EL PASO VA (0924-06-620)

Items: 83

County: EL PASO
Length: N/A
Highway: VA
District: EL PASO
Control Number: 0924-06-620
DBE Goal: N/A
Project: F 2022(823)
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $7,890,149.99
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
ALDO MADRID
JONATHAN CONCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$7,890,149.99
$8,297,285.79
Over/Under Est: 5.16% $407,135.80
Subcontractor Percentage Amount
APACHE BARRICADE & SIGN 2.84% $239,368.41
BORDER DRILLING LLC 2.11% $177,840.61
Total: 4.95% $417,209.02

Bid Items & Bid Tabulations

83 Total 0 of 83
EL PASO  |  VA  |  EL PASO  |  0924-06-620  |  09/07/2022  |  $7,890,149.99  |  F 2022(823)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRI STATE ELECTRIC, LTD.
PREPARING ROW
STA 3.000 $283.330 $46,000.000
REMOVING CONC (RIPRAP)
SY 85.000 $30.000 $85.000
DRILL SHAFT (42 IN)
LF 21.000 $475.000 $550.000
DRILL SHAFT (48 IN)
LF 401.000 $560.000 $587.000
DRILL SHAFT (54 IN)
LF 136.000 $600.000 $600.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 612.000 $300.000 $375.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 32.000 $700.000 $800.000
CL C CONC (RAIL FOUNDATION)
CY 29.000 $450.000 $800.000
RIPRAP (CONC)(4 IN)
CY 35.000 $450.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 155.000 $500.000 $500.000
RAIL (TY T552)
LF 270.000 $80.000 $185.000
MOBILIZATION
LS 1.000 $354,293.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $45,000.000 $25,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,035.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,035.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 616.000 $10.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 616.000 $7.500 $5.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 320.000 $20.000 $20.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 40.000 $30.000 $60.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 320.000 $20.000 $18.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $30.000 $120.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,875.000 $40.000 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $3,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,500.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $10.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $400.000 $385.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $350.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $3,100.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $450.000 $350.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $73,000.000 $31,000.000
CONDT (PVC) (SCH 40) (2")
LF 11,615.000 $33.000 $25.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,995.000 $40.000 $40.000
CONDT (PVC) (SCH 40) (3")
LF 9,935.000 $42.000 $35.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 2,565.000 $47.000 $54.000
ELEC CONDR (NO.14) INSULATED
LF 15,915.000 $1.750 $2.000
ELEC CONDR (NO.10) INSULATED
LF 8,880.000 $2.500 $2.200
ELEC CONDR (NO.8) INSULATED
LF 10,470.000 $3.750 $3.000
ELEC CONDR (NO.6) INSULATED
LF 3,580.000 $4.000 $3.200
ELEC CONDR (NO.4) INSULATED
LF 11,820.000 $4.200 $3.750
ELEC CONDR (NO.3) INSULATED
LF 15,555.000 $4.700 $4.000
ELEC CONDR (NO.2) INSULATED
LF 22,540.000 $5.250 $4.100
GROUND BOX TY A (122311)W/APRON
EA 84.000 $1,525.000 $1,850.000
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
EA 21.000 $8,000.000 $8,500.000
ELC SRV TY D 120/240 100(NS)GS(N)EX(O)
EA 2.000 $6,600.000 $8,500.000
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 4.000 $7,100.000 $9,500.000
ELC SRV TY D 120/240 125(NS)GS(N)GC(O)
EA 1.000 $7,900.000 $10,000.000
ALUMINUM SIGNS (TY G)
SF 4,368.000 $36.000 $41.000
ALUMINUM SIGNS (TY O)
SF 2,688.000 $39.000 $44.000
REMOVE SM RD SN SUP&AM
EA 1.000 $150.000 $125.000
INSTALL LRSS (STRUCT STEEL)
LB 22,587.000 $6.750 $8.960
RELOCATE LRSA
EA 4.000 $6,600.000 $8,500.000
REMOVE LRSA
EA 2.000 $2,350.000 $2,500.000
INS OH SN SUP(20 FT BAL TEE)
EA 4.000 $35,000.000 $54,000.000
INS OH SN SUP(30 FT BAL TEE)
EA 10.000 $45,000.000 $56,000.000
INS OH SN SUP(35 FT CANT)
EA 4.000 $45,000.000 $62,440.000
INS OH SN SUP(60 FT BRDG)(CIRC TUBE)
EA 1.000 $145,000.000 $212,000.000
VEH SIG SEC (12")LED(YEL)
EA 38.000 $400.000 $650.000
ITS COM CBL (ETHERNET)
LF 1.000 $6.000 $250.000
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 26,170.000 $12.000 $14.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 68.000 $4,000.000 $4,500.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 8.000 $4,400.000 $3,000.000
FIBER OPTIC FUSION SPLICE
EA 32.000 $120.000 $250.000
REMOVE FIBER OPTIC CABLE
LF 655.000 $3.000 $1.250
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 14.000 $4,600.000 $550.000
REMOVE CCTV FIELD EQUIPMENT
EA 7.000 $1,300.000 $550.000
CONDUIT (PREPARE)
LF 6,335.000 $2.500 $7.000
GROUND BOX (PREPARE)
EA 44.000 $475.000 $2,000.000
INSTALL DMS (POLE MTD CABINET)
EA 15.000 $40,000.000 $35,000.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 19.000 $40,000.000 $46,000.000
ITS POLE (55 FT)(90 MPH)
EA 1.000 $24,500.000 $29,254.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $9,000.000 $1,250.000
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 6.000 $12,000.000 $18,335.920
INSTALLATION OF FES (FIELD CABINET)
EA 52.000 $4,200.000 $3,000.000
INSTALLATION OF FES (HUB CABINET)
EA 1.000 $3,000.000 $4,500.000
REMOVE EXISTING CABLES (POWER)
LF 820.000 $3.000 $3.000
TMA (STATIONARY)
DAY 181.000 $450.000 $225.000
ITS GND BOX (POLY) TY 1 (243648)W/APRN
EA 47.000 $4,500.000 $4,000.000
ITS GND BOX (POLY) TY 2 (366048)W/APRN
EA 4.000 $4,900.000 $5,000.000
REMOVE ITS GROUND BOX
EA 2.000 $1,500.000 $1,200.000
HIGH MAST ASSEMBLY FOR ITS
EA 1.000 $60,000.000 $102,000.000
ITS RVSD (DC ONLY) (INSTALL ONLY)
EA 5.000 $1,000.000 $750.000
ITS RVSD (DC ONLY) (REMOVE)
EA 2.000 $500.000 $500.000
SYSTEM INTEGRATION
LS 1.000 $225,000.000 $195,000.000
Totals: $7,890,149.990 $8,297,285.790