PREPARING ROW
|
STA
|
145.000
|
$900.000
|
$7,000.000
|
$2,025.000
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
232.000
|
$750.000
|
$500.000
|
$225.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
190.000
|
$900.000
|
$720.000
|
$225.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
3,410.000
|
$35.000
|
$20.000
|
$16.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
2,865.000
|
$15.500
|
$14.000
|
$14.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,707.000
|
$23.000
|
$16.000
|
$25.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
7,418.000
|
$7.600
|
$4.000
|
$6.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
31,803.000
|
$15.000
|
$5.500
|
$5.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
336.000
|
$27.000
|
$20.000
|
$18.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
62.000
|
$15.000
|
$14.000
|
$45.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
29.000
|
$9.500
|
$18.000
|
$75.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
107,410.000
|
$4.500
|
$1.000
|
$5.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
3,934.000
|
$7.000
|
$9.000
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
30,549.000
|
$14.000
|
$20.000
|
$18.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
99,711.000
|
$11.500
|
$14.000
|
$19.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
15,593.000
|
$15.000
|
$38.000
|
$20.500
|
|
|
VEGETATION BARRIER
|
SY
|
29,094.000
|
$3.000
|
$1.750
|
$2.950
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
56.000
|
$3.500
|
$26.000
|
$50.000
|
|
|
PROOF ROLLING
|
HR
|
48.000
|
$100.000
|
$100.000
|
$75.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
49,796.000
|
$15.500
|
$19.000
|
$18.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
25,364.000
|
$6.500
|
$7.000
|
$8.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
20,884.000
|
$2.500
|
$2.150
|
$4.000
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
953.000
|
$4.000
|
$10.000
|
$15.000
|
|
|
STRUCT EXCAV
|
CY
|
67,039.000
|
$20.000
|
$8.000
|
$1.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
295.000
|
$150.000
|
$180.000
|
$215.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
185.000
|
$130.000
|
$150.000
|
$300.000
|
|
|
SAND BACKFILL
|
CY
|
38.000
|
$50.000
|
$80.000
|
$35.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
534.000
|
$230.000
|
$250.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
25,748.000
|
$4.000
|
$4.500
|
$4.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
1,264.000
|
$420.000
|
$380.000
|
$375.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
33.000
|
$450.000
|
$400.000
|
$395.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
65.000
|
$600.000
|
$400.000
|
$400.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$750.000
|
$525.000
|
$525.000
|
|
|
CL A CONC (MISC)
|
CY
|
460.000
|
$600.000
|
$485.000
|
$900.000
|
|
|
CL A CONC (FLUME)
|
CY
|
67.000
|
$650.000
|
$480.000
|
$850.000
|
|
|
CL C CONC (MISC)
|
CY
|
0.260
|
$19,231.000
|
$2,300.000
|
$25,000.000
|
|
|
RETAINING WALL (STONE)
|
SF
|
9,300.000
|
$35.000
|
$19.000
|
$27.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
55.300
|
$480.000
|
$1,000.000
|
$1,000.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
1,430.000
|
$230.000
|
$315.000
|
$300.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
884.000
|
$225.000
|
$315.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
59.000
|
$150.000
|
$200.000
|
$250.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
202.000
|
$200.000
|
$315.000
|
$300.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
127.000
|
$180.000
|
$150.000
|
$250.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
124.000
|
$300.000
|
$370.000
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
57.000
|
$350.000
|
$495.000
|
$600.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
2,093.000
|
$550.000
|
$760.000
|
$850.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
381.000
|
$650.000
|
$735.000
|
$850.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,672.000
|
$110.000
|
$125.000
|
$145.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,434.000
|
$140.000
|
$175.000
|
$175.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,462.000
