EL PASO US 54 (0167-01-113)

Items: 451

County: EL PASO
Length: N/A
Highway: US 54
District: EL PASO
Control Number: 0167-01-113
DBE Goal: N/A
Project: NH 2019(166)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $97,716,680.01
Date: 11/06/2018 (7 years ago)
Contract Number: N/A
Type: INTERCHANGE IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$97,716,680.01
$96,506,598.40
Over/Under Est: -1.24% -$1,210,081.61
$103,860,382.04
Over/Under Est: 6.29% $6,143,702.03
Amt Left: 7.62% $7,353,783.64
$108,559,158.64
Over/Under Est: 11.1% $10,842,478.63
Amt Left: 12.49% $12,052,560.24
Delta: -4.52% -$4,698,776.60
Over/Under Est: 16.92% $16,530,033.79
Amt Left: 18.38% $17,740,115.40
Delta: -5.24% -$5,687,555.16

Bid Items & Bid Tabulations

451 Total 0 of 451
EL PASO  |  US 54  |  EL PASO  |  0167-01-113  |  11/06/2018  |  $97,716,680.01  |  NH 2019(166)  |  INTERCHANGE IMPRVS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
SUNDT CONSTRUCTION, INC.
J.D. ABRAMS, L.P.
PULICE CONSTRUCTION, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
STA 59.000 $12,076.000 $8,000.000 $75,000.000 $105,000.000 $175,265.920
REMOVING CONC (PAV)
SY 63,224.000 $11.500 $11.000 $7.500 $10.000 $8.000
REMOVING CONC (MEDIANS)
SY 6,676.000 $10.920 $9.000 $6.000 $8.000 $10.000
REMOVING CONC (SIDEWALKS)
SY 3,743.000 $21.850 $11.000 $10.200 $12.000 $10.000
REMOVING CONC (CURB)
LF 560.000 $3.770 $5.000 $2.800 $3.000 $5.000
REMOVING CONC (CURB AND GUTTER)
LF 12,180.000 $3.400 $5.000 $3.200 $4.000 $5.000
REMOVING CONC (CTB)
LF 3,827.000 $9.850 $17.000 $3.700 $20.000 $12.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 242.000 $5.000 $13.500 $9.400 $50.000 $13.000
REMOVING CONC (FLUME)
SY 15.000 $9.880 $108.000 $31.500 $100.000 $50.000
REMOVE CONCRETE (MSE PANELS)
SF 918.000 $50.000 $8.000 $11.500 $10.000 $25.000
REMOVING STAB BASE & ASPH PAV(16")
SY 1,017.000 $8.350 $11.500 $15.700 $9.000 $4.100
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 4,537.000 $2.390 $11.500 $11.900 $7.000 $3.800
REMOVING STAB BASE & ASPH PAV (0-6")
SY 5,728.000 $50.000 $4.300 $7.300 $2.500 $2.750
EXCAVATION (ROADWAY)
CY 118,015.000 $8.000 $16.000 $8.400 $20.000 $8.500
EXCAVATION (CHANNEL)
CY 3,238.000 $16.920 $26.000 $7.900 $15.000 $12.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 128.000 $23.680 $11.000 $4.700 $30.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 23,887.000 $23.600 $15.000 $11.500 $18.000 $6.500
IRRIGATION SYSTEM
LS 1.000 $100,000.000 $60,000.000 $60,000.000 $177,807.330 $59,375.000
PLANT MATERIAL (1-GAL)
EA 617.000 $10.000 $13.000 $13.000 $11.300 $12.750
PLANT SOIL MIX
CY 1,720.000 $44.980 $30.000 $30.000 $52.700 $29.730
VEGETATION BARRIER
SY 60,897.000 $1.550 $1.450 $1.450 $0.950 $1.430
PLANT MATERIAL (30 GAL) (TREE)
EA 39.000 $150.000 $350.000 $349.000 $310.600 $348.000
PLANT MATERIAL (65 GAL) (TREE)
EA 74.000 $500.000 $585.000 $580.000 $575.000 $575.000
PLANT MATERIAL (3 GAL) (SHRUB)
EA 858.000 $15.000 $24.000 $24.000 $15.620 $23.950
PLANT MATERIAL (MIN 4'HT) (BARE ROOT)
EA 44.000 $50.000 $40.000 $40.000 $350.000 $39.750
CONC LNDSCP EDG (12 IN WIDTH)
LF 1,919.000 $15.000 $20.000 $20.000 $18.680 $19.750
PLANT MAINTENANCE
MO 12.000 $4,779.000 $430.000 $450.000 $915.800 $425.000
IRRIGATION SYSTEM OPER AND MAINT
