PREPARING ROW
|
STA
|
475.000
|
$5,200.000
|
$30,526.320
|
$30,572.990
|
$17,650.000
|
$34,000.000
|
$35,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,844.000
|
$6.000
|
$11.480
|
$6.040
|
$5.520
|
$6.500
|
$25.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,520.000
|
$7.250
|
$7.580
|
$3.050
|
$4.870
|
$3.250
|
$25.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
12,785.000
|
$7.750
|
$7.190
|
$4.840
|
$6.910
|
$5.250
|
$25.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,270.000
|
$5.750
|
$3.180
|
$3.580
|
$1.790
|
$4.000
|
$25.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
814.000
|
$7.750
|
$10.560
|
$15.760
|
$6.960
|
$17.000
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
235,997.000
|
$5.400
|
$0.890
|
$1.500
|
$0.580
|
$0.650
|
$1.900
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
48,001.000
|
$5.000
|
$0.570
|
$2.110
|
$1.000
|
$1.250
|
$3.750
|
|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
179,855.000
|
$2.250
|
$5.030
|
$5.170
|
$3.920
|
$4.150
|
$7.700
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
56,142.000
|
$8.800
|
$5.000
|
$3.770
|
$1.000
|
$3.150
|
$5.700
|
|
|
REMOVING STAB BASE & ASPH PAV (1.5")
|
SY
|
131,855.000
|
$4.070
|
$1.000
|
$1.380
|
$0.500
|
$0.500
|
$1.650
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
305,414.000
|
$7.300
|
$4.730
|
$7.000
|
$10.530
|
$7.250
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
65,896.000
|
$11.000
|
$10.000
|
$10.500
|
$14.810
|
$11.500
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
399,705.000
|
$7.400
|
$7.030
|
$6.000
|
$12.720
|
$11.250
|
$10.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
97,132.000
|
$43.000
|
$48.110
|
$30.000
|
$58.070
|
$81.000
|
$80.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
25,190.000
|
$1.250
|
$0.960
|
$0.950
|
$0.970
|
$0.950
|
$0.950
|
|
|
BLOCK SODDING
|
SY
|
251,903.000
|
$3.250
|
$2.650
|
$2.630
|
$3.530
|
$2.630
|
$2.650
|
|
|
STRAW OR HAY MULCH
|
SY
|
25,190.000
|
$0.250
|
$0.140
|
$0.140
|
$0.420
|
$0.140
|
$0.150
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
25,190.000
|
$0.190
|
$0.250
|
$0.250
|
$0.190
|
$0.250
|
$0.250
|
|
|
FERTILIZER
|
AC
|
106.000
|
$575.000
|
$503.130
|
$500.000
|
$700.920
|
$500.000
|
$500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
12,720.000
|
$9.000
|
$28.440
|
$24.000
|
$42.400
|
$24.500
|
$32.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
480,566.000
|
$3.500
|
$2.550
|
$2.800
|
$3.200
|
$3.500
|
$3.250
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
6,508.000
|
$177.000
|
$324.000
|
$330.000
|
$355.210
|
$350.000
|
$300.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
480,566.000
|
$10.750
|
$9.070
|
$9.500
|
$13.870
|
$13.000
|
$12.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
26,431.000
|
$80.600
|
$93.580
|
$93.000
|
$97.020
|
$100.930
|
$112.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
418,959.000
|
$70.000
|
$67.550
|
$69.000
|
$70.880
|
$74.440
|
$79.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
32,488.000
|
$120.000
|
$99.070
|
$75.000
|
$121.110
|
$119.870
|
$101.500
|
|
|
CEM STABIL BKFL
|
CY
|
19,944.000
|
$45.000
|
$45.470
|
$90.000
|
$56.260
|
$78.000
|
$80.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
261.000
|
$45.000
|
$43.150
|
$107.990
|
$56.260
|
$78.000
|
$80.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
250.000
|
$275.000
|
$146.100
|
$193.260
|
$150.550
|
$200.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,429.000
|
$2.000
|
$7.940
|
$2.590
|
$1.080
|
$30.000
|
$3.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
29,754.000
|
$8.000
|
$15.710
|
$5.450
|
$31.440
|
$28.000
|
$26.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
9,614.000
|
$160.000
|
$173.140
|
$190.000
|
$171.300
|
$200.000
|
$200.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
6,412.000
|
$249.000
|
$248.390
|
$250.000
|
$233.450
|
$280.000
|
$280.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
3,696.000
|
$325.000
|
$322.390
|
$320.000
|
$304.050
|
$360.000
|
