PREPARING ROW
|
STA
|
333.000
|
$1,000.000
|
$500.000
|
$496.170
|
$2,920.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
85.000
|
$28.500
|
$11.000
|
$19.980
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
142,225.000
|
$6.560
|
$11.000
|
$9.470
|
$11.650
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
19,783.000
|
$6.750
|
$10.000
|
$8.940
|
$5.000
|
|
|
BLADING
|
HR
|
132.000
|
$103.320
|
$140.000
|
$96.900
|
$100.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
321,120.000
|
$1.320
|
$0.750
|
$0.750
|
$0.600
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
321,120.000
|
$0.140
|
$0.140
|
$0.180
|
$0.170
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
321,120.000
|
$0.100
|
$0.120
|
$0.120
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
5,009.000
|
$19.810
|
$21.000
|
$23.310
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
321,120.000
|
$0.890
|
$0.800
|
$0.700
|
$0.600
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$61.730
|
$75.000
|
$79.800
|
$65.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
123,220.000
|
$33.700
|
$50.000
|
$54.100
|
$56.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
69,098.000
|
$3.100
|
$4.500
|
$3.830
|
$4.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
39,032.000
|
$59.420
|
$77.000
|
$88.680
|
$84.000
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
13,853.000
|
$67.950
|
$77.000
|
$75.900
|
$77.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
41,526.000
|
$80.000
|
$89.000
|
$84.210
|
$84.000
|
|
|
CEM STABIL BKFL
|
CY
|
639.000
|
$122.490
|
$88.000
|
$110.000
|
$140.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
238.000
|
$80.430
|
$45.000
|
$63.000
|
$30.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
104.000
|
$2.870
|
$7.250
|
$20.000
|
$30.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
16.000
|
$419.320
|
$1,100.000
|
$600.000
|
$1,300.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
66.000
|
$825.000
|
$1,050.000
|
$825.000
|
$1,400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
154.000
|
$336.000
|
$484.000
|
$410.000
|
$440.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
339.000
|
$426.250
|
$450.000
|
$430.000
|
$480.000
|
|
|
RAIL (TY T221)
|
LF
|
444.000
|
$135.000
|
$150.000
|
$185.000
|
$170.000
|
|
|
RAIL (TY T631)
|
LF
|
3,232.000
|
$73.070
|
$74.000
|
$95.000
|
$85.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
20.000
|
$253.000
|
$468.000
|
$530.000
|
$800.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
420.000
|
$63.230
|
$68.000
|
$80.000
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
266.000
|
$88.690
|
$88.000
|
$90.000
|
$90.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$3,770.690
|
$4,970.000
|
$4,100.000
|
$7,300.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$5,012.000
|
$5,288.000
|
$4,700.000
|
$7,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$1,335.190
|
$1,220.000
|
$1,250.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$1,677.040
|
$1,251.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,550.000
|
$1,415.000
|
$1,700.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
12.000
|
$1,600.000
|
$2,950.000
|
$1,925.000
|
$1,700.000
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$1,029.430
|
$881.000
|
$1,500.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,923,588.460
|
$1,465,000.000
|
$1,960,622.880
|
$1,970,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$7,581.890
|
$3,000.000
|
$5,428.060
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
2,000.000
|
$27.400
|
$23.250
|
$19.000
|
$20.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
485.000
|
$25.090
|
$26.500
|
$55.000
|
$25.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
640.000
|
$52.610
|
$78.740
|
$48.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,125.000
|
$7.560
|
$7.250
|
$8.000
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,092.000
|
$13.430
|
$12.560
|
$25.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,092.000
|
$4.460
|
$4.350
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
29,065.000
|
$1.980
|
$1.850
|
$1.690
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
29,065.000
|
$0.500
|
$0.250
|
$0.400
|
$0.300
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
5,000.000
|
$71.980
|
$56.000
|
$96.900
|
$45.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
18.000
|
$3,539.280
|
$4,000.000
|
$2,706.250
|
$2,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,380.000
|
$45.000
|
$26.000
|
$20.000
|
$35.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
10,480.000
|
$22.050
|
$14.000
|
$18.000
|
$32.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
600.000
|
$24.540
|
$14.000
|
$21.000
|
$32.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
9,520.000
|
$4.150
|
$11.000
|
$6.500
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
157,200.000
|
$5.400
|
$4.000
|
$6.000
|
$6.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
900.000
|
$7.940
|
$4.000
|
$6.000
|
$6.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,380.000
|
$4.480
|
$17.000
|
$13.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
10,480.000
|
$8.800
|
$14.000
|
$11.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
600.000
|
$10.740
|
$14.000
|
$11.000
|
$10.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,414.000
|
$36.670
|
$60.000
|
$29.610
|