MO 12.000 $800.000 $111.000 $115.000 $589.830 $110.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 170.000 $56.000 $70.000 $74.000 $76.640 $55.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 59,303.000 $2.100 $8.000 $5.900 $8.680 $9.500
PRIME COAT (CSS-1H)
GAL 14,559.000 $3.050 $5.000 $2.450 $5.120 $3.500
D-GR HMA TY-B PG64-22
TON 1,184.000 $90.000 $88.000 $57.000 $65.000 $85.000
D-GR HMA TY-C PG64-22
TON 1,667.000 $62.000 $94.000 $80.500 $65.000 $90.000
D-GR HMA TY-D PG64-22
TON 15,497.000 $75.000 $87.000 $60.000 $65.000 $90.000
PLANE ASPH CONC PAV (2 1/2"-3")
SY 1,590.000 $35.000 $3.500 $2.400 $7.370 $3.000
PLANE ASPH CONC PAV (4")
SY 4,407.000 $3.000 $2.250 $2.700 $5.480 $3.100
CONC PVMT (CONT REINF - CRCP) (7")
SY 4,263.000 $85.310 $50.000 $44.000 $45.000 $45.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 31,529.000 $55.000 $53.000 $56.000 $52.000 $58.000
CONC PVMT (CONT REINF - CRCP) (11")
SY 31,706.000 $70.000 $59.000 $62.000 $55.000 $59.000
CONC PVMT (JOINTED-CPCD)(HES)(10")
SY 20.000 $71.000 $105.000 $220.000 $60.000 $150.000
STRUCT EXCAV (PIPE)
CY 9,235.000 $5.420 $1.000 $3.000 $7.000 $2.000
CEM STABIL BKFL
CY 1,030.000 $112.000 $130.000 $135.000 $95.000 $65.000
FLOWABLE BACKFILL
CY 3,295.000 $117.370 $65.000 $95.000 $100.000 $100.000
TRENCH EXCAVATION PROTECTION
LF 8,214.000 $25.000 $1.000 $2.000 $1.000 $10.000
TEMPORARY SPL SHORING
SF 17,949.000 $8.000 $1.000 $8.300 $5.000 $78.000
PRESTR CONC PIL (16 IN SQ)
LF 881.000 $90.000 $200.000 $137.000 $250.000 $125.000
SOIL NAIL ANCHORS
LF 25,758.000 $15.160 $26.500 $25.500 $25.000 $35.000
DRILL SHAFT (18 IN)
LF 452.000 $140.000 $118.000 $97.000 $145.000 $120.000
DRILL SHAFT (24 IN)
LF 102.000 $180.000 $107.000 $148.000 $290.000 $125.000
DRILL SHAFT (30 IN)
LF 200.000 $180.000 $190.000 $244.000 $340.000 $220.000
DRILL SHAFT (36 IN)
LF 1,696.000 $240.000 $230.000 $220.000 $280.000 $275.000
DRILL SHAFT (42 IN)
LF 5,198.000 $300.000 $260.000 $373.000 $320.000 $300.000
DRILL SHAFT (48 IN)
LF 9,011.000 $315.000 $300.000 $395.000 $365.000 $350.000
DRILL SHAFT (54 IN)
LF 2,181.000 $375.000 $550.000 $695.000 $595.000 $600.000
DRILL SHAFT (60 IN)
LF 354.000 $450.000 $480.000 $555.000 $600.000 $475.000
DRILL SHAFT (66 IN)
LF 4,823.000 $685.000 $750.000 $885.000 $670.000 $750.000
DRILL SHAFT (72 IN)
LF 162.000 $800.000 $800.000 $990.000 $900.000 $1,200.000
DRILL SHAFT (84 IN)
LF 206.000 $1,100.000 $950.000 $1,190.000 $1,100.000 $950.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 572.000 $475.000 $300.000 $510.000 $589.200 $300.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 308.000 $500.000 $350.000 $530.000 $645.120 $350.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 125.000 $640.000 $380.000 $570.000 $742.850 $400.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 22.000 $312.420 $265.000 $260.000 $394.140 $280.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 65.000 $357.880 $300.000 $300.000 $428.400 $320.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $410.000 $400.000 $390.000 $475.460 $420.000
DRILL SHAFT (90 IN)
LF 146.000 $1,300.000 $1,100.000 $1,310.000 $1,200.000 $1,200.000
DRILL SHAFT (102 IN)
LF 66.000 $2,000.000 $1,600.000 $1,920.000 $1,800.000 $1,800.000
CL A CONC (FLUME)
CY 72.000 $1,000.000 $450.000 $1,160.000 $332.550 $400.000
CL C CONC (ABUT)(HPC)
CY 264.100 $825.000 $675.000 $820.000 $850.000 $1,200.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 39.800 $1,400.000 $950.000 $2,070.000 $950.000 $1,350.000