$360.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
3,015.000
|
$460.000
|
$487.600
|
$420.000
|
$385.470
|
$460.000
|
$470.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
4,212.000
|
$425.000
|
$501.910
|
$520.000
|
$488.370
|
$570.000
|
$575.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
132.000
|
$250.000
|
$246.540
|
$245.000
|
$245.000
|
$250.000
|
$245.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
418.000
|
$350.000
|
$472.940
|
$470.000
|
$470.000
|
$479.590
|
$470.000
|
|
|
CL C CONC (ABUT)
|
CY
|
784.400
|
$785.000
|
$982.680
|
$750.000
|
$950.670
|
$1,050.000
|
$1,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
1,354.700
|
$1,000.000
|
$1,104.550
|
$1,300.000
|
$1,198.300
|
$1,100.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
769.600
|
$900.000
|
$1,457.540
|
$1,300.000
|
$1,010.480
|
$1,350.000
|
$1,000.000
|
|
|
REINF CONC SLAB
|
SF
|
289,454.000
|
$16.500
|
$18.600
|
$15.000
|
$16.970
|
$20.000
|
$15.000
|
|
|
BRIDGE MEDIAN
|
SF
|
31,707.660
|
$9.250
|
$8.030
|
$12.810
|
$7.380
|
$20.000
|
$10.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
22,007.780
|
$145.000
|
$145.090
|
$170.000
|
$164.800
|
$155.000
|
$160.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
19,600.000
|
$181.000
|
$178.580
|
$170.000
|
$156.960
|
$155.000
|
$165.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2,485.000
|
$460.000
|
$426.300
|
$440.000
|
$328.240
|
$525.000
|
$500.000
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
859.000
|
$535.000
|
$397.660
|
$410.000
|
$336.530
|
$525.000
|
$500.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
838.000
|
$430.000
|
$487.410
|
$435.000
|
$327.440
|
$625.000
|
$500.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
343.000
|
$275.000
|
$436.710
|
$485.000
|
$370.170
|
$550.000
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
133.000
|
$150.000
|
$200.160
|
$292.860
|
$254.690
|
$210.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
426.000
|
$476.750
|
$493.580
|
$585.000
|
$612.920
|
$625.000
|
$500.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
896.000
|
$9.250
|
$20.120
|
$29.630
|
$16.170
|
$14.000
|
$25.000
|
|
|
RAIL (TY T223)
|
LF
|
114.000
|
$95.000
|
$243.240
|
$196.950
|
$74.090
|
$180.000
|
$150.000
|
|
|
RAIL (TY C223)
|
LF
|
308.000
|
$140.000
|
$231.070
|
$236.460
|
$107.410
|
$230.000
|
$175.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
8,290.000
|
$135.000
|
$114.750
|
$121.640
|
$97.590
|
$150.000
|
$115.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
19,556.000
|
$55.000
|
$49.850
|
$58.000
|
$45.440
|
$55.000
|
$55.000
|
|
|
RAIL (TY PR11)
|
LF
|
454.000
|
$139.000
|
$98.920
|
$104.020
|
$90.630
|
$145.000
|
$98.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,279.500
|
$121.000
|
$184.840
|
$228.380
|
$152.640
|
$163.000
|
$210.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
306.000
|
$170.000
|
$256.530
|
$346.100
|
$266.370
|
$280.000
|
$285.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,708.000
|
$205.000
|
$254.460
|
$324.840
|
$272.890
|
$280.000
|
$285.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
504.000
|
$220.000
|
$297.200
|
$375.340
|
$282.330
|
$315.000
|
$325.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
2,300.000
|
$263.000
|
$650.000
|
$430.000
|
$330.400
|
$370.000
|
$365.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
524.000
|
$271.000
|
$377.080
|
$459.020
|
$339.470
|
$390.000
|
$405.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
2,178.000
|
$330.000
|
$394.100
|
$450.000
|
$379.930
|
$435.000
|
$420.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
4,531.000
|
$340.000
|
$435.240
|
$525.000
|
$425.850
|
$485.000
|
$465.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
366.000
|
$345.000
|
$516.380
|
$671.790
|
$506.310
|
$580.000
|
$575.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
84.000
|
$460.000
|
$563.400
|
$737.090
|
$576.040
|
$655.000
|
$650.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
1,536.000
|
$465.000
|
$694.760
|
$700.000
|
$607.560
|
