REMOV CONC (PAV)
|
SY
|
14,064.000
|
$30.000
|
$25.000
|
$35.000
|
$18.000
|
$28.740
|
$50.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
5,992.000
|
$20.000
|
$12.000
|
$20.000
|
$12.000
|
$16.170
|
$50.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
1,255.000
|
$40.000
|
$10.000
|
$35.000
|
$12.000
|
$16.170
|
$50.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
432.000
|
$48.000
|
$10.000
|
$50.000
|
$15.000
|
$32.340
|
$50.000
|
|
|
REMOV CONC (CURB)
|
LF
|
1,308.000
|
$7.500
|
$4.250
|
$10.000
|
$4.000
|
$7.180
|
$25.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
3,474.000
|
$20.000
|
$16.000
|
$18.000
|
$25.000
|
$35.930
|
$18.390
|
|
|
EXCAV (SPECIAL)
|
CY
|
24.000
|
$30.000
|
$1,250.000
|
$500.000
|
$500.000
|
$179.670
|
$18.390
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
7,644.000
|
$45.000
|
$20.000
|
$18.000
|
$31.000
|
$35.930
|
$31.270
|
|
|
BACKFILL (TY A OR B)
|
STA
|
107.000
|
$250.000
|
$700.000
|
$400.000
|
$650.000
|
$359.340
|
$1,287.510
|
|
|
RDSIDE AMENITY
|
EA
|
2.000
|
$100,000.000
|
$70,000.000
|
$90,000.000
|
$75,000.000
|
$6,611.850
|
$5,923.180
|
|
|
PROOF ROLLING
|
HR
|
12.000
|
$200.000
|
$80.000
|
$80.000
|
$83.000
|
$179.670
|
$128.750
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (4")
|
SY
|
4,355.000
|
$45.000
|
$10.000
|
$13.000
|
$11.500
|
$15.570
|
$14.740
|
|
|
CEMENT
|
TON
|
125.000
|
$300.000
|
$270.000
|
$360.000
|
$325.000
|
$359.340
|
$311.150
|
|
|
CEMENT TRT (SUBGRADE)(6")
|
SY
|
23,939.000
|
$10.000
|
$7.000
|
$3.250
|
$3.000
|
$3.590
|
$6.440
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
5,665.000
|
$7.500
|
$7.000
|
$7.500
|
$6.000
|
$10.780
|
$9.660
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,922.000
|
$120.000
|
$97.000
|
$105.000
|
$120.000
|
$131.750
|
$202.720
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
481.000
|
$150.000
|
$108.000
|
$200.000
|
$175.000
|
$143.730
|
$213.980
|
|
|
CONC PVMT (CRCP) (10")
|
SY
|
2,504.000
|
$160.000
|
$89.000
|
$85.000
|
$110.000
|
$113.790
|
$114.800
|
|
|
CONC PVMT (CRCP) (12")
|
SY
|
19,840.000
|
$180.000
|
$108.000
|
$95.000
|
$120.000
|
$119.780
|
$118.020
|
|
|
STRUCT EXCAV
|
CY
|
63.000
|
$20.000
|
$7.000
|
$200.000
|
$1.000
|
$53.900
|
$42.920
|
|
|
CEM STABIL BKFL
|
CY
|
618.000
|
$225.000
|
$165.000
|
$120.000
|
$225.000
|
$200.410
|
$189.910
|
|
|
FLOWABLE BACKFILL
|
CY
|
151.000
|
$275.000
|
$180.000
|
$120.000
|
$250.000
|
$194.420
|
$183.470
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
180.000
|
$240.000
|
$265.000
|
$330.000
|
$300.000
|
$299.450
|
$500.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,000.000
|
$300.000
|
$325.000
|
$460.000
|
$325.000
|
$329.390
|
$600.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
240.000
|
$350.000
|
$355.000
|
$390.000
|
$375.000
|
$421.620
|
$377.450
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
39.000
|
$450.000
|
$400.000
|
$445.000
|
$450.000
|
$479.120
|
$428.010
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
131.000
|
$1,650.000
|
$1,200.000
|
$900.000
|
$1,050.000
|
$1,437.360
|
$1,512.820
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
115.600
|
$1,600.000
|
$1,260.000
|
$1,500.000
|
$1,700.000
|
$1,976.370
|
$1,512.820
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
104.800
|
$1,600.000
|
$1,300.000
|
$1,200.000
|
$1,000.000
|
$1,557.140
|
$1,512.820
