FORT BEND SH 99 (3510-04-019)

Items: 299

County: FORT BEND
Length: N/A
Highway: SH 99
District: HOUSTON
Control Number: 3510-04-019
DBE Goal: N/A
Project: STP 2022(936)MM
Guaranty: N/A
Time: 780 WORKING DAYS
Engineer's Estimate: $102,182,803.45
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: ADVANCED TRAFFIC MANAGEMENT SYSTEM
Mail/Deliver Bids To: N/A
CARLOS ZEPEDA
DANIEL DVORAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$102,182,803.45
1
$90,916,059.57
Over/Under Est: -11.03% -$11,266,743.88
Over/Under Est: -7.29% -$7,446,727.60
Amt Left: 4.2% $3,820,016.28
Over/Under Est: -5.83% -$5,960,166.21
Amt Left: 5.84% $5,306,577.67
Delta: -1.57% -$1,486,561.39
Over/Under Est: -2.63% -$2,690,594.57
Amt Left: 9.43% $8,576,149.31
Delta: -3.40% -$3,269,571.64
Over/Under Est: 2.2% $2,248,512.10
Amt Left: 14.87% $13,515,255.98
Delta: -4.96% -$4,939,106.67
Over/Under Est: 5.69% $5,817,196.52
Amt Left: 18.79% $17,083,940.40
Delta: -3.42% -$3,568,684.42
$108,127,332.27
Over/Under Est: 5.82% $5,944,528.82
Amt Left: 18.93% $17,211,272.70
Delta: -0.12% -$127,332.30
Subcontractor Percentage Amount
THIRD COAST SERVICES LLC 4.82% $4,749,218.14
HB FARMER FOUNDATION, LLC 3.36% $3,310,658.29
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.24% $1,221,790.56
ROADWAY SPECIALTIES, INC. 1.23% $1,211,937.41
GMJ PAVING CO. 1.01% $995,168.12
PROFESSIONAL TRAFFIC CONTROL LLC 0.72% $709,426.78
BORTUNCO 0.53% $522,216.93
DELENA CONSTRUCTION SERVICES LLC 0.53% $522,216.93
PRIMATE CONSTRUCTION, LP 0.36% $354,713.39
AGGREGATE TECHNOLOGIES, INC. 0.33% $325,153.94
SCOTT DERR PAINTING CO, LLC 0.14% $137,944.10
JB PINNACLE GROUP, LLC 0.13% $128,090.95
BELLA PAVING, INC. 0.09% $88,678.35
MTAM CORPORATION 0.07% $68,972.05
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.04% $39,412.60
AMERITEX IMAGING AND SERVICES, LLC 0.03% $29,559.45
JH CONTRACT FIELD SERVICES, LLC 0.02% $19,706.30
CURB PLANET INC. 0.02% $19,706.30
Total: 14.67% $14,454,570.59

Bid Items & Bid Tabulations

299 Total 0 of 299
FORT BEND  |  SH 99  |  HOUSTON  |  3510-04-019  |  01/05/2023  |  $102,182,803.45  |  STP 2022(936)MM  |  ADVANCED TRAF MGT SYSTEM  |  780 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
JAMES CONSTRUCTION GROUP, LLC
MAIN LANE INDUSTRIES LTD.
ZACHRY CONSTRUCTION CORPORATION
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
GRANITE CONSTRUCTION COMPANY
PULICE CONSTRUCTION, INC.
PREPARING ROW
STA 355.400 $14,000.000 $25,100.000 $6,500.000 $3,300.000 $28,137.310 $29,300.000 $21,400.000 $30,000.000
REMOVING CONC (PAV)
SY 41,221.000 $6.000 $11.700 $10.500 $19.000 $15.000 $25.000 $12.000 $19.000
REMOVING CONC (RIPRAP)
SY 2,860.000 $8.170 $3.550 $15.860 $9.000 $5.000 $7.000 $4.000 $2.000
REMOVING CONC (MEDIANS)
SY 620.000 $13.240 $5.600 $12.760 $10.000 $4.850 $9.000 $12.000 $3.000
REMOVING CONC (DRIVEWAYS)
SY 119.000 $12.920 $11.400 $50.710 $10.000 $9.700 $30.000 $15.000 $2.000
REMOVING CONC (CURB)
LF 13,404.000 $6.250 $2.250 $2.240 $0.100 $1.940 $2.000 $2.000 $4.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,688.000 $7.670 $2.800 $4.020 $0.100 $2.430 $4.000 $2.200 $4.000
REMOVING CONC (COPING)
LF 3,359.000 $28.750 $14.500 $6.530 $10.000 $9.700 $6.000 $12.000 $5.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 283.000 $15.360 $5.600 $25.220 $10.000 $4.850 $30.000 $12.000 $13.000
REMOVE CONC (RAIL)
LF 11,218.000 $15.000 $6.700 $7.140 $7.000 $10.000 $12.000 $15.000 $8.000
REMOVING CONC (MISC)
CY 16.200 $184.780 $191.000 $160.500 $650.000 $151.300 $350.000 $250.000 $600.000
REMOVING TREATED BASE (8")
SY 45,812.000 $3.850 $5.850 $5.260 $4.000 $5.270 $7.000 $3.000 $7.000
EXCAVATION (ROADWAY)
CY 114,620.000 $13.970 $4.000 $15.100 $16.000 $9.110 $20.000 $15.000 $11.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 51,377.000 $15.860 $5.000 $39.660 $5.500 $5.950 $30.000 $35.000 $8.570
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 468.000 $45.000 $50.000 $60.470 $60.000 $75.000 $60.000 $56.000 $80.000
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 2,366.000 $38.580 $50.000 $54.860 $60.000 $45.620 $60.000 $50.000 $90.000
BLOCK SODDING
SY 174,967.000 $3.130 $4.250 $4.160 $4.500 $3.750 $4.250 $4.300 $7.200
STRAW OR HAY MULCH
SY 166,219.000 $0.200 $0.200 $0.430 $0.500 $0.180 $0.200 $0.200 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 8,749.000 $0.120 $0.300 $0.240 $0.300 $0.260 $0.300 $0.300 $0.950
DRILL SEED (TEMP)(WARM OR COOL)
SY 166,219.000 $0.110 $0.300 $0.140 $0.170 $0.280 $0.320 $0.320 $1.110
FERTILIZER
AC 50.310 $700.000 $750.000 $756.970 $800.000 $661.350 $750.000 $770.000 $1,170.000
VEGETATIVE WATERING
MG 4,840.700 $16.000 $38.000 $46.450 $18.000 $30.200 $30.000 $34.000 $36.000
