Show Job Controls
Bid Cobra

ERATH SH 220 (0467-02-020)

Items: 92

County: ERATH
Length: 0.0190 MILES
Highway: SH 220
District: FORT WORTH
Control Number: 0467-02-020
DBE Goal: 7.0%
Project: BR 2025(203)
Guaranty: $100,000.00
Time: 512 WORKING DAYS
Engineer's Estimate: $11,062,766.90
Date: 10/02/2024 (1 year ago)
Contract Number: 10243229
Type: BRIDGE REPLACEMENT
Project ID: A00064427
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SARAH HORNER
EMMANUEL NAVARRO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$11,062,766.90
$9,849,854.95
Over/Under Est: -10.96% -$1,212,911.95
Over/Under Est: -3.38% -$373,716.56
Amt Left: 8.52% $839,195.39
$10,774,542.61
Over/Under Est: -2.61% -$288,224.29
Amt Left: 9.39% $924,687.66
Delta: -0.80% -$85,492.27
Over/Under Est: 13.29% $1,469,845.16
Amt Left: 27.24% $2,682,757.11
Delta: -16.32% -$1,758,069.45
Over/Under Est: 15.77% $1,745,072.70
Amt Left: 30.03% $2,957,984.65
Delta: -2.20% -$275,227.54
Subcontractor Percentage Amount
TEXAS SHAFTS, INC. 2.65% $262,441.99
HERMANOS STEEL, LLC 2.55% $252,538.52
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.37% $234,712.27
JB PINNACLE GROUP, LLC 2.18% $215,895.68
LINDAMOOD, INC. 1.19% $117,851.31
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 1.04% $102,996.10
TRP CONSTRUCTION GROUP, LLC 0.97% $96,063.67
DIIBS SPECIALISTS, LLC 0.75% $74,276.04
CEN-TREE SOLUTIONS LLC 0.50% $49,517.36
CND CONTRACTING, LLC 0.27% $26,739.37
PRIMATE CONSTRUCTION, LP 0.20% $19,806.94
WILKO INDUSTRIAL, L.L.C. 0.11% $10,893.82
TEX OP CONSTRUCTION, LP 0.08% $7,922.78
Total: 14.86% $1,471,655.85

