Show Job Controls
Bid Cobra

FORT BEND IH 69 (0027-12-160)

Items: 172

County: FORT BEND
Length: N/A
Highway: IH 69
District: HOUSTON
Control Number: 0027-12-160
DBE Goal: 0.0%
Project: C 27-12-160
Guaranty: N/A
Time: 687 WORKING DAYS
Engineer's Estimate: $60,124,320.92
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$60,124,320.92
$53,190,823.06
Over/Under Est: -11.53% -$6,933,497.86
Over/Under Est: -11.5% -$6,912,048.87
Amt Left: 0.04% $21,448.99
Over/Under Est: -4.6% -$2,765,347.37
Amt Left: 7.84% $4,168,150.49
Delta: -7.79% -$4,146,701.50
Over/Under Est: 7.53% $4,526,113.79
Amt Left: 21.54% $11,459,611.65
Delta: -12.71% -$7,291,461.16
Subcontractor Percentage Amount
HB FARMER FOUNDATION, LLC 9.64% $5,450,491.66
ROADWAY CONSTRUCTION, INC. 5.31% $3,002,293.64
FLORIDA TRAFFIC CONTROL DEVICES, INC. 3.20% $1,809,291.84
TOM-MAC, INC. 1.25% $706,754.62
MARTIN MARIETTA MATERIALS, INC. 1.08% $610,636.00
SEMARCK LANDSCAPE SERVICES, INC. 0.72% $407,090.66
STRIPE LINES, INC. 0.57% $322,280.11
D. SOLIS TRUCKING, INC. 0.48% $271,393.78
MONTALVO BRIDGE SYSTEMS, LLC 0.46% $260,085.70
A. SANCHEZ TRUCKING 0.44% $248,777.63
WILLOW CITY SIGN & RAIL, INC. 0.33% $186,583.22
SELRICO COMMUNICATIONS 0.30% $169,621.11
PENHALL COMPANY 0.26% $147,004.96
CONSOLIDATED CRANE & RIGGING 0.15% $84,810.55
HOUSTON SAWING & DRILLING 0.12% $67,848.44
SCOTT DERR PAINTING CO, LLC 0.09% $50,886.33
SWEEPING CORPORATION OF AMERICA, LLC 0.09% $50,886.33
C & C TRAFFIC CONTROL 0.05% $28,270.18
A BROTHERS MILLING, LLC 0.05% $28,270.18
BATTEN DRILLING, INC. 0.03% $16,962.11
PRV SERVICES, INC. 0.03% $16,962.11
CURB PLANET INC. 0.01% $5,654.04
Total: 24.66% $13,942,855.20

Bid Items & Bid Tabulations

172 Total 0 of 172
FORT BEND  |  IH 69  |  HOUSTON  |  0027-12-160  |  03/05/2024  |  $60,124,320.92  |  C 27-12-160  |  HWY IMPRV  |  687 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SER CONSTRUCTION PARTNERS, LLC
JAMES CONSTRUCTION GROUP, LLC
ZACHRY CONSTRUCTION CORPORATION
PULICE CONSTRUCTION, INC.
PREPARING ROW
STA 21.000 $20,000.000 $100,000.000 $148,760.000 $271,428.570 $309,499.650
REMOVING CONC (PAV)
SY 37,874.000 $13.500 $6.000 $3.200 $3.180 $5.670
REMOVING CONC (RIPRAP)
SY 298.000 $14.000 $4.500 $3.030 $3.190 $3.400
REMOVING CONC (CTB)
LF 4,329.000 $12.000 $8.300 $18.410 $17.050 $6.180
REMOVE CONC (RAIL)
LF 5,959.000 $15.000 $4.100 $2.020 $2.130 $2.060
REMOVING CONC (INTER ART CONC BLOCKS)
SY 1,477.000 $10.000 $7.300 $4.450 $4.690 $12.950
REMOVING CONCRETE(MOW STRIP)
LF 6,160.000 $10.000 $3.800 $2.440 $2.570 $3.090
REMOVING STAB BASE AND ASPH PAV (13")
SY 39,725.000 $4.320 $8.000 $1.750 $1.840 $10.410
EXCAVATION (ROADWAY)
CY 216,057.000 $15.000 $18.500 $12.380 $8.000 $11.520
EXCAVATION (CHANNEL)
CY 5,198.000 $30.000 $11.900 $20.350 $19.250 $32.740
EXCAVATION (SPECIAL)
CY 15,737.000 $50.000 $20.500 $18.060 $21.780 $24.960
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,472.000 $35.000 $13.300 $13.910 $4.030 $22.490
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 350.000 $60.000 $79.000 $92.960 $98.370 $268.110
BLOCK SODDING
SY 50,954.000 $8.000 $4.200 $3.620 $3.810 $3.280
DRILL SEEDING (TEMP) (WARM)
SY 25,478.000 $0.110 $0.200 $0.210 $0.220 $0.150
DRILL SEEDING (TEMP) (COOL)
SY 25,478.000 $0.110 $0.200 $0.200 $0.210 $0.150
FERTILIZER
AC 22.000 $2,000.000 $1,050.000 $600.000 $631.740 $763.580
VEGETATIVE WATERING
MG 6,004.000 $30.000 $2.000 $26.000 $33.690 $44.520
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 140.000 $350.000 $357.500 $382.200 $342.200 $681.650
