$8.400
|
$9.240
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
19.000
|
$951.000
|
$1,363.790
|
$1,007.000
|
$1,000.000
|
$1,325.000
|
$950.000
|
$974.250
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
9.000
|
$955.000
|
$1,581.990
|
$1,272.000
|
$1,300.000
|
$1,537.000
|
$1,200.000
|
$1,331.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$250.000
|
$545.510
|
$482.300
|
$460.000
|
$530.000
|
$455.000
|
$4,500.500
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,830.000
|
$8,728.220
|
$5,904.200
|
$5,600.000
|
$8,480.000
|
$5,570.000
|
$16,129.090
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$6,180.000
|
$8,182.710
|
$7,950.000
|
$7,500.000
|
$7,950.000
|
$7,500.000
|
$19,680.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
142.500
|
$27.200
|
$38.190
|
$29.680
|
$26.000
|
$31.800
|
$28.000
|
$35.070
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
52.000
|
$846.000
|
$792.090
|
$650.000
|
$570.000
|
$795.000
|
$815.000
|
$930.600
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$1,000.000
|
$831.360
|
$773.800
|
$740.000
|
$848.000
|
$730.000
|
$759.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$1,240.000
|
$1,063.750
|
$12,000.000
|
$1,100.000
|
$927.500
|
$1,150.000
|
$1,035.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,470.000
|
$1,060.480
|
$1,219.000
|
$1,300.000
|
$1,033.500
|
$1,150.000
|
$1,308.460
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$980.000
|
$1,249.230
|
$1,166.000
|
$1,000.000
|
$1,166.000
|
$975.000
|
$1,075.210
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$1,050.000
|
$1,223.040
|
$1,102.400
|
$1,100.000
|
$1,139.500
|
$1,040.000
|
$1,154.100
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,110.000
|
$1,428.160
|
$1,166.000
|
$1,200.000
|
$1,219.000
|
$1,100.000
|
$1,213.840
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
5.000
|
$1,570.000
|
$2,066.410
|
$1,643.000
|
$1,700.000
|
$2,120.000
|
$1,550.000
|
$1,721.010
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
94.000
|
$111.000
|
$106.920
|
$96.460
|
$100.000
|
$94.690
|
$91.000
|
$104.580
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
156.000
|
$237.000
|
$13.380
|
$212.000
|
$200.000
|
$106.110
|
$200.000
|
$203.530
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
738.500
|
$6.100
|
$9.820
|
$8.480
|
$6.000
|
$6.360
|
$8.000
|
$40.660
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
18.000
|
$65.000
|
$101.470
|
$159.000
|
$70.000
|
$132.500
|
$93.000
|
$85.800
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
51.000
|
$22.000
|
$49.440
|
$26.500
|
$32.000
|
$19.610
|
$27.000
|
$24.200
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
41.000
|
$26.000
|
$20.180
|
$26.500
|
$25.000
|
$19.610
|
$28.000
|
$26.050
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
34.000
|
$41.000
|
$49.440
|
$26.500
|
$35.000
|
$19.610
|
$5.000
|
$37.090
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
32,623.000
|
$0.200
|
$0.280
|
$0.380
|
$0.300
|
$0.280
|
$0.260
|
$0.410
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
140.000
|
$2.400
|
$1.690
|
$6.360
|
$1.700
|
$1.640
|
$1.550
|
$5.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
27,458.000
|
$0.200
|
$0.280
|
$0.380
|
$0.300
|
$0.280
|
$0.260
|
$0.460
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
876.300
|
$3.000
|
$5.460
|
$4.510
|
$5.000
|
$5.300
|
$5.000
|
$4.060
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
690.000
|
$0.900
|
$1.640
|
$1.720
|
$1.500
|
$1.590
|
$1.500
|
$1.030
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
52,100.000
|
$1.000
|
$0.710
|
$0.690
|
$1.000
|
$0.690
|