|
$185.000
|
$215.000
|
$225.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
578.000
|
$228.000
|
$270.000
|
$250.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
325.000
|
$116.000
|
$120.000
|
$175.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
410.000
|
$260.000
|
$235.000
|
$250.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
5.000
|
$7,700.000
|
$7,600.000
|
$7,500.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$8,000.000
|
$9,300.000
|
$9,000.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$4,000.000
|
$10,300.000
|
$10,000.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
5.000
|
$4,500.000
|
$10,500.000
|
$10,000.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$7,000.000
|
$13,800.000
|
$11,000.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
9.000
|
$11,000.000
|
$23,000.000
|
$20,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
24.000
|
$5,000.000
|
$8,200.000
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
17.000
|
$5,000.000
|
$8,400.000
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
5.000
|
$10,000.000
|
$8,800.000
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
1.000
|
$8,000.000
|
$7,100.000
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
7.000
|
$10,000.000
|
$8,400.000
|
$9,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
2.000
|
$10,000.000
|
$9,600.000
|
$10,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
2.000
|
$5,000.000
|
$8,700.000
|
$8,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
4.000
|
$6,000.000
|
$9,600.000
|
$9,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
6.000
|
$6,000.000
|
$9,700.000
|
$9,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
5.000
|
$7,000.000
|
$10,600.000
|
$9,000.000
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
4.000
|
$8,500.000
|
$11,100.000
|
$11,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
6.000
|
$7,000.000
|
$7,700.000
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,500.000
|
$8,100.000
|
$8,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$8,000.000
|
$13,000.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$2,100.000
|
$2,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$2,200.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (2: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$2,900.000
|
$2,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$2,700.000
|
$2,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$8,000.000
|
$4,700.000
|
$3,000.000
|
|
|
SLOT DRAIN (GAL STL) (18 IN)
|
LF
|
300.000
|
$325.000
|
$275.000
|
$175.000
|
|
|
PRE-CAST TRENCH DRAIN (IN CONC PAVEMNT)
|
LF
|
250.000
|
$700.000
|
$700.000
|
$625.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$650.000
|
$1,000.000
|
$600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
506.000
|
$35.000
|
$27.000
|
$30.000
|
|
|
REMOV STR (ROCKWALL)
|
EA
|
6.000
|
$1,000.000
|
$800.000
|
$2,200.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
172.000
|
$6.000
|
$1.600
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,000,000.000
|
$3,640,000.000
|
$3,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$15,000.000
|
$20,000.000
|
$20,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,418.000
|
$30.000
|
$25.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,418.000
|
$9.000
|
$8.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
47,087.000
|
$4.000
|
$4.000
|
$4.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
47,087.000
|
$1.000
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,955.000
|
$10.000
|
$12.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,955.000
|
$3.000
|
$4.000
|
$3.550
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
500.000
|
$50.000
|
$125.000
|
$100.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
7,480.000
|
$30.000
|
$16.000
|
$20.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
380.000
|
$35.000
|
$16.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
27,020.000
|
$9.000
|
$8.000
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
2,540.000
|
$9.000
|
$8.000
|
$8.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
7,480.000
|
$30.000
|
$11.000
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
