PREPARING ROW
|
STA
|
3.000
|
$283.330
|
$46,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
85.000
|
$30.000
|
$85.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
21.000
|
$475.000
|
$550.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
401.000
|
$560.000
|
$587.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
136.000
|
$600.000
|
$600.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
612.000
|
$300.000
|
$375.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
32.000
|
$700.000
|
$800.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
29.000
|
$450.000
|
$800.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
35.000
|
$450.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
155.000
|
$500.000
|
$500.000
|
|
|
RAIL (TY T552)
|
LF
|
270.000
|
$80.000
|
$185.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$354,293.000
|
$380,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$45,000.000
|
$25,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,035.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,035.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
616.000
|
$10.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
616.000
|
$7.500
|
$5.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
320.000
|
$20.000
|
$20.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$30.000
|
$60.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
320.000
|
$20.000
|
$18.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$30.000
|
$120.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,875.000
|
$40.000
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,250.000
|
$3,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
12.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
50.000
|
$10.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$400.000
|
$385.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$350.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$3,100.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$450.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$73,000.000
|
$31,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
11,615.000
|
$33.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
2,995.000
|
$40.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
9,935.000
|
$42.000
|
$35.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
2,565.000
|
$47.000
|
$54.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
15,915.000
|
$1.750
|
$2.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
8,880.000
|
$2.500
|
$2.200
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
10,470.000
|
$3.750
|
$3.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
3,580.000
|
$4.000
|
$3.200
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
11,820.000
|
$4.200
|
$3.750
|
|
|
ELEC CONDR (NO.3) INSULATED
|
LF
|
15,555.000
|
$4.700
|
$4.000
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
22,540.000
|
$5.250
|
$4.100
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
84.000
|
$1,525.000
|
$1,850.000
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
|
EA
|
21.000
|
$8,000.000
|
$8,500.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)EX(O)
|
EA
|
2.000
|
$6,600.000
|
$8,500.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
|
EA
|
4.000
|
$7,100.000
|
$9,500.000
|
|
|
ELC SRV TY D 120/240 125(NS)GS(N)GC(O)
|
EA
|
1.000
|
$7,900.000
|
$10,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
4,368.000
|
$36.000
|
$41.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,688.000
|
$39.000
|
$44.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$150.000
|
$125.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
22,587.000
|
$6.750
|
$8.960
|
|
|
RELOCATE LRSA
|
EA
|
4.000
|
$6,600.000
|
$8,500.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$2,350.000
|
$2,500.000
|
|
|
INS OH SN SUP(20 FT BAL TEE)
|
EA
|
4.000
|
$35,000.000
|
$54,000.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
10.000
|
$45,000.000
|
$56,000.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
4.000
|
$45,000.000
|
$62,440.000
|
|
|
INS OH SN SUP(60 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$145,000.000
|
$212,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
38.000
|
$400.000
|
$650.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
1.000
|
$6.000
|
$250.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
26,170.000
|
$12.000
|
$14.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
68.000
|
$4,000.000
|
$4,500.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
8.000
|
$4,400.000
|
$3,000.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
32.000
|
$120.000
|
$250.000
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
655.000
|
$3.000
|
$1.250
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
14.000
|
$4,600.000
|
$550.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
7.000
|
$1,300.000
|
$550.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
6,335.000
|
$2.500
|
$7.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
44.000
|
$475.000
|
$2,000.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
15.000
|
$40,000.000
|
$35,000.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
19.000
|
$40,000.000
|
$46,000.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
1.000
|
$24,500.000
|
$29,254.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
1.000
|
$9,000.000
|
$1,250.000
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
6.000
|
$12,000.000
|
$18,335.920
|
|
|
INSTALLATION OF FES (FIELD CABINET)
|
EA
|
52.000
|
$4,200.000
|
$3,000.000
|
|
|
INSTALLATION OF FES (HUB CABINET)
|
EA
|
1.000
|
$3,000.000
|
$4,500.000
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
820.000
|
$3.000
|
$3.000
|
|
|
TMA (STATIONARY)
|
DAY
|
181.000
|
$450.000
|
$225.000
|
|
|
ITS GND BOX (POLY) TY 1 (243648)W/APRN
|
EA
|
47.000
|
$4,500.000
|
$4,000.000
|
|
|
ITS GND BOX (POLY) TY 2 (366048)W/APRN
|
EA
|
4.000
|
$4,900.000
|
$5,000.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
2.000
|
$1,500.000
|
$1,200.000
|
|
|
HIGH MAST ASSEMBLY FOR ITS
|
EA
|
1.000
|
$60,000.000
|
$102,000.000
|
|
|
ITS RVSD (DC ONLY) (INSTALL ONLY)
|
EA
|
5.000
|
$1,000.000
|
$750.000
|
|
|
ITS RVSD (DC ONLY) (REMOVE)
|
EA
|
2.000
|
$500.000
|
$500.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$225,000.000
|
$195,000.000
|
|
Totals: |
$7,890,149.990
|