$710.000
|
$643.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
540.000
|
$600.000
|
$714.140
|
$945.260
|
$663.060
|
$770.000
|
$750.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
1,806.000
|
$790.000
|
$1,038.500
|
$1,200.000
|
$933.560
|
$1,060.000
|
$1,000.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
780.000
|
$740.000
|
$1,037.360
|
$1,200.000
|
$978.740
|
$1,100.000
|
$1,100.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
260.000
|
$875.000
|
$1,144.600
|
$1,478.270
|
$1,024.590
|
$1,200.000
|
$1,150.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
160.000
|
$310.000
|
$379.920
|
$481.810
|
$404.180
|
$432.000
|
$425.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,240.000
|
$73.000
|
$76.100
|
$75.380
|
$122.220
|
$67.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
9,496.000
|
$81.000
|
$84.880
|
$90.000
|
$101.470
|
$83.000
|
$95.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,720.000
|
$87.000
|
$101.990
|
$109.780
|
$98.350
|
$97.000
|
$110.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
564.000
|
$107.000
|
$136.010
|
$153.990
|
$153.320
|
$133.000
|
$145.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
244.000
|
$150.000
|
$180.300
|
$203.330
|
$185.530
|
$183.000
|
$200.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
2.000
|
$4,425.000
|
$4,417.130
|
$4,181.190
|
$4,515.720
|
$2,500.000
|
$6,500.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
7.000
|
$6,125.000
|
$8,388.980
|
$10,160.040
|
$7,308.940
|
$6,900.000
|
$9,900.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$8,700.000
|
$8,366.700
|
$11,111.870
|
$8,304.710
|
$6,900.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
2.000
|
$7,000.000
|
$7,500.000
|
$4,952.860
|
$3,386.480
|
$2,700.000
|
$5,400.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
12.000
|
$6,500.000
|
$6,714.810
|
$4,953.330
|
$9,063.920
|
$3,500.000
|
$10,600.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
3.000
|
$9,500.000
|
$7,048.160
|
$9,628.300
|
$9,853.870
|
$3,900.000
|
$11,500.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
4.000
|
$5,030.000
|
$5,872.940
|
$8,344.340
|
$5,941.020
|
$4,500.000
|
$8,300.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
1.000
|
$6,000.000
|
$5,820.860
|
$6,950.140
|
$4,975.320
|
$4,600.000
|
$6,600.000
|
|
|
JCT BOX (COMPL) (CIP) (8FTX5FT)
|
EA
|
2.000
|
$8,000.000
|
$15,211.610
|
$14,959.510
|
$16,448.420
|
$5,800.000
|
$19,600.000
|
|
|
INLET (CURB)(SPL)
|
EA
|
8.000
|
$2,720.000
|
$5,714.860
|
$10,926.880
|
$5,236.320
|
$3,200.000
|
$7,300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
4.000
|
$3,700.000
|
$10,537.310
|
$7,702.590
|
$6,759.150
|
$5,200.000
|
$6,600.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$7,000.000
|
$8,319.640
|
$7,650.920
|
$6,759.160
|
$5,300.000
|
$8,100.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$7,520.000
|
$9,700.800
|
$7,029.580
|
$6,759.140
|
$5,000.000
|
$7,100.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$6,200.000
|
$11,357.440
|
$8,168.110
|
$12,122.830
|
$12,500.000
|
$45,000.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
2.000
|
$11,250.000
|
$16,802.840
|
$10,854.740
|
$12,122.850
|
$15,000.000
|
$47,500.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$39,000.000
|
$126,688.170
|
$47,586.160
|
$65,383.330
|
$74,000.000
|
$77,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$33,000.000
|
$166,613.790
|
$53,422.540
|
$70,416.860
|
$89,000.000
|
$95,000.000
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
2.000
|
$44,000.000
|
$255,972.180
|
$92,202.830
|
$109,146.130
|
$156,000.000
|
$188,000.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
5.000
|
$8,650.000
|
$11,338.430
|
$14,569.550
|
$17,604.230
|
$9,200.000
|
$27,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
6.000
|
$10,700.000
|
$17,047.850
|
$8,506.730
|
$17,604.220
|
$13,000.000
|
$34,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
3.000
|
$15,000.000
|
$21,963.550
|
$9,387.830
|
$21,125.060
|
$16,000.000
|
$32,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