LIME TRT (SUBGRADE)(6")
SY 10,681.000 $5.690 $3.900 $7.770 $8.000 $10.970
CEM TRT(PLNT MX) (CL M)(TYD)(GR1-2)(6")
SY 10,681.000 $6.000 $24.400 $21.850 $21.960 $34.880
CEM TRT(PLNT MX)(CL M)(TYD)(GR1-2)(12")
SY 2,041.000 $15.000 $52.400 $44.410 $53.530 $67.050
ASPHALT STAB BASE (GR 4)(PG 76)
TON 562.000 $112.000 $111.200 $275.000 $206.370 $190.350
CONC PVMT (CONT REINF - CRCP) (10")
SY 8,207.000 $73.000 $83.900 $89.520 $97.130 $133.900
CONC PVMT (CONT REINF - CRCP) (15")
SY 1,513.000 $95.000 $126.700 $171.330 $165.710 $253.210
CEM STABIL BKFL
CY 6,789.000 $70.000 $52.500 $46.330 $88.610 $81.030
CEMENT STAB BACKFILL (INLET OR MH)
CY 191.000 $59.000 $52.500 $46.330 $88.580 $81.080
TRENCH EXCAVATION PROTECTION
LF 2,202.000 $4.690 $1.100 $1.110 $24.300 $17.210
SHEET PILING (NZ-38)
SF 46,852.000 $180.000 $83.000 $115.010 $114.160 $120.900
SOIL NAIL ANCHORS
LF 101,370.000 $24.000 $18.300 $18.750 $12.180 $12.350
DRILL SHAFT (18 IN)
LF 64.000 $150.000 $79.800 $104.320 $65.380 $136.880
DRILL SHAFT (48 IN)
LF 17,848.000 $400.000 $362.600 $348.870 $387.690 $555.280
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 40.000 $1,008.000 $743.400 $595.000 $626.470 $1,219.360
CL C CONC (ABUT)
CY 234.600 $1,350.000 $1,101.000 $1,033.360 $1,209.480 $1,799.280
CL C CONC (CAP)
CY 1,232.400 $1,600.000 $1,025.100 $1,282.660 $1,481.820 $1,372.240
CL C CONC (COLUMN)
CY 677.000 $1,460.000 $1,367.000 $1,372.130 $1,143.190 $1,188.260
CL C CONC (WEBWALL)
CY 470.100 $2,500.000 $1,455.600 $1,395.450 $1,180.030 $2,645.010
REINF CONC SLAB
SF 302,463.000 $20.750 $22.600 $16.940 $19.970 $18.380
RETAINING WALL (SOIL NAIL)(FACIA)
SF 58,271.000 $58.000 $26.300 $24.510 $21.750 $8.240
PRESTR CONC GIRDER (TX46)
LF 2,703.440 $156.000 $182.000 $178.960 $184.330 $338.740
PRESTR CONC GIRDER (TX54)
LF 33,340.540 $185.000 $178.300 $177.570 $188.400 $185.870
RIPRAP (CONC)(5 IN)
CY 35.000 $500.000 $486.800 $406.890 $507.890 $852.140
RIPRAP (CONC)(CL B)
CY 3.000 $830.000 $770.700 $806.910 $1,574.070 $1,463.840
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 413.000 $500.000 $495.400 $545.150 $445.040 $1,032.610
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 2,352.000 $240.000 $326.800 $211.890 $166.460 $381.100
RIPRAP (STONE PROTECTION)(18 IN)
CY 86.000 $200.000 $327.600 $227.020 $300.000 $423.610
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $575.000 $513.400 $656.740 $575.090 $1,361.390
RAIL (TY T402)
LF 6,426.000 $207.000 $174.700 $163.850 $169.400 $135.640
RAIL (TY T551)
LF 210.000 $105.000 $59.200 $115.250 $306.290 $59.390
RAIL (TY T552)
LF 999.000 $174.460 $62.800 $76.710 $82.020 $76.820
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,402.000 $200.000 $173.400 $185.950 $213.960 $357.670
RC PIPE (CL III)(18 IN)
LF 264.000 $164.000 $99.100 $95.610 $109.630 $130.510
RC PIPE (CL III)(24 IN)
LF 270.000 $152.000 $126.100 $139.010 $141.600 $159.510
RC PIPE (CL III)(60 IN)
LF 1,668.000 $450.000 $437.000 $392.060 $489.920 $596.550
MANH (COMPL)(PRM)(48IN)
EA 1.000 $5,961.000 $9,017.900 $11,956.690 $13,587.690 $17,719.250
MANH (COMPL)(PRM)(72IN)
EA 5.000 $10,650.000 $18,266.300 $15,310.530 $14,314.180 $29,946.910
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 2.000 $6,300.000 $6,648.100 $6,767.720 $6,647.410 $9,119.190
INLET (COMPL)(PCO)(3FT)(NONE)
EA 6.000 $6,500.000 $6,182.300 $12,346.170 $11,806.600 $10,613.290
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $6,500.000 $5,772.800 $12,207.160 $12,254.110 $12,745.970
