Items: 93

County: FAYETTE
Length: N/A
Highway: SH 71
District: YOAKUM
Control Number: 0266-01-086
DBE Goal: N/A
Project: F 2021(587)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $3,254,483.00
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: ADD ACCELERATING AND DECELERATING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$3,254,483.00
$3,518,108.38
Over/Under Est: 8.1% $263,625.38
Over/Under Est: 12.44% $404,764.57
Amt Left: 4.01% $141,139.19
Subcontractor Percentage Amount
RUCOBA & MAYA CONSTRUCTION, LLC 4.13% $159,102.01
TRP CONSTRUCTION GROUP, LLC 2.89% $111,332.89
BATTERSON, LLP 0.87% $33,515.44
CPAVE, INC. 0.60% $23,114.09
LONE STAR EROSION CONTROL 0.54% $20,802.68
LONESTAR TRAFFIC SAFETY, LLC 0.29% $11,171.81
THIRD COAST SERVICES LLC 0.15% $5,778.52
WEST TEXAS ROCK RESOURCES, LLC 0.10% $3,852.35
Total: 9.57% $368,669.79

Bid Items & Bid Tabulations

93 Total 0 of 93
FAYETTE  |  SH 71  |  YOAKUM  |  0266-01-086  |  06/04/2021  |  $3,254,483.00  |  F 2021(587)  |  ADD ACCELERATING AND DECELERATING LA...  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 1.000 $2,500.000 $2,700.000 $3,330.000
REMOVING CONC (PAV)
SY 140.000 $25.000 $100.000 $109.890
REMOVING STAB BASE & ASPH PAV(16")
SY 7,334.000 $8.000 $7.750 $9.990
OBLITERATING ABANDONED ROAD
SY 473.000 $5.500 $10.000 $8.940
EXCAVATION (ROADWAY)
CY 3,570.000 $10.000 $24.250 $9.990
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,312.000 $15.000 $8.500 $9.990
BLADING
HR 25.000 $100.000 $95.000 $96.900
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 400.000 $0.300 $0.170 $3.160
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 37,029.000 $0.150 $0.170 $0.160
DRILL SEEDING (TEMP) (WARM)
SY 9,265.000 $0.150 $0.180 $0.170
DRILL SEEDING (TEMP) (COOL)
SY 9,265.000 $0.150 $0.180 $0.170
VEGETATIVE WATERING
MG 314.200 $15.000 $11.000 $19.980
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,013.000 $64.000 $100.000 $62.900
REWORK BS MTL (TY C) (8") (DENS CONT)
SY 7,939.000 $3.500 $2.450 $2.280
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 364.000 $174.000 $150.000 $162.750
LIME TRT (SUBGRADE)(6")
SY 30,396.000 $3.000 $4.000 $2.280
CEMENT
TON 175.000 $145.000 $162.000 $168.000
CEMENT TREAT(EXIST MATL)(8")
SY 14,313.000 $2.450 $3.000 $2.280
PRIME COAT (MC-30)
GAL 7,340.000 $4.000 $4.300 $4.470
AGGR(TY-PE GR-4 SAC-B)
CY 265.000 $100.000 $118.000 $92.110
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 8,973.000 $4.000 $4.000 $3.800
CONC PVMT (CONT REINF - CRCP) (10")
SY 11,561.000 $62.000 $77.800 $95.000
CONC PVMT (CONT REINF-CRCP)(HES)(10")
SY 615.000 $90.000 $97.900 $105.000
CEM STABIL BKFL
CY 8.000 $160.000 $160.000 $265.000
TEMPORARY SPL SHORING
SF 1,234.000 $21.000 $37.650 $40.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 10.000 $220.000 $245.000 $231.000
CL A CONC (COLLAR)
EA 1.000 $1,000.000 $545.000 $750.000
RIPRAP (CONC)(5 IN)
CY 26.000 $475.000 $530.000 $520.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 96.000 $150.000 $240.000 $250.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 5.000 $850.000 $1,800.000 $850.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 22.000 $925.000 $1,820.000 $1,300.000
RC PIPE (CL III)(24 IN)
LF 32.000 $80.000 $202.000 $100.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $5,000.000 $8,400.000 $6,500.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $7,200.000 $8,100.000 $4,500.000
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
EA 4.000 $12,000.000 $17,900.000 $15,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,600.000 $1,400.000 $2,200.000
MOBILIZATION
LS 1.000 $280,000.000 $183,500.000 $385,239.300
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $3,000.000 $5,653.410
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 120.000 $30.000 $37.100 $29.740
ROCK FILTER DAMS (REMOVE)
LF 120.000 $10.000 $10.600 $9.480
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,234.000 $3.400 $4.250 $4.820