10.000
|
$19,000.000
|
$39,523.970
|
$14,042.180
|
$24,645.900
|
$24,000.000
|
$44,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
6.000
|
$23,000.000
|
$44,667.840
|
$17,704.990
|
$29,395.410
|
$25,000.000
|
$49,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
3.000
|
$25,000.000
|
$66,772.040
|
$21,951.300
|
$30,624.080
|
$37,000.000
|
$51,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
5.000
|
$30,500.000
|
$73,536.880
|
$23,630.610
|
$54,452.200
|
$42,000.000
|
$63,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
6.000
|
$8,900.000
|
$4,735.520
|
$11,454.450
|
$18,318.930
|
$5,400.000
|
$15,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
33.000
|
$10,000.000
|
$8,351.480
|
$9,148.910
|
$12,868.910
|
$7,000.000
|
$18,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$8,500.000
|
$10,235.170
|
$11,438.530
|
$16,383.870
|
$9,000.000
|
$21,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
12.000
|
$8,000.000
|
$9,242.350
|
$10,199.430
|
$9,809.900
|
$8,200.000
|
$14,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$12,000.000
|
$13,479.980
|
$19,018.110
|
$13,955.750
|
$6,900.000
|
$21,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
4.000
|
$9,700.000
|
$14,390.910
|
$17,267.240
|
$15,005.450
|
$13,300.000
|
$21,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
6.000
|
$15,500.000
|
$17,858.890
|
$21,605.480
|
$19,920.010
|
$17,400.000
|
$26,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (P)
|
EA
|
2.000
|
$14,400.000
|
$20,537.030
|
$33,932.850
|
$20,911.420
|
$10,800.000
|
$27,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
84.000
|
$1,000.000
|
$1,964.850
|
$2,077.620
|
$1,336.830
|
$1,100.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
6.000
|
$1,200.000
|
$2,140.070
|
$2,025.740
|
$1,315.630
|
$1,100.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,575.000
|
$3,000.730
|
$2,123.050
|
$1,475.740
|
$1,100.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
178.000
|
$1,255.000
|
$2,168.010
|
$2,226.770
|
$1,872.300
|
$1,200.000
|
$1,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$3,530.720
|
$3,112.220
|
$1,617.280
|
$1,700.000
|
$1,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$2,350.000
|
$4,153.420
|
$3,883.360
|
$2,402.450
|
$2,300.000
|
$2,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$3,950.000
|
$6,426.540
|
$6,814.360
|
$4,586.770
|
$4,800.000
|
$4,700.000
|
|
|
REMOV STR (INLET)
|
EA
|
9.000
|
$600.000
|
$1,199.310
|
$1,192.190
|
$857.950
|
$700.000
|
$5,000.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$850.000
|
$1,814.040
|
$1,319.040
|
$1,139.620
|
$700.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
152.000
|
$350.000
|
$550.000
|
$610.820
|
$571.960
|
$350.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,340.000
|
$1,836.700
|
$2,443.290
|
$1,845.830
|
$2,200.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
11,182.000
|
$18.000
|
$17.140
|
$13.730
|
$21.130
|
$17.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
697.000
|
$46.000
|
$78.240
|
$35.860
|
$69.860
|
$65.000
|
$75.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$50,000.000
|
$36,640.360
|
$41,266.800
|
$36,594.950
|
$70,000.000
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$9,500,000.000
|
$14,326,920.000
|
$14,300,170.640
|
$14,000,000.000
|
$16,300,000.000
|
$17,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
62.000
|
$6,600.000
|
$8,545.750
|
$6,528.190
|
$10,940.340
|
$16,700.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,320.000
|
$27.000
|
$25.160
|
$25.000
|
$35.620
|
$26.340
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,320.000
|
$10.000
|
$10.060
|
$10.000
|
$10.570
|
$10.540
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,500.000
|
$22.500
|
$25.160
|
$25.000
|
$41.770
|
$26.340
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
4,500.000
|
$7.500
|
$10.060
|
$10.000
|
$10.120
|
$10.540
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,930.000
|
$2.500
|
$2.260
|
$2.250
|
$5.930
|
$2.370