LIME TRT (EXST MATL) (6")
SY 167,793.000 $2.500 $5.000 $3.680 $3.000 $3.330 $3.000 $5.000 $4.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,288.490 $190.300 $275.000 $292.710 $280.000 $269.350 $320.000 $300.000 $170.000
CEMENT
TON 176.000 $175.970 $250.000 $223.410 $250.000 $166.660 $210.000 $200.000 $200.000
CEMENT TREAT (EXIST MATL) (6")
SY 11,369.000 $2.500 $5.000 $2.140 $4.000 $3.820 $4.000 $4.000 $2.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 179,162.000 $23.720 $11.000 $16.270 $14.000 $13.750 $6.000 $20.000 $15.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 8,514.000 $195.000 $106.000 $109.100 $125.000 $93.960 $98.000 $120.000 $100.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 114,548.000 $98.500 $65.000 $83.230 $80.000 $72.600 $56.700 $93.000 $76.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 51,711.000 $105.000 $75.000 $99.220 $94.000 $85.580 $89.000 $97.000 $95.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 14,516.000 $162.500 $104.000 $139.020 $126.000 $109.670 $122.000 $125.000 $140.000
STRUCT EXCAV
CY 2,678.000 $5.830 $15.000 $16.620 $25.000 $16.910 $12.000 $35.000 $10.000
CEM STABIL BKFL
CY 43,626.000 $125.000 $50.000 $51.980 $50.000 $41.390 $68.009 $30.000 $62.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 1,165.000 $45.000 $50.000 $51.980 $50.000 $40.330 $68.010 $40.000 $60.000
TRENCH EXCAVATION PROTECTION
LF 25,777.000 $2.800 $1.800 $1.090 $1.000 $3.190 $3.423 $6.500 $2.000
TEMPORARY SPL SHORING
SF 81,802.000 $31.500 $10.000 $0.010 $1.000 $40.000 $0.010 $12.000 $6.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 1.000 $52,815.970 $69,700.000 $69,650.000 $160,000.000 $142,721.660 $70,000.000 $200,000.000 $72,980.500
PRESTR CONC PIL (16 IN SQ)
LF 640.000 $80.000 $120.000 $92.090 $130.000 $106.430 $105.000 $160.000 $260.000
PRESTR CONC PIL (20 IN SQ)
LF 3,460.000 $150.000 $170.000 $156.940 $150.000 $153.270 $95.000 $200.000 $220.000
PRESTR CONC PIL (24 IN SQ)
LF 1,440.000 $155.750 $200.000 $175.760 $220.000 $204.250 $195.000 $250.000 $250.000
DRILL SHAFT (18 IN)
LF 320.000 $100.420 $80.000 $75.220 $150.000 $55.210 $150.000 $75.000 $170.000
DRILL SHAFT (30 IN)
LF 3,325.000 $225.000 $180.000 $181.260 $150.000 $128.540 $250.000 $200.000 $340.000
DRILL SHAFT (36 IN)
LF 2,459.000 $193.780 $230.000 $236.660 $360.000 $205.890 $400.000 $250.000 $320.000
DRILL SHAFT (42 IN)
LF 1,304.000 $300.000 $350.000 $292.020 $480.000 $245.830 $450.000 $350.000 $370.000
DRILL SHAFT (54 IN)
LF 900.000 $455.760 $700.000 $541.480 $800.000 $411.930 $600.000 $600.000 $490.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 714.000 $400.000 $275.000 $274.360 $360.000 $233.680 $400.000 $250.000 $330.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 2,102.000 $585.000 $291.000 $291.000 $480.000 $304.230 $450.000 $350.000 $430.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 56.000 $620.000 $707.000 $707.000 $710.000 $623.440 $707.000 $800.000 $540.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 297.000 $248.890 $260.000 $260.000 $260.000 $229.270 $260.000 $185.000 $230.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 108.000 $160.000 $212.000 $212.000 $220.000 $186.950 $212.000 $250.000 $180.000
DRILL SHAFT (90 IN)
LF 84.000 $380.000 $1,650.000 $1,507.110 $2,000.000 $1,213.890 $2,000.000 $1,600.000 $1,270.000
DRILL SHAFT (102 IN)
LF 325.000 $380.000 $2,100.000 $1,849.330 $2,500.000 $1,520.550 $2,500.000 $2,500.000 $1,730.000
CL C CONC (ABUT)
CY 25.000 $1,000.000 $1,500.000 $1,310.570 $1,700.000 $1,503.500 $1,800.000 $1,100.000 $1,340.000
CL C CONC (ABUT)(EXTEND)
CY 666.500 $1,820.000 $1,750.000 $1,304.940 $1,900.000 $1,269.060 $1,800.000 $1,400.000 $1,060.000
CL C CONC (CAP)
CY 236.000 $1,033.310 $1,500.000 $1,655.720 $1,700.000 $1,412.740 $2,300.000 $1,500.000 $1,520.000
CL C CONC (COLUMN)
CY 429.200 $1,000.000 $1,500.000 $1,198.010 $1,700.000 $1,000.070 $1,300.000 $2,000.000 $1,400.000
CL C CONC (FOOTING)
CY 118.200 $832.000 $1,500.000 $859.940 $1,500.000 $920.120 $1,100.000 $1,500.000 $790.000
CL C CONC (CAP)(INVT)
CY 288.200 $2,600.000 $1,500.000 $1,019.490 $1,100.000 $1,679.200 $1,000.000 $1,500.000 $1,090.000
CL F CONC (CAP)(INVT)
CY 230.800 $2,600.000 $1,500.000 $994.710 $1,400.000 $1,497.410 $2,000.000 $1,700.000 $920.000
CL C CONC (CAP)(STRDL)
CY 83.900 $2,600.000 $1,500.000 $1,022.240 $1,100.000 $1,712.840 $1,300.000 $2,500.000 $1,970.000
REINF CONC SLAB
SF 25,356.000 $40.000 $20.000 $22.160 $26.000 $22.380 $25.000 $35.000 $21.000
REINF CONC SLAB (EXTEND SLAB)
SF 105,938.040 $31.000 $22.000 $31.000 $32.000 $27.190 $30.000 $42.000 $21.000
APPROACH SLAB (EXTEND)