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,234.000 $1.100 $1.050 $1.140
DRIVEWAYS (ACP)
SY 261.000 $40.000 $96.000 $35.040
RUMBLE STRIPS (SHOULDER)
LF 19,977.000 $0.230 $0.210 $0.160
MAILBOX INSTALL-S (WC-POST) TY 3
EA 4.000 $200.000 $200.000 $180.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $2,000.000 $1,810.000 $1,710.000
CONDT (PVC) (SCH 40) (2")
LF 30.000 $8.000 $7.900 $7.460
ELEC CONDR (NO.8) BARE
LF 30.000 $1.240 $1.650 $1.580
ELEC CONDR (NO.8) INSULATED
LF 115.000 $1.300 $2.000 $1.870
GROUND BOX TY A (122311)W/APRON
EA 1.000 $797.000 $1,100.000 $1,067.000
REMOVE GROUND BOX
EA 1.000 $319.560 $212.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 11.000 $650.000 $735.000 $695.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $640.000 $600.000 $565.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $670.000 $700.000 $670.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 56.000 $380.000 $265.000 $250.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 8.000 $450.000 $290.000 $275.000
REMOVE SM RD SN SUP&AM
EA 42.000 $75.000 $63.600 $60.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 11.000 $80.000 $34.000 $32.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 2,762.000 $0.800 $0.550 $0.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 31,628.000 $0.750 $0.550 $0.650
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 532.000 $3.000 $1.050 $1.200
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 6,718.000 $1.300 $1.000 $1.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 20,442.000 $0.750 $0.550 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,728.000 $1.300 $1.000 $1.410
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,295.000 $1.100 $0.500 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 216.000 $1.400 $0.900 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,580.000 $0.850 $0.750 $0.800
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,644.000 $0.400 $0.350 $0.330
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,326.000 $0.300 $0.350 $0.330
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,651.000 $0.300 $0.350 $0.330
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 9,263.000 $0.520 $1.050 $0.520
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 8,494.000 $0.600 $1.050 $0.520
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 39.000 $14.000 $12.750 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 9.000 $260.000 $226.850 $230.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 10.000 $380.000 $360.400 $380.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $450.000 $711.250 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 18.000 $350.000 $291.500 $275.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 56.000 $45.000 $36.000 $36.000
REFL PAV MRKR TY II-C-R
EA 681.000 $4.000 $5.300 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 40,250.000 $0.400 $0.500 $0.350
PAV SURF PREP FOR MRK (4")
LF 20,666.000 $0.100 $0.100 $0.060
PAV SURF PREP FOR MRK (8")
LF 4,399.000 $0.130 $0.170 $0.130
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $20.000 $15.900 $20.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 5.000 $30.000 $31.800 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 10.000 $25.000 $31.800 $20.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 44.000 $6.000 $10.600 $10.000
D-GR HMA TY-B PG64-22
TON 10,317.000 $82.850 $78.900 $75.120
D-GR HMA TY-D SAC-B PG76-22
TON 2,257.000 $87.000 $92.500 $83.340
TACK COAT
GAL 5,727.000 $3.250 $3.200 $3.170
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $8,000.000 $8,118.750
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 670.000 $55.000 $46.000 $45.000
TMA (STATIONARY)
DAY 15.000 $270.000 $150.000 $324.750
TMA (MOBILE OPERATION)
DAY 30.000 $450.000 $150.000 $324.750
Totals: $3,254,483.000 $3,518,108.380 $3,659,247.576