EL PASO FM 1905 (2551-01-011)

Items: 112

County: EL PASO
Length: N/A
Highway: FM 1905
District: EL PASO
Control Number: 2551-01-011
DBE Goal: N/A
Project: STP 2021(542)MM
Guaranty: N/A
Time: 145 WORKING DAYS
Engineer's Estimate: $3,214,798.12
Date: 05/05/2021 (5 years ago)
Contract Number: N/A
Type: RECONSTRUCT EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$3,214,798.12
$2,157,120.72
Over/Under Est: -32.9% -$1,057,677.40
Over/Under Est: -14.02% -$450,863.57
Amt Left: 28.13% $606,813.83
Over/Under Est: -10.69% -$343,611.78
Amt Left: 33.1% $714,065.62
Delta: -3.88% -$107,251.79

Bid Items & Bid Tabulations

112 Total 0 of 112
EL PASO  |  FM 1905  |  EL PASO  |  2551-01-011  |  05/05/2021  |  $3,214,798.12  |  STP 2021(542)MM  |  RECON EXIST ROADWAY  |  145 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. A. R. CONCRETE, INC.
INTERNATIONAL EAGLE ENTERPRISES, INC.
DEL MAR CONTRACTING, INC.
PREPARING ROW
STA 65.100 $4,700.000 $233.000 $480.000 $1,000.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 30.000 $250.000 $221.500 $1,000.000 $750.000
REMOVING CONC (RIPRAP)
SY 885.000 $13.200 $11.000 $18.000 $15.000
REMOVING CONC (SIDEWALKS)
SY 1,486.000 $11.400 $10.750 $15.000 $15.000
REMOVING CONC (DRIVEWAYS)
SY 787.000 $13.950 $12.850 $16.000 $22.000
REMOVING CONC (CURB)
LF 3,945.000 $2.250 $4.500 $7.000 $5.000
REMOVING CONC (CURB AND GUTTER)
LF 1,232.000 $5.160 $6.250 $10.000 $6.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 2,088.000 $10.000 $3.500 $5.000 $15.000
EXCAVATION (ROADWAY)
CY 4,654.800 $7.200 $13.200 $12.000 $32.000
SUBGRADE WIDENING (DENS CONT)
STA 130.000 $550.000 $220.000 $700.000 $700.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 507.500 $20.080 $14.000 $20.000 $25.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 7,210.000 $30.000 $9.500 $12.000 $12.000
PRIME COAT (AE-P)
GAL 1,349.000 $6.500 $4.250 $6.000 $7.000
ASPH (AC-20-5TR)
GAL 11,395.000 $3.750 $4.000 $6.000 $7.000
AGGR(TY-PB GR-4 SAC-B)
CY 259.000 $120.000 $147.500 $140.000 $250.000
D-GR HMA(SQ) TY-D PG70-22
TON 72.000 $150.000 $393.000 $180.000 $144.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 22.000 $120.000 $387.500 $250.000 $150.000
TOM-C (AGGREGATE) SAC-A
TON 1,473.000 $107.740 $47.500 $140.000 $75.000
TOM (ASPHALT) PG 70-22
TON 94.000 $955.000 $950.000 $1,500.000 $1,050.000
TACK COAT
GAL 149.000 $12.500 $10.200 $6.000 $20.000
PLANE ASPH CONC PAV(0" TO 1")
SY 1,529.000 $2.770 $2.000 $2.200 $6.000
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
SY 528.000 $7.530 $1.800 $2.250 $8.500
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $284.640 $399.890 $420.000 $450.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $414.840 $529.000 $600.000 $600.000
CL A CONC (FLUME)
CY 32.000 $440.000 $843.000 $500.000 $840.000
RIPRAP (CONC)(4 IN)
CY 32.000 $424.500 $374.000 $500.000 $390.000
RIPRAP (STONE TY R)(DRY)(6 IN)
CY 58.000 $400.000 $66.000 $180.000 $120.000
STR STEEL (RAILS / POSTS / PLATES)
LB 11,576.000 $8.000 $7.000 $10.000 $3.000
RAIL (HANDRAIL)(TY B)
LF 1,429.000 $84.000 $72.500 $83.000 $170.000
ADJUSTING MANHOLES
EA 25.000 $528.000 $300.000 $800.000 $450.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 21.000 $410.000 $300.000 $800.000 $250.000