CL C CONC (CAP)(HPC)
CY 1,986.200 $1,800.000 $855.000 $1,190.000 $1,100.000 $1,200.000
CL C CONC (CAP)(HPC)(MASS)
CY 305.500 $1,350.000 $810.000 $1,350.000 $1,250.000 $1,200.000
CL C CONC (CAP)(HPC)(EXTEND)
CY 12.000 $2,500.000 $2,600.000 $2,420.000 $2,500.000 $1,400.000
CL C CONC (COLUMN)(HPC)
CY 2,682.300 $1,700.000 $600.000 $1,350.000 $700.000 $950.000
CL C CONC (COLUMN)(HPC)(MASS)
CY 1,395.700 $900.000 $900.000 $960.000 $775.000 $950.000
CL C CONC (FOOTING)(HPC)
CY 101.400 $1,200.000 $750.000 $1,020.000 $650.000 $850.000
CL C CONC (FOOTING)(HPC)(MASS)
CY 1,410.000 $1,700.000 $750.000 $720.000 $750.000 $900.000
CL C CONC (RAIL FOUNDATION)
CY 107.000 $330.000 $350.000 $350.000 $410.000 $400.000
CL C CONC (MISC)
CY 3.000 $800.000 $950.000 $625.000 $500.000 $550.000
CL H CONC (CAP)(HPC)
CY 812.000 $1,700.000 $820.000 $1,835.000 $1,400.000 $2,200.000
REINF CONC SLAB (HPC)
SF 302,513.000 $16.000 $22.000 $18.500 $12.500 $22.000
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 48,198.000 $20.000 $25.000 $24.200 $15.000 $26.000
BRIDGE MEDIAN (HPC)
SF 1,971.000 $10.000 $7.000 $10.000 $20.000 $15.000
BRIDGE SIDEWALK (HPC)
SF 5,585.000 $10.000 $7.000 $7.000 $13.000 $15.000
APPROACH SLAB (HPC)
CY 387.400 $600.000 $550.000 $490.000 $550.000 $500.000
APPROACH SLAB (EXTEND) (HPC)
CY 31.100 $610.000 $550.000 $835.000 $500.000 $500.000
RETAINING WALL (MSE)
SF 5,381.000 $55.000 $56.000 $62.600 $50.000 $65.000
RETAINING WALL (DRILL SHAFT) (FACIA)
SF 6,844.000 $55.000 $45.000 $61.500 $55.000 $65.000
RETAINING WALL (SOIL NAIL)(FACIA)
SF 17,313.000 $50.000 $50.000 $52.000 $55.000 $55.000
PRESTR CONC GIRDER (TX34)
LF 3,712.370 $134.000 $250.000 $201.000 $170.000 $180.000
PRESTR CONC GIRDER (TX40)
LF 2,408.840 $140.000 $255.000 $198.000 $172.000 $185.000
PRESTR CONC GIRDER (TX46)
LF 2,991.390 $150.000 $260.000 $199.000 $190.000 $185.000
PRESTR CONC GIRDER (TX54)
LF 30,039.380 $179.000 $200.000 $220.000 $200.000 $200.000
PRESTR CONC GIRDER (TX62)
LF 4,852.070 $185.000 $275.000 $141.000 $215.000 $225.000
PRESTR CONC BEAM (TY C)
LF 671.010 $340.000 $275.000 $203.000 $195.000 $200.000
CONCRETE PAINT FINISH
SF 6,203.000 $0.350 $0.260 $0.280 $0.250 $0.300
RIPRAP (CONC)(4 IN)
CY 877.500 $322.000 $430.000 $585.000 $437.830 $410.000
RIPRAP (CONC)(5 IN)
CY 267.000 $444.000 $395.000 $414.000 $437.830 $415.000
RIPRAP (CONC)(CL B)
CY 4.000 $380.240 $450.000 $469.000 $620.300 $580.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 261.000 $400.000 $475.000 $555.000 $485.330 $455.000
STR STEEL (ROLLED BEAM)
LB 458,150.000 $2.000 $1.750 $1.770 $2.000 $2.000
RAIL (TY SSTR)
LF 6,127.000 $40.000 $46.000 $53.000 $66.270 $50.000
RAIL (TY SSTR)(HPC)
LF 19,623.010 $55.000 $65.000 $59.000 $75.000 $55.000
RAIL (TY PR1)
LF 44.000 $74.220 $150.000 $182.000 $200.000 $85.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 382.000 $31.200 $80.000 $61.500 $85.000 $55.000
RAIL (TY SSTR)(MOD)
LF 22.000 $100.000 $175.000 $244.000 $94.860 $200.000
RAIL (TY SSTR) (HPC) (MOD)
LF 52.500 $100.000 $175.000 $545.000 $100.480 $225.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 112.510 $140.000 $170.000 $188.000 $77.670 $130.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 132.400 $225.000 $95.000 $139.000 $90.490 $210.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 1,895.500 $70.000 $125.000 $86.000 $139.330 $95.000
ARMOR JOINT (SEALED)
