Show Job Controls
Bid Cobra

FRIO IH 35 (0017-06-084)

Items: 127

County: FRIO
Length: N/A
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-06-084
DBE Goal: N/A
Project: NH 2018(910)
Guaranty: N/A
Time: 358 WORKING DAYS
Engineer's Estimate: $15,775,305.00
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING FRONTAGE ROADS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$15,775,305.00
$13,995,985.02
Over/Under Est: -11.28% -$1,779,319.98
Over/Under Est: -10.4% -$1,640,202.30
Amt Left: 0.99% $139,117.68
$14,920,872.61
Over/Under Est: -5.42% -$854,432.39
Amt Left: 6.61% $924,887.59
Delta: -5.56% -$785,769.91
Over/Under Est: -3.93% -$619,630.48
Amt Left: 8.29% $1,159,689.50
Delta: -1.57% -$234,801.91
$15,438,329.19
Over/Under Est: -2.14% -$336,975.81
Amt Left: 10.31% $1,442,344.17
Delta: -1.87% -$282,654.67
$16,181,296.34
Over/Under Est: 2.57% $405,991.34
Amt Left: 15.61% $2,185,311.32
Delta: -4.81% -$742,967.15
Over/Under Est: 4.3% $678,673.65
Amt Left: 17.56% $2,457,993.63
Delta: -1.69% -$272,682.31
$17,629,179.09
Over/Under Est: 11.75% $1,853,874.09
Amt Left: 25.96% $3,633,194.07
Delta: -7.14% -$1,175,200.44

Bid Items & Bid Tabulations

127 Total 0 of 127
FRIO  |  IH 35  |  SAN ANTONIO  |  0017-06-084  |  05/01/2018  |  $15,775,305.00  |  NH 2018(910)  |  REHAB EXIST FRONTAGE ROADS  |  358 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. L. ZUMWALT CONSTRUCTION, INC.
ANGEL BROTHERS HOLDINGS CORP.
DEAN WORD COMPANY, LTD.
CURRAN CONTRACTING COMPANY
RAY FARIS, INC.
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
J3 COMPANY, LLC
PREPARING ROW
STA 339.410 $1,000.000 $350.000 $225.000 $442.469 $362.900 $516.000 $522.870 $600.000 $400.000
REMOVING CONC (RIPRAP)
SY 2,411.000 $12.600 $5.000 $15.000 $17.640 $4.150 $14.190 $20.000 $14.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 1,056.000 $14.000 $5.000 $15.000 $19.720 $4.500 $14.770 $25.000 $12.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 352.600 $4.600 $4.000 $7.000 $9.426 $5.050 $11.000 $9.000 $10.000 $8.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 2,674.000 $4.600 $1.580 $2.500 $4.006 $5.150 $8.880 $3.610 $5.700 $10.640
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 8,289.000 $3.200 $1.580 $2.500 $4.006 $2.000 $5.400 $2.560 $2.400 $8.510
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 224,203.000 $2.700 $3.170 $3.250 $3.015 $4.250 $3.780 $4.500 $3.300 $8.510
EXCAVATION (ROADWAY)
CY 38,945.000 $9.300 $8.000 $8.500 $13.084 $15.900 $9.720 $8.940 $11.000 $15.970
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 6,735.000 $10.300 $10.000 $8.500 $6.724 $4.450 $9.720 $8.940 $4.500 $8.510
COMPOST MANUF TOPSOIL (4")
SY 191,333.000 $1.300 $0.650 $1.250 $0.682 $1.100 $1.270 $0.620 $1.100 $2.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 191,333.000 $0.200 $0.150 $0.130 $0.134 $0.150 $0.140 $0.140 $0.140 $0.160
DRILL SEED (TEMP)(WARM OR COOL)
SY 191,333.000 $0.100 $0.110 $0.130 $0.082 $0.150 $0.100 $0.100 $0.100 $0.130
VEGETATIVE WATERING
MG 4,477.000 $16.600 $25.000 $25.000 $22.101 $33.750 $15.640 $19.980 $30.000 $27.070
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 23,059.000 $0.900 $0.820 $0.790 $0.773 $0.900 $0.780 $1.350 $0.800 $1.200
ASPH (AC-15P)
GAL 52,805.000 $2.700 $2.350 $2.250 $3.066 $4.150 $2.950 $2.990 $3.200 $2.490
AGGR(TY-PB GR-5 SAC-B)
CY 1,829.000 $98.000 $55.000 $50.000 $79.261 $106.150 $70.240 $63.340 $92.000 $82.780
D-GR HMA TY-B PG70-22
TON 133,185.000 $58.000 $54.500 $56.250 $54.980 $57.600 $54.500 $63.260 $61.000 $53.170
