FLOYD FM 97 (0145-11-011)

Items: 107

County: FLOYD
Length: N/A
Highway: FM 97
District: LUBBOCK
Control Number: 0145-11-011
DBE Goal: N/A
Project: STP 2019(158)
Guaranty: N/A
Time: 360 WORKING DAYS
Engineer's Estimate: $9,812,566.10
Date: 11/06/2018 (7 years ago)
Contract Number: N/A
Type: REHABILIATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$9,812,566.10
$9,844,109.88
Over/Under Est: 0.32% $31,543.78
$10,548,273.34
Over/Under Est: 7.5% $735,707.24
Amt Left: 7.15% $704,163.46
Over/Under Est: 10.83% $1,062,437.41
Amt Left: 10.47% $1,030,893.63
Delta: -3.10% -$326,730.17
$11,042,057.14
Over/Under Est: 12.53% $1,229,491.04
Amt Left: 12.17% $1,197,947.26
Delta: -1.54% -$167,053.63
$11,084,275.66
Over/Under Est: 12.96% $1,271,709.56
Amt Left: 12.6% $1,240,165.78
Delta: -0.38% -$42,218.52

Bid Items & Bid Tabulations

107 Total 0 of 107
FLOYD  |  FM 97  |  LUBBOCK  |  0145-11-011  |  11/06/2018  |  $9,812,566.10  |  STP 2019(158)  |  REHABILIATION  |  360 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
A. L. HELMCAMP, INC.
ALLEN BUTLER CONSTRUCTION, INC.
DUININCK, INC.
J. LEE MILLIGAN, INC.
PREP ROW (TREE)(GREATER THAN 8 IN DIA)
EA 4.000 $2,000.000 $1,500.000 $2,600.000 $1,007.360 $1,800.000 $1,355.000
REMOVING CONC (RIPRAP)
SY 36.000 $7.000 $20.000 $78.000 $39.520 $13.500 $50.000
REMOVING CONC (SIDEWALKS)
SY 71.000 $7.000 $20.000 $21.000 $29.340 $27.500 $14.500
REMOVING CONC (DRIVEWAYS)
SY 596.000 $7.000 $20.000 $29.000 $18.760 $27.500 $26.450
REMOVING CONC (CURB AND GUTTER)
LF 561.000 $9.000 $17.500 $20.000 $5.030 $17.500 $9.550
SUBGRADE WIDENING (DENS CONT)
STA 425.000 $425.000 $1,000.000 $600.000 $243.730 $255.000 $1,185.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 200.000 $50.000 $35.000 $30.000 $48.530 $18.000 $36.200
BACKFILL (TY B)
STA 425.000 $150.000 $150.000 $300.000 $112.230 $110.000 $145.000
BLADING
STA 425.000 $150.000 $75.000 $250.000 $148.190 $280.000 $94.550
BLOCK SODDING
SY 53.000 $5.000 $30.000 $15.000 $21.660 $22.000 $21.000
PROOF ROLLING
HR 40.000 $200.000 $150.000 $85.000 $95.880 $165.000 $145.000
FL BS (CMP IN PLC)(TY A GR 4)(4")
SY 14,815.000 $7.500 $7.000 $4.300 $5.470 $5.750 $6.500
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 130,350.000 $7.500 $7.000 $5.600 $6.420 $6.100 $7.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 42,021.000 $4.000 $3.000 $3.000 $6.110 $3.550 $3.300
FOG SEAL (CSS-1H)
GAL 50,259.000 $4.000 $3.300 $3.000 $7.840 $3.150 $5.500
AGGR(TY-B GR-5 SAC-B)
CY 1,289.000 $100.000 $80.000 $100.000 $174.780 $115.000 $87.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 19,815.000 $120.000 $135.000 $143.000 $140.860 $149.000 $131.350
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,699.000 $30.000 $60.000 $48.000 $56.900 $55.500 $55.200
PLANE CONC PAV(0" TO 4")
SY 1,935.000 $8.000 $3.750 $7.000 $5.780 $8.750 $9.250
PLANE ASPH CONC PAV (2")
SY 26,992.000 $2.000 $2.500 $2.000 $1.150 $1.550 $1.850
CEM STABIL BKFL
CY 439.000 $150.000 $170.000 $160.000 $154.930 $275.000 $235.000
TRENCH EXCAVATION PROTECTION
LF 38.000 $8.000 $40.000 $32.000 $28.700 $55.500 $46.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 2,836.000 $10.000 $50.000 $40.000 $29.580 $72.000 $42.000
RIPRAP (CONC)(4 IN)
CY 24.260 $400.000 $750.000 $650.000 $670.910 $445.000 $575.000
RIPRAP (CONC) (CL A )
CY 42.960 $500.000 $750.000 $650.000 $677.830 $445.000 $485.000
RAIL (HANDRAIL)(TY B)
LF 100.000 $100.000 $125.000 $160.000 $103.120 $165.000 $200.000
CMP (GAL STL 24 IN)
LF 80.000 $100.000 $125.000 $75.000 $136.410 $88.500 $73.250
CMP AR (GAL STL DES 5)
LF 24.000 $200.000 $145.000 $140.000 $200.900 $165.000 $128.000
RC PIPE (CL III)(24 IN)
LF 718.000 $120.000 $150.000 $90.000 $137.340 $140.000 $145.000
RC PIPE (CL III)(30 IN)
LF 136.000 $160.000 $165.000 $150.000 $161.620 $245.000 $215.000
RC PIPE (CL III)(42 IN)