LF 800.000 $78.000 $95.000 $91.000 $131.650 $150.000
GABIONS (3' X 3')(GALV)
CY 392.000 $350.000 $175.000 $173.000 $300.000 $200.000
RC PIPE (CL III)(18 IN)
LF 237.000 $122.520 $110.000 $62.000 $109.750 $97.000
RC PIPE (CL III)(24 IN)
LF 5,719.000 $75.340 $115.000 $64.000 $118.560 $90.000
RC PIPE (CL III)(30 IN)
LF 821.000 $120.600 $115.000 $105.000 $163.260 $149.000
RC PIPE (CL V)(30 IN)
LF 133.000 $157.900 $200.000 $54.000 $222.790 $160.000
MANH (COMPL)(PRM)(60IN)
EA 16.000 $9,500.000 $6,000.000 $4,400.000 $8,158.630 $6,000.000
MANH (COMPL)(PRM)(72IN)
EA 5.000 $5,868.750 $7,500.000 $6,300.000 $10,577.100 $8,000.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 8.000 $5,200.000 $5,500.000 $4,800.000 $8,849.950 $3,500.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 1.000 $6,000.000 $5,500.000 $4,300.000 $9,309.660 $3,600.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $6,000.000 $5,500.000 $5,300.000 $8,912.470 $4,000.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 26.000 $9,644.580 $5,500.000 $5,700.000 $9,868.550 $4,400.000
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $4,752.000 $7,000.000 $6,300.000 $10,808.730 $5,000.000
INLET (COMPL)(PSL)(RH)(4FTX4FT)
EA 2.000 $3,994.000 $6,000.000 $3,500.000 $8,039.570 $3,400.000
INLET (COMPL)(PSL)(RH)(6FTX6FT)
EA 2.000 $10,000.000 $8,000.000 $5,600.000 $10,174.460 $5,200.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $3,740.000 $5,000.000 $3,300.000 $7,515.910 $3,200.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 21.000 $2,910.000 $5,000.000 $3,800.000 $8,202.920 $4,000.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 11.000 $4,363.180 $5,000.000 $4,100.000 $7,645.580 $4,000.000
INLET (COMPL)(RWI)(TY I)
EA 2.000 $4,553.000 $5,200.000 $1,700.000 $10,228.910 $4,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 1.000 $712.300 $1,400.000 $1,900.000 $2,082.180 $1,200.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 97.000 $2,500.000 $2,400.000 $1,100.000 $1,509.330 $1,240.000
JACK BOR OR TUN PIPE(30 IN)(RC)(CL V)
LF 83.000 $1,000.000 $915.000 $870.000 $696.710 $1,000.000
ADJUSTING INLET (CAP)
EA 2.000 $1,756.400 $2,500.000 $1,050.000 $1,695.050 $1,000.000
PIPE (PVC) (SCH 40) (6 IN)
LF 4,621.000 $55.000 $50.000 $3.900 $40.000 $80.000
REMOV STR (INLET)
EA 41.000 $2,800.000 $900.000 $250.000 $250.000 $500.000
REMOV STR (MANHOLE)
EA 19.000 $352.000 $1,100.000 $435.000 $250.000 $1,000.000
REMOV STR (PIPE)
LF 2,071.000 $20.580 $35.000 $7.500 $10.000 $15.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 8.000 $78,000.000 $58,000.000 $24,000.000 $91,769.630 $200,000.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 2.000 $100,000.000 $225,000.000 $150,000.000 $119,981.510 $500,000.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 2.000 $200,000.000 $230,000.000 $63,000.000 $165,379.920 $850,000.000
REMOVE STR (JUNCTION BOX)
EA 40.000 $1,700.000 $120.000 $405.000 $1,000.000 $900.000
REMOV STR (RET WALL)
LF 2,311.000 $35.000 $42.000 $62.000 $50.600 $30.000
REMOV STR (CONC GIRDER SPAN)
EA 6.000 $10,000.000 $18,200.000 $8,500.000 $50,265.340 $40,000.000
REMOVE STR (RAIL)
LF 20.000 $52.000 $70.000 $30.000 $22.000 $20.000
MOBILIZATION
LS 1.000 $6,560,000.000 $9,734,575.000 $9,600,000.000 $11,400,000.000 $11,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 43.000 $10,000.000 $34,000.000 $33,500.000 $35,000.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 170.000 $35.440 $80.000 $32.500 $59.500 $44.000