ADJUSTING INLET (CAP)
EA 6.000 $2,800.000 $1,456.400 $1,293.480 $2,185.530 $2,852.220
ADJUSTING MANHOLES(CAP)
EA 6.000 $1,500.000 $1,456.400 $3,491.120 $2,185.530 $2,852.220
REMOV STR (INLET)
EA 31.000 $737.000 $573.300 $873.500 $930.380 $1,140.140
REMOV STR (MANHOLE)
EA 6.000 $856.000 $938.700 $502.540 $922.910 $3,684.770
REMOV STR (PIPE)
LF 2,756.000 $53.000 $29.500 $14.290 $35.550 $23.070
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $100,000.000 $151,557.100 $95,019.730 $99,451.650 $136,197.670
REMOVE STR (JUNCTION BOX)
EA 1.000 $1,000.000 $1,722.000 $1,845.500 $922.910 $7,400.810
REMOV STR (RET WALL)
LF 4,024.000 $120.000 $3.000 $75.130 $14.960 $4.120
REMOV STR (LARGE)
EA 2.000 $27,000.000 $1,842.800 $1,878.890 $1,978.280 $1,807.450
MOBILIZATION
LS 1.000 $4,547,773.870 $5,200,000.000 $5,000,000.000 $5,700,000.000 $6,155,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $12,000.000 $15,000.000 $100,000.000 $100,000.000 $37,841.340
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 736.000 $38.000 $89.300 $30.000 $31.590 $35.550
ROCK FILTER DAMS (REMOVE)
LF 736.000 $14.500 $10.500 $15.000 $15.790 $11.460
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 360.000 $29.000 $31.500 $30.000 $31.590 $39.850
CONSTRUCTION EXITS (REMOVE)
SY 360.000 $7.670 $5.300 $15.000 $15.790 $10.780
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,310.000 $3.300 $2.100 $3.000 $3.160 $3.260
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,310.000 $0.830 $0.500 $1.000 $1.050 $1.010
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 80.000 $8.200 $8.400 $7.000 $7.370 $4.430
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 11,490.000 $16.000 $14.300 $9.710 $10.250 $13.600
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 20,460.000 $10.000 $9.700 $6.870 $8.030 $7.130
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 11,490.000 $15.000 $14.100 $8.740 $7.920 $10.310
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 900.000 $25.000 $14.800 $11.110 $10.800 $11.860
PORT CTB CONNECT HARDWARE
EA 517.000 $95.350 $99.800 $1.090 $105.290 $35.960
PERM CTB (F-SHAPE) (TY 1)
LF 3,695.000 $110.000 $61.200 $60.990 $49.270 $82.510
PERM CTB (F-SHAPE) (TY 2)
LF 50.000 $250.000 $61.800 $173.450 $47.170 $214.710
CONC CURB (MONO) (TY I)
LF 361.000 $11.500 $3.900 $4.350 $26.320 $15.000
CONC CURB (MONO) (TY II)
LF 2,733.000 $8.520 $3.800 $4.360 $8.400 $8.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $26.000 $36.800 $25.000 $29.480 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,219.000 $2,625.000 $2,000.000 $2,579.600 $2,159.970
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.370 $12.600 $1.000 $8.420 $1.080
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $300.000 $294.000 $225.000 $526.440 $243.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,419.000 $3,150.000 $3,000.000 $3,316.630 $3,239.960
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $312.000 $420.000 $300.000 $526.440 $324.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,515.000 $6,231.300 $1,200.000 $1,947.860 $1,295.980
CRASH CUSH ATTEN (REMOVE)
EA 11.000 $1,200.000 $1,050.000 $800.000 $1,000.250 $863.990
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $36,571.630 $29,166.800 $33,000.000 $35,114.160 $35,639.520
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 10.000 $9,684.000 $10,285.700 $7,800.000 $8,949.630 $8,423.890
GATE (REMOVE)
EA 2.000 $1,000.000 $1,050.000 $265.000 $555.760 $2,563.770
REMOVE RD IL ASM (CTB MOUNT)