CY 700.250 $575.000 $750.000 $778.940 $850.000 $1,200.000 $500.000 $700.000 $790.000
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
SF 45,894.000 $40.000 $55.000 $40.330 $58.000 $59.000 $50.000 $50.000 $70.000
PRESTR CONC U - BEAM (U54)
LF 2,140.550 $350.000 $390.000 $394.870 $500.000 $190.320 $210.000 $383.510 $260.000
PRESTR CONC GIRDER (TX40)
LF 1,842.260 $149.680 $180.000 $175.110 $250.000 $196.760 $115.000 $191.950 $430.000
PRESTR CONC GIRDER (TX54)
LF 12,964.630 $200.000 $185.000 $198.420 $253.000 $179.710 $135.000 $181.280 $220.000
CONCRETE PAINT FINISH
SF 60,546.610 $0.340 $0.350 $0.430 $0.350 $0.500 $0.270 $0.350 $0.500
RIPRAP (CONC)(4 IN)
CY 520.300 $409.880 $430.000 $442.080 $500.000 $750.000 $600.000 $364.780 $920.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 148.100 $440.000 $483.000 $485.960 $650.000 $509.380 $600.000 $550.000 $770.000
RIPRAP (CONC) (CL B) (4")
CY 129.140 $350.000 $422.000 $621.290 $1,050.000 $900.000 $600.000 $550.000 $950.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,580.380 $695.000 $439.000 $614.430 $400.000 $509.360 $650.000 $410.000 $770.000
RAIL (TY SSTR)
LF 16,930.570 $45.000 $55.000 $53.170 $60.000 $65.710 $45.000 $60.000 $70.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 3,042.000 $45.000 $55.000 $53.850 $65.000 $55.620 $50.000 $65.000 $110.000
RAIL (TY SSTR)(MOD)(ILLUM)
LF 20.000 $241.870 $250.000 $426.360 $460.000 $479.300 $275.000 $300.000 $190.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 995.400 $125.770 $210.000 $164.740 $250.000 $174.840 $175.000 $230.000 $110.000
CONC BOX CULV (3 FT X 3 FT)
LF 448.000 $192.910 $250.000 $331.480 $355.000 $285.290 $387.000 $300.000 $340.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,916.000 $215.000 $250.000 $332.170 $10.000 $371.000 $356.000 $300.000 $350.000
CONC BOX CULV (4 FT X 3 FT)
LF 40.000 $236.710 $260.000 $376.800 $450.000 $543.750 $475.000 $971.480 $390.000
CONC BOX CULV (5 FT X 3 FT)
LF 334.000 $294.930 $400.000 $445.600 $530.000 $398.040 $484.000 $550.000 $470.000
CONC BOX CULV (5 FT X 4 FT)
LF 107.000 $360.000 $450.000 $491.850 $610.000 $440.030 $555.000 $600.000 $540.000
CONC BOX CULV (6 FT X 3 FT)
LF 799.000 $350.000 $510.000 $560.980 $620.000 $459.600 $570.000 $670.000 $580.000
CONC BOX CULV (6 FT X 4 FT)
LF 3,165.000 $400.000 $560.000 $617.900 $680.000 $523.120 $611.000 $705.000 $640.000
CONC BOX CULV (7 FT X 3 FT)
LF 1,950.000 $350.000 $620.000 $726.570 $710.000 $528.190 $680.000 $800.000 $730.000
CONC BOX CULV (7 FT X 4 FT)
LF 12,234.000 $650.750 $652.000 $785.140 $860.000 $950.000 $800.000 $1,050.000 $810.000
CONC BOX CULV (8 FT X 5 FT)
LF 261.000 $620.000 $750.000 $865.620 $950.000 $1,250.000 $880.000 $1,100.000 $900.000
CONC BOX CULV (8 FT X 6 FT)
LF 29.000 $711.120 $750.000 $1,107.450 $1,400.000 $1,076.120 $1,070.000 $948.210 $1,180.000
CONC BOX CULV (8 FT X 7 FT)
LF 1,107.000 $729.800 $884.300 $1,066.230 $1,150.000 $777.040 $1,030.000 $1,170.000 $1,140.000
CONC BOX CULV (8 FT X 3 FT)
LF 9.000 $475.360 $740.000 $880.120 $1,000.000 $1,493.950 $915.000 $1,450.000 $1,370.000
CONC BOX CULV (6 FT X 2 FT)
LF 6.000 $419.160 $500.000 $629.620 $780.000 $532.910 $665.000 $1,050.000 $680.000
CONC BOX CULV (10 FT X 4 FT)
LF 752.000 $807.390 $1,000.000 $1,153.730 $1,320.000 $1,035.890 $1,208.000 $1,400.000 $1,250.000
RC PIPE (CL III)(12 IN)
LF 15.000 $64.140 $90.000 $97.300 $120.000 $76.370 $158.211 $117.000 $60.000
RC PIPE (CL III)(18 IN)
LF 66.000 $75.000 $88.000 $215.740 $150.000 $72.550 $323.301 $196.000 $70.000
RC PIPE (CL III)(24 IN)
LF 3,997.000 $90.000 $108.000 $100.020 $120.000 $106.000 $119.874 $90.000 $90.000
RC PIPE (CL III)(30 IN)
LF 466.000 $97.870 $150.000 $153.670 $150.000 $110.840 $164.413 $143.000 $110.000
RC PIPE (CL III)(36 IN)
LF 5.000 $170.000 $165.000 $307.110 $350.000 $126.850 $272.956 $318.000 $210.000
RC PIPE (CL III)(60 IN)
LF 60.000 $375.000 $350.000 $411.340 $475.000 $347.060 $544.000 $400.000 $440.000
RC PIPE (CL IV)(24 IN)
LF 250.000 $111.000 $140.000 $103.220 $150.000 $84.540 $160.390 $150.000 $100.000
RC PIPE (CL IV)(30 IN)
LF 6.000 $107.940 $1,000.000 $140.260 $250.000 $118.180 $253.857 $633.000 $150.000
RC PIPE (CL IV) (54 IN)
LF 5.000 $385.000 $1,000.000 $518.790 $1,300.000 $696.750 $2,920.000 $1,300.000 $570.000
INLET (COMPL)(TY AAD)
EA 16.000 $10,450.000 $7,470.000 $9,924.860 $11,000.000 $9,905.010 $10,935.831 $12,600.000 $10,999.950
INLET (COMPL)(TY AD)
EA 4.000 $5,025.870 $6,780.000 $7,168.090 $8,000.000 $7,586.470 $7,931.151 $8,500.000 $7,500.000
INLET (COMPL)(TY AZ)
EA 4.000 $6,000.000 $10,130.000 $7,343.720 $8,100.000 $7,729.400 $9,112.173 $8,600.000 $6,000.000
INLET (COMPL)(TY AZR)