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 29,002.000 $78.000 $66.500 $74.000 $66.596 $69.750 $68.600 $69.280 $77.000 $61.220
CEM STABIL BKFL
CY 171.600 $40.000 $138.000 $165.000 $118.450 $135.200 $105.000 $110.260 $172.000 $109.620
TEMPORARY SPL SHORING
SF 1,568.000 $17.400 $21.000 $20.500 $20.600 $19.150 $22.000 $23.100 $21.000 $20.000
RIPRAP (CONC)(4 IN)
CY 213.900 $350.000 $430.000 $420.000 $445.100 $367.650 $370.000 $388.540 $422.000 $478.960
RIPRAP (CONC)(5 IN)
CY 40.700 $360.000 $435.000 $420.000 $445.100 $553.550 $370.000 $388.540 $423.000 $478.960
RIPRAP (CONC)(CL B)
CY 102.000 $350.000 $435.000 $420.000 $445.100 $349.400 $370.000 $388.540 $423.000 $478.960
RIPRAP (MOW STRIP)(4 IN)
CY 198.000 $380.000 $435.000 $420.000 $453.400 $498.550 $395.000 $414.790 $423.000 $478.960
RAIL (TY T223)
LF 59.030 $78.000 $130.000 $128.000 $128.750 $138.050 $125.000 $131.260 $127.000 $186.260
CMP AR (GAL STL DES 3)
LF 76.700 $59.000 $68.000 $68.000 $66.950 $65.650 $79.050 $83.010 $67.000 $106.440
CONC BOX CULV (4 FT X 2 FT)
LF 131.000 $190.000 $315.000 $315.000 $309.000 $30.850 $223.600 $234.800 $306.000 $425.740
CONC BOX CULV (5 FT X 2 FT)
LF 102.000 $340.000 $370.000 $370.000 $360.500 $30.850 $549.900 $577.450 $360.000 $585.400
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 37.400 $530.000 $525.000 $505.000 $515.000 $949.950 $800.000 $840.080 $510.000 $585.400
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 6.900 $640.000 $580.000 $575.000 $566.500 $981.350 $850.000 $892.590 $560.000 $585.400
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 38.200 $630.000 $680.000 $675.000 $669.500 $724.300 $850.000 $892.590 $660.000 $585.400
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $9,600.000 $7,100.000 $7,000.000 $6,952.500 $12,435.100 $7,078.500 $7,433.160 $6,900.000 $26,608.920
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $9,200.000 $10,000.000 $9,600.000 $9,785.000 $16,130.900 $10,501.400 $11,027.560 $9,700.000 $26,608.920
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $16,600.000 $15,800.000 $15,250.000 $15,450.000 $19,163.950 $20,020.000 $21,023.090 $15,300.000 $26,608.930
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $4,300.000 $6,300.000 $6,100.000 $6,180.000 $4,931.200 $5,167.500 $5,426.410 $6,100.000 $26,608.920
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $5,800.000 $6,300.000 $6,100.000 $6,180.000 $8,548.950 $6,565.000 $6,893.930 $6,100.000 $26,608.930
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 6.000 $4,300.000 $3,950.000 $3,800.000 $3,862.500 $2,446.850 $4,160.000 $4,368.430 $3,800.000 $26,608.930
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 3.000 $5,200.000 $5,800.000 $5,600.000 $5,665.000 $6,744.050 $6,597.500 $6,928.060 $5,600.000 $21,287.140
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $5,800.000 $6,000.000 $5,850.000 $5,922.500 $9,000.850 $7,117.500 $7,474.120 $5,800.000 $21,287.140
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 16.000 $4,600.000 $3,700.000 $3,600.000 $3,605.000 $3,442.950 $4,420.000 $4,641.460 $3,600.000 $15,965.360
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 6.000 $4,900.000 $3,950.000 $3,800.000 $3,862.500 $4,351.950 $4,667.000 $4,900.840 $3,800.000 $14,366.720
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $6,200.000 $4,200.000 $4,100.000 $4,120.000 $4,581.800 $5,661.500 $5,945.170 $4,100.000 $15,400.360
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
EA 1.000 $11,400.000 $7,900.000 $7,700.000 $7,725.000 $15,547.000 $21,937.500 $23,036.660 $7,600.000 $21,591.210