ROCK FILTER DAMS (REMOVE)
LF 170.000 $10.680 $13.000 $13.700 $13.080 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 581.000 $21.060 $22.000 $29.500 $24.660 $21.000
CONSTRUCTION EXITS (REMOVE)
SY 581.000 $6.930 $3.000 $11.000 $10.730 $8.000
CONSTRUCTION PERIMETER FENCE
LF 6,940.000 $3.620 $8.000 $21.000 $3.420 $2.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 15,286.000 $3.110 $2.000 $2.900 $4.390 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 15,286.000 $0.760 $0.600 $0.950 $1.220 $0.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,525.000 $4.440 $2.250 $5.900 $4.010 $3.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,525.000 $1.080 $0.750 $2.400 $2.190 $1.500
CONSTRUCTING DETOURS (TY 1)
SY 6,108.000 $53.860 $58.000 $48.000 $60.780 $55.000
CONSTRUCTING DETOURS (TY 2)
SY 2,515.000 $65.000 $56.000 $46.000 $75.570 $50.000
CONSTRUCTING DETOURS (TY 3)
SY 1,472.000 $65.000 $45.000 $60.000 $110.070 $50.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 19,140.000 $45.000 $80.000 $75.000 $52.000 $60.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,800.000 $34.000 $85.000 $69.000 $48.000 $50.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 280.000 $43.000 $80.000 $99.000 $60.000 $45.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 36,720.000 $5.500 $7.000 $2.600 $4.000 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,300.000 $6.000 $5.000 $3.300 $4.000 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 460.000 $8.000 $8.000 $10.000 $4.000 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 19,140.000 $6.000 $9.800 $3.450 $4.500 $6.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 4,800.000 $10.000 $8.500 $3.600 $4.500 $6.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 280.000 $8.000 $8.500 $3.600 $4.500 $8.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,182.000 $50.320 $60.000 $59.000 $70.000 $55.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 1,600.000 $160.900 $88.000 $97.000 $150.000 $200.000
LANDSCAPE PAVERS
SY 1,803.000 $75.000 $65.000 $76.500 $80.300 $45.000
CONC CURB (TY II)
LF 2,338.000 $12.000 $22.000 $1.750 $4.710 $2.500
CONC CURB & GUTTER (TY II)
LF 11,880.000 $18.000 $19.000 $11.600 $12.170 $10.000
CONC SIDEWALKS (4")
SY 6,354.000 $47.560 $45.000 $35.000 $36.590 $33.970
CURB RAMPS (TY 1)
EA 13.000 $1,540.300 $1,500.000 $1,100.000 $1,101.950 $1,023.010
CURB RAMPS (TY 2)
EA 3.000 $3,100.000 $1,500.000 $1,600.000 $1,626.440 $1,509.940
CURB RAMPS (TY 5)
EA 1.000 $2,120.100 $3,500.000 $2,600.000 $2,675.400 $2,483.770
CURB RAMPS (TY 10)
EA 8.000 $1,950.000 $1,000.000 $1,200.000 $1,256.680 $1,166.670
CURB RAMPS (TY 21)
EA 1.000 $1,860.000 $1,700.000 $1,900.000 $1,965.430 $1,824.650
CONC MEDIAN
SY 194.000 $49.010 $55.000 $36.000 $37.490 $34.810
MTL W-BEAM GD FEN (TIM POST)
LF 2,063.000 $19.320 $28.000 $21.000 $18.400 $26.030
MTL W-BEAM GD FEN (STEEL POST)
LF 4,507.000 $22.340 $29.000 $26.000 $23.340 $33.020
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 23.000 $1,900.000 $1,700.000 $2,500.000 $2,237.590 $3,165.590
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $850.000 $1,500.000 $1,130.000 $1,022.170 $1,446.100
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,226.000 $2,200.000 $2,850.000 $2,562.160 $3,624.770