LF 102.000 $220.000 $250.000 $260.000 $192.390 $330.000 $300.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $3,000.000 $15,000.000 $10,000.000 $9,530.490 $11,000.000 $7,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 8.000 $1,800.000 $2,500.000 $1,000.000 $1,545.390 $1,700.000 $4,800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 22.000 $2,000.000 $2,250.000 $1,000.000 $1,604.450 $1,800.000 $4,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $2,500.000 $2,500.000 $1,000.000 $1,801.500 $1,800.000 $4,800.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 5.000 $3,000.000 $2,500.000 $1,800.000 $2,510.190 $3,900.000 $5,900.000
SET (TY II) (42 IN) (CMP) (6: 1) (P)
EA 2.000 $3,500.000 $4,500.000 $4,500.000 $3,613.960 $5,300.000 $4,900.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 4.000 $4,000.000 $4,000.000 $4,500.000 $3,836.050 $5,500.000 $9,500.000
SET (TY II) (DES 5) (CMP) (6: 1) (P)
EA 2.000 $3,500.000 $4,500.000 $5,000.000 $3,142.240 $6,100.000 $4,525.000
ADJUSTING MANHOLES (SANITARY)
EA 15.000 $1,500.000 $2,000.000 $1,600.000 $865.910 $1,400.000 $1,200.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 3.000 $600.000 $2,000.000 $1,100.000 $953.060 $665.000 $1,300.000
ADJUSTING MANHOLES (WATER METER)
EA 29.000 $600.000 $2,000.000 $1,100.000 $881.390 $665.000 $350.000
CLEAN EXIST CULVERTS
EA 27.000 $2,000.000 $1,500.000 $2,000.000 $1,668.090 $3,900.000 $1,910.000
REMOV STR (PIPE)
EA 9.000 $2,000.000 $2,500.000 $500.000 $712.640 $555.000 $2,000.000
MOBILIZATION
LS 1.000 $892,000.000 $979,500.000 $990,000.000 $1,743,448.290 $1,100,000.000 $1,080,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $8,000.000 $6,800.000 $19,000.000 $4,499.710 $22,000.000 $6,900.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 400.000 $20.000 $35.000 $22.000 $30.550 $44.500 $41.000
CONSTRUCTION EXITS (REMOVE)
SY 400.000 $10.000 $10.000 $4.000 $8.250 $16.500 $5.000
SANDBAGS FOR EROSION CONTROL
EA 216.000 $5.000 $15.000 $25.000 $6.500 $16.500 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,000.000 $3.000 $2.230 $3.000 $1.960 $2.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,000.000 $1.000 $1.000 $1.000 $0.530 $0.540 $2.200
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,800.000 $8.000 $4.500 $5.000 $3.900 $4.000 $8.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,800.000 $3.000 $1.500 $1.500 $0.530 $0.540 $2.450
CONC CURB & GUTTER (TY II)
LF 561.000 $30.000 $35.000 $32.000 $42.520 $22.000 $34.150
CONCRETE CURB (SPECIAL)
LF 1,282.000 $50.000 $40.000 $36.000 $29.140 $33.000 $28.750
INTERSECTIONS (ACP)
SY 1,907.000 $20.000 $40.000 $26.000 $26.400 $33.000 $23.750
DRIVEWAYS (CONC)
SY 1,431.000 $70.000 $100.000 $100.000 $103.650 $69.500 $83.800
DRIVEWAYS (ACP)
SY 2,788.000 $20.000 $40.000 $26.000 $46.680 $44.500 $28.500
TURNOUTS (ACP)
SY 733.000 $20.000 $40.000 $85.000 $49.860 $58.500 $100.000
CONC SIDEWALKS (4")
SY 4,053.000 $50.000 $70.000 $70.000 $68.720 $55.000 $47.500
CURB RAMPS (TY 7)
SY 148.000 $200.000 $135.000 $100.000 $136.410 $130.000 $117.000
CURB RAMPS (SPECIAL)
SY 703.000 $200.000 $160.000 $100.000 $125.880 $130.000 $142.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 20.000 $300.000 $225.000 $240.000 $265.500 $475.000 $267.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 4.000 $400.000 $400.000 $290.000 $297.880 $485.000 $282.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 5.000 $600.000 $600.000 $610.000 $628.240 $805.000 $565.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 46.000 $600.000 $375.000 $520.000 $574.070 $730.000 $615.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $600.000 $600.000 $660.000 $671.570 $870.000 $745.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $700.000 $800.000 $800.000 $812.390 $985.000 $855.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 9.000 $600.000 $500.000 $570.000 $584.920 $745.000 $855.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 3.000 $600.000 $800.000 $670.000 $682.400 $850.000 $745.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $800.000 $925.000 $900.000 $920.710 $1,100.000 $1,180.000
