Show Job Controls
Bid Cobra

EL PASO IH0010 (6341-01-001)

Items: 28

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6341-01-001
DBE Goal: N/A
Project: RMC - 634101001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $536,950.00
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: ROADWAY SPALL & FULL DEPTH REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$536,950.00
Over/Under Est: 0.97% $5,186.54
Over/Under Est: 17.76% $95,350.00
Amt Left: 16.63% $90,163.46
Over/Under Est: 79.5% $426,900.00
Amt Left: 77.79% $421,713.46
Delta: -52.44% -$331,550.00

Bid Items & Bid Tabulations

28 Total 0 of 28
EL PASO  |  IH0010  |  EL PASO  |  6341-01-001  |  02/06/2019  |  $536,950.00  |  RMC - 634101001  |  ROADWAY SPALL & FULL DEPTH REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY PROJECT CONTRACTORS, INC.
INTERNATIONAL EAGLE ENTERPRISES, INC.
DAN WILLIAMS COMPANY
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 260.000 $800.000 $1,060.200 $650.000 $2,530.000
MOBILIZATION
LS 1.000 $20,000.000 $17,601.600 $10,000.000 $90,000.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 200.000 $15.000 $9.960 $25.000 $25.000
PORT CONC TRAF BAR (STKPL,INSTL&RETRN)
LF 200.000 $15.000 $12.540 $45.000 $25.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $12,000.000 $16,530.000 $18,000.000 $10,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $1,824.000 $2,000.000 $750.000
PREFAB PAV MRK TY C (W) (4") (BRK)
LF 100.000 $5.000 $2.280 $3.000 $35.000
PREFAB PAV MRK TY C (W) (4") (SLD)
LF 100.000 $5.000 $2.280 $4.000 $35.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 100.000 $5.000 $2.280 $4.000 $35.000
REFL PAV MRKR TY I-C
EA 50.000 $5.000 $1.140 $4.000 $15.000
REFL PAV MRKR TY II-C-R
EA 50.000 $5.000 $1.140 $4.000 $15.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 100.000 $120.000 $102.600 $150.000 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $100.000 $79.800 $85.000 $75.000
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $8,200.000 $2,908.140 $4,200.000 $5,500.000
TMA (MOBILE OPERATION)
HR 1,200.000 $65.000 $45.600 $40.000 $30.000
1 LN CLOSURE 4 LN RD
HR 50.000 $110.000 $79.800 $200.000 $95.000
2 LN CLOSURE 4 LN RD
HR 20.000 $120.000 $91.200 $240.000 $95.000
FREEWAY 1 LANE CLOSURE
HR 90.000 $140.000 $102.600 $250.000 $100.000
FREEWAY 2 LANE CLOSURE
HR 100.000 $170.000 $114.000 $350.000 $100.000
FREEWAY 3 LANE CLOSURE
HR 200.000 $220.000 $136.800 $550.000 $100.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 100.000 $110.000 $68.400 $200.000 $90.000
COMPLETE FREEWAY CLOSURE
HR 270.000 $230.000 $250.800 $450.000 $120.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 40.000 $110.000 $79.800 $60.000 $90.000
TWO LANE FRONTAGE ROAD CLOSURE
HR 70.000 $105.000 $102.600 $80.000 $90.000
ONE LANE CONNECTING RAMP CLOSURE
HR 20.000 $120.000 $120.840 $60.000 $90.000
TWO LANE CONNECTING RAMP CLOSURE
HR 40.000 $180.000 $148.200 $80.000 $90.000
WORK AREA ON SHOULDER
HR 20.000 $95.000 $68.400 $250.000 $90.000
TURN AROUND CLOSURE
HR 10.000 $90.000 $68.400 $60.000 $90.000
Totals: $536,950.000 $542,136.540 $632,300.000 $963,850.000