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
149.000
|
$675.000
|
$585.000
|
$800.000
|
$500.000
|
$598.900
|
$1,512.820
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
28,761.000
|
$30.000
|
$24.000
|
$26.000
|
$34.000
|
$33.530
|
$34.410
|
|
|
APPROACH SLAB (HPC)
|
CY
|
324.700
|
$700.000
|
$410.000
|
$700.000
|
$600.000
|
$718.680
|
$869.070
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
3,815.520
|
$300.000
|
$237.000
|
$280.000
|
$250.000
|
$441.660
|
$272.620
|
|
|
CONCRETE PAINT FINISH
|
SF
|
11,000.000
|
$0.750
|
$2.250
|
$2.000
|
$2.400
|
$2.090
|
$26.820
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
50.000
|
$342.000
|
$190.000
|
$300.000
|
$225.000
|
$323.210
|
$321.880
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
579.000
|
$600.000
|
$455.000
|
$380.000
|
$525.000
|
$778.570
|
$577.590
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
557.000
|
$700.000
|
$500.000
|
$380.000
|
$500.000
|
$808.510
|
$577.590
|
|
|
RIPRAP (STONE TY R)(GROUT)(8 IN)
|
CY
|
244.000
|
$230.000
|
$360.000
|
$580.000
|
$200.000
|
$359.340
|
$81.140
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
624.000
|
$50.250
|
$40.000
|
$24.000
|
$14.000
|
$95.820
|
$53.650
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
544.000
|
$70.000
|
$120.000
|
$90.000
|
$75.000
|
$89.830
|
$211.080
|
|
|
RAIL (TY T80PP-TS)
|
LF
|
433.000
|
$550.000
|
$530.000
|
$150.000
|
$450.000
|
$119.780
|
$486.630
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
251.000
|
$240.000
|
$280.000
|
$275.000
|
$215.000
|
$239.560
|
$241.410
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
159.000
|
$110.000
|
$170.000
|
$170.000
|
$250.000
|
$131.750
|
$134.120
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
174.000
|
$380.000
|
$215.000
|
$190.000
|
$300.000
|
$155.710
|
$187.760
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
4.000
|
$9,500.000
|
$10,600.000
|
$13,000.000
|
$17,500.000
|
$8,085.150
|
$8,851.610
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
6.000
|
$13,500.000
|
$13,000.000
|
$15,000.000
|
$17,500.000
|
$12,936.240
|
$16,683.950
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$10,432.000
|
$4,000.000
|
$4,000.000
|
$1,275.000
|
$2,395.600
|
$2,145.850
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$1,200.000
|
$1,170.000
|
$1,000.000
|
$575.000
|
$718.680
|
$1,072.920
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$150,000.000
|
$61,000.000
|
$180,000.000
|
$175,000.000
|
$107,802.000
|
$75,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
4.000
|
$3,000.000
|
$3,500.000
|
$20,000.000
|
$3,000.000
|
$26,351.600
|
$8,583.380
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,600,000.000
|
$916,000.000
|
$850,000.000
|
$1,000,000.000
|
$1,087,688.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$30,000.000
|
$12,000.000
|
$15,000.000
|
$15,000.000
|
$13,779.700
|
$9,119.850
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$14,000.000
|
$16,000.000
|
$10,000.000
|
$3,593.400
|
$21,458.460
|
|
|
TMA (STATIONARY)
|
DAY
|
22.000
|
$275.000
|
$300.000
|
$150.000
|
$200.000
|
$479.120
|
$1,072.920
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$550.000
|
$405.000
|
$300.000
|
$650.000
|
$419.230
|
$1,072.920
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,584.000
|
$60.000
|
$40.000
|
$25.000
|
$1.000
|
$17.960
|
$59.010