880.000
|
$35.000
|
$11.000
|
$10.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
8,342.000
|
$85.000
|
$63.000
|
$105.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,469.000
|
$20.000
|
$14.000
|
$30.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
367.000
|
$27.000
|
$21.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
25,888.000
|
$20.000
|
$20.000
|
$30.000
|
|
|
CONC CURB (TY IV)
|
LF
|
17,298.000
|
$14.000
|
$10.000
|
$24.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
5,762.000
|
$75.000
|
$67.000
|
$125.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
2,327.000
|
$40.000
|
$52.000
|
$95.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
30.000
|
$1,500.000
|
$1,500.000
|
$1,800.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
26.000
|
$2,800.000
|
$1,500.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
28.000
|
$1,900.000
|
$1,500.000
|
$1,800.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
14.000
|
$2,600.000
|
$1,800.000
|
$1,800.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
5.000
|
$2,700.000
|
$2,200.000
|
$9,000.000
|
|
|
GATE (INSTALL) (DOUBLE)
|
SF
|
240.000
|
$12.500
|
$14.000
|
$50.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
42.000
|
$425.000
|
$800.000
|
$1,000.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
17.000
|
$1,017.000
|
$1,250.000
|
$1,250.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
11.000
|
$940.000
|
$750.000
|
$750.000
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
44.000
|
$4,800.000
|
$5,890.000
|
$5,890.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
17,250.000
|
$31.000
|
$20.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
8,680.000
|
$40.000
|
$28.000
|
$28.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
160.000
|
$41.000
|
$25.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
1,390.000
|
$47.000
|
$32.000
|
$32.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
65.000
|
$60.000
|
$26.000
|
$26.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
72,065.000
|
$2.750
|
$3.000
|
$2.950
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
12,340.000
|
$4.000
|
$3.250
|
$3.250
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
57.000
|
$1,600.000
|
$1,450.000
|
$1,450.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
22.000
|
$2,200.000
|
$1,750.000
|
$1,750.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
4.000
|
$3,000.000
|
$950.000
|
$950.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
5.000
|
$9,500.000
|
$8,900.000
|
$8,900.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
1.000
|
$14,000.000
|
$9,000.000
|
$9,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)GC(O)
|
EA
|
3.000
|
$22,500.000
|
$8,000.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
168.000
|
$850.000
|
$900.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
24.000
|
$900.000
|
$1,100.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
8.000
|
$864.000
|
$925.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
10.000
|
$326.000
|
$275.000
|
$275.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
99.000
|
$770.000
|
$550.000
|
$550.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$720.000
|
$625.000
|
$625.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
53.000
|
$180.000
|
$125.000
|
$125.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
12,628.000
|
$0.350
|
$0.750
|
$0.720
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
3,677.000
|
$0.250
|
$1.500
|
$1.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
14,368.000
|
$0.310
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
513.000
|
$0.790
|
$1.800
|
$1.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
936.000
|
$0.610
|
$1.000
|
$0.960
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
230.000
|
$2.510
|
$7.600
|
$7.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
9.000
|
$65.000
|
$96.000
|
$95.500
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
9.000
|
$83.000
|
$100.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
11.000
|
$6.780
|
$33.000
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,685.000
|
$0.500
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(DOT)
|
LF
|
3,159.000
|