EA 2.000 $7,874.100 $8,820.000 $6,518.830 $9,700.000 $7,693.340 $9,923.094 $9,000.000 $10,000.000
INLET (COMPL)(TY AZR2G)
EA 6.000 $11,054.240 $10,120.000 $12,558.040 $12,000.000 $9,388.540 $12,889.367 $12,300.000 $14,999.930
MANH (COMPL)(TY A)
EA 9.000 $7,410.340 $8,450.000 $5,965.330 $7,000.000 $7,456.000 $7,903.338 $8,000.000 $7,800.000
INLET (COMPL)(CURB)(TY C)
EA 1.000 $6,026.360 $5,990.000 $5,954.680 $6,800.000 $6,685.130 $7,891.037 $13,500.000 $8,600.000
INLET (COMPL)(TY AZ2G)
EA 14.000 $7,500.000 $6,760.000 $5,959.170 $11,000.000 $9,803.590 $12,560.835 $12,000.000 $6,700.000
INLET (COMPL)(TY C)(5')
EA 6.000 $7,700.000 $5,480.000 $5,986.620 $6,600.000 $6,617.910 $7,785.222 $7,700.000 $9,200.000
JCT BOX (COMPL)(SPL)
EA 39.000 $34,000.000 $35,000.000 $38,363.880 $57,000.000 $49,539.000 $51,725.581 $25,000.000 $23,700.000
INLET (COMPL)(TY C1)(STAGE II)
EA 15.000 $3,116.000 $3,620.000 $4,523.900 $5,500.000 $5,686.790 $5,798.413 $5,900.000 $8,200.000
INLET (COMPL)(EXT TY C)
EA 4.000 $1,383.030 $1,820.000 $1,473.370 $1,800.000 $3,226.530 $1,599.030 $2,100.000 $2,200.000
MANH (COMPL)(RISER ONLY)
EA 13.000 $2,203.000 $2,420.000 $6,976.140 $2,300.000 $5,253.480 $2,535.157 $2,800.000 $1,870.000
INLET (COMPL)(TY C)(MOD)
EA 1.000 $5,060.000 $4,730.000 $24,710.820 $26,000.000 $20,417.920 $36,236.172 $27,000.000 $8,000.000
INLET (COMPL)(TRENCH DRAIN)(40')
EA 1.000 $7,275.000 $23,300.000 $17,910.540 $19,000.000 $18,581.050 $31,190.148 $10,100.000 $11,239.950
JUNCT BOX (COMPL)(JB)(4FT X 4FT)(FTW)
EA 3.000 $9,000.000 $8,000.000 $9,552.660 $17,000.000 $14,411.310 $18,714.267 $13,000.000 $9,000.000
JUNCT BOX (COMPL)(JB)(5FT X 5FT)(FTW)
EA 1.000 $14,500.000 $7,700.000 $12,392.360 $12,000.000 $16,702.310 $21,705.103 $57,000.000 $10,699.950
JUNCT BOX (COMPL)(JB)(6FT X 6FT)(FTW)
EA 2.000 $15,000.000 $10,000.000 $16,825.560 $25,000.000 $18,084.070 $27,178.258 $19,000.000 $11,269.950
JUNCT BOX (COMPL)(JB)(8FT X 8FT)(FTW)
EA 3.000 $35,000.000 $23,670.000 $21,775.140 $27,000.000 $19,235.450 $34,415.490 $58,000.000 $12,939.940
INLET (STG II)(TY AAD)
EA 3.000 $4,000.000 $4,480.000 $5,369.680 $6,000.000 $6,365.790 $5,729.082 $4,300.000 $3,700.000
INLET (STG II)(TY AD)
EA 12.000 $5,500.000 $2,740.000 $3,315.660 $4,000.000 $4,668.290 $3,496.199 $4,200.000 $4,100.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 1.000 $3,750.000 $3,130.000 $3,766.670 $9,000.000 $1,390.590 $10,000.000 $3,493.660 $3,500.000
JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV)
LF 455.000 $800.000 $920.000 $1,111.470 $600.000 $836.530 $1,310.025 $987.420 $1,460.000
JACK BOR TUN BOX CULV (4 FT X 3 FT)
LF 57.000 $1,357.550 $1,680.000 $2,095.510 $1,100.000 $1,491.470 $2,463.267 $1,700.000 $1,900.000
JACK BOR TUN BOX CULV (8 FT X 6 FT)
LF 49.000 $2,800.000 $2,440.000 $2,939.890 $2,300.000 $2,088.320 $3,296.817 $2,153.940 $3,000.000
ADJUSTING MANHOLES
EA 1.000 $756.630 $5,000.000 $1,380.830 $1,000.000 $1,257.250 $1,921.009 $1,100.000 $1,530.000
ADJUSTING MANHOLES & INLETS
EA 10.000 $2,200.000 $5,000.000 $1,460.770 $1,200.000 $1,257.250 $1,921.091 $1,572.580 $1,530.000
REMOV STR (INLET)
EA 21.000 $600.000 $1,500.000 $856.810 $700.000 $862.100 $599.060 $1,167.800 $1,430.000
REMOV STR (MANHOLE)
EA 6.000 $850.000 $1,500.000 $856.860 $900.000 $865.670 $814.023 $1,156.670 $1,920.000
REMOV STR (SET)
EA 1.000 $400.000 $1,500.000 $752.920 $900.000 $890.660 $384.002 $483.720 $1,390.000
REMOV STR (HEADWALL)
EA 1.000 $1,609.210 $5,000.000 $2,388.670 $2,000.000 $1,706.370 $4,284.020 $1,398.530 $2,900.000
REMOV STR (PIPE)
LF 1,317.000 $19.000 $25.000 $30.290 $24.000 $21.550 $45.734 $31.880 $26.000
REMOV STR (RET WALL)
LF 154.000 $42.200 $200.000 $19.520 $350.000 $124.790 $400.000 $61.970 $600.000
MOBILIZATION
LS 1.000 $9,134,000.000 $9,000,000.000 $9,400,000.000 $9,500,000.000 $9,200,000.000 $11,449,581.000 $8,784,486.170 $10,175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $9,000.000 $5,000.000 $20,488.990 $10,400.000 $12,267.660 $25,000.000 $20,000.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 270.000 $28.280 $35.000 $38.930 $40.000 $30.870 $31.000 $40.000 $31.000
ROCK FILTER DAMS (REMOVE)
LF 270.000 $10.000 $15.000 $12.130 $13.000 $13.230 $12.000 $20.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,886.000 $25.000 $35.000 $39.480 $40.000 $30.870 $55.000 $40.000 $24.000
CONSTRUCTION EXITS (REMOVE)
SY 2,886.000 $7.500 $15.000 $10.140 $10.000 $13.230 $12.000 $20.000 $9.000
SANDBAGS FOR EROSION CONTROL