ADJUSTING MANHOLES (WATER METER)
EA 18.000 $745.000 $300.000 $500.000 $450.000
REMOV STR (RET WALL)
LF 29.000 $44.000 $126.000 $60.000 $45.000
REMOVE STR (RAIL)
LF 70.000 $23.500 $37.000 $50.000 $7.000
MOBILIZATION
LS 1.000 $310,000.000 $203,185.000 $280,000.000 $142,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $17,000.000 $8,700.000 $7,000.000 $25,000.000
SANDBAGS FOR EROSION CONTROL
EA 20.000 $10.000 $31.500 $4.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,134.000 $3.300 $3.000 $3.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,134.000 $1.300 $2.500 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 9,518.000 $2.800 $3.000 $3.800 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 9,518.000 $1.100 $3.000 $1.000 $1.000
CONC CURB (MONO) (TY II)
LF 848.000 $8.000 $10.500 $9.000 $12.000
CONC CURB & GUTTER (TY II)
LF 1,067.000 $13.000 $14.750 $16.000 $13.000
CONC CURB & GUTTER TY II (MOD)
LF 12,170.000 $21.000 $12.750 $15.000 $19.000
DRIVEWAYS (CONC)
SY 1,818.000 $66.000 $47.500 $40.000 $59.000
CONC SIDEWALKS (4")
SY 5,271.000 $74.000 $34.100 $32.000 $43.000
CURB RAMPS (TY 1)
EA 5.000 $900.000 $1,070.000 $1,100.000 $700.000
CURB RAMPS (TY 2)
EA 4.000 $1,330.320 $1,070.000 $1,100.000 $900.000
CURB RAMPS (TY 5)
EA 1.000 $2,500.000 $990.000 $1,100.000 $1,300.000
CURB RAMPS (TY 10)
EA 37.000 $1,500.000 $980.000 $1,100.000 $900.000
CONC MEDIAN
SY 172.000 $50.000 $44.500 $38.000 $43.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 24.000 $212.000 $250.000 $380.000 $600.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $207.000 $290.000 $500.000 $900.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $355.000 $290.000 $500.000 $950.000
RELOCATE EXISTING MAILBOX
EA 1.000 $125.000 $400.000 $280.000 $450.000
CONDT (PVC) (SCH 40) (3")
LF 185.000 $16.500 $19.500 $23.000 $19.500
CONDT (PVC) (SCH 40) (3") (BORE)
LF 200.000 $34.500 $32.000 $36.000 $32.000
ELEC CONDR (NO.8) INSULATED
LF 640.000 $3.300 $2.950 $4.000 $2.950
ELEC CONDR (NO.6) INSULATED
LF 495.000 $3.700 $3.250 $5.000 $3.250
GROUND BOX TY D (162922)W/APRON
EA 3.000 $1,520.000 $1,550.000 $1,800.000 $1,550.000
TIMBER POLE (CL 2) 35 FT
EA 1.000 $1,200.000 $1,855.000 $2,300.000 $1,855.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 82.000 $579.970 $500.000 $800.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $840.000 $859.000 $800.000 $859.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $700.000 $400.000 $500.000 $400.000
REMOVE SM RD SN SUP&AM
EA 55.000 $180.000 $115.000 $180.000 $115.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 74.000 $1.000 $16.910 $7.000 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 494.000 $0.500 $5.640 $5.000 $3.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 164.000 $2.500 $3.500 $5.000 $3.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 310.000 $1.300 $3.000 $5.500 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,713.000 $6.100 $6.250 $7.250 $6.250
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $150.000 $188.000 $220.000 $188.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $101.000 $188.000 $220.000 $188.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 38.000 $142.000 $155.000 $210.000 $155.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 38.000 $205.000 $240.000 $320.000 $240.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 210.000 $1.000 $4.000 $8.000 $4.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 11,490.000 $0.630 $0.880 $1.900 $0.880