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $950.000 $1,260.000 $1,250.000 $1,236.000 $91.450 $1,332.500 $1,399.260 $1,220.000 $2,203.140
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,300.000 $1,260.000 $1,250.000 $1,236.000 $91.450 $1,332.500 $1,399.260 $1,220.000 $2,203.140
SET (TY II) (DES 3) (CMP) (3: 1) (C)
EA 17.000 $1,200.000 $1,100.000 $1,050.000 $1,030.000 $986.500 $1,326.000 $1,392.440 $1,020.000 $2,337.640
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 1.000 $2,050.000 $1,600.000 $1,525.000 $1,545.000 $1,563.050 $1,241.500 $1,303.700 $1,530.000 $2,307.450
CLEAN EXIST CULVERTS
EA 34.000 $1,350.000 $1,600.000 $1,800.000 $1,802.500 $476.350 $1,200.000 $1,260.130 $1,800.000 $1,683.760
REMOV STR (WINGWALL)
EA 22.000 $1,450.000 $1,320.000 $1,525.000 $1,545.000 $202.600 $624.000 $655.270 $1,530.000 $2,203.330
REMOV STR (HEADWALL)
EA 16.000 $1,300.000 $1,320.000 $1,525.000 $1,545.000 $186.750 $624.000 $655.270 $1,530.000 $1,442.680
REMOV STR (PIPE)
EA 6.000 $325.000 $265.000 $260.000 $257.500 $586.900 $1,300.000 $1,365.140 $255.000 $1,442.680
MOBILIZATION
LS 1.000 $1,092,000.000 $640,000.000 $552,000.000 $1,299,969.528 $650,000.000 $1,615,859.650 $1,228,576.620 $1,650,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $5,000.000 $7,000.000 $1,500.000 $4,148.638 $2,967.250 $2,448.490 $3,778.480 $2,060.000 $21,287.140
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 240.000 $23.200 $30.000 $35.000 $30.540 $24.950 $45.000 $29.650 $30.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 240.000 $7.400 $7.500 $1.000 $8.446 $6.350 $7.000 $8.200 $9.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $13.600 $15.000 $20.000 $14.935 $19.650 $14.000 $14.500 $15.000 $11.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $4.800 $2.500 $1.000 $5.665 $6.350 $2.000 $5.500 $6.000 $6.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 84.000 $76.000 $79.000 $58.000 $89.256 $138.250 $48.000 $79.800 $80.000 $70.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,930.000 $1.700 $2.000 $1.900 $2.060 $2.900 $1.870 $2.000 $2.000 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,930.000 $0.400 $1.050 $0.250 $0.258 $0.550 $1.000 $0.250 $0.300 $0.600
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,284.000 $3.800 $3.600 $3.500 $4.893 $3.700 $3.350 $4.750 $4.800 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,284.000 $0.800 $1.050 $0.250 $1.030 $1.600 $1.000 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 378.000 $45.000 $47.000 $37.000 $80.327 $38.800 $72.400 $39.420 $68.000 $41.050
ONE-WAY TRAF CONT (PILOT CAR)
HR 2,560.000 $64.000 $75.000 $60.000 $82.248 $96.700 $80.800 $85.500 $50.000 $27.480
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 12.000 $1,150.000 $3,200.000 $1,575.000 $3,180.000 $1,948.800 $1,500.000 $3,600.000 $3,500.000 $3,200.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 240.000 $28.000 $90.000 $15.000 $20.453 $34.550 $12.480 $13.110 $50.000 $67.070
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $24.800 $95.000 $15.000 $37.699 $35.250 $12.480 $13.110 $50.000 $76.380
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 6,480.000 $6.800 $6.000 $5.000 $8.775 $6.600 $11.000 $11.550 $9.500 $17.080
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,080.000 $11.400 $6.000 $5.000 $10.845 $9.850 $11.000 $11.550 $9.500 $21.590
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 240.000 $6.600 $8.000 $10.000 $19.570 $23.200 $12.480 $13.110 $12.000 $24.490