EA 479.000 $19.000 $10.200 $30.630 $31.000 $27.010 $15.000 $15.000 $23.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,865.000 $2.200 $3.500 $3.580 $3.600 $3.090 $4.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,865.000 $0.500 $1.250 $0.850 $1.000 $1.100 $1.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,626.000 $5.000 $5.250 $5.300 $6.000 $4.630 $8.000 $7.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,052.000 $1.000 $1.250 $1.620 $2.000 $1.100 $2.000 $1.500 $2.000
CONSTRUCTING DETOURS
SY 605.000 $60.000 $165.000 $138.220 $115.000 $84.150 $173.810 $150.000 $110.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 54,030.000 $9.470 $7.500 $8.750 $14.000 $11.240 $7.000 $7.000 $12.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 6,420.000 $10.000 $7.500 $9.860 $14.000 $13.070 $7.000 $8.000 $16.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 120.000 $13.480 $7.500 $11.780 $20.000 $19.040 $7.000 $7.000 $17.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 22,290.000 $5.000 $6.000 $3.380 $10.000 $2.140 $7.000 $4.000 $7.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,740.000 $7.180 $6.000 $3.160 $10.000 $4.470 $7.000 $3.000 $12.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $9.760 $6.000 $3.160 $20.000 $13.170 $7.000 $3.000 $7.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 54,030.000 $6.000 $7.000 $8.140 $10.000 $11.210 $7.000 $6.500 $9.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 6,420.000 $8.650 $7.000 $9.040 $10.000 $13.070 $7.000 $5.500 $12.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 120.000 $11.500 $7.000 $10.960 $10.000 $16.460 $7.000 $5.640 $13.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,550.000 $70.000 $75.000 $64.140 $85.000 $76.360 $70.000 $115.000 $110.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 360.000 $186.910 $200.000 $209.380 $200.000 $236.510 $220.000 $200.000 $220.000
PERM CTB (F-SHAPE) (TY 1)
LF 303.920 $60.000 $100.000 $145.380 $120.000 $70.780 $260.000 $86.010 $100.000
CONC CURB (MONO) (TY II)
LF 11,954.000 $4.500 $17.400 $3.480 $5.000 $2.830 $6.000 $2.500 $15.000
CONC CURB (DOWEL)
LF 10,402.000 $8.000 $23.400 $9.370 $7.000 $7.180 $8.000 $13.920 $23.000
DRIVEWAYS (CONC)
SY 649.000 $65.000 $70.000 $68.640 $85.000 $91.920 $100.000 $89.270 $160.000
CONC SIDEWALKS (5")
SY 5,341.000 $70.000 $55.500 $60.200 $62.000 $67.290 $90.000 $58.890 $130.000
CURB RAMPS (TY 1)
EA 3.000 $2,000.000 $1,880.000 $2,058.260 $1,800.000 $1,763.620 $2,100.000 $1,664.210 $2,900.000
CURB RAMPS (TY 21)
EA 8.000 $2,225.700 $2,280.000 $2,450.300 $3,000.000 $2,645.440 $2,500.000 $1,285.970 $3,200.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,751.000 $33.340 $27.500 $29.340 $30.000 $24.250 $30.750 $28.370 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,077.790 $2,420.000 $2,423.000 $2,500.000 $2,129.580 $2,762.000 $2,342.800 $1,880.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 13.000 $1,226.540 $1,540.000 $1,413.640 $1,500.000 $1,353.580 $1,235.000 $1,366.850 $1,290.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 1.000 $600.000 $2,530.000 $2,357.730 $2,400.000 $2,226.580 $2,350.000 $2,279.690 $1,810.000
REMOVE METAL BEAM GUARD FENCE
LF 4,677.000 $2.250 $5.000 $9.500 $10.000 $4.410 $4.350 $9.190 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 28.000 $250.000 $450.000 $265.180 $300.000 $396.810 $213.000 $256.400 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 26.000 $175.000 $300.000 $128.420 $150.000 $264.540 $217.000 $124.170 $210.000
CABLE BARRIER SYSTEM (TL-4)
LF 18,063.000 $11.940 $24.200 $22.910 $23.000 $21.160 $23.450 $23.000 $13.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 12.000 $3,150.000 $3,760.000 $4,500.820 $5,000.000 $3,289.170 $4,565.000 $5,391.790 $3,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 21.000 $3,300.000 $2,900.000 $3,262.520 $3,300.000 $2,557.260 $2,975.000 $3,154.530 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $250.000 $300.000 $265.180 $300.000 $264.540 $525.000 $256.400 $280.000
CRASH CUSH ATTEN (REMOVE)
EA 45.000 $869.000 $1,500.000 $779.300 $500.000 $1,322.720 $775.000 $1,827.410 $950.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 7.000 $24,000.000 $24,900.000 $29,866.140 $30,000.000 $21,957.160 $25,900.000 $28,000.000 $22,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 45.000 $25,000.000 $32,750.000 $39,593.130 $7,500.000 $28,879.390 $34,775.000 $33,000.000 $22,900.000
IN RD IL AM (TY SP) 38S-8 (250W) S
EA 3.000 $1,200.000 $4,580.000 $4,582.000 $4,700.000 $4,040.470 $4,832.000 $4,664.750 $4,900.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 35.000 $1,300.000 $989.000 $989.000 $1,000.000 $872.110 $989.000 $1,006.860 $1,210.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 40.000 $3,897.620 $4,060.000 $4,060.000 $4,200.000 $3,580.170 $4,310.000 $4,133.320 $3,900.000
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