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 8.000 $2,500.000 $2,140.000 $2,850.000 $2,562.160 $3,624.770
CRASH CUSH ATTEN (INSTL)
EA 38.000 $14,000.000 $13,000.000 $15,000.000 $11,482.500 $11,482.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 36.000 $1,700.000 $1,200.000 $2,200.000 $1,707.700 $1,707.700
CHAIN LINK FENCE (REMOVE)
LF 3,870.000 $3.930 $20.000 $4.200 $4.270 $4.270
CHAIN LINK FENCE (INSTALL) (8')
LF 251.900 $37.780 $2.000 $202.000 $27.220 $27.220
RELOCATE RD IL ASM (BRIDGE MOUNT)
EA 1.000 $2,000.000 $1,500.000 $1,550.000 $962.950 $1,515.150
RELOCATE RD IL ASM (U/P)
EA 59.000 $795.000 $1,250.000 $1,300.000 $1,024.890 $1,262.630
REMOVE RD IL ASM (CTB MOUNT)
EA 16.000 $967.000 $450.000 $455.000 $843.840 $454.550
REMOVE RD IL ASM (TRANS-BASE)
EA 12.000 $2,435.000 $795.000 $800.000 $1,649.770 $803.030
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 22.000 $1,350.000 $1,455.000 $1,460.000 $3,671.760 $1,469.700
IN RD IL (U/P) (TY 1) (250W EQ) LED
EA 5.000 $1,350.000 $1,625.000 $1,650.000 $1,768.020 $1,643.430
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 2.000 $1,150.000 $1,770.000 $1,780.000 $3,496.460 $1,788.890
IN RD IL (TY SA) 30B-8 (250W EQ) LED
EA 6.000 $3,000.000 $3,800.000 $3,850.000 $3,377.990 $3,838.380
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 20.000 $4,000.000 $4,500.000 $4,550.000 $4,388.450 $4,545.450
IN RD IL (TY SA) 50S-8-8 (400W EQ) LED
EA 5.000 $4,500.000 $5,000.000 $5,100.000 $6,871.960 $5,050.510
HI MST IL POLE (125 FT)( 80 MPH)
EA 1.000 $16,550.000 $23,000.000 $23,500.000 $24,534.770 $23,463.640
HI MST IL POLE (125 FT)(100 MPH)
EA 3.000 $32,000.000 $35,000.000 $35,600.000 $36,052.900 $35,916.160
HI MST IL ASM (12-400W)(ASYM)(TY A)
EA 1.000 $30,000.000 $35,000.000 $35,100.000 $43,861.950 $35,353.540
TEMP RD IL (RD IL ASM)
EA 11.000 $4,815.000 $3,900.000 $4,000.000 $2,436.680 $3,939.390
CONDT (PVC) (SCH 40) (2")
LF 18,027.000 $10.000 $15.000 $15.500 $18.990 $15.150
CONDT (PVC) (SCH 40) (2") (BORE)
LF 4,160.000 $26.750 $28.000 $28.500 $34.330 $28.280
CONDT (PVC) (SCH 40) (3")
LF 22,468.000 $27.810 $18.000 $18.500 $22.110 $18.180
CONDT (PVC) (SCH 40) (3") (BORE)
LF 12,978.000 $44.350 $30.000 $31.000 $49.350 $30.300
CONDT (PVC) (SCH 40) (4")
LF 5.000 $17.010 $17.000 $18.000 $21.640 $17.170
CONDT (PVC) (SCH 40) (4") (BORE)
LF 785.000 $27.290 $40.000 $41.000 $47.600 $40.400
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,062.000 $21.000 $30.000 $31.000 $40.300 $30.300
CONDT (RM) (2")
LF 5,565.000 $20.500 $31.000 $32.000 $75.100 $32.200
CONDT (RM) (3")
LF 30.000 $72.000 $145.000 $146.000 $76.580 $146.460
ELEC CONDR (NO.14) INSULATED
LF 44,478.000 $1.850 $1.350 $1.370 $1.020 $1.360
ELEC CONDR (NO.12) BARE
LF 408.000 $1.500 $1.000 $1.050 $1.270 $1.010
ELEC CONDR (NO.12) INSULATED
LF 816.000 $5.000 $1.000 $1.050 $2.950 $1.010
ELEC CONDR (NO.8) BARE
LF 16,890.000 $3.100 $2.450 $2.500 $1.690 $2.470
ELEC CONDR (NO.8) INSULATED
LF 82,047.000 $5.000 $2.450 $2.500 $1.730 $2.470
ELEC CONDR (NO.6) BARE
LF 2,216.000 $1.190 $2.650 $2.700 $1.990 $2.680
ELEC CONDR (NO.6) INSULATED
LF 2,172.000 $3.270 $2.650 $2.700 $2.100 $2.680
ELEC CONDR (NO.4) INSULATED
LF 39,115.000 $3.050 $3.000 $3.100 $2.730 $3.030
ELEC CONDR (NO.2) INSULATED
LF 25,560.000 $3.860 $3.000 $3.300 $2.960 $3.230
ELEC CONDR (NO.1/0) INSULATED
LF 6,020.000 $4.200 $4.000 $4.100 $2.360 $4.040
ELEC CONDR (NO.2/0) INSULATED