$0.650
|
$0.830
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
306.000
|
$10.000
|
$16.470
|
$16.010
|
$16.000
|
$16.010
|
$15.100
|
$12.430
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
1,085.000
|
$1.200
|
$1.640
|
$1.590
|
$1.500
|
$1.590
|
$1.500
|
$1.010
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
45,052.000
|
$1.000
|
$0.710
|
$0.690
|
$0.700
|
$0.690
|
$0.650
|
$0.850
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
13,157.000
|
$0.800
|
$0.930
|
$0.900
|
$0.850
|
$0.900
|
$0.850
|
$0.980
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
5,880.000
|
$0.200
|
$0.130
|
$0.130
|
$0.140
|
$0.130
|
$0.120
|
$0.110
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
43,736.000
|
$0.200
|
$0.130
|
$0.450
|
$0.140
|
$0.130
|
$0.120
|
$0.120
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
63,101.000
|
$0.200
|
$0.130
|
$0.450
|
$0.140
|
$0.130
|
$0.120
|
$0.110
|
|
|
PAVEMENT SEALER 24"
|
LF
|
280.000
|
$2.200
|
$1.310
|
$21.160
|
$1.200
|
$1.270
|
$1.200
|
$2.200
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$71.000
|
$11.670
|
$11.340
|
$11.000
|
$11.340
|
$10.700
|
$27.500
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$71.000
|
$12.930
|
$12.560
|
$12.000
|
$12.560
|
$11.850
|
$33.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
2.000
|
$116.000
|
$19.420
|
$18.870
|
$18.000
|
$18.870
|
$17.800
|
$84.670
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
14.000
|
$21.100
|
$10.910
|
$10.600
|
$10.000
|
$10.600
|
$10.000
|
$23.160
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,880.000
|
$0.300
|
$0.460
|
$0.450
|
$0.440
|
$0.450
|
$0.420
|
$0.760
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
43,736.000
|
$0.300
|
$0.460
|
$0.450
|
$0.440
|
$0.450
|
$0.420
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
63,101.000
|
$0.300
|
$0.460
|
$0.450
|
$0.440
|
$0.450
|
$0.420
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
280.000
|
$13.000
|
$21.780
|
$21.160
|
$20.000
|
$21.160
|
$19.960
|
$15.690
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$246.000
|
$341.800
|
$477.000
|
$320.000
|
$332.080
|
$313.280
|
$227.140
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$690.000
|
$882.100
|
$857.010
|
$900.000
|
$857.010
|
$808.500
|
$482.900
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$320.000
|
$490.960
|
$477.000
|
$450.000
|
$477.000
|
$450.000
|
$341.780
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
14.000
|
$29.000
|
$42.000
|
$40.810
|
$40.000
|
$40.810
|
$38.500
|
$86.350
|
|
PREFAB PAV MRK TY C (Y) (MED NOSE)
|
EA
|
3.000
|
$93.000
|
$343.290
|
$333.530
|
$320.000
|
$333.530
|
$314.650
|
$436.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
763.000
|
$3.800
|
$3.270
|
$3.180
|
$3.000
|
$3.180
|
$3.000
|
$4.360
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,572.000
|
$2.900
|
$3.270
|
$3.180
|
$3.000
|
$3.180
|
$3.000
|
$4.360
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
199.000
|
$3.800
|
$3.270
|
$3.180
|
$3.000
|
$3.180
|
$3.000
|
$3.630
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
40,445.000
|
$0.500
|
$0.820
|
$0.800
|
$0.800
|
$0.800
|
$0.750
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
112,717.000
|
$0.100
|
$0.160
|
$0.160
|
$0.150
|
$0.160
|
$0.150
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
13,157.000
|
$0.200
|
$0.330
|
$0.320
|
$0.300
|
$0.320
|
$0.300
|
$0.970
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
280.000
|
$1.000
|
$1.110
|
$1.250
|
$1.000
|
$1.080
|
$1.020
|
$2.750
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
16.000
|
$21.000
|
$27.280
|
$26.000
|
$25.000
|