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,930.000
|
$0.600
|
$0.750
|
$0.750
|
$1.190
|
$0.790
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
510.000
|
$4.250
|
$5.030
|
$5.000
|
$5.650
|
$5.270
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
510.000
|
$1.000
|
$0.500
|
$0.500
|
$1.780
|
$0.530
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
28,006.000
|
$59.000
|
$86.410
|
$85.000
|
$90.390
|
$120.000
|
$117.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
420.000
|
$38.000
|
$51.770
|
$95.140
|
$86.020
|
$90.000
|
$80.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,840.000
|
$52.100
|
$63.640
|
$81.750
|
$74.630
|
$77.000
|
$80.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
42,079.000
|
$12.500
|
$6.620
|
$8.180
|
$8.040
|
$8.750
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
48,107.000
|
$5.500
|
$2.800
|
$3.580
|
$3.360
|
$7.000
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,800.000
|
$6.800
|
$5.710
|
$3.270
|
$12.000
|
$9.500
|
$10.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
320.000
|
$5.500
|
$16.070
|
$6.000
|
$17.930
|
$16.500
|
$15.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
37,079.000
|
$8.250
|
$15.000
|
$10.150
|
$7.000
|
$10.000
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
1,540.000
|
$11.400
|
$8.630
|
$11.060
|
$7.100
|
$10.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
100.000
|
$7.500
|
$12.600
|
$8.710
|
$84.190
|
$19.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
5,000.000
|
$7.800
|
$11.790
|
$8.710
|
$7.100
|
$10.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
300.000
|
$8.650
|
$11.930
|
$14.540
|
$7.100
|
$10.000
|
$10.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
21.000
|
$75.000
|
$100.620
|
$125.800
|
$159.050
|
$200.000
|
$125.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
81,595.000
|
$4.020
|
$2.950
|
$23.150
|
$3.210
|
$4.000
|
$7.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
11,284.000
|
$63.000
|
$77.060
|
$88.000
|
$62.520
|
$95.000
|
$70.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
4,956.000
|
$80.000
|
$77.950
|
$97.000
|
$76.190
|
$118.000
|
$80.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
114,577.000
|
$69.000
|
$44.370
|
$40.000
|
$43.700
|
$55.000
|
$56.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
17.000
|
$1,725.000
|
$3,018.770
|
$2,200.000
|
$1,934.110
|
$2,900.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
27.000
|
$2,650.000
|
$3,018.770
|
$3,600.000
|
$2,250.780
|
$3,300.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
12.000
|
$1,650.000
|
$3,018.770
|
$2,150.000
|
$2,955.030
|
$4,200.000
|
$2,000.000
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
92,814.000
|
$0.300
|
$0.600
|
$0.790
|
$0.820
|
$0.900
|
$1.250
|
|
|
CONC MEDIAN
|
SY
|
292.000
|
$64.000
|
$40.250
|
$110.000
|
$69.450
|
$70.000
|
$64.250
|
|
|
CONCRETE MEDIAN (NOSE)
|
SY
|
52.000
|
$60.000
|
$40.250
|
$130.000
|
$117.390
|
$115.000
|
$64.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
6,669.000
|
$32.000
|
$26.160
|
$26.000
|
$26.000
|
$26.530
|
$26.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
29.000
|
$1,300.000
|
$1,293.040
|
$1,285.000
|
$1,285.000
|
$1,311.220
|
$1,290.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
29.000
|
$2,003.000
|
$2,364.700
|
$2,350.000
|
$2,350.000
|
$2,397.960
|
$2,350.000
|
|
|
SHORT RADIUS
|
LF
|
111.000
|
$60.000
|
$65.410
|
$65.000
|
$65.000
|
$66.330
|
$65.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
25.000
|
$1,300.000
|
$1,509.390
|
$1,500.000
|
$1,500.000
|
$1,530.610
|
$1,500.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
3.000
|
$900.000
|
$1,459.080
|
$1,450.000
|
$1,450.000
|
$1,479.590
|
$1,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,965.000
|
$2.000
|
$4.020
|
$4.000
|
$4.000
|
$4.080
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
37.000
|
$3,050.000
|
$2,867.830
|
$2,850.000
|
$2,850.000
|
$2,908.160
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
25.000
|
$255.000
|
$276.720
|
$250.000
|
$275.000
|
$275.000
|