LF 5,145.000 $4.750 $5.000 $5.200 $7.980 $5.050
GROUND BOX TY A (122311)
EA 8.000 $1,200.000 $900.000 $905.000 $1,125.520 $909.090
GROUND BOX TY A (122311)W/APRON
EA 89.000 $1,247.000 $1,250.000 $1,260.000 $1,339.650 $1,262.630
GROUND BOX TY C (162911)W/APRON
EA 13.000 $1,566.670 $1,450.000 $1,460.000 $1,011.960 $1,464.650
REMOVE GROUND BOX
EA 70.000 $1,272.880 $125.000 $127.000 $637.700 $126.260
ELC SRV TY A 240/480 060(NS)SS(E)TP(O)
EA 3.000 $5,500.000 $6,000.000 $6,100.000 $6,464.650 $6,060.610
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 1.000 $5,716.750 $7,400.000 $7,500.000 $6,916.720 $7,474.750
ELC SRV TY D 120/240 070(NS)GS(N)GC(O)
EA 21.000 $3,300.000 $6,500.000 $6,600.000 $7,138.910 $6,565.660
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $5,311.430 $7,500.000 $7,600.000 $6,046.460 $7,575.760
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 2.000 $7,250.000 $5,755.000 $5,800.000 $8,719.420 $5,813.130
ELC SRV TY D 120/240 100(NS)SS(E)TP(O)
EA 1.000 $5,600.000 $6,000.000 $6,100.000 $4,621.680 $6,060.610
ELC SRV TY D 120/240 150(NS)GS(N)GC(O)
EA 3.000 $5,600.000 $6,100.000 $6,200.000 $7,392.150 $6,161.620
ALUMINUM SIGNS (TY A)
SF 36.000 $50.000 $26.000 $26.000 $40.010 $25.250
ALUMINUM SIGNS (TY A)
SF 624.000 $50.000 $26.000 $26.000 $40.000 $25.250
ALUMINUM SIGNS (TY G)
SF 373.000 $38.000 $26.000 $26.000 $45.890 $25.250
ALUMINUM SIGNS (TY O)
SF 1,162.000 $40.000 $23.000 $22.500 $46.740 $22.220
ALUMINUM SIGNS (TY O)
SF 12,757.800 $40.000 $23.000 $22.500 $48.000 $22.220
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 42.000 $575.000 $710.000 $695.000 $742.170 $690.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 28.000 $626.560 $770.000 $760.000 $746.190 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $625.000 $735.000 $720.000 $865.000 $715.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $700.000 $640.000 $630.000 $725.000 $625.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 2.000 $700.000 $820.000 $805.000 $930.500 $800.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,100.000 $1,175.000 $1,200.000 $750.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $600.000 $560.000 $555.000 $801.280 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 14.000 $700.000 $700.000 $680.000 $942.350 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $950.000 $795.000 $780.000 $989.600 $775.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $950.000 $925.000 $910.000 $1,350.000 $900.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,100.000 $1,230.000 $1,250.000 $850.000 $1,200.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 8.000 $2,000.000 $2,050.000 $2,100.000 $2,688.330 $2,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $700.000 $3,060.000 $3,000.000 $3,286.540 $2,987.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 14.000 $900.000 $3,645.000 $3,600.000 $4,207.400 $3,558.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $250.000 $510.000 $510.000 $300.000 $500.000
REMOVE SM RD SN SUP&AM
EA 104.000 $165.780 $105.000 $102.000 $149.850 $100.000
RELOCATE LRSA
EA 1.000 $4,300.000 $6,660.000 $6,600.000 $4,551.830 $6,500.000
REMOVE LRSA
EA 11.000 $3,244.440 $1,485.000 $1,500.000 $2,304.370 $1,450.000
INS OH SN SUP(30 FT BAL TEE)
EA 11.000 $43,000.000 $25,600.000 $26,000.000 $35,992.120 $25,252.530
INS OH SN SUP(30 FT CANT)(CIRC TUBE)