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,584.000
|
$15.000
|
$10.000
|
$10.000
|
$1.000
|
$9.580
|
$21.460
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$35.000
|
$25.000
|
$35.000
|
$32.000
|
$35.930
|
$59.010
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$13.000
|
$10.000
|
$15.000
|
$10.000
|
$11.970
|
$21.460
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,267.000
|
$5.500
|
$5.000
|
$4.500
|
$8.000
|
$3.890
|
$6.440
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,267.000
|
$1.500
|
$3.000
|
$1.000
|
$5.000
|
$0.950
|
$1.880
|
|
|
CONSTRUCTING DETOURS
|
SY
|
492.000
|
$70.000
|
$100.000
|
$120.000
|
$125.000
|
$167.690
|
$95.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
5,970.000
|
$50.000
|
$15.000
|
$8.000
|
$10.000
|
$33.530
|
$50.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
5,040.000
|
$15.000
|
$7.000
|
$5.000
|
$3.500
|
$21.560
|
$12.880
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
5,970.000
|
$22.000
|
$8.000
|
$8.000
|
$7.000
|
$23.950
|
$18.240
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
|
LF
|
630.000
|
$115.000
|
$180.000
|
$75.000
|
$115.000
|
$503.070
|
$105.150
|
|
|
CONC CURB (TY II)
|
LF
|
6,177.000
|
$50.000
|
$12.000
|
$12.000
|
$12.000
|
$21.560
|
$42.920
|
|
|
FIXED BOLLARD
|
EA
|
5.000
|
$1,648.050
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
$479.120
|
$536.460
|
|
|
CONC MEDIAN
|
SY
|
453.000
|
$150.000
|
$70.000
|
$50.000
|
$60.000
|
$167.690
|
$193.130
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,050.000
|
$35.000
|
$30.000
|
$36.000
|
$30.000
|
$37.130
|
$33.260
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,750.000
|
$3,000.000
|
$2,200.000
|
$2,400.000
|
$3,892.850
|
$3,487.000
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
6.000
|
$2,000.000
|
$200.000
|
$2,000.000
|
$1,400.000
|
$1,347.520
|
$1,207.040
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,500.000
|
$2,000.000
|
$2,500.000
|
$1,750.000
|
$2,156.040
|
$1,877.620
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,525.000
|
$5.000
|
$2.500
|
$4.000
|
$5.000
|
$7.180
|
$6.440
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$1,000.000
|
$225.000
|
$800.000
|
$350.000
|
$718.680
|
$643.750
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$350.000
|
$225.000
|
$500.000
|
$350.000
|
$718.680
|
$643.750
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
|
LF
|
602.000
|
$20.000
|
$90.000
|
$40.000
|
$28.000
|
$53.900
|
$48.280
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-4)
|
EA
|
2.000
|
$3,750.000
|
$6,000.000
|
$7,000.000
|
$5,000.000
|
$9,582.400
|
$8,046.920
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
859.000
|
$6.000
|
$4.000
|
$10.000
|
$4.000
|
$4.790
|
$4.290
|
|
|
CABLE BARRIER TERMINAL SECTION (REMOVE)
|
EA
|
2.000
|
$900.000
|
$450.000
|
$600.000
|
$400.000
|
$1,557.140
|
$1,072.920
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,500.000
|
$3,400.000
|
$2,500.000
|
$3,500.000
|
$4,551.640
|
$4,023.460
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$250.000
|
$800.000
|
$350.000
|
$479.120
|
$429.170
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,500.000
|
$950.000
|
$1,500.000
|
$750.000
|
$1,437.360
|
$3,755.230
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,200.000
|
$950.000
|
$800.000
|
$700.000
|
$1,497.250
|
$1,341.150