$2.000
|
$1.500
|
$1.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
12,669.000
|
$0.300
|
$0.600
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
53.000
|
$4.130
|
$6.500
|
$6.150
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
2,364.000
|
$0.380
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
3,773.000
|
$1.140
|
$3.050
|
$3.050
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
8,780.000
|
$1.550
|
$3.000
|
$2.900
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
239.000
|
$2.000
|
$4.250
|
$4.250
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
128.000
|
$10.000
|
$15.250
|
$15.250
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
2.000
|
$135.000
|
$335.000
|
$335.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
2.000
|
$210.000
|
$485.000
|
$485.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
5.000
|
$50.000
|
$75.000
|
$74.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
1,842.000
|
$1.200
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
1,733.000
|
$2.700
|
$2.100
|
$2.100
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
4,115.000
|
$1.550
|
$2.900
|
$2.900
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
5,525.000
|
$2.500
|
$2.200
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8,143.000
|
$1.450
|
$2.000
|
$1.900
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
215.000
|
$3.300
|
$4.500
|
$4.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
5,719.000
|
$6.700
|
$9.200
|
$9.200
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
70.000
|
$144.600
|
$175.000
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
60.000
|
$155.600
|
$230.000
|
$230.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
10.000
|
$125.700
|
$345.000
|
$345.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
119.000
|
$48.900
|
$45.000
|
$45.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
54.000
|
$66.000
|
$65.000
|
$65.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
10.000
|
$175.000
|
$150.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
10.000
|
$250.000
|
$245.000
|
$245.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
32,116.000
|
$1.150
|
$1.350
|
$1.350
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
14,038.000
|
$0.650
|
$1.150
|
$1.150
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,752.000
|
$1.130
|
$1.300
|
$1.300
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
280.000
|
$1.000
|
$3.000
|
$2.950
|
|
REFL PAV MRKR TY I-C
|
EA
|
128.000
|
$4.400
|
$5.500
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
14.000
|
$3.700
|
$5.500
|
$5.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,069.000
|
$4.350
|
$5.500
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,104.000
|
$0.450
|
$0.850
|
$0.850
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
9,016.000
|
$0.300
|
$1.150
|
$1.150
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
519.000
|
$0.750
|
$1.300
|
$1.300
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
411.000
|
$3.750
|
$5.000
|
$5.050
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$145.000
|
$135.000
|
$135.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$145.000
|
$145.000
|
$145.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,032.000
|
$0.150
|
$0.250
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
46,154.000
|
$0.100
|
$0.350
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
13,667.000
|
$0.150
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
215.000
|
$0.500
|
$1.250
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
5,720.000
|
$1.250
|
$2.500
|
$2.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
70.000
|
$55.000
|
$80.000
|
$77.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
60.000
|
$55.000
|
$80.000
|
$77.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
10.000
|
$57.800
|
$75.000
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
119.000
|
$20.000
|
$40.000
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
54.000
|
$30.000
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
10.000
|
$25.000
|
$90.000
|
$88.000
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
10.000
|
$75.000
|
$90.000
|
$88.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