Bid Items & Bid Tabulations

92 Total 0 of 92
ERATH  |  SH 220  |  FORT WORTH  |  0467-02-020  |  10/02/2024  |  $11,062,766.90  |  BR 2025(203)  |  BRIDGE REPL  |  512 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
INDUS ROAD & BRIDGE, INC.
C. E. BARKER, LTD.
RAGLE CONSTRUCTION, INC.
COPPELL CONSTRUCTION CO., INC.
PREPARING ROW
STA 25.500 $10,000.000 $5,000.000 $40,727.680 $42,000.000 $46,000.000 $5,500.000
EXCAV (ROADWAY)
CY 1,312.000 $40.000 $38.000 $47.000 $30.130 $70.000 $65.000
EMBANK (FNL)(DC)(TY C2)
CY 17,028.000 $60.000 $40.000 $50.000 $37.910 $45.600 $40.000
EMBANK (FNL)(DC)(TY D)
CY 1,312.000 $40.000 $55.000 $50.000 $30.130 $44.000 $65.000
BACKFILL (TY A)
STA 25.500 $220.000 $900.000 $400.000 $1,004.500 $3,723.000 $1,500.000
COMPOST MANUF TOPSOIL (4")
SY 13,532.000 $7.000 $9.750 $2.000 $11.180 $5.000 $10.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 13,532.000 $1.000 $0.340 $0.200 $1.090 $0.260 $0.300
STRAW/HAY MLCH SEED (TEMP_WARM)
SY 6,766.000 $3.000 $0.850 $0.850 $1.090 $0.500 $1.000
STRAW/HAY MLCH SEED (TEMP_COOL)
SY 6,766.000 $3.000 $0.900 $0.850 $1.090 $0.580 $1.000
VEGETATIVE WATERING
TGL 946.000 $90.000 $25.000 $21.000 $81.990 $60.600 $200.000
SOIL RET BLKT(CHAN_TEMP_4 PSF)
SY 3,040.000 $10.000 $4.250 $2.500 $7.110 $2.700 $4.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 2,457.000 $125.000 $110.000 $95.000 $145.100 $73.000 $76.000
LIME (COM OR QK)(SLURRY)
TON 171.000 $400.000 $350.000 $310.000 $343.840 $300.000 $550.000
LIME TRT (EXIST MATL)(8")
SY 10,262.000 $5.000 $7.750 $8.000 $15.070 $5.500 $5.000
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 8,116.000 $10.000 $9.000 $7.000 $6.030 $11.100 $15.000
PRIME COAT (MC-30)
GAL 6,156.000 $10.000 $7.000 $8.000 $8.750 $5.700 $10.000
D-GR HMA TY-B SAC-B PG64-22
TON 3,569.000 $155.000 $185.000 $200.000 $191.310 $141.100 $175.000
TACK COAT
GAL 4,069.000 $7.000 $4.500 $8.000 $16.400 $6.200 $10.000
SP MIXES SP-C SAC-A PG70-28
TON 1,160.000 $180.000 $260.000 $290.000 $202.240 $235.600 $300.000
CEM STABIL BKFL
CY 340.000 $210.000 $345.000 $250.000 $248.820 $164.400 $600.000
TEMPORARY SPL SHORING
SF 7,327.000 $80.000 $32.000 $35.000 $32.400 $19.200 $90.000
DRILL SHAFT (36 IN)
LF 830.000 $350.000 $595.000 $361.000 $498.060 $414.000 $565.000
CL C CONC (ABUT)(HPC)
CY 105.600 $1,700.000 $2,250.000 $1,100.000 $1,894.870 $1,249.000 $2,300.000
CL C CONC (CAP)(HPC)
CY 83.200 $1,900.000 $2,250.000 $1,300.000 $1,726.910 $4,000.000 $1,870.000
CL C CONC (COLUMN)(HPC)
CY 59.200 $1,800.000 $2,250.000 $1,800.000 $1,997.890 $3,000.000 $1,950.000
CL C CONC (COLLAR)
EA 2.000 $2,000.000 $2,000.000 $1,800.000 $438.810 $1,420.000 $5,000.000
REINF CONC SLAB (HPC)
SF 16,790.000 $40.000 $37.500 $25.000 $33.150 $34.100 $45.000
APPROACH SLAB (HPC)
CY 141.200 $900.000 $920.000 $925.000 $778.230 $750.500 $1,550.000
PRESTR CONC GIRDER (TX28)
LF 2,172.000 $250.000 $350.000 $250.000 $303.050 $223.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 76.000 $725.000 $950.000 $976.000 $808.040 $696.000 $800.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,343.000 $200.000 $160.000 $180.000 $141.170 $176.500 $300.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 4,185.000 $250.000 $165.000 $241.000 $149.450 $185.000 $325.000
RAIL (TY SSTR)(HPC)
LF 826.000 $110.000 $250.000 $105.000 $174.910 $119.000 $245.000
ARMOR JOINT (SEALED)
LF 168.000 $145.000 $200.000 $125.000 $184.430 $118.000 $210.000
RC PIPE (CL III)(18 IN)
LF 57.000 $250.000 $150.000 $156.000 $143.360 $161.000 $200.000
RC PIPE (CL III)(24 IN)
LF 20.000 $300.000 $200.000 $190.000 $170.810 $300.000 $200.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $5,000.000 $10,000.000 $10,000.000 $18,336.730 $6,300.000 $30,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $2,500.000 $3,000.000 $1,625.780 $10,000.000 $7,000.000
REMOV STR (HEADWALL)
EA 2.000 $1,200.000 $2,000.000 $9,000.000 $3,173.340 $1,778.000 $8,500.000
REMOV STR (PIPE)
LF 51.000 $50.000 $50.000 $35.000 $92.120 $35.500 $75.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $200,000.000 $150,000.000 $85,000.000 $60,836.470 $902,500.000 $325,000.000
MOBILIZATION
LS 1.000 $1,034,781.000 $975,000.000 $1,060,000.000 $1,070,000.000 $1,190,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $28,000.000 $4,300.000 $20,000.000 $6,559.190 $49,500.000 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $29,000.000 $60,000.000 $27,329.950 $50,000.000 $30,000.000
TMA (STATIONARY)
DAY 212.000 $285.000 $250.000 $300.000 $437.280 $346.000 $200.000
TMA (MOBILE OPERATION)