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$22,000.000
|
$29,000.000
|
$35,000.000
|
$35,000.000
|
$32,340.600
|
$37,552.310
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$20,500.000
|
$12,000.000
|
$40,000.000
|
$10,000.000
|
$11,978.000
|
$37,552.310
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
101.000
|
$15.000
|
$8.000
|
$40.000
|
$12.000
|
$8.380
|
$10.730
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
16.000
|
$3,300.000
|
$3,102.000
|
$3,400.000
|
$3,105.000
|
$3,715.570
|
$3,327.800
|
|
|
RELOCATE RD IL ASM (U/P)
|
EA
|
6.000
|
$1,300.000
|
$1,207.000
|
$1,340.000
|
$1,210.000
|
$1,445.740
|
$1,294.400
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
2.000
|
$1,500.000
|
$2,183.000
|
$2,415.000
|
$2,185.000
|
$2,614.790
|
$2,341.950
|
|
|
IN RD IL (TY SA) 50T-4 (400W EQ) LED
|
EA
|
8.000
|
$5,200.000
|
$5,156.000
|
$5,700.000
|
$5,160.000
|
$6,175.850
|
$5,531.180
|
|
|
CONDT (PVC) (SCH 40) (1") (BORE)
|
LF
|
320.000
|
$27.000
|
$24.000
|
$25.000
|
$23.500
|
$28.740
|
$24.780
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
6,630.000
|
$30.000
|
$21.000
|
$22.000
|
$20.000
|
$23.950
|
$21.420
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
370.000
|
$28.000
|
$29.000
|
$31.000
|
$28.500
|
$35.930
|
$30.220
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
355.000
|
$31.000
|
$30.000
|
$31.000
|
$29.000
|
$35.930
|
$30.620
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
15.000
|
$35.000
|
$55.000
|
$75.000
|
$55.000
|
$65.870
|
$59.010
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
405.000
|
$42.000
|
$37.000
|
$40.000
|
$37.000
|
$47.910
|
$39.490
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
415.000
|
$37.000
|
$31.000
|
$33.000
|
$31.000
|
$37.130
|
$32.850
|
|
|
CONDT (RM) (1")
|
LF
|
675.000
|
$35.000
|
$37.000
|
$40.000
|
$37.000
|
$44.310
|
$38.800
|
|
|
CONDUIT (PREPARE)
|
LF
|
3,680.000
|
$5.500
|
$4.000
|
$5.000
|
$3.950
|
$4.790
|
$4.210
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
440.000
|
$1.850
|
$1.400
|
$1.750
|
$1.450
|
$2.390
|
$1.510
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
400.000
|
$2.300
|
$1.850
|
$2.000
|
$1.850
|
$2.690
|
$1.980
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
36,165.000
|
$3.150
|
$3.000
|
$3.250
|
$2.950
|
$3.590
|
$3.150
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,850.000
|
$3.150
|
$3.400
|
$3.750
|
$3.400
|
$4.790
|
$3.640
|
|
|
ITS GND BOX (POLY) TY 1 (243648)W/APRN
|
EA
|
3.000
|
$4,000.000
|
$3,640.000
|
$4,025.000
|
$3,635.000
|
$4,354.000
|
$3,900.080
|
|
|
ITS GND BOX (POLY) TY 2 (366048)W/APRN
|
EA
|
1.000
|
$6,500.000
|
$6,100.000
|
$6,745.000
|
$6,100.000
|
$7,306.580
|
$6,536.250
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
16.000
|
$1,700.000
|
$1,400.000
|
$1,550.000
|
$1,400.000
|
$1,736.810
|
$1,500.140
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$2,000.000
|
$1,800.000
|
$870.000
|
$1,800.000
|
$2,156.040
|
$1,912.530
|
|
|
REMOVE GROUND BOX
|
EA
|
24.000
|
$750.000
|
$475.000
|
$525.000
|
$475.000
|
$598.900
|
$506.080
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
91.250
|
$40.000
|
$32.000
|
$37.000
|
$32.000
|
$47.910
|
$33.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$1,100.000
|
$1,025.000
|
$1,225.000
|
$1,025.000
|
$1,257.690
|
$1,098.860
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
2.000
|
$800.000
|
$1,080.000