958.000
|
$1.000
|
$6.200
|
$6.200
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
3.000
|
$30,000.000
|
$32,000.000
|
$32,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$7,000.000
|
$8,500.000
|
$8,500.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$150,000.000
|
$125,000.000
|
$125,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
28.000
|
$450.000
|
$550.000
|
$550.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
11.000
|
$450.000
|
$550.000
|
$550.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
28.000
|
$450.000
|
$550.000
|
$550.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
16.000
|
$450.000
|
$550.000
|
$550.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
28.000
|
$450.000
|
$550.000
|
$550.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
11.000
|
$450.000
|
$550.000
|
$550.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
34.000
|
$750.000
|
$1,000.000
|
$1,000.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
5.000
|
$220.000
|
$250.000
|
$250.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
34.000
|
$185.000
|
$250.000
|
$250.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
6,347.000
|
$2.500
|
$3.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
7,495.000
|
$3.000
|
$4.000
|
$4.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
4,694.000
|
$4.000
|
$6.000
|
$6.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
|
LF
|
2,275.000
|
$6.000
|
$6.500
|
$6.500
|
|
|
INS TRF SIG PL AM (S)1 ARM(20')LUM
|
EA
|
1.000
|
$11,000.000
|
$7,000.000
|
$7,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$12,000.000
|
$8,500.000
|
$8,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$14,000.000
|
$10,000.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
2.000
|
$16,000.000
|
$12,000.000
|
$12,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
3.000
|
$18,000.000
|
$18,000.000
|
$18,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$45,000.000
|
$23,000.000
|
$23,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
3.000
|
$47,000.000
|
$30,000.000
|
$30,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
24.000
|
$2,500.000
|
$2,000.000
|
$2,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
31.000
|
$1,200.000
|
$650.000
|
$650.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$5,500.000
|
$8,500.000
|
$8,500.000
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
14.000
|
$320.000
|
$250.000
|
$250.000
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
16.000
|
$85.000
|
$250.000
|
$250.000
|
|
|
REMOVE EXIST WATER PIPE (6")
|
LF
|
192.000
|
$25.000
|
$36.000
|
$27.000
|
|
|
REMOVE EXIST WATER PIPE (8")
|
LF
|
115.000
|
$30.000
|
$38.000
|
$27.000
|
|
|
NEW WATER SERVICE (3/4")
|
EA
|
35.000
|
$1,450.000
|
$1,200.000
|
$1,500.000
|
|
|
FIRE HYDRANT (REMOVE & SALVAGE)
|
EA
|
11.000
|
$200.000
|
$1,500.000
|
$3,000.000
|
|
|
FIRE HYDRANT (NEW)
|
EA
|
17.000
|
$10,000.000
|
$10,000.000
|
$11,500.000
|
|
|
FIRE HYDRANT RELOCATE & RECONNECT
|
EA
|
2.000
|
$800.000
|
$11,000.000
|
$11,500.000
|
|
|
SAN SEWER MANHOLE (48 IN)(6 FT)
|
EA
|
19.000
|
$8,025.000
|
$7,000.000
|
$6,500.000
|
|
|
SAN SEWER MANHOLE (48 IN)(EXTRA DEPTH)
|
LF
|
100.000
|
$500.000
|
$270.000
|
$400.000
|
|
|
REMOVE EXIST SAN SEWER PIPE (8")
|
LF
|
383.000
|
$30.000
|
$47.000
|
$44.000
|
|
|
ABAND/FILL EXIST SAN SEWER PIPE (12")
|
LF
|
4,790.000
|
$27.500
|
$46.000
|
$45.000
|
|
|
REMOVE EXIST SAN SEWER PIPE (12")
|
LF
|
48.000
|
$36.000
|
$58.000
|
$52.000
|
|
|
CASING (STEEL) (16 IN) (OPEN TRENCH)
|
LF
|
38.000
|
$400.000
|
$600.000
|
$900.000
|
|
|
CONCRETE CAP
|
LF
|
54.000
|
$60.000
|
$55.000
|
$75.000
|
|
|
8"X8" TAPPING SLEEVE & VALVE
|
EA
|
1.000
|
$14,000.000
|
$10,000.000
|
$9,500.000
|
|
|
12"X12" TAPPING SLEEVE & VALVE
|
EA
|
1.000
|
$16,000.000
|
$15,000.000
|
$13,800.000
|
|
|
8" GATE VALVE AND BOX
|
EA
|
11.000
|
$4,500.000
|
$3,500.000
|
$3,500.000
|
|
|
16" GATE VALVE AND BOX
|
EA
|
22.000
|
$11,050.000
|
$18,000.000
|
$20,000.000
|
|
|
ADJUST VALVE BOX TO GRADE
|
EA
|
69.000
|
$515.000
|
$700.000
|
$250.000
|
|
|
12" GATE VALVE AND BOX
|
EA
|
2.000
|
$6,000.000
|
$6,000.000
|
$5,500.000
|
|
|
16"X16" TAPPING SLEEVE AND VALVE
|
EA
|
1.000
|
$20,000.000
|