$275.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
11.000
|
$300.000
|
$311.940
|
$275.000
|
$310.000
|
$400.000
|
$310.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
6.000
|
$600.000
|
$669.160
|
$650.000
|
$665.000
|
$550.000
|
$665.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,920.000
|
$10.000
|
$16.300
|
$16.200
|
$16.200
|
$16.530
|
$16.200
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
200.000
|
$15.250
|
$17.460
|
$17.350
|
$17.350
|
$17.700
|
$17.400
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,045.000
|
$14.250
|
$23.500
|
$23.350
|
$23.350
|
$23.830
|
$23.400
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
1,245.000
|
$18.750
|
$22.540
|
$22.400
|
$22.400
|
$22.860
|
$22.400
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
440.000
|
$20.500
|
$30.440
|
$30.250
|
$30.250
|
$30.870
|
$30.250
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
775.000
|
$27.000
|
$28.480
|
$28.300
|
$28.300
|
$28.880
|
$28.300
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
4,510.000
|
$1.700
|
$1.760
|
$1.750
|
$1.750
|
$1.790
|
$1.750
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
475.000
|
$2.300
|
$2.060
|
$2.050
|
$2.050
|
$2.090
|
$2.050
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
875.000
|
$2.800
|
$2.520
|
$2.500
|
$2.500
|
$2.550
|
$2.500
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
6,415.000
|
$2.250
|
$2.870
|
$2.850
|
$2.850
|
$2.910
|
$2.850
|
|
|
GROUND BOX TY D (162922)
|
EA
|
1.000
|
$835.000
|
$1,061.600
|
$1,055.000
|
$1,055.000
|
$1,076.530
|
$1,060.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
44.000
|
$981.000
|
$1,222.600
|
$1,215.000
|
$1,215.000
|
$1,239.800
|
$1,220.000
|
|
|
ZINC-COAT STL WIRE STRAND (1/4")
|
LF
|
135.000
|
$2.000
|
$2.010
|
$2.000
|
$2.000
|
$2.040
|
$2.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
80.000
|
$2.250
|
$2.520
|
$2.500
|
$2.500
|
$2.550
|
$2.500
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
270.000
|
$3.750
|
$3.520
|
$3.500
|
$3.500
|
$3.570
|
$3.500
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$260.000
|
$649.030
|
$645.000
|
$645.000
|
$658.160
|
$645.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
9.000
|
$5,210.000
|
$6,404.820
|
$6,365.000
|
$6,365.000
|
$6,494.900
|
$6,370.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
94.000
|
$22.000
|
$18.110
|
$18.000
|
$18.000
|
$18.370
|
$18.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
117.000
|
$470.000
|
$422.630
|
$420.000
|
$420.000
|
$428.570
|
$420.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$600.000
|
$558.470
|
$555.000
|
$555.000
|
$566.330
|
$555.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$760.000
|
$603.760
|
$600.000
|
$600.000
|
$612.250
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
20.000
|
$850.000
|
$719.480
|
$715.000
|
$715.000
|
$729.590
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$975.000
|
$820.100
|
$815.000
|
$815.000
|
$831.630
|
$815.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$955.000
|
$910.660
|
$905.000
|
$905.000
|
$923.470
|
$905.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$2,310.000
|
$1,610.010
|
$1,600.000
|
$1,600.000
|
$1,632.660
|
$1,600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
22.000
|
$375.000
|
$367.280
|
$365.000
|
$365.000
|
$372.450
|
$365.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
161.000
|
$60.000
|
$80.500
|
$80.000
|
$80.000
|
$81.630
|
$80.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
165,307.000
|
$0.750
|
$1.260
|
$1.250
|
$1.250
|
$1.260
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
180,854.000
|
$0.800
|
$1.260
|
$1.250
|
$1.250
|
$1.260
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
269.000
|
$200.000
|
$201.260
|
$200.000
|
$200.000
|
$202.020
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$350.000
|
$352.190
|
$350.000
|
$350.000
|
$353.540
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
247.000
|
$250.000
|
$251.570
|
$250.000
|
$250.000
|
$252.530
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