|
$1,300.000
|
$1,080.000
|
$1,317.580
|
$1,156.110
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$1,200.000
|
$1,650.000
|
$2,395.000
|
$1,645.000
|
$2,036.260
|
$1,761.850
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$5,000.000
|
$2,950.000
|
$3,665.000
|
$2,945.000
|
$3,593.400
|
$3,155.680
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$3,800.000
|
$2,950.000
|
$3,665.000
|
$2,945.000
|
$3,593.400
|
$3,155.680
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
1.000
|
$315.000
|
$103.000
|
$1,645.000
|
$105.000
|
$125.760
|
$110.080
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
9.000
|
$750.000
|
$750.000
|
$718.000
|
$750.000
|
$898.350
|
$796.070
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
18.000
|
$230.000
|
$120.000
|
$180.000
|
$120.000
|
$143.730
|
$127.060
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
52.000
|
$45.000
|
$50.000
|
$22.000
|
$75.000
|
$65.870
|
$56.330
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
12.000
|
$55.000
|
$70.000
|
$95.000
|
$75.000
|
$71.860
|
$64.380
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
897.000
|
$1.200
|
$8.000
|
$11.400
|
$6.850
|
$8.200
|
$7.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,452.000
|
$1.200
|
$8.000
|
$11.000
|
$6.850
|
$8.140
|
$7.350
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
597.000
|
$1.200
|
$7.000
|
$9.500
|
$6.000
|
$7.180
|
$6.440
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
13,226.000
|
$2.500
|
$2.750
|
$3.750
|
$2.450
|
$2.890
|
$2.600
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
11,740.000
|
$1.000
|
$2.000
|
$2.750
|
$1.750
|
$2.090
|
$1.880
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
598.000
|
$0.350
|
$2.000
|
$2.750
|
$1.750
|
$2.090
|
$1.880
|
|
REFL PAV MRK TY I (W)6"(LNDP)(090MIL)
|
LF
|
1,284.000
|
$2.000
|
$1.200
|
$1.650
|
$1.050
|
$1.240
|
$1.120
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,332.000
|
$1.500
|
$1.750
|
$2.460
|
$1.600
|
$1.880
|
$1.680
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
1,246.000
|
$3.350
|
$4.600
|
$6.400
|
$4.150
|
$4.930
|
$4.420
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
215.000
|
$9.000
|
$9.750
|
$13.400
|
$8.750
|
$10.780
|
$9.370
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
18.000
|
$150.000
|
$170.000
|
$235.000
|
$155.000
|
$180.860
|
$162.010
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
6.000
|
$200.000
|
$245.000
|
$335.000
|
$220.000
|
$263.510
|
$232.820
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
6.000
|
$380.000
|
$380.000
|
$535.000
|
$340.000
|
$407.250
|
$363.720
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
18.000
|
$165.000
|
$170.000
|
$235.000
|
$155.000
|
$182.060
|
$163.080
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(090MIL)
|
EA
|
8.000
|
$175.000
|
$160.000
|
$220.000
|
$145.000
|
$173.680
|
$154.500
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(090MIL)
|
EA
|
8.000
|
$215.000
|
$207.000
|
$290.000
|
$185.000
|
$221.590
|
$198.490
|
|
RE PM TY II (W) 6" (BRK)
|
LF
|
3,253.000
|
$0.500
|
$0.600
|
$0.860
|
$0.550
|
$0.650
|
$0.590
|
|
RE PM TY II (W) 6" (DOT)
|
LF
|
598.000
|
$1.400
|
$1.250
|
$1.700
|
$1.100
|
$1.310
|
$1.170
|
|
RE PM TY II (W) 6" (LNDP)
|
LF
|
1,284.000
|
$1.900
|
$0.750
|
$1.000
|
$0.650
|
$0.740
|
$0.670
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