EA 4.000 $5,000.000 $5,510.000 $5,509.000 $5,700.000 $4,857.900 $5,759.000 $5,608.490 $3,900.000
CONDT (PVC) (SCH 40) (2")
LF 11,108.000 $13.930 $7.850 $7.830 $8.000 $6.910 $7.830 $7.970 $14.000
CONDT (PVC) (SCH 40) (3")
LF 4,435.000 $20.000 $12.700 $12.670 $13.000 $11.170 $12.670 $12.900 $20.000
CONDT (PVC) (SCH 80) (2")
LF 460.000 $12.220 $8.450 $8.430 $9.000 $7.430 $8.430 $8.580 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 575.000 $22.560 $10.800 $10.750 $11.000 $9.480 $10.750 $10.940 $23.000
CONDT (PVC) (SCH 80) (3")
LF 770.000 $17.380 $18.100 $18.120 $19.000 $15.980 $18.120 $18.450 $21.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 4,999.000 $28.600 $20.500 $20.450 $21.000 $18.030 $20.450 $20.820 $29.000
CONDT (RM) (3/4")
LF 2,716.000 $25.000 $17.600 $17.560 $18.000 $15.490 $17.560 $17.880 $21.000
CONDT (RM) (3")
LF 1,578.000 $60.000 $51.000 $51.000 $52.000 $44.980 $51.000 $51.920 $60.000
ELEC CONDR (NO.14) INSULATED
LF 33,862.000 $1.100 $1.200 $1.180 $1.200 $1.040 $1.180 $1.200 $0.800
ELEC CONDR (NO.8) BARE
LF 14,534.000 $1.360 $1.650 $1.660 $1.700 $1.460 $1.660 $1.690 $2.000
ELEC CONDR (NO.8) INSULATED
LF 29,068.000 $1.540 $1.700 $1.720 $1.750 $1.520 $1.720 $1.750 $2.000
ELEC CONDR (NO.6) BARE
LF 5,688.000 $1.800 $1.850 $1.830 $1.900 $1.610 $1.830 $1.860 $2.000
ELEC CONDR (NO.6) INSULATED
LF 11,336.000 $2.360 $2.000 $2.020 $2.100 $1.780 $2.020 $2.060 $2.000
ELEC CONDR (NO.4) BARE
LF 1,439.000 $2.470 $2.450 $2.430 $2.500 $2.140 $2.430 $2.470 $2.000
ELEC CONDR (NO.4) INSULATED
LF 2,878.000 $3.000 $2.550 $2.560 $2.600 $2.260 $2.560 $2.610 $3.000
GROUND BOX TY A (122311)W/APRON
EA 31.000 $864.810 $918.000 $918.000 $920.000 $809.500 $918.000 $934.580 $1,050.000
GROUND BOX TY D (162922)
EA 9.000 $1,306.000 $973.000 $973.000 $1,000.000 $858.000 $973.000 $990.570 $840.000
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,082.000 $1,140.000 $1,143.000 $1,150.000 $1,007.910 $1,143.000 $1,163.640 $1,150.000
RELOCATE ELECTRICAL SERVICES
EA 1.000 $5,306.210 $1,520.000 $1,524.000 $1,550.000 $1,343.880 $1,824.000 $1,551.520 $2,700.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 11.000 $6,300.000 $6,860.000 $6,863.000 $6,900.000 $6,051.890 $7,363.000 $6,986.940 $6,600.000
ELC SRV TY D 120/240 060(SS)SS(E)SP(O)
EA 1.000 $4,994.000 $5,710.000 $5,711.000 $5,800.000 $5,036.030 $6,211.000 $5,814.140 $5,000.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 16.000 $4,882.410 $5,090.000 $5,093.000 $5,100.000 $4,491.070 $5,593.000 $5,184.980 $5,100.000
ALUMINUM SIGNS (TY O)
SF 7,039.000 $25.700 $25.900 $25.870 $26.000 $7.940 $25.870 $26.480 $27.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 27.000 $586.970 $590.000 $455.000 $600.000 $401.220 $590.000 $598.980 $610.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $710.850 $690.000 $662.000 $700.000 $583.760 $835.000 $700.510 $710.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 8.000 $803.000 $690.000 $525.000 $700.000 $462.950 $745.000 $700.510 $770.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $925.270 $800.000 $800.000 $800.000 $705.450 $980.000 $812.180 $880.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $993.680 $850.000 $1,250.000 $850.000 $1,102.270 $1,170.000 $862.950 $960.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,049.620 $1,050.000 $1,150.000 $1,100.000 $1,014.080 $1,100.000 $1,065.990 $1,030.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $713.540 $1,100.000 $760.000 $1,150.000 $670.170 $970.000 $1,116.750 $940.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 1.000 $681.420 $1,180.000 $1,235.000 $1,200.000 $1,089.040 $1,190.000 $1,192.890 $950.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 1.000 $2,900.000 $1,700.000 $5,500.000 $1,800.000 $4,849.970 $3,645.000 $1,725.890 $3,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $449.030 $300.000 $385.000 $300.000 $339.500 $760.000 $304.570 $540.000
REMOVE SM RD SN SUP&AM
EA 74.000 $80.000 $75.000 $75.000 $75.000 $66.140 $125.000 $76.140 $120.000
RELOCATE LRSA
EA 3.000 $5,984.250 $2,650.000 $2,649.000 $3,000.000 $2,335.920 $3,649.000 $2,711.700 $3,400.000
REMOVE LRSA
EA 2.000 $1,500.000 $186.000 $186.000 $10,000.000 $164.020 $1,186.000 $190.400 $1,030.000
INS OH SN SUP(25 FT BAL TEE)
EA 3.000 $29,850.000 $17,760.000 $17,758.000 $18,000.000 $15,659.250 $25,000.000 $18,178.310 $21,200.000
INS OH SN SUP(30 FT BAL TEE)
EA 5.000 $58,900.000 $19,710.000 $19,711.000 $20,000.000 $17,381.430 $35,000.000 $20,177.540 $32,600.000
INS OH SN SUP(30 FT CANT)
EA 1.000 $26,497.150 $19,360.000 $19,364.000 $20,000.000 $17,075.440 $35,000.000 $19,822.330 $27,100.000
INS OH SN SUP(35 FT BAL TEE)
