Show Job Controls
Bid Cobra

GALVESTON SH 87 (0051-04-067)

Items: 90

County: GALVESTON
Length: N/A
Highway: SH 87
District: HOUSTON
Control Number: 0051-04-067
DBE Goal: N/A
Project: NH 1902(174)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $8,180,408.51
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$8,180,408.51
$10,994,229.66
Over/Under Est: 34.4% $2,813,821.15

Bid Items & Bid Tabulations

90 Total 0 of 90
GALVESTON  |  SH 87  |  HOUSTON  |  0051-04-067  |  07/10/2019  |  $8,180,408.51  |  NH 1902(174)  |  SURF/ROADWAY RESTOR  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (CURB)
LF 195.000 $6.000 $5.000
REMOVING CONC (MISC)
SY 5,690.000 $6.970 $15.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 200.000 $19.180 $14.000
BLOCK SODDING
SY 100.000 $2.830 $8.000
FL BS (CMP IN PLC)(TY E, GR4)(2")
SY 4,039.000 $7.500 $1.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 11,797.000 $1.400 $5.550
SALV HAUL & STKPL RCL APH PV (6")
SY 167,225.000 $3.500 $4.000
SALV, HAUL & STKPL RCL APH PV (2"-6")
SY 44,827.000 $4.840 $3.050
ASPH (A-R TYPE II OR III)
GAL 89,006.000 $3.330 $2.500
AGGR(TY-PB GR-4 SAC-B)
CY 2,226.000 $130.000 $136.000
D-GR HMA TY-D SAC-A PG76-22
TON 947.000 $87.000 $175.000
TOM (ASPHALT) PG 76-22
TON 1,633.000 $125.000 $148.500
TOM-C (AGGREGATE) SAC-A
TON 10,945.000 $125.000 $148.500
TOM - F (AGGREGATE) SAC - A
TON 10,910.000 $125.000 $148.500
CONC PVMT (CONT REINF - CRCP) (7")
SY 829.000 $85.000 $200.000
CONC PVMT (CONT REINF) (FAST TRK) (9")
SY 2,988.000 $90.000 $175.000
FULL - DEPTH REPAIR CRCP (8"-14")
SY 482.000 $348.550 $450.000
STRUCT EXCAV
CY 106.000 $8.250 $1.000
STRUCT EXCAV (BOX)
CY 8,510.000 $4.200 $1.000
CEM STABIL BKFL
CY 2,944.000 $39.120 $65.000
FLOWABLE BACKFILL
CY 63.000 $135.270 $300.000
TRENCH EXCAVATION PROTECTION
LF 6,058.000 $1.430 $2.500
CONC BOX CULV (4 FT X 2 FT)
LF 4,554.000 $134.740 $270.000
CONC BOX CULV (4 FT X 3 FT)
LF 14.000 $203.370 $340.000
CONC BOX CULV (4 FT X 4 FT)
LF 218.000 $215.630 $410.000
RC PIPE (CL III)(18 IN)
LF 50.000 $60.820 $135.000
RC PIPE (CL III)(24 IN)
LF 157.000 $71.740 $140.000
RC PIPE (CL III)(30 IN)
LF 262.000 $76.430 $151.000
RC PIPE (CL III)(36 IN)
LF 162.000 $95.600 $175.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 32.000 $140.000 $211.000
MANH (COMPL)(PRM)(48IN)
EA 6.000 $2,564.930 $3,670.000
INLET (COMPL)(TY A)(SPL)
EA 49.000 $3,694.730 $4,500.000
MANH (COMPL)(TY M)
EA 7.000 $2,654.930 $6,730.000
INLET (STG II)(TY BB)
EA 9.000 $1,700.000 $2,960.000
GRATE & FRAME
EA 76.000 $790.560 $1,650.000
PRE-CAST TRNCH DRAIN(W/OUT CONC PVMNT)
LF 1,616.000 $200.000 $430.000
ADJUSTING MANHOLES
EA 25.000 $478.190 $500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 6.000 $350.000 $275.000
REMOV STR (INLET)
EA 85.000 $531.790 $375.000
REMOV STR (MANHOLE)
EA 30.000 $569.120 $450.000
REMOV STR (PIPE)
LF 97.000 $19.260 $10.000
REMOV STR (BOX CULVERT)
LF 6,228.000 $56.470 $11.000
MOBILIZATION
LS 1.000 $564,000.000 $805,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $6,932.000 $1,180.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,920.000 $20.840 $70.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 200.000 $19.550 $70.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,740.000 $2.000 $11.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,120.000 $2.000 $12.500
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 1,920.000 $8.200 $12.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 200.000 $10.300 $12.000
CONC CURB (TY II)
LF 90.000 $13.960 $10.000
CONC CURB & GUTTER (TY II)
LF 3,308.000 $21.550 $115.000
CONC CURB (DOWEL)
LF 1,436.000 $7.270 $94.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 99.000 $37.190 $81.000
CONCRETE GUTTER (MODIFIED)
LF 278.000 $20.000 $130.000
DRIVEWAYS (CONC)
SY 84.000 $88.000 $125.000
CONC SIDEWALKS (5")
SY 8.000 $54.000 $100.000
CURB RAMPS (TY 21)
EA 13.000 $2,150.000 $1,440.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 422.760 $27.000 $19.100
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 62.000 $489.530 $375.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 56,140.000 $0.300 $0.400
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 11,500.000 $0.450 $1.200
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 22,330.000 $0.300 $0.400
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 600.000 $0.470 $0.900
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,865.000 $0.430 $0.700
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 51,315.000 $1.320 $0.900
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 13,260.000 $2.920 $1.800
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 48.000 $56.990 $40.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 39.000 $65.930 $50.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 4,524.000 $0.300 $0.400
WK ZN PAV MRK NON-REMOV (Y)8"(SLD)
LF 1,548.000 $0.440 $1.200
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 291.000 $3.000 $3.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 200.000 $1.270 $1.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,955.000 $1.000 $1.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 17,105.000 $2.830 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,420.000 $5.770 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $106.620 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $128.530 $180.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 516.000 $0.910 $0.900
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 97.000 $5.240 $7.000
REFL PAV MRK TY II (Y) 12" (SLD)
LF 5,421.000 $1.010 $1.200
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 16,980.000 $0.480 $0.700
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 32,995.000 $0.480 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,508.000 $0.440 $0.800
REFL PAV MRKR TY II-A-A
EA 26.000 $7.000 $8.400
REFL PAV MRKR TY II-C-R
EA 1,029.000 $5.000 $5.100
VEH LP DETECT (SAWCUT)
LF 612.000 $10.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 420.000 $57.730 $10.000
TMA (STATIONARY)
DAY 158.000 $280.000 $270.000
TMA (MOBILE OPERATION)
HR 66.000 $25.000 $50.000
Totals: $8,180,408.510 $10,994,229.666