IN SM RD SN SUP&AM TYS80(1)SB(U-WC)
EA 2.000 $1,000.000 $1,700.000 $950.000 $969.450 $950.000 $1,300.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 24.000 $500.000 $300.000 $450.000 $454.940 $600.000 $515.000
REMOVE SM RD SN SUP&AM
EA 80.000 $100.000 $45.000 $80.000 $81.230 $88.500 $150.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 82.000 $90.000 $65.000 $80.000 $81.240 $88.500 $135.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 32.000 $90.000 $70.000 $80.000 $81.240 $94.000 $140.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 72.000 $30.000 $25.000 $55.000 $54.160 $16.500 $51.550
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 167,964.000 $0.200 $0.150 $0.160 $0.160 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 7,930.000 $0.400 $0.300 $0.320 $0.320 $0.330 $0.320
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 140.000 $3.000 $3.000 $3.150 $3.250 $3.300 $3.160
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 80.000 $100.000 $5.000 $5.250 $5.420 $5.550 $5.270
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 15,396.000 $0.200 $0.150 $0.160 $0.160 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 87,952.000 $0.200 $0.150 $0.160 $0.160 $0.170 $0.160
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,276.000 $2.000 $1.000 $0.510 $0.450 $1.100 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,544.000 $2.000 $1.000 $0.510 $0.490 $1.100 $1.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 84,020.000 $0.400 $0.420 $0.440 $0.450 $0.460 $0.440
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,690.000 $0.500 $0.540 $0.570 $0.580 $0.600 $0.570
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,653.000 $0.400 $0.420 $0.440 $0.450 $0.460 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 43,895.000 $0.400 $0.420 $0.440 $0.450 $0.460 $0.440
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 80.000 $5.000 $10.000 $10.500 $10.830 $11.000 $10.540
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 120.000 $10.000 $20.000 $21.000 $21.660 $22.000 $21.080
REFL PAV MRKR TY I-C
EA 272.000 $3.000 $3.000 $3.150 $3.250 $3.300 $286.710
REFL PAV MRKR TY II-A-A
EA 2,420.000 $3.000 $3.000 $3.150 $3.250 $3.300 $3.160
ELIM EXT PAV MRK & MRKS (4")
LF 135,656.000 $0.500 $0.670 $0.600 $0.540 $0.770 $0.900
ELIM EXT PAV MRK & MRKS (6")
LF 3,965.000 $0.600 $0.670 $0.800 $0.540 $0.770 $1.300
ELIM EXT PAV MRK & MRKS (24")
LF 70.000 $3.000 $0.670 $7.000 $4.330 $3.300 $21.000
TEMP TRAF SIGNALS
EA 12.000 $8,000.000 $9,500.000 $2,000.000 $19,346.960 $14,000.000 $7,500.000
FULL - WIDTH MOWING
CYC 4.000 $6,000.000 $2,000.000 $4,000.000 $1,509.050 $4,400.000 $5,100.000
LITTER REMOVAL
CYC 4.000 $4,000.000 $1,500.000 $2,500.000 $2,363.060 $6,600.000 $2,100.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 4,845.000 $5.000 $25.000 $11.000 $26.850 $56.000 $8.800
ASPHALT BINDER (PG64-22)
GAL 348,395.000 $2.600 $2.500 $3.300 $2.910 $2.900 $2.800
CEMENT
TON 545.000 $150.000 $140.000 $180.000 $155.980 $180.000 $151.800
FOAMED ASPHALT TREAT (8") (DC)
SY 145,165.000 $9.000 $3.000 $8.200 $3.570 $5.550 $7.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $15,000.000 $16,000.000 $10,831.810 $14,000.000 $27,500.000
TMA (STATIONARY)
DAY 660.000 $250.000 $190.000 $75.000 $244.730 $255.000 $470.000
TMA (MOBILE OPERATION)
DAY 30.000 $500.000 $950.000 $600.000 $1,984.330 $885.000 $665.000
SOLAR POWERED LED WARNING SIGN
EA 2.000 $3,000.000 $5,000.000 $3,000.000 $2,870.430 $2,900.000 $3,180.000
Totals: $9,812,566.100 $9,844,109.880 $10,548,273.340 $10,875,003.523 $11,042,057.140 $11,084,275.660