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $8.200 $8.000 $10.000 $20.590 $6.600 $12.480 $13.110 $13.000 $33.800
CONC CURB & GUTTER (TY I)
LF 981.000 $21.400 $31.000 $31.000 $30.900 $31.750 $19.000 $19.950 $30.000 $15.970
DRIVEWAYS (CONC)
SY 1,056.000 $55.000 $76.000 $75.000 $81.925 $73.350 $62.560 $57.760 $74.000 $69.180
DRIVEWAYS (ACP)
SY 6,188.000 $39.000 $30.000 $30.000 $26.246 $29.900 $42.960 $29.610 $34.000 $42.500
TURNOUTS (ACP)
SY 512.000 $36.000 $35.000 $30.000 $26.246 $60.350 $47.960 $29.610 $40.000 $50.610
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 57,620.000 $0.200 $0.120 $0.250 $0.134 $0.150 $0.100 $0.190 $0.240 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 2,212.500 $19.000 $22.000 $20.000 $21.682 $20.750 $21.520 $21.050 $19.600 $19.600
MTL THRIE-BEAM GD FEN (TIM POST)
LF 37.500 $33.000 $72.000 $71.000 $70.112 $74.150 $91.070 $68.070 $70.000 $70.070
SHORT RADIUS
LF 38.000 $28.000 $28.500 $27.000 $27.800 $27.500 $26.990 $26.990 $26.000 $26.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $24.000 $23.000 $20.000 $22.197 $20.750 $22.550 $21.550 $19.600 $19.600
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $1.100 $1.050 $2.000 $1.030 $2.100 $1.000 $1.000 $2.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,250.000 $2,400.000 $2,500.000 $2,359.730 $2,642.050 $2,392.000 $2,291.000 $2,496.000 $2,496.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $205.000 $163.000 $155.000 $159.650 $158.800 $155.000 $155.000 $150.000 $150.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 23.000 $235.000 $155.000 $148.000 $169.950 $174.650 $165.000 $165.000 $147.000 $175.220
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 6.000 $185.000 $218.000 $208.000 $185.400 $190.550 $180.000 $180.000 $207.000 $238.200
REPLACE LUMINAIRE W/LED (250W EQ)
EA 9.000 $790.000 $650.000 $960.000 $636.540 $654.150 $618.000 $618.000 $950.000 $725.000
ALUMINUM SIGNS (TY A)
SF 2,058.000 $30.000 $10.500 $10.250 $12.875 $13.250 $12.500 $12.500 $10.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 83.000 $600.000 $327.000 $315.000 $262.650 $269.900 $255.000 $255.000 $312.000 $484.790
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 26.000 $550.000 $385.000 $370.000 $278.100 $285.800 $270.000 $270.000 $367.000 $536.290
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 43.000 $650.000 $395.000 $380.000 $324.450 $333.450 $315.000 $315.000 $374.000 $519.790
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 16.000 $650.000 $430.000 $415.000 $365.650 $375.750 $355.000 $355.000 $408.000 $552.790
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $850.000 $590.000 $575.000 $442.900 $455.150 $430.000 $430.000 $560.000 $617.790
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 7.000 $2,000.000 $1,310.000 $1,275.000 $1,004.250 $1,032.050 $975.000 $975.000 $1,250.000 $1,188.790
REMOVE SM RD SN SUP&AM
EA 148.000 $150.000 $74.000 $71.000 $41.200 $42.350 $40.000 $40.000 $70.000 $65.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 56.000 $24.000 $16.000 $16.000 $18.540 $12.700 $18.000 $18.000 $15.000 $12.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 4.000 $13.000 $50.000 $48.000 $43.260 $43.400 $42.000 $42.000 $47.000 $40.990
INSTL OM ASSM (OM-2Y)(WC)GND
EA 108.000 $75.000 $50.000 $48.000 $49.440 $43.400 $48.000 $48.000 $47.000 $40.990
REMOVE DELIN & OBJECT MARKER ASSMS
EA 129.000 $18.000 $7.400 $7.000 $5.150 $26.450 $5.000 $5.000 $7.000 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 139,062.000 $0.300 $0.280 $0.260 $0.268 $0.300 $0.260 $0.140 $0.260 $0.260