EA 2.000 $45,000.000 $44,220.000 $44,221.000 $45,000.000 $38,994.670 $45,000.000 $45,267.670 $40,000.000
INS OH SN SUP(40 FT CANT)
EA 9.000 $39,000.000 $25,060.000 $25,058.000 $26,000.000 $22,096.480 $40,000.000 $25,651.100 $40,000.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $55,000.000 $52,500.000 $52,465.000 $63,000.000 $46,264.330 $75,000.000 $53,706.790 $49,600.000
INS OH SN SUP(90 FT BRDG)
EA 2.000 $70,000.000 $60,100.000 $60,064.000 $71,000.000 $52,965.250 $85,000.000 $61,485.650 $60,905.180
INS OH SN SUP(100 FT BRDG)
EA 2.000 $83,030.660 $74,600.000 $74,567.000 $85,000.000 $65,754.190 $90,000.000 $76,331.930 $71,161.030
INS OH SN SUP(110 FT BRDG)
EA 1.000 $446.670 $88,400.000 $88,409.000 $100,000.000 $77,960.240 $135,000.000 $90,501.550 $92,353.460
REMOVE OVERHD SIGN SUP
EA 29.000 $5,300.000 $1,670.000 $1,674.000 $3,000.000 $1,476.160 $35,812.000 $1,713.620 $5,900.000
SIGN WALKWAY (36 IN) WITH HNDRL
LF 62.000 $330.000 $467.000 $467.000 $475.000 $411.800 $467.000 $478.050 $620.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 162.000 $25.000 $18.500 $25.000 $50.000 $22.050 $20.000 $25.960 $21.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 26.000 $23.390 $23.100 $30.000 $50.000 $26.460 $20.000 $40.320 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 10.000 $19.980 $19.100 $27.000 $100.000 $23.810 $22.000 $38.700 $34.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 36,359.000 $0.950 $1.000 $1.000 $1.100 $0.880 $1.000 $1.020 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 155,002.000 $0.820 $0.950 $0.950 $1.000 $0.840 $0.950 $0.960 $0.950
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 384.000 $1.820 $2.000 $2.000 $2.200 $1.760 $2.000 $2.030 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 101,059.000 $0.850 $1.000 $1.000 $1.100 $0.880 $1.000 $1.020 $0.950
PAVEMENT SEALER 6"
LF 196,253.000 $0.180 $0.100 $0.100 $0.100 $0.090 $0.100 $0.100 $0.300
PAVEMENT SEALER 8"
LF 24,005.000 $0.310 $0.200 $0.200 $0.200 $0.180 $0.200 $0.200 $0.400
PAVEMENT SEALER 12"
LF 4,611.000 $0.500 $0.300 $0.300 $0.300 $0.260 $0.300 $0.300 $0.900
PAVEMENT SEALER 24"
LF 1,131.000 $1.000 $0.500 $0.500 $0.550 $0.440 $0.500 $0.510 $2.000
REFL PAV MRKR TY I-C
EA 111.000 $4.000 $4.200 $4.200 $4.500 $3.700 $4.200 $4.260 $5.000
REFL PAV MRKR TY II-C-R
EA 141.000 $4.000 $4.250 $4.250 $4.500 $3.750 $4.250 $4.310 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 290,372.000 $0.340 $0.250 $0.250 $0.290 $0.220 $0.250 $0.250 $0.900
ELIM EXT PAV MRK & MRKS (8")
LF 384.000 $0.530 $0.500 $0.500 $0.500 $0.440 $0.500 $0.510 $1.000
PAV SURF PREP FOR MRK (6")
LF 8,124.000 $0.030 $0.020 $0.020 $0.020 $0.020 $0.020 $0.020 $0.150
PAV SURF PREP FOR MRK (8")
LF 2,576.000 $0.080 $0.050 $0.040 $0.050 $0.040 $0.040 $0.040 $0.250
PAV SURF PREP FOR MRK (24")
LF 103.000 $0.600 $0.100 $0.120 $0.140 $0.110 $0.120 $0.120 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 13.000 $10.000 $5.000 $5.000 $5.500 $4.410 $5.000 $5.080 $21.000
PAV SURF PREP FOR MRK (WORD)
EA 13.000 $10.000 $7.000 $7.000 $7.500 $6.170 $7.000 $7.110 $25.000
PAV SURF PREP FOR MRK (BLAST CLN)(6")
LF 196,253.000 $0.070 $0.050 $0.050 $0.050 $0.040 $0.050 $0.050 $0.520
PAV SURF PREP FOR MRK (BLAST CLN)(8")
LF 24,005.000 $0.400 $0.100 $0.100 $0.100 $0.090 $0.100 $0.100 $0.800
PAV SURF PREP FOR MRK (BLAST CLN)(12")
LF 4,611.000 $1.350 $0.200 $0.200 $0.200 $0.180 $0.200 $0.200 $0.500
PAV SURF PREP FOR MRK (BLAST CLN)(24")
LF 1,131.000 $3.070 $0.500 $0.500 $0.500 $0.440 $0.500 $0.510 $3.000
PV SURF PREP FOR MRK (BLST CLN)(ARRWS)
EA 76.000 $59.510 $5.000 $5.000 $5.000 $4.410 $5.000 $5.080 $35.000
PV SURF PREP MRKS (BLST CLN)(DBL ARW)
EA 5.000 $67.690 $10.000 $10.000 $10.000 $8.820 $10.000 $10.150 $10.000
PV SURF PRP FOR MRK (BLST CLN)(WORDS)
EA 40.000 $62.530 $10.000 $10.000 $10.000 $8.820 $10.000 $10.150 $35.000
INSTALL HWY TRF SIG (UPGRADE)
EA 5.000 $8,804.000 $12,100.000 $12,101.000 $12,500.000 $10,670.820 $12,101.000 $12,319.540 $9,200.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 4.000 $6,118.210 $5,090.000 $5,088.000 $5,100.000 $4,486.660 $5,088.000 $5,179.890 $6,700.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $500.000 $93.000 $93.000 $100.000 $82.000 $393.000 $94.680 $820.000
PED POLE ASSEMBLY
EA 15.000 $2,082.000 $2,200.000 $2,203.000 $2,300.000 $1,942.630 $2,203.000 $2,242.780 $2,000.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $823.660 $597.000 $597.000 $600.000 $526.440 $597.000 $607.780 $770.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,064.130 $3,430.000 $3,430.000 $3,500.000 $3,024.620 $3,430.000 $3,491.950 $2,700.000
REMOVE LUMINAIRE POLE
EA 17.000 $413.330 $372.000 $372.000 $400.000 $328.040 $2,872.000 $378.720 $5,900.000