$26.500
|
$25.000
|
$28.170
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
12.000
|
$21.000
|
$38.190
|
$40.000
|
$35.000
|
$37.100
|
$35.000
|
$28.170
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
14.000
|
$11.000
|
$10.910
|
$15.000
|
$10.000
|
$10.600
|
$10.000
|
$5.630
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
3.000
|
$31.200
|
$27.280
|
$27.000
|
$25.000
|
$26.500
|
$25.000
|
$11.330
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$25,200.000
|
$32,730.840
|
$28,000.000
|
$26,500.000
|
$31,800.000
|
$26,500.000
|
$55,640.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,600.000
|
$10,910.280
|
$6,000.000
|
$5,600.000
|
$10,600.000
|
$5,600.000
|
$7,158.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$38,200.000
|
$224,390.920
|
$25,000.000
|
$23,000.000
|
$94,320.330
|
$23,000.000
|
$142,560.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
16.000
|
$260.000
|
$327.310
|
$225.000
|
$200.000
|
$318.000
|
$200.000
|
$313.350
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$260.000
|
$327.310
|
$225.000
|
$200.000
|
$318.000
|
$200.000
|
$314.600
|
|
|
BACK PLATE (12")(2 SEC)(VENTED)ALUM
|
EA
|
12.000
|
$135.000
|
$81.830
|
$150.000
|
$135.000
|
$79.500
|
$135.000
|
$148.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
485.000
|
$2.100
|
$3.270
|
$2.250
|
$2.400
|
$3.180
|
$2.200
|
$2.400
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
150.000
|
$2.300
|
$3.820
|
$2.500
|
$2.400
|
$3.710
|
$2.300
|
$2.780
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
1,655.000
|
$5.100
|
$4.360
|
$6.000
|
$6.000
|
$4.240
|
$5.500
|
$6.770
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$920.000
|
$381.860
|
$1,000.000
|
$1,000.000
|
$371.000
|
$950.000
|
$1,602.280
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
2.000
|
$7,900.000
|
$12,546.830
|
$10,000.000
|
$9,000.000
|
$12,190.000
|
$8,600.000
|
$14,285.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
2.000
|
$9,600.000
|
$14,183.370
|
$10,000.000
|
$10,000.000
|
$13,780.000
|
$9,200.000
|
$21,880.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
2.000
|
$20,700.000
|
$38,185.990
|
$26,000.000
|
$27,000.000
|
$37,100.000
|
$24,500.000
|
$34,850.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
7.000
|
$1,500.000
|
$1,391.060
|
$2,000.000
|
$7,100.000
|
$5,179.040
|
$500.000
|
$6,454.020
|
|
|
LITTER REMOVAL
|
CYC
|
42.000
|
$1,500.000
|
$1,276.620
|
$750.000
|
$4,700.000
|
$9,980.590
|
$250.000
|
$2,879.660
|
|
|
SP MIXES SP-B PG70-22
|
TON
|
28,738.000
|
$92.000
|
$110.570
|
$122.000
|
$69.000
|
$96.680
|
$101.500
|
$109.420
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,700.000
|
$19,936.940
|
$25,000.000
|
$11,000.000
|
$11,983.270
|
$7,500.000
|
$54,043.200
|
|
|
CONDUIT (PREPARE)
|
LF
|
100.000
|
$2.200
|
$9.820
|
$0.600
|
$0.500
|
$9.540
|
$0.500
|
$2.200
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$622.000
|
$1,581.990
|
$265.000
|
$270.000
|
$1,537.000
|
$250.000
|
$250.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
1,900.000
|
$4.000
|
$13.640
|
$13.250
|
$3.300
|
$13.250
|
$12.500
|
$21.520
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$8,830.000
|
$8,343.500
|
$9,500.000
|
$9,700.000
|
$11,412.640
|
$8,820.000
|
$20,925.000
|
|
|
TMA (STATIONARY)
|
DAY
|
24.000
|
$220.000
|
$314.440
|
$400.000
|
$340.000
|
$363.610
|
$650.000
|
$531.960
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$64.000
|
$44.600
|
$40.000
|
$59.000
|
$49.410
|
$50.000
|
$61.300
|
|
Totals: |
$28,510,931.500
|
$26,934,934.652
|
$27,624,164.092
|
$29,843,846.350
|
$30,258,502.954
|
$31,693,815.740
|
$32,486,035.474
|