$26,000.000
|
$25,000.000
|
|
|
CONNECT TO EXISTING SAN. SEWER LINE
|
EA
|
3.000
|
$4,500.000
|
$5,000.000
|
$5,000.000
|
|
|
MANHOLE ADJUSTMENT (SAN. SEWER)
|
EA
|
20.000
|
$920.000
|
$1,200.000
|
$1,000.000
|
|
|
REMOVE EXISTING MANHOLE (SAN. SEWER)
|
EA
|
17.000
|
$2,400.000
|
$1,900.000
|
$1,750.000
|
|
|
SERVICE CONNECTION (SAN. SEWER)
|
EA
|
34.000
|
$3,600.000
|
$1,700.000
|
$1,600.000
|
|
|
CONNECT TO EXISTING SAN.SEWER MANHOLE
|
EA
|
1.000
|
$6,500.000
|
$7,000.000
|
$6,000.000
|
|
|
SDR 35 PIPES (12") (10-12)
|
LF
|
769.000
|
$85.000
|
$96.000
|
$95.000
|
|
|
SDR 35 PIPES (12") (12-14)
|
LF
|
617.000
|
$95.000
|
$114.000
|
$115.000
|
|
|
SDR 35 PIPES (12") (14-16)
|
LF
|
35.000
|
$100.000
|
$180.000
|
$170.000
|
|
|
SDR 35 PIPES (8") (0-8)
|
LF
|
281.000
|
$60.000
|
$69.000
|
$65.000
|
|
|
SDR 35 PIPES (8") (8-10)
|
LF
|
116.000
|
$65.000
|
$73.000
|
$68.000
|
|
|
SDR 35 PIPES (8") (10-12)
|
LF
|
253.000
|
$70.000
|
$83.000
|
$80.000
|
|
|
SDR 35 PIPES (12") (0-8)
|
LF
|
1,166.000
|
$65.000
|
$81.000
|
$80.000
|
|
|
SDR 35 PIPES (12") (8-10)
|
LF
|
680.000
|
$75.000
|
$86.000
|
$85.000
|
|
|
C-900 DR 25 PIPES (12") (16-18)
|
LF
|
512.000
|
$150.000
|
$196.000
|
$190.000
|
|
|
C-900 DR 25 PIPES (12") (14-16)
|
LF
|
942.000
|
$140.000
|
$145.000
|
$140.000
|
|
|
C-900 DR 25 PIPES (12") (12-14)
|
LF
|
42.000
|
$130.000
|
$125.000
|
$136.000
|
|
|
C-900 DR 25 PIPES (12") (10-12)
|
LF
|
21.000
|
$120.000
|
$112.000
|
$110.000
|
|
|
C-900 DR 25 PIPES (12") (0-8)
|
LF
|
21.000
|
$110.000
|
$106.000
|
$103.000
|
|
|
SDR 35 PIPES (8") (12-14)
|
LF
|
53.000
|
$75.000
|
$108.000
|
$105.000
|
|
|
C-900 DR 25 PIPES (8") (8-10)
|
LF
|
21.000
|
$70.000
|
$83.000
|
$80.000
|
|
|
C-900 DR 25 PIPES (8") (14-16)
|
LF
|
21.000
|
$100.000
|
$130.000
|
$125.000
|
|
|
BYPASS PUMPING
|
WK
|
1.000
|
$301,000.000
|
$90,000.000
|
$80,000.000
|
|
|
C-900 DR 18 PIPE (8")
|
LF
|
1,261.000
|
$80.000
|
$80.000
|
$76.000
|
|
|
C-900 DR 18 PIPE (12")
|
LF
|
137.000
|
$90.000
|
$135.000
|
$140.000
|
|
|
C-900 DR 18 PIPE (16")
|
LF
|
7,411.000
|
$175.000
|
$148.000
|
$145.000
|
|
|
WET CONNECTION
|
EA
|
4.000
|
$3,000.000
|
$6,000.000
|
$6,000.000
|
|
|
REMOVE EXISTING GATE VALVE
|
EA
|
12.000
|
$2,000.000
|
$1,600.000
|
$1,450.000
|
|
|
FRP DROP MANHOLE
|
EA
|
3.000
|
$17,500.000
|
$24,000.000
|
$22,800.000
|
|
|
3" COMBINATION AIR RELEASE VALVE
|
EA
|
2.000
|
$32,000.000
|
$16,000.000
|
$19,500.000
|
|
|
CASING (STEEL) (21 IN) (OPEN TRENCH)
|
LF
|
10.000
|
$500.000
|
$900.000
|
$850.000
|
|
|
BYPASS PUMPING
|
DAY
|
5.000
|
$43,000.000
|
$12,000.000
|
$10,000.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
5,365.000
|
$100.000
|
$100.000
|
$112.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
5,365.000
|
$90.000
|
$154.000
|
$106.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
31,320.000
|
$117.000
|
$125.500
|
$155.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
3,883.000
|
$120.000
|
$140.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
17,842.000
|
$7.500
|
$7.000
|
$8.500
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
11,388.000
|
$153.000
|
$165.000
|
$215.000
|
|
|
TACK COAT
|
GAL
|
12,423.000
|
$7.500
|
$7.000
|
$8.500
|
|
|
ASBESTOS ABATEMENT(CONDUIT)
|
LF
|
391.000
|
$175.000
|
$51.000
|
$90.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$13,000.000
|
$13,500.000
|
$15,000.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
265.000
|
$25.000
|
$9.600
|
$10.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
2.000
|
$3,500.000
|
$2,500.000
|
$2,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
170.000
|
$250.000
|
$270.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
62.000
|
$500.000
|
$380.000
|
$600.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$14,000.000
|
$7,862.000
|
$7,862.080
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
14.000
|
$15,000.000
|
$7,862.000
|
$7,862.080
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
2.000
|
$3,500.000
|
$500.000
|
$500.000
|
|
|
FLOOD GAUGE ASSEMBLY
|
EA
|
15.000
|
$500.000
|
$2,800.000
|
$8,000.000
|
|
|
LED DECORATIVE ILLUMINATION ASSEMBLY
|
EA
|
114.000
|
$6,600.000
|
$8,500.000
|
$8,500.000
|
|
Totals: |
$34,696,221.340
|
$36,413,139.650
|
$38,908,190.610
|