WIDE FLANGE PAVEMENT TERMINALS
LF 227.000 $449.160 $650.000 $455.730 $950.000 $679.900 $450.000 $611.310 $1,250.000
SOUND WALL (12 FT)
LF 2,042.000 $750.000 $375.000 $398.320 $350.000 $303.240 $350.000 $334.570 $490.000
SOUND WALL (16FT)(HORIZ SCHEME)
LF 573.150 $850.000 $500.000 $517.810 $450.000 $389.560 $550.000 $428.480 $630.000
TIP TESTING(DRILL SHAFT)
EA 8.000 $4,500.000 $6,000.000 $7,900.000 $8,000.000 $6,440.590 $5,200.000 $6,293.100 $6,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 32.000 $64.870 $1,000.000 $1,500.000 $200.000 $132.360 $10.000 $85.000 $120.000
FO CBL (72 SMF)
LF 73,288.000 $4.560 $2.700 $2.710 $2.800 $2.390 $2.710 $2.760 $2.830
ITS GRND MNT CAB (TY 6) (CONF 1)
EA 1.000 $16,334.460 $12,740.000 $12,375.000 $13,000.000 $11,229.890 $12,735.000 $12,964.990 $10,359.950
COMMUNICATION CABINET FOUNDATION
EA 1.000 $14,500.000 $4,120.000 $4,116.000 $4,200.000 $3,629.540 $4,116.000 $4,190.330 $2,600.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 6.000 $7,050.000 $7,650.000 $7,653.000 $7,700.000 $6,748.510 $7,653.000 $7,791.210 $8,000.000
CCTV MOUNT (POLE)
EA 6.000 $450.000 $143.000 $143.000 $150.000 $126.100 $143.000 $145.580 $1,180.000
REMOVE CCTV FIELD EQUIPMENT
EA 3.000 $1,250.000 $279.000 $279.000 $300.000 $246.020 $2,779.000 $284.040 $1,030.000
ITS MULTI-DUCT CND (PVC-40)
LF 57,198.000 $29.210 $20.500 $20.520 $21.000 $18.100 $20.520 $20.890 $23.990
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 9,254.000 $25.130 $24.900 $24.920 $25.000 $21.980 $24.920 $25.370 $35.000
CONDUIT (PREPARE)
LF 665.000 $1.740 $0.500 $0.500 $1.000 $0.440 $0.500 $0.510 $2.000
GROUND BOX (PREPARE)
EA 28.000 $400.000 $276.000 $276.000 $300.000 $243.380 $276.000 $280.980 $350.000
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $14,000.000 $3,660.000 $3,660.000 $4,000.000 $3,227.440 $3,660.000 $3,726.100 $16,679.930
REFL PAV MRKR TY II C-R
EA 3,398.000 $4.000 $4.250 $4.250 $4.500 $3.750 $4.250 $4.310 $3.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 62,834.000 $0.500 $0.700 $0.700 $0.750 $0.620 $0.700 $0.710 $0.980
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 35,661.000 $0.560 $0.750 $0.750 $0.800 $0.660 $0.750 $0.760 $0.750
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 26,491.000 $0.900 $1.400 $1.400 $1.500 $1.230 $1.400 $1.420 $1.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 5,153.000 $3.000 $3.000 $3.000 $3.100 $2.650 $3.000 $3.050 $3.000
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 90.000 $3.270 $4.000 $4.000 $4.200 $3.530 $4.000 $4.060 $3.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,234.000 $6.000 $6.000 $6.000 $6.300 $5.290 $6.000 $6.090 $6.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 71,701.000 $0.500 $0.700 $0.700 $0.750 $0.620 $0.700 $0.710 $0.770
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 34,181.000 $0.790 $0.750 $0.750 $0.800 $0.660 $0.750 $0.760 $0.800
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 107.000 $100.000 $140.000 $140.000 $150.000 $123.450 $140.000 $142.130 $200.000
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
EA 13.000 $284.680 $350.000 $350.000 $360.000 $308.640 $350.000 $355.330 $230.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 68.000 $250.000 $150.000 $150.000 $160.000 $132.270 $150.000 $152.280 $230.000
MULTIPOLYMER PAV MRK (W)(U-TURN ARROW)
EA 1.000 $150.000 $200.000 $200.000 $210.000 $176.320 $200.000 $203.050 $240.000
ITS POLE (55 FT)(90 MPH)
EA 6.000 $23,950.000 $20,000.000 $20,000.000 $21,000.000 $17,636.280 $20,000.000 $20,361.190 $21,400.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 6.000 $5,240.000 $6,290.000 $6,294.000 $6,300.000 $5,550.140 $6,294.000 $6,407.670 $6,700.000
TMA (MOBILE OPERATION)
HR 10.000 $67.890 $113.000 $1,000.000 $100.000 $56.590 $86.000 $200.000 $80.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 117.000 $3,997.680 $3,500.000 $3,498.000 $3,500.000 $3,084.580 $3,498.000 $3,561.170 $3,500.000
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 6.000 $525.000 $672.000 $672.000 $700.000 $592.580 $672.000 $684.140 $710.000
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 2.000 $500.000 $672.000 $672.000 $700.000 $592.580 $672.000 $684.140 $720.000
ITS RVSD (DATA COLLECT ONLY) SYS
EA 6.000 $8,000.000 $12,460.000 $12,462.000 $13,000.000 $10,989.160 $12,462.000 $12,687.060 $8,600.000
INST WRONG WAY DRIVER SYSTEM EQUIPMENT
EA 9.000 $5,104.090 $3,030.000 $3,030.000 $3,200.000 $2,671.890 $3,030.000 $3,084.720 $4,600.000
Totals: $102,182,265.959 $90,916,059.573 $94,736,075.963 $96,222,637.244 $99,492,208.987 $104,431,315.715 $108,000,000.003 $108,127,332.275