EA 4.000 $600.000 $902.100 $544.000 $572.780 $742.410
REMOVE RD IL ASM (TRANS-BASE)
EA 8.000 $850.000 $1,052.200 $544.000 $572.780 $742.410
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 12.000 $8,300.000 $8,755.500 $7,626.000 $8,029.390 $8,189.340
IN RD IL (TY SA) 50S-10 (400W EQ) LED
EA 16.000 $6,000.000 $5,356.100 $5,000.000 $5,264.490 $5,592.700
HI MST IL POLE (150 FT)(100 MPH)
EA 1.000 $65,000.000 $81,896.400 $63,549.000 $66,910.650 $64,913.290
CONDT (PVC) (SCH 80) (2")
LF 602.000 $13.500 $9.100 $14.150 $14.900 $18.030
CONDT (PVC) (SCH 80) (2") (BORE)
LF 185.000 $26.000 $18.000 $33.420 $35.190 $21.430
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
LF 840.000 $22.000 $22.900 $13.550 $14.270 $26.770
CONDT (RM) (2")
LF 8,960.000 $30.000 $20.800 $41.150 $43.330 $32.210
CONDT (RM) (3")
LF 4,360.000 $91.110 $178.400 $76.270 $80.300 $87.300
ELEC CONDR (NO.8) BARE
LF 10,794.000 $2.250 $0.900 $1.700 $1.790 $1.350
ELEC CONDR (NO.8) INSULATED
LF 22,538.000 $2.000 $1.100 $1.770 $1.860 $1.650
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,312.000 $1,120.800 $1,054.000 $1,109.750 $1,722.330
REMOVE GROUND BOX
EA 1.000 $750.000 $561.900 $557.000 $586.470 $456.380
ELC SRV TY A 240/480 100(SS)SS(E)GC(O)
EA 1.000 $8,000.000 $12,624.000 $8,958.000 $9,431.860 $5,419.510
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $760.000 $535.500 $555.000 $579.100 $555.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $780.000 $684.600 $625.000 $763.360 $625.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 3.000 $775.000 $871.500 $775.000 $1,000.250 $775.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 5.000 $3,500.000 $6,405.000 $3,800.000 $5,001.260 $3,800.000
REMOVE SM RD SN SUP&AM
EA 25.000 $132.500 $178.500 $73.000 $100.020 $73.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 57.000 $18.500 $26.300 $13.000 $26.320 $13.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 24.000 $10.000 $26.300 $20.000 $26.320 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 29.000 $21.000 $26.300 $20.000 $26.850 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $16.500 $47.300 $28.000 $36.850 $28.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 3.000 $30.000 $47.300 $28.000 $36.850 $28.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 97,837.000 $0.240 $0.500 $0.260 $0.530 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 21,947.000 $0.260 $0.500 $0.260 $0.530 $0.260
PREFAB PAV MRK TY C (W) (ARROW)
EA 38.000 $226.000 $204.800 $184.000 $205.320 $184.000
PREFAB PAV MRK TY C (W) (WORD)
EA 38.000 $291.000 $262.500 $250.530 $263.230 $230.530
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 16.000 $499.000 $367.500 $392.790 $368.510 $392.790
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 49.000 $2,500.000 $2,625.000 $1,230.850 $2,632.240 $1,230.850
REFL PAV MRKR TY II-C-R
EA 1,556.000 $4.660 $6.000 $7.710 $6.050 $7.710
ELIM EXT PAV MRK & MRKS (4")
LF 170,143.000 $0.450 $0.400 $0.280 $0.370 $0.280
ELIM EXT PAV MRK & MRKS (6")
LF 57,400.000 $0.600 $0.400 $0.320 $0.370 $0.320
ELIM EXT PAV MRK & MRKS (8")
LF 19,161.000 $0.810 $0.500 $0.410 $0.530 $0.410
ELIM EXT PAV MRK & MRKS (12")
LF 6,030.000 $1.250 $1.100 $0.720 $1.050 $0.720
ELIM EXT PAV MRK & MRKS (ARROW)
EA 37.000 $55.000 $36.800 $60.000 $36.850 $60.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 38.000 $60.000 $42.000 $60.000 $42.110 $60.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 16.000 $62.000 $54.600 $60.000 $54.750 $60.000