18,716.000
|
$0.500
|
$0.300
|
$0.400
|
$0.250
|
$0.290
|
$0.270
|
|
RE PM TY II (W) 8" (SLD)
|
LF
|
3,332.000
|
$0.750
|
$0.900
|
$1.250
|
$0.800
|
$0.950
|
$0.850
|
|
RE PM TY II (W) 12" (SLD)
|
LF
|
1,246.000
|
$2.000
|
$3.750
|
$5.000
|
$3.200
|
$3.830
|
$3.430
|
|
RE PM TY II (W) 24" (SLD)
|
LF
|
215.000
|
$5.000
|
$6.200
|
$8.650
|
$5.500
|
$6.580
|
$5.860
|
|
RE PM TY II (W) (ARROW)
|
EA
|
18.000
|
$120.000
|
$255.000
|
$355.000
|
$230.000
|
$275.490
|
$244.630
|
|
RE PM TY II (W) (DBL ARROW)
|
EA
|
6.000
|
$130.000
|
$150.790
|
$220.000
|
$135.000
|
$161.700
|
$141.630
|
|
RE PM TY II (W) (LN REDUCT ARW)
|
EA
|
6.000
|
$185.000
|
$180.000
|
$260.000
|
$160.000
|
$191.640
|
$169.520
|
|
RE PM TY II (W) (WORD)
|
EA
|
18.000
|
$130.000
|
$105.000
|
$145.000
|
$95.000
|
$119.780
|
$100.850
|
|
RE PM TY II (W) (BIKE ARROW)
|
EA
|
7.000
|
$80.000
|
$95.000
|
$130.000
|
$81.000
|
$119.780
|
$86.910
|
|
RE PM TY II (W) (BIKE SYMBOL)
|
EA
|
7.000
|
$85.000
|
$80.000
|
$110.000
|
$71.000
|
$119.780
|
$76.180
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
17,095.000
|
$0.600
|
$0.300
|
$0.400
|
$0.300
|
$0.330
|
$0.280
|
|
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
|
LF
|
3,253.000
|
$1.000
|
$1.750
|
$2.500
|
$1.600
|
$1.910
|
$1.680
|
|
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
|
LF
|
18,716.000
|
$1.000
|
$1.050
|
$1.500
|
$0.950
|
$1.130
|
$1.010
|
|
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
|
LF
|
17,095.000
|
$1.000
|
$1.000
|
$1.500
|
$0.900
|
$1.070
|
$0.970
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
6.000
|
$6.000
|
$10.000
|
$18.450
|
$8.950
|
$10.780
|
$9.580
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
488.000
|
$6.000
|
$10.000
|
$14.000
|
$8.950
|
$10.780
|
$9.570
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
10,134.000
|
$0.750
|
$0.700
|
$1.000
|
$0.650
|
$0.740
|
$0.650
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,039.000
|
$1.750
|
$3.500
|
$4.600
|
$3.050
|
$3.650
|
$3.250
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
224.000
|
$3.000
|
$8.500
|
$11.450
|
$7.450
|
$8.980
|
$7.970
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
8.000
|
$130.000
|
$190.000
|
$320.000
|
$167.000
|
$203.620
|
$179.180
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
4.000
|
$110.000
|
$240.000
|
$332.000
|
$208.000
|
$251.530
|
$223.170
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
8.000
|
$145.000
|
$220.000
|
$304.000
|
$191.000
|
$228.780
|
$204.930
|
|
|
ELIM EXT PM & MRKS (SYMBOL)
|
EA
|
4.000
|
$80.000
|
$170.000
|
$275.000
|
$149.000
|
$179.670
|
$159.870
|
|
|
ELIM EXT PM & MARKS (BIKE ARROW)
|
EA
|
4.000
|
$50.000
|
$200.000
|
$332.000
|
$175.000
|
$215.600
|
$187.760
|
|
|
ELIM EXT PM & MARKS (BIKE SYMBOL)
|
EA
|
4.000
|
$70.000
|
$200.000
|
$332.000
|
$175.000
|
$215.604
|
$187.760
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
40,946.000
|
$0.500
|
$0.550
|
$0.750
|
$0.500
|
$0.590
|
$0.520
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,332.000
|
$0.300
|
$0.650
|
$0.900
|
$0.600
|
$0.670
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,246.000
|
$0.500
|
$0.750
|
$1.450
|
$0.700
|
$0.830
|
$0.720
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
215.000
|
$3.000
|
$0.950
|
$2.000
|
$0.850
|
$1.010
|
$0.890
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
24.000
|
$27.000
|
