EL PASO VARIOUS (0924-00-183)

Items: 51

County: EL PASO
Length: 0.2370 MILES
Highway: VARIOUS
District: EL PASO
Control Number: 0924-00-183
DBE Goal: 200.0%
Project: BR 2B25(034)
Guaranty: $100,000.00
Time: 164 WORKING DAYS
Engineer's Estimate: $6,376,065.64
Date: 09/05/2025 (9 months ago)
Contract Number: 9253214
Type: PREVENTIVE MAINTENANCE
Project ID: A00211965
Contract Type: Federal
Project Description: BRIDGE REHABILITATION (NBI 240550000303090/91, 240720212103249/50, 241230000304095/96)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ARMANDO RAMIREZ
ALDO MADRID
MONICA RUIZ
RENE ROMERO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$6,376,065.64
Over/Under Est: -29.29% -$1,867,849.92
$5,505,586.36
Over/Under Est: -13.65% -$870,479.28
Amt Left: 22.12% $997,370.64
Over/Under Est: -3.37% -$214,731.04
Amt Left: 36.67% $1,653,118.88
Delta: -11.91% -$655,748.24
Over/Under Est: -0.57% -$36,354.40
Amt Left: 40.63% $1,831,495.52
Delta: -2.90% -$178,376.64
Over/Under Est: 47.9% $3,053,843.36
Amt Left: 109.17% $4,921,693.28
Delta: -48.74% -$3,090,197.76