DAY 32.000 $475.000 $100.000 $400.000 $874.560 $662.000 $900.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 330.000 $50.000 $80.000 $60.000 $54.660 $36.250 $70.000
ROCK FILTER DAMS (REMOVE)
LF 330.000 $25.000 $20.000 $11.000 $27.330 $15.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 450.000 $50.000 $60.000 $57.000 $54.900 $35.350 $60.000
CONSTRUCTION EXITS (REMOVE)
SY 450.000 $20.000 $20.000 $11.000 $21.960 $12.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,946.000 $4.000 $9.000 $7.000 $5.490 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,946.000 $1.500 $2.250 $1.000 $2.200 $1.500 $2.000
CONSTRUCTING DETOURS
SY 2,089.000 $150.000 $75.000 $120.000 $185.840 $75.600 $160.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 24.000 $7,500.000 $5,500.000 $6,000.000 $5,465.990 $3,000.000 $4,500.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 3,600.000 $70.000 $100.000 $114.000 $110.160 $42.900 $75.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 5,940.000 $25.000 $19.000 $14.000 $29.400 $12.500 $40.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 3,600.000 $20.000 $22.000 $17.000 $32.200 $12.200 $40.000
DRIVEWAYS (SURF TREAT)
SY 153.000 $50.000 $75.000 $125.000 $54.660 $160.000 $113.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 4,210.000 $0.500 $3.750 $3.000 $4.370 $0.820 $4.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $30.000 $37.500 $26.000 $32.800 $24.950 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $3,230.000 $2,700.000 $2,789.120 $2,800.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,377.000 $7.000 $2.500 $4.000 $5.470 $3.000 $15.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $3,750.000 $3,200.000 $3,552.890 $2,860.000 $2,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,500.000 $3,500.000 $480.000 $2,186.400 $300.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,500.000 $1,750.000 $1,000.000 $1,366.500 $750.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $15,000.000 $12,000.000 $12,500.000 $10,931.980 $7,700.000 $7,500.000
WIRE FENCE (TY C)
LF 260.000 $30.000 $50.000 $75.000 $27.330 $22.500 $60.000
WIRE FENCE (REMOVE)
LF 260.000 $8.000 $25.000 $8.000 $12.860 $6.750 $5.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $1,000.000 $1,250.000 $700.000 $901.890 $635.000 $725.000
REMOVE SM RD SN SUP&AM
EA 12.000 $250.000 $150.000 $120.000 $125.720 $100.000 $145.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 16.000 $40.000 $25.000 $27.000 $21.860 $22.500 $17.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 30.000 $60.000 $32.000 $34.000 $27.330 $28.000 $33.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 8,896.000 $2.000 $1.560 $2.000 $3.500 $0.810 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 88.000 $12.000 $8.560 $10.000 $16.940 $5.000 $25.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 888.000 $2.000 $1.560 $2.000 $3.610 $0.850 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,000.000 $3.500 $1.750 $1.500 $5.470 $1.810 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,000.000 $4.500 $1.750 $1.500 $3.280 $1.960 $5.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 5,100.000 $3.000 $1.880 $1.000 $3.280 $0.810 $5.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 5,100.000 $3.500 $1.880 $1.000 $3.280 $0.850 $5.000
RE PM TY II (W) 6" (SLD)
LF 890.000 $2.000 $0.880 $3.000 $2.190 $1.550 $3.000
RE PM TY II (Y) 6" (SLD)
LF 110.000 $2.000 $0.880 $3.000 $2.190 $1.600 $3.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 7,560.000 $1.500 $6.250 $4.000 $4.320 $2.000 $4.000
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 1,818.000 $1.500 $6.250 $4.000 $4.210 $2.000 $4.000
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
LF 965.000 $1.000 $6.250 $4.000 $4.150 $2.100 $6.000
PAVEMENT SLER 6"
LF 10,343.000 $0.500 $1.000 $1.500 $2.190 $0.800 $1.000
REFL PAV MRKR TY II-A-A
EA 70.000 $6.000 $37.500 $18.000 $10.930 $9.000 $10.000
ELIM EXT PM & MRKS (4")
LF 4,362.000 $0.700 $1.000 $1.500 $2.730 $0.650 $3.000
PAV SURF PREP FOR MRK (6")
LF 4,482.000 $0.500 $1.000 $0.700 $2.190 $0.400 $1.000
PAV SURF PREP FOR MRK (RPM)
EA 32.000 $6.000 $30.000 $4.000 $0.550 $2.000 $2.000
TREE TRIMMING / BRUSH REMOVAL
MI 0.500 $50,000.000 $100,000.000 $75,000.000 $8,356.940 $100,000.000 $35,000.000
INSTALL FTB
LF 228.000 $80.000 $60.000 $80.000 $219.610 $81.000 $60.000
REMOVE FTB
LF 228.000 $10.000 $20.000 $25.000 $10.980 $23.000 $25.000
Totals: $11,062,766.900 $9,849,854.950 $10,689,050.340 $10,774,542.628 $12,532,612.060 $12,807,839.600