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 49.000 $100.000 $131.300 $75.000 $131.620 $75.000
PAV SURF PREP FOR MRK (6")
LF 37,152.000 $0.060 $0.100 $0.070 $0.060 $0.070
PAV SURF PREP FOR MRK (8")
LF 17,840.000 $0.090 $0.100 $0.080 $0.080 $0.080
PAV SURF PREP FOR MRK (12")
LF 3,794.000 $0.260 $0.100 $0.410 $0.130 $0.410
PAV SURF PREP FOR MRK (ARROW)
EA 38.000 $20.000 $7.400 $25.000 $7.370 $25.000
PAV SURF PREP FOR MRK (WORD)
EA 38.000 $23.500 $7.400 $25.000 $7.370 $25.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 16.000 $58.000 $10.500 $25.000 $10.530 $25.000
PAV SURF PREP FOR MRKS (SHIELD)
EA 49.000 $15.000 $26.300 $35.000 $26.320 $35.000
REMOVAL OF CONDUIT
LF 1,230.000 $8.000 $3.700 $1.720 $1.810 $15.000
FULL - WIDTH MOWING
CYC 6.000 $3,000.000 $7,875.000 $1,632.640 $3,067.610 $8,233.330
LITTER REMOVAL
CYC 6.000 $1,825.000 $2,940.000 $863.300 $2,343.290 $8,470.640
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 23.000 $1,875.000 $2,415.000 $2,127.850 $2,304.530 $8,470.640
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 23.000 $1,180.000 $892.500 $2,127.850 $1,855.370 $16,941.280
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 23.000 $2,000.000 $682.500 $1,921.160 $2,422.050 $4,235.320
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 23.000 $1,715.000 $3,150.000 $1,603.680 $1,947.060 $4,654.390
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 23.000 $1,745.000 $1,890.000 $1,603.680 $1,816.540 $4,654.390
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 23.000 $1,700.000 $1,680.000 $1,603.680 $1,830.180 $4,654.390
WIDE FLANGE PAVEMENT TERMINALS
LF 246.000 $500.000 $683.100 $737.480 $893.680 $1,354.740
REMOVE HIGH MAST ILLUM FIXTURE
EA 1.000 $4,170.000 $11,618.600 $412.000 $433.770 $15,000.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 15,725.000 $2.600 $1.300 $1.580 $1.660 $3.750
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 19,620.000 $4.000 $2.600 $4.030 $4.240 $6.570
FIBER OPTIC SPLICE ENCLOSURE
EA 2.000 $1,800.000 $4,901.500 $1,512.000 $1,591.970 $4,824.780
REMOVE FIBER OPTIC CABLE
LF 19,620.000 $1.870 $0.700 $0.660 $0.690 $0.940
ITS MULTI-DUCT CND (PVC-80)(CONC ENCSE)
LF 200.000 $28.000 $45.400 $27.820 $29.290 $46.320
ITS MULTI-DUCT CND (RMC)
LF 2,180.000 $125.000 $202.400 $121.000 $127.400 $148.490
JUNCTION BOX (INSTALL)
EA 28.000 $700.000 $1,076.400 $877.000 $923.390 $1,175.240
GROUND BOX (PREPARE)
EA 31.000 $350.000 $468.000 $204.000 $214.790 $342.290
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 12,712.000 $0.660 $0.800 $0.940 $0.790 $0.940
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 6,575.000 $0.670 $0.800 $0.940 $0.820 $0.940
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 17,840.000 $2.150 $1.600 $2.330 $1.580 $2.330
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 2,680.000 $2.820 $4.700 $6.330 $4.740 $6.330
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 1,114.000 $12.000 $4.700 $6.330 $4.740 $6.330
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 12,350.000 $0.960 $0.800 $0.940 $0.790 $0.940
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 5,515.000 $0.820 $0.900 $0.950 $0.950 $0.950
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 1.000 $34,300.000 $43,977.100 $38,006.000 $40,016.460 $47,218.260
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
EA 3.000 $8,000.000 $6,932.900 $17,474.000 $18,398.350 $9,260.060
Totals: $60,124,320.920 $53,190,823.062 $53,212,272.075 $57,358,973.580 $64,650,434.740