$60.000
|
$83.000
|
$51.000
|
$61.080
|
$54.720
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
6.000
|
$32.000
|
$170.000
|
$295.000
|
$150.000
|
$179.670
|
$158.790
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
18.000
|
$32.000
|
$185.000
|
$260.000
|
$166.000
|
$198.830
|
$178.110
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
7.000
|
$32.000
|
$158.000
|
$316.000
|
$141.000
|
$173.680
|
$151.280
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
7.000
|
$40.000
|
$100.000
|
$190.000
|
$88.500
|
$107.080
|
$94.950
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$15,000.000
|
$10,700.000
|
$11,750.000
|
$15,000.000
|
$12,816.460
|
$11,391.660
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$38,000.000
|
$10,300.000
|
$11,400.000
|
$15,000.000
|
$12,337.400
|
$11,041.450
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
5.000
|
$450.000
|
$330.000
|
$375.000
|
$330.000
|
$395.270
|
$352.780
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$445.000
|
$330.000
|
$370.000
|
$330.000
|
$395.270
|
$352.780
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
9.000
|
$435.000
|
$330.000
|
$370.000
|
$330.000
|
$395.270
|
$352.780
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$425.000
|
$330.000
|
$390.000
|
$330.000
|
$395.270
|
$352.780
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
9.000
|
$435.000
|
$330.000
|
$370.000
|
$330.000
|
$395.270
|
$352.780
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
1.000
|
$430.000
|
$330.000
|
$445.000
|
$330.000
|
$395.270
|
$352.780
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
9.000
|
$330.000
|
$165.000
|
$180.000
|
$165.000
|
$203.620
|
$172.900
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
1.000
|
$330.000
|
$215.000
|
$330.000
|
$215.000
|
$263.510
|
$226.060
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
410.000
|
$6.750
|
$3.000
|
$3.150
|
$2.850
|
$3.590
|
$3.060
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
1,260.000
|
$8.000
|
$9.500
|
$10.450
|
$9.500
|
$11.970
|
$10.100
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
2.000
|
$16,000.000
|
$14,000.000
|
$15,300.000
|
$15,000.000
|
$16,769.200
|
$14,823.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$17,000.000
|
$16,000.000
|
$17,000.000
|
$17,500.000
|
$18,565.900
|
$16,482.240
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
83.000
|
$123.000
|
$140.000
|
$25.000
|
$50.000
|
$143.730
|
$160.940
|
|
|
RELOCATE RVDS
|
EA
|
3.000
|
$2,000.000
|
$1,270.000
|
$1,400.000
|
$1,275.000
|
$1,796.700
|
$1,352.960
|
|
|
RADAR PRESENCE DETECTOR COMM CABLE
|
LF
|
1,350.000
|
$3.750
|
$4.000
|
$4.500
|
$3.950
|
$4.790
|
$4.240
|
|
|
GROUND BOX (PREPARE)
|
EA
|
9.000
|
$600.000
|
$525.000
|
$580.000
|
$525.000
|
$1,197.800
|
$563.280
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
108.000
|
$140.000
|
$115.000
|
$125.000
|
$115.000
|
$149.720
|
$120.610
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
1.000
|
$2,700.000
|
$2,500.000
|
$2,745.000
|
$2,500.000
|
$2,994.500
|
$2,660.850
|
|
|
FO CBL (12 SMF)
|
LF
|
440.000
|
$11.000
|
$8.000
|
$8.350
|
$7.550
|
$11.970
|
$8.090
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
605.000
|
$1.300
|
$19.000
|
$20.700
|
$18.750
|
$23.950
|
$19.970
|
|
Totals: |
$16,966,232.750
|
$11,897,786.230
|
$12,636,764.600
|
$12,749,191.050
|
$15,059,265.477
|
$16,639,050.582
|