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 192.000 $3.300 $5.250 $5.000 $5.150 $5.350 $5.000 $5.980 $5.000 $5.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 84.000 $20.200 $35.000 $33.000 $33.990 $35.350 $33.000 $17.940 $33.000 $33.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 257,062.000 $0.300 $0.280 $0.260 $0.268 $0.300 $0.260 $0.140 $0.260 $0.260
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 576.000 $9.400 $4.200 $4.000 $4.120 $4.300 $4.000 $11.960 $4.000 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 20,298.000 $0.500 $1.250 $0.500 $1.171 $1.100 $1.100 $1.760 $1.500 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,444.000 $1.500 $0.740 $0.700 $0.721 $0.750 $0.700 $0.780 $0.700 $0.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 208.000 $6.000 $5.250 $5.000 $5.150 $5.350 $5.000 $3.590 $5.000 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $190.000 $92.000 $87.000 $89.610 $93.200 $87.000 $125.570 $87.000 $87.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 80.000 $32.000 $35.000 $33.000 $33.990 $35.350 $33.000 $29.900 $33.000 $33.000
PAVEMENT SEALER 4"
LF 110,659.000 $0.200 $0.110 $0.100 $0.103 $0.100 $0.100 $0.020 $0.100 $0.100
PAVEMENT SEALER 6"
LF 124,700.000 $0.200 $0.160 $0.150 $0.155 $0.150 $0.150 $0.050 $0.150 $0.150
PAVEMENT SEALER 8"
LF 1,444.000 $0.300 $0.420 $0.400 $0.412 $0.450 $0.400 $0.100 $0.400 $0.400
PAVEMENT SEALER 24"
LF 208.000 $2.000 $3.200 $3.000 $3.090 $3.200 $3.000 $1.200 $3.000 $3.000
PAVEMENT SEALER (ARROW)
EA 16.000 $30.000 $56.000 $53.000 $54.590 $56.800 $53.000 $11.960 $53.000 $53.000
PAVEMENT SEALER (YLD TRI)
EA 80.000 $25.000 $23.000 $22.000 $22.660 $23.550 $22.000 $4.780 $22.000 $22.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 124,700.000 $1.000 $0.500 $0.480 $0.494 $0.500 $0.480 $0.540 $0.480 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,150.000 $1.000 $0.360 $0.340 $0.350 $0.350 $0.340 $0.450 $0.340 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 103,509.000 $1.000 $0.340 $0.320 $0.330 $0.350 $0.320 $0.450 $0.320 $0.320
REFL PAV MRKR TY II-A-A
EA 1,311.000 $3.500 $3.100 $3.000 $3.090 $3.200 $3.000 $3.590 $3.000 $3.000
TRAFFIC BUTTON TY II-A-A
EA 5,904.000 $2.600 $3.100 $3.000 $3.090 $3.200 $3.000 $4.190 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 84,960.000 $0.500 $0.340 $0.320 $0.330 $0.350 $0.320 $0.180 $0.320 $0.320
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $9,520.000 $2,300.000 $1,250.000 $2,170.210 $2,230.250 $2,107.000 $2,107.000 $1,200.000 $5,000.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $250.000 $350.000 $400.000 $340.930 $350.350 $331.000 $331.000 $390.000 $350.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $250.000 $350.000 $400.000 $340.930 $350.350 $331.000 $331.000 $390.000 $350.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,000.000 $20,000.000 $6,500.000 $11,660.000 $7,906.250 $4,500.000 $7,805.960 $10,000.000 $5,042.400
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 360.000 $17.000 $12.000 $11.500 $11.330 $11.800 $11.000 $14.350 $11.000 $2.000
TMA (STATIONARY)
DAY 256.000 $290.000 $160.000 $70.000 $132.500 $51.150 $400.000 $125.000 $150.000 $124.960
TMA (MOBILE OPERATION)
DAY 76.000 $290.000 $230.000 $70.000 $159.000 $501.550 $50.000 $325.000 $275.000 $351.910
Totals: $15,775,305.000 $13,995,985.020 $14,135,102.700 $14,920,872.758 $15,155,674.560 $15,438,329.200 $16,181,296.402 $16,453,978.650 $17,629,179.119