PREPARING ROW
|
STA
|
398.000
|
$3,000.000
|
$220.000
|
$350.000
|
$602.000
|
$729.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
119.000
|
$10.000
|
$10.000
|
$25.000
|
$10.000
|
$45.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
25,880.000
|
$10.000
|
$10.500
|
$10.000
|
$10.000
|
$10.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
398.000
|
$360.000
|
$155.000
|
$400.000
|
$259.000
|
$600.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
17,508.000
|
$6.000
|
$5.000
|
$10.000
|
$144.000
|
$10.250
|
|
|
BACKFILL (TY A)
|
STA
|
398.000
|
$200.000
|
$115.000
|
$112.000
|
$241.000
|
$100.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
294,205.000
|
$1.200
|
$1.000
|
$0.920
|
$1.000
|
$5.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
294,205.000
|
$0.200
|
$0.130
|
$0.120
|
$0.160
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
147,107.000
|
$0.100
|
$0.090
|
$0.080
|
$0.120
|
$0.080
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
147,107.000
|
$0.100
|
$0.090
|
$0.080
|
$0.120
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
10,304.000
|
$7.000
|
$15.000
|
$1.000
|
$30.000
|
$24.510
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
3,473.000
|
$1.000
|
$3.600
|
$4.000
|
$4.000
|
$3.250
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
19,034.000
|
$50.000
|
$36.750
|
$65.000
|
$36.000
|
$90.000
|
|
|
REWORK BS MTL (TY A) (8") (ORD COMP)
|
SY
|
91,009.000
|
$3.500
|
$1.750
|
$1.550
|
$1.000
|
$3.000
|
|
|
CEMENT
|
TON
|
2,468.000
|
$200.000
|
$214.500
|
$270.000
|
$323.000
|
$292.000
|
|
|
CEMENT TRT (MX EXST MTL & NW BS)(10")
|
SY
|
141,312.000
|
$2.000
|
$2.200
|
$2.250
|
$2.500
|
$2.000
|
|
|
ASPH (AC-20XP)
|
GAL
|
54,936.000
|
$3.500
|
$4.700
|
$5.000
|
$6.000
|
$5.110
|
|
|
ASPH (RC-250)
|
GAL
|
31,098.000
|
$4.000
|
$5.650
|
$4.500
|
$7.000
|
$6.420
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,446.000
|
$130.000
|
$95.000
|
$164.000
|
$184.000
|
$159.710
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,242.000
|
$100.000
|
$125.000
|
$193.000
|
$241.000
|
$208.760
|
|
|
CEM STABIL BKFL
|
CY
|
170.000
|
$200.000
|
$110.000
|
$200.000
|
$229.000
|
$200.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
251.000
|
$100.000
|
$156.000
|
$205.000
|
$72.000
|
$126.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
43.000
|
$3.000
|
$3.300
|
$10.500
|
$12.000
|
$2.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
237.000
|
$35.000
|
$57.000
|
$63.000
|
$72.000
|
$42.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
23.000
|
$460.000
|
$550.000
|
$565.000
|
$644.000
|
$676.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
20.000
|
$400.000
|
$550.000
|
$565.000
|
$644.000
|
$731.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
287.000
|
$160.000
|
$92.000
|
$155.000
|
$181.000
|
$249.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
130.000
|
$200.000
|
$250.000
|
$220.000
|
$253.000
|
$484.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
50.000
|
$250.000
|
$325.000
|
$270.000
|
$307.000
|
$744.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
46.000
|
$500.000
|
$855.000
|
$675.000
|
$764.000
|
$1,457.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
12.000
|
$500.000
|
$680.000
|
$680.000
|
$770.000
|
$1,910.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,284.000
|
$60.000
|
$95.000
|
$54.000
|
$61.000
|
$107.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
571.000
|
$85.000
|
$98.000
|
$74.000
|
$84.000
|
$279.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
50.000
|
$100.000
|
$135.000
|
$94.000
|
$107.000
|
$265.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
65.000
|
$130.000
|
$210.000
|
$135.000
|
$153.000
|
$475.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$6,500.000
|
$6,000.000
|
$6,700.000
|
$7,655.000
|
$17,061.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
4.000
|
$7,500.000
|
$8,250.000
|
$7,000.000
|
$7,980.000
|
$13,988.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$12,500.000
|
$13,000.000
|
$15,045.000
|
$13,513.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$12,500.000
|
$13,000.000
|
$14,804.000
|
$15,093.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$17,800.000
|
$18,300.000
|
$20,943.000
|
$15,093.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$14,000.000
|
$14,500.000
|
$16,730.000
|
$16,876.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$18,000.000
|
$18,500.000
|
$21,183.000
|
$16,876.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$1,000.000
|
$2,250.000
|
$1,525.000
|
$1,444.000
|
$1,539.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
26.000
|
$1,450.000
|
$2,450.000
|
$1,875.000
|
$1,835.000
|
$1,713.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
22.000
|
$1,500.000
|
$2,650.000
|
$2,100.000
|
$2,257.000
|
$1,713.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$3,350.000
|
$2,750.000
|
$2,528.000
|
$4,145.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$3,000.000
|
$4,050.000
|
$3,500.000
|
$3,286.000
|
$2,667.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$3,000.000
|
$4,450.000
|
$4,400.000
|
$3,846.000
|
$2,667.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$5,500.000