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,791.000 $0.350 $0.900 $2.000 $0.900
REFL PAV MRKR TY I-C
EA 21.000 $3.100 $4.950 $6.500 $4.950
REFL PAV MRKR TY II-A-A
EA 245.000 $2.800 $4.950 $6.500 $4.950
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $29,000.000 $26,964.000 $31,000.000 $26,964.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $3,900.000 $4,550.000 $6,000.000 $4,550.000
TEMP TRAF SIGNALS
EA 1.000 $43,100.000 $86,993.000 $92,000.000 $86,993.000
VEH SIG SEC (12")LED(GRN)
EA 5.000 $345.000 $427.000 $600.000 $427.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $345.000 $398.000 $520.000 $398.000
VEH SIG SEC (12")LED(YEL)
EA 5.000 $345.000 $295.660 $430.000 $295.660
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $345.000 $292.100 $400.000 $292.100
VEH SIG SEC (12")LED(RED)
EA 5.000 $345.000 $299.340 $430.000 $299.340
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $345.000 $384.120 $500.000 $384.120
PED SIG SEC (LED)(COUNTDOWN)
EA 6.000 $1,035.000 $741.860 $1,200.000 $741.860
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,549.000 $1.700 $1.890 $3.000 $1.890
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,395.000 $2.030 $2.280 $3.750 $2.280
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 75.000 $2.300 $3.020 $4.250 $3.020
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 479.000 $4.100 $4.380 $5.500 $4.380
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $3,750.000 $5,312.000 $7,000.000 $5,312.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 1.000 $10,850.000 $12,443.000 $16,000.000 $12,443.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $22,000.000 $27,998.630 $34,000.000 $27,998.630
PED POLE ASSEMBLY
EA 3.000 $2,300.000 $2,296.300 $3,200.000 $2,296.300
PEDESTRIAN PUSH BUTTON POLE
EA 1.000 $1,750.000 $1,854.000 $2,600.000 $1,854.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $920.000 $816.550 $1,000.000 $816.550
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,600.000 $3,169.000 $3,900.000 $3,169.000
REMOVAL OF TIMBER POLES
EA 1.000 $600.000 $300.000 $500.000 $300.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 2.000 $72.000 $100.000 $500.000 $440.000
SP MIXES SP-C SAC-B PG70-22
TON 272.000 $150.000 $107.750 $150.000 $125.000
TACK COAT
GAL 4,273.000 $8.500 $5.000 $6.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,538.690 $9,600.000 $10,000.000 $8,000.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 2.000 $6,620.000 $7,988.220 $8,500.000 $7,988.220
TMA (STATIONARY)
DAY 7.000 $180.000 $598.000 $290.000 $150.000
TMA (MOBILE OPERATION)
DAY 3.000 $230.000 $570.000 $500.000 $350.000
VIVDS PROSR SYS
EA 1.000 $8,300.000 $8,837.000 $9,500.000 $8,837.000
VIVDS CAM ASSY FXD LNS
EA 2.000 $1,950.000 $2,455.000 $3,200.000 $2,455.000
VIVDS CNTRL SOFTWARE
EA 1.000 $500.000 $1,512.000 $2,100.000 $1,512.000
VIVDS CABLING
LF 470.000 $2.750 $2.860 $4.000 $2.860
Totals: $3,214,798.120 $2,157,120.720 $2,763,934.550 $2,871,186.340