346,161.000
|
$0.300
|
$0.350
|
$0.350
|
$0.350
|
$0.350
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
346,161.000
|
$0.100
|
$0.040
|
$0.040
|
$0.040
|
$0.040
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
184,262.000
|
$0.020
|
$0.060
|
$0.060
|
$0.060
|
$0.060
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
43,655.000
|
$0.040
|
$0.080
|
$0.080
|
$0.080
|
$0.080
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
3,617.000
|
$0.130
|
$0.240
|
$0.240
|
$0.240
|
$0.240
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
269.000
|
$4.250
|
$15.090
|
$15.000
|
$15.000
|
$15.150
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$7.250
|
$35.220
|
$35.000
|
$35.000
|
$35.360
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
247.000
|
$6.500
|
$35.220
|
$35.000
|
$35.000
|
$35.350
|
$35.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
8.000
|
$26,600.000
|
$30,137.350
|
$29,950.000
|
$29,950.000
|
$30,561.230
|
$29,950.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
8.000
|
$3,550.000
|
$4,301.740
|
$4,275.000
|
$4,275.000
|
$4,362.250
|
$4,280.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
6.000
|
$25,000.000
|
$35,068.010
|
$34,850.000
|
$34,850.000
|
$35,561.230
|
$34,850.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
61.000
|
$211.000
|
$276.720
|
$275.000
|
$275.000
|
$280.610
|
$275.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
24.000
|
$200.000
|
$276.720
|
$275.000
|
$275.000
|
$280.610
|
$275.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
61.000
|
$192.000
|
$276.720
|
$275.000
|
$275.000
|
$280.610
|
$275.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
24.000
|
$207.000
|
$276.720
|
$275.000
|
$275.000
|
$280.610
|
$275.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
61.000
|
$192.000
|
$276.720
|
$275.000
|
$275.000
|
$280.610
|
$275.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
48.000
|
$190.000
|
$276.720
|
$275.000
|
$275.000
|
$280.610
|
$275.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
34.000
|
$520.000
|
$729.540
|
$725.000
|
$725.000
|
$739.800
|
$725.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
24.000
|
$131.000
|
$226.410
|
$225.000
|
$225.000
|
$229.590
|
$225.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
61.000
|
$117.000
|
$196.230
|
$195.000
|
$195.000
|
$198.980
|
$195.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
9,575.000
|
$1.650
|
$1.660
|
$1.650
|
$1.650
|
$1.680
|
$1.650
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
9,790.000
|
$2.150
|
$2.060
|
$2.050
|
$2.050
|
$2.090
|
$2.050
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
14,985.000
|
$2.750
|
$2.970
|
$2.950
|
$2.950
|
$3.010
|
$2.950
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
10,280.000
|
$1.850
|
$1.510
|
$1.500
|
$1.500
|
$1.530
|
$1.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$6,050.000
|
$8,301.620
|
$8,250.000
|
$8,250.000
|
$8,418.370
|
$8,250.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
8.000
|
$300.000
|
$583.630
|
$580.000
|
$580.000
|
$591.840
|
$580.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
5.000
|
$8,400.000
|
$9,644.960
|
$9,585.000
|
$9,585.000
|
$9,780.610
|
$9,590.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$9,200.000
|
$11,164.410
|
$11,095.000
|
$11,095.000
|
$11,321.430
|
$11,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
1.000
|
$9,950.000
|
$11,868.790
|
$11,795.000
|
$11,795.000
|
$12,035.710
|
$11,800.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$11,550.000
|
$12,955.550
|
$12,875.000
|
$12,875.000
|
$13,137.760
|
$12,880.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
3.000
|
$27,650.000
|
$30,187.670
|
$30,000.000
|
$30,000.000
|
$30,612.240
|
$30,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$25,850.000
|
$28,451.890
|
$28,275.000
|
$28,275.000
|
$28,852.040
|
$28,280.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
4.000
|
$30,000.000
|
$31,470.650
|
$31,275.000
|
$31,275.000
|
$31,913.270
|
$31,280.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