|
$6,050.000
|
$5,500.000
|
$5,061.000
|
$4,746.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$2,000.000
|
$1,650.000
|
$1,375.000
|
$1,565.000
|
$2,776.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$500.000
|
$325.000
|
$210.000
|
$118.000
|
$1,201.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$2,500.000
|
$1,250.000
|
$850.000
|
$963.000
|
$2,498.000
|
|
|
REMOV STR (PIPE)
|
LF
|
556.000
|
$25.000
|
$13.000
|
$12.500
|
$14.000
|
$41.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
61.000
|
$50.000
|
$40.000
|
$105.000
|
$12.000
|
$394.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$900,000.000
|
$625,000.000
|
$950,000.000
|
$650,000.000
|
$1,270,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$10,000.000
|
$10,500.000
|
$19,000.000
|
$2,489.000
|
$12,849.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
784.000
|
$30.000
|
$37.500
|
$36.000
|
$48.000
|
$47.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
468.000
|
$40.000
|
$98.500
|
$90.000
|
$84.000
|
$124.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,252.000
|
$5.000
|
$20.250
|
$18.500
|
$13.000
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,869.000
|
$3.000
|
$3.300
|
$4.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,869.000
|
$0.750
|
$0.600
|
$0.550
|
$2.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$5,000.000
|
$4,550.000
|
$5,000.000
|
$7,823.000
|
$3,470.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
120.000
|
$50.000
|
$87.500
|
$100.000
|
$102.000
|
$118.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,960.000
|
$6.000
|
$8.000
|
$15.000
|
$58.000
|
$34.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
220.000
|
$80.000
|
$105.000
|
$155.000
|
$102.000
|
$169.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
304.000
|
$50.000
|
$56.000
|
$90.000
|
$124.000
|
$149.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,533.000
|
$30.000
|
$23.000
|
$30.000
|
$17.000
|
$20.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
383.000
|
$30.000
|
$23.000
|
$40.000
|
$0.110
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
79,500.000
|
$0.210
|
$0.100
|
$0.180
|
$0.110
|
$0.240
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
39,750.000
|
$0.210
|
$0.100
|
$0.180
|
$0.140
|
$0.250
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
66.000
|
$1,500.000
|
$1,150.000
|
$250.000
|
$1,805.000
|
$4,101.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,350.000
|
$1,500.000
|
$1,204.000
|
$1,041.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,000.000
|
$10,000.000
|
$12,500.000
|
$15,045.000
|
$11,662.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
25.000
|
$250.000
|
$275.000
|
$265.000
|
$295.000
|
$347.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$250.000
|
$330.000
|
$320.000
|
$317.000
|
$416.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$650.000
|
$605.000
|
$585.000
|
$746.000
|
$763.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
56.000
|
$650.000
|
$704.000
|
$680.000
|
$782.000
|
$888.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$800.000
|
$858.000
|
$830.000
|
$1,023.000
|
$1,083.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$935.000
|
$900.000
|
$1,192.000
|
$1,180.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$1,320.000
|
$1,275.000
|
$1,715.000
|
$1,666.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
61.000
|
$140.000
|
$110.000
|
$105.000
|
$90.000
|
$139.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
24.000
|
$115.000
|
$88.000
|
$85.000
|
$132.000
|
$111.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
34.000
|
$200.000
|
$95.000
|
$91.000
|
$150.000
|
$119.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
118,950.000
|
$0.350
|
$0.170
|
$0.150
|
$0.420
|
$0.490
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
118,950.000
|
$0.350
|
$0.170
|
$0.150
|
$0.420
|
$0.490
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
534.000
|
$8.000
|
$5.500
|
$5.300
|
$10.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,160.000
|
$0.800
|
$1.210
|
$1.150
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
8,202.000
|
$1.500
|
$1.500
|
$1.400
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
176.000
|
$7.000
|
$8.800
|
$8.510
|
$7.000
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
78,279.000
|
$0.400
|
$0.390
|
$0.370
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
7,704.000
|
$0.400
|
$0.420
|
$0.400
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
37,823.000
|
$0.400
|
$0.400
|
$0.380
|
$1.000
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
868.000
|
$3.000
|
$5.500
|
$5.320
|
$4.000
|
$5.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
16,262.000
|
$100.000
|
$142.000
|
$144.000
|
$187.000
|
$160.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$11,000.000
|
$20,000.000
|
$3,090.000
|
$13,604.000
|
|
|
TMA (STATIONARY)
|
DAY
|
313.000
|
$170.000
|
$200.000
|
$10.000
|
$154.000
|
$284.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$300.000
|
$200.000
|
$10.000
|
$301.000
|
$311.000
|
|
Totals: |
$9,105,557.550
|
$8,247,728.350
|
$9,512,728.810
|
$12,618,049.610
|
$13,387,677.210
|