$46.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,563.000
|
$21.130
|
$20.500
|
$19.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$1,736.390
|
$2,050.000
|
$1,850.000
|
$1,700.000
|
|
|
SHORT RADIUS
|
LF
|
19.000
|
$26.000
|
$30.000
|
$30.000
|
$32.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,010.000
|
$965.000
|
$1,000.000
|
$1,050.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,132.250
|
$990.000
|
$1,150.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,400.000
|
$2.930
|
$2.000
|
$2.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
35.000
|
$2,450.290
|
$2,615.000
|
$2,350.000
|
$2,450.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$268.670
|
$315.000
|
$150.000
|
$160.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
22.000
|
$10,530.950
|
$7,000.000
|
$7,000.000
|
$7,700.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
46.000
|
$1,488.040
|
$500.000
|
$1,000.000
|
$700.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
22.000
|
$825.000
|
$100.000
|
$500.000
|
$500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$200.000
|
$220.000
|
$180.000
|
$185.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
55.000
|
$394.810
|
$440.000
|
$360.000
|
$370.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
63.000
|
$463.860
|
$490.000
|
$450.000
|
$460.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$590.130
|
$610.000
|
$570.000
|
$590.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$623.470
|
$680.000
|
$640.000
|
$660.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
4.000
|
$738.430
|
$712.000
|
$740.000
|
$770.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$685.080
|
$729.000
|
$705.000
|
$730.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
132.000
|
$67.020
|
$85.000
|
$40.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
14.000
|
$47.920
|
$52.000
|
$56.000
|
$58.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
5.000
|
$17.910
|
$25.000
|
$25.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
130.000
|
$18.180
|
$25.000
|
$26.000
|
$27.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
627,249.000
|
$0.280
|
$0.280
|
$0.250
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
93,024.000
|
$0.270
|
$0.280
|
$0.250
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
62,724.000
|
$0.970
|
$1.390
|
$1.250
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
9,302.000
|
$1.000
|
$1.390
|
$1.250
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,308.000
|
$0.830
|
$0.750
|
$2.500
|
$0.780
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,127.000
|
$0.730
|
$0.840
|
$0.950
|
$0.870
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
84.000
|
$5.090
|
$10.000
|
$6.500
|
$10.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$93.750
|
$134.000
|
$200.000
|
$140.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
8.000
|
$339.130
|
$244.000
|
$250.000
|
$260.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$127.150
|
$157.000
|
$200.000
|
$165.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$520.150
|
$555.000
|
$450.000
|
$570.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$58.180
|
$55.000
|
$25.000
|
$58.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
161,068.000
|
$0.080
|
$0.120
|
$0.150
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
150,366.000
|
$0.140
|
$0.200
|
$0.180
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,127.000
|
$0.270
|
$0.440
|
$0.300
|
$0.460
|
|
|
PAVEMENT SEALER 24"
|
LF
|
84.000
|
$2.380
|
$3.500
|
$2.500
|
$3.600
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$43.610
|
$77.000
|
$75.000
|
$80.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$47.910
|
$77.000
|
$75.000
|
$80.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
8.000
|
$142.830
|
$147.000
|
$95.000
|
$155.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
1.000
|
$42.030
|
$344.000
|
$125.000
|
$360.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
4.000
|
$16.240
|
$33.000
|
$10.000
|
$35.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
145,112.000
|
$0.970
|
$0.970
|
$0.850
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
147,604.000
|
$0.640
|
$0.670
|
$0.650
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
9,340.000
|
$0.390
|
$0.380
|
$0.750
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
5,254.000
|
$0.470
|
$0.520
|
$0.750
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,816.000
|
$0.340
|
$0.380
|
$0.750
|
$0.400
|
|
REFL PAV MRKR TY I-C
|
EA
|
518.000
|
$3.340
|
$3.880
|
$5.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,033.000
|
$3.050
|
$3.770
|
$5.000
|
$3.900
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6.000
|
$3.580
|
$20.000
|
$5.000
|
$21.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$20,000.000
|
$5,700.000
|
$1,000.000
|
$2,500.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
107,797.000
|
$2.730
|
$4.200
|
$3.720
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$57.740
|
$60.000
|
$81.190
|
$90.000
|
|
|
TMA (STATIONARY)
|
DAY
|
152.000
|
$185.580
|
$175.000
|
$162.370
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2.000
|
$43.040
|
$60.000
|
$162.370
|
$100.000
|
|
|
DRIVEWAY ASSISTANCE DEVICE SYSTEM
|
MO
|
18.000
|
$8,013.750
|
$5,700.000
|
$4,735.940
|
$2,800.000
|
|
Totals: |
$19,884,677.950
|
$22,794,970.100
|
$24,126,032.680
|
$24,989,600.960
|