6.000
|
$30,000.000
|
$32,205.210
|
$32,005.000
|
$32,005.000
|
$32,658.160
|
$32,010.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
4.000
|
$29,050.000
|
$33,105.820
|
$32,900.000
|
$32,900.000
|
$33,571.430
|
$32,900.000
|
|
|
RELOC TRF SG PL AM(S)SNGL MST ARM POLE
|
EA
|
2.000
|
$4,500.000
|
$4,276.580
|
$4,250.000
|
$4,250.000
|
$4,336.740
|
$4,250.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
35.000
|
$1,650.000
|
$2,299.300
|
$2,285.000
|
$2,285.000
|
$2,331.630
|
$2,290.000
|
|
|
REMOVE PED POLE ASSEMBLY
|
EA
|
2.000
|
$1,000.000
|
$316.970
|
$315.000
|
$315.000
|
$321.430
|
$315.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
36.000
|
$760.000
|
$739.600
|
$735.000
|
$735.000
|
$750.000
|
$735.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$2,000.000
|
$3,018.770
|
$3,000.000
|
$3,000.000
|
$3,061.220
|
$3,000.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
980.000
|
$10.500
|
$13.430
|
$13.350
|
$13.350
|
$13.620
|
$13.400
|
|
|
INSTALL OF TIMBER POLES
|
EA
|
1.000
|
$1,650.000
|
$1,433.900
|
$1,425.000
|
$1,425.000
|
$1,454.080
|
$1,430.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$2,200.000
|
$2,119.580
|
$3,302.570
|
$1,974.590
|
$6,000.000
|
$10,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$1,500.000
|
$1,464.280
|
$2,177.300
|
$771.100
|
$5,000.000
|
$10,000.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
1,152.000
|
$450.000
|
$627.350
|
$675.960
|
$458.820
|
$800.000
|
$650.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$10,250.000
|
$18,136.370
|
$18,781.380
|
$13,508.820
|
$9,700.000
|
$25,000.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,025.000
|
$1.550
|
$1.910
|
$1.900
|
$1.900
|
$1.940
|
$1.900
|
|
|
GROUND BOX (PREPARE)
|
EA
|
13.000
|
$340.000
|
$176.090
|
$175.000
|
$175.000
|
$178.570
|
$175.000
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
2,183.000
|
$15.000
|
$6.040
|
$6.000
|
$6.000
|
$6.060
|
$26.500
|
|
|
REFL PAV MRKR TY II A-A
|
EA
|
146.000
|
$15.000
|
$6.040
|
$6.000
|
$6.000
|
$6.060
|
$25.000
|
|
|
REFL PAV MRKR TY II C-R
|
EA
|
1,142.000
|
$15.000
|
$6.040
|
$6.000
|
$6.000
|
$6.060
|
$25.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
94,433.000
|
$0.600
|
$0.900
|
$0.890
|
$0.890
|
$0.900
|
$0.900
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
25,927.000
|
$0.550
|
$1.000
|
$0.990
|
$0.990
|
$1.000
|
$1.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
43,655.000
|
$1.000
|
$1.510
|
$1.500
|
$1.500
|
$1.520
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
3,118.000
|
$6.250
|
$7.040
|
$7.000
|
$7.000
|
$7.070
|
$7.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
51,530.000
|
$0.500
|
$0.900
|
$0.890
|
$0.890
|
$0.900
|
$0.900
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
259.000
|
$85.000
|
$1.000
|
$0.990
|
$0.990
|
$1.000
|
$1.000
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
499.000
|
$5.280
|
$8.050
|
$8.000
|
$8.000
|
$8.080
|
$8.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
25,927.000
|
$0.760
|
$1.260
|
$1.250
|
$1.250
|
$1.260
|
$1.250
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
8.000
|
$6,600.000
|
$8,306.650
|
$8,255.000
|
$8,255.000
|
$8,423.470
|
$8,260.000
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
|
EA
|
9.000
|
$2,700.000
|
$3,637.620
|
$3,615.000
|
$3,615.000
|
$3,688.780
|
$3,620.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
29.000
|
$550.000
|
$754.690
|
$750.000
|
$750.000
|
$765.310
|
$750.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
18.000
|
$550.000
|
$820.100
|
$815.000
|
$815.000
|
$831.630
|
$815.000
|
|
|
RELOCATE RVDS
|
EA
|
1.000
|
$380.000
|
$1,006.260
|
$1,000.000
|
$1,000.000
|
$1,020.410
|
$1,000.000
|
|
|
VIVDS TEMPORARY
|
EA
|
6.000
|
$1,500.000
|
$19,873.550
|
$19,750.000
|
$19,750.000
|
$20,153.060
|
$19,750.000
|
|
|
CASING STEEL (48IN)
|
LF
|
70.000
|
$753.000
|
$503.130
|
$304.330
|
$286.770
|
$700.000
|
$750.000
|
|
Totals: |
$125,496,639.845
|
$144,686,970.411
|
$144,999,706.045
|
$145,005,389.231
|
$165,215,456.710
|
$170,926,230.000
|