Bid Items & Bid Tabulations

51 Total 0 of 51
EL PASO  |  VARIOUS  |  EL PASO  |  0924-00-183  |  09/05/2025  |  $6,376,065.64  |  BR 2B25(034)  |  PREVENT MAINT  |  164 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INTERNATIONAL EAGLE ENTERPRISES, INC.
DAN WILLIAMS COMPANY
GIBSON & ASSOCIATES, INC.
SPARTAN CONSTRUCTION OF TEXAS, INC.
SOUTHERN ROAD & BRIDGE, LLC
REMOV CONC (RIPRAP)
SY 53.000 $26.000 $200.000 $42.000 $27.500 $104.640 $25.000
EMBANK (FNL)(OC)(TY A)
CY 2.000 $161.000 $500.000 $300.000 $750.000 $1,962.000 $95.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 4.000 $45.000 $1,000.000 $1,500.000 $1,250.000 $1,700.400 $25.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 3,800.000 $10.000 $2.000 $10.000 $15.380 $33.984 $25.000
FLOWABLE BACKFILL
CY 10.000 $275.000 $350.000 $1,000.000 $467.500 $849.600 $1,950.000
EPOXY WATERPROOF FINISH (TY X)
SF 9,080.000 $18.000 $5.000 $11.000 $13.200 $15.696 $22.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 330.000 $225.000 $160.000 $250.000 $308.000 $294.300 $485.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,024.000 $300.000 $170.000 $225.000 $380.000 $176.580 $600.000
RIPRAP (CONC)(4 IN)
CY 7.000 $930.000 $1,200.000 $2,000.000 $973.500 $1,373.400 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $550.000 $850.000 $1,700.000 $907.500 $1,308.000 $500.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 15.000 $145.000 $500.000 $300.000 $313.500 $654.000 $500.000
ELASTOMERIC BEARING (LAMINATED)
EA 72.000 $3,000.000 $200.000 $550.000 $350.000 $915.600 $4,250.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 225.000 $36.000 $30.000 $30.000 $48.000 $52.320 $125.000
CONCRETE OVERLAY (3 IN)
SY 6,980.000 $130.000 $125.000 $143.000 $178.000 $183.120 $225.000
MISC NON-BRIDGE (NBIS)
LB 336.000 $25.000 $20.000 $15.000 $25.000 $23.544 $95.000
HYDRO-DEMOLITION (2 1/2 IN)
SY 3,800.000 $132.000 $140.000 $240.000 $186.000 $156.960 $408.000
HYDRO-DEMOLITION (3 IN)
SY 3,180.000 $140.000 $140.000 $249.000 $162.000 $189.660 $525.000
RAISING EXIST STRUCT
LS 2.000 $100,000.000 $250,000.000 $150,000.000 $137,000.000 $326,400.000 $77,000.000
MOBILIZATION
LS 1.000 $800,000.000 $400,000.000 $500,000.000 $736,000.000 $629,016.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $12,000.000 $20,000.000 $30,000.000 $51,000.000 $19,620.000 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $12,000.000 $14,000.000 $12,000.000 $25,000.000 $13,080.000 $22,000.000
TMA (STATIONARY)
DAY 375.000 $300.000 $100.000 $175.000 $450.000 $523.200 $330.000
TMA (MOBILE OPERATION)
DAY 8.000 $500.000 $300.000 $650.000 $1,050.000 $4,578.000 $300.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $46.000 $40.000 $35.000 $53.080 $71.940 $39.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $10.000 $2.000 $6.000 $11.000 $13.080 $6.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $300.000 $800.000 $350.000 $1,650.000 $1,962.000 $1,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,500.000 $3,000.000 $4,000.000 $5,340.500 $5,886.000 $3,988.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $325.000 $800.000 $350.000 $1,650.000 $1,308.000 $7,500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,330.000 $2,500.000 $2,000.000 $5,791.500 $3,270.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 12.000 $22.000 $10.000 $55.000 $203.500 $91.560 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $38.000 $10.000 $55.000 $203.500 $91.560 $110.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 12.000 $20.000 $5.000 $55.000 $203.500 $91.560 $110.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 130.000 $2.300 $4.000 $2.250 $10.000 $6.540 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 130.000 $2.300 $4.000 $2.250 $10.000 $6.540 $1.000
RE PM TY II (W) 6" (BRK)
LF 486.000 $0.200 $1.600 $0.800 $0.880 $1.112 $1.000
RE PM TY II (W) 6" (SLD)
LF 1,940.000 $0.490 $0.700 $0.350 $0.390 $0.523 $2.000
RE PM TY II (Y) 6" (SLD)
LF 1,940.000 $0.490 $0.700 $0.350 $0.390 $0.523 $2.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 1,940.000 $2.250 $4.600 $2.300 $2.530 $3.139 $3.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 1,940.000 $2.250 $4.600 $2.300 $2.530 $3.139 $3.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 486.000 $1.840 $4.800 $2.400 $2.640 $3.270 $4.000
PREFAB PM TY B (W)(6")(BRK)
LF 834.000 $13.000 $13.000 $6.500 $7.150 $8.633 $10.000
PREFAB PM TY B (W)(6")(SLD)
LF 1,112.000 $10.000 $12.000 $6.000 $6.600 $8.110 $9.000
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 834.000 $25.000 $28.000 $14.000 $15.400 $18.312 $18.000
PREFAB PM TY B (Y)(6")(SLD)
LF 1,112.000 $10.000 $13.000 $6.500 $7.150 $8.633 $10.000
REFL PAV MRKR TY II-C-R
EA 68.000 $8.050 $18.000 $9.000 $9.900 $13.080 $12.000
PAV SURF PREP FOR MRK (6")
LF 7,424.000 $0.400 $0.680 $0.340 $0.370 $0.589 $1.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.100 $2,750.000 $2,000.000 $10,000.000 $20,000.000 $235,440.000 $25,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 3.000 $78.000 $15.000 $300.000 $500.000 $1,308.000 $353.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 1,196.000 $800.000 $500.000 $500.000 $500.000 $555.900 $858.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 8,280.000 $155.000 $40.000 $35.000 $41.000 $58.860 $105.000
BENT CAP/ABUTMENT CAP CLEANING
EA 16.000 $1,100.000 $1,000.000 $750.000 $1,400.000 $3,270.000 $1,500.000
Totals: $6,376,065.640 $4,508,215.720 $5,505,586.360 $6,161,334.600 $6,339,711.238 $9,429,909.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $40,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $5,000.00
Total: $55,000.00