EA 1.000 $64,887.000 $85,600.000 $84,000.000 $94,000.000 $84,400.000
INS OH SN SUP(40 FT CANT)(CIRC TUBE)
EA 1.000 $45,000.000 $98,000.000 $96,000.000 $137,000.000 $96,515.150
INS OH SN SUP(55 FT BRDG)(CIRC TUBE)
EA 2.000 $20,000.000 $87,300.000 $86,000.000 $140,000.000 $86,060.610
INS OH SN SUP(65 FT BRDG)(CIRC TUBE)
EA 4.000 $19,000.000 $95,500.000 $94,000.000 $170,000.000 $94,424.240
INS OH SN SUP(70 FT BRDG)(CIRC TUBE)
EA 3.000 $53,800.000 $97,000.000 $95,000.000 $175,000.000 $95,515.150
INS OH SN SUP(75 FT BRDG)(CIRC TUBE)
EA 1.000 $53,800.000 $97,700.000 $96,000.000 $261,638.010 $96,295.960
INS OH SN SUP(80 FT BRDG)(CIRC TUBE)
EA 9.000 $60,000.000 $112,800.000 $111,000.000 $192,000.000 $111,151.520
INS OH SN SUP(90 FT BRDG)(CIRC TUBE)
EA 3.000 $70,000.000 $114,500.000 $112,000.000 $264,225.030 $112,727.270
INS OH SN SUP(100 FT BRDG)(CIRC TUBE)
EA 5.000 $75,000.000 $152,500.000 $150,000.000 $276,534.940 $150,303.030
INS OH SN SUP(105 FT BRDG)(CIRC TUBE)
EA 1.000 $75,000.000 $179,300.000 $177,000.000 $285,962.970 $17,676.770
INS OH SN SUP(110 FT BRDG)(CIRC TUBE)
EA 1.000 $75,000.000 $193,600.000 $190,000.000 $225,000.000 $190,909.090
REMOVE OVERHD SIGN SUP
EA 23.000 $17,176.000 $7,700.000 $7,600.000 $16,156.470 $7,575.760
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 27.000 $874.000 $720.000 $710.000 $632.000 $707.070
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF(BI)
EA 525.000 $25.000 $130.000 $52.000 $50.960 $75.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)SRF
EA 705.000 $62.000 $130.000 $52.000 $72.890 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 525.000 $20.000 $50.000 $26.000 $24.330 $20.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 11,317.000 $1.520 $1.750 $2.100 $1.650 $1.680
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 1,107.000 $1.320 $1.750 $2.100 $1.650 $1.680
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 50,890.000 $1.180 $1.750 $2.100 $1.650 $1.680
WK ZN PAV MRK REMOV (W)8"(LNDP)
LF 661.000 $2.000 $2.200 $2.700 $2.100 $2.140
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 7,648.000 $2.570 $2.200 $2.700 $2.100 $2.140
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 840.000 $3.200 $2.600 $3.200 $2.500 $2.550
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 51.000 $6.900 $7.000 $8.200 $6.500 $6.620
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 50,085.000 $1.170 $1.750 $2.100 $1.650 $1.680
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,874.000 $1.010 $0.350 $0.360 $0.350 $0.360
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 117.000 $2.770 $0.400 $0.420 $0.400 $0.410
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,831.000 $1.020 $0.400 $0.420 $0.400 $0.410
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,762.000 $2.850 $0.600 $0.570 $0.550 $0.560
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,046.000 $5.340 $5.260 $5.200 $5.000 $5.090
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 22.000 $104.670 $94.000 $90.000 $89.000 $90.660
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 5.000 $179.400 $95.000 $92.000 $90.000 $91.680
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 1.000 $195.510 $99.000 $97.000 $95.000 $96.780
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 4.000 $682.350 $630.000 $610.000 $600.000 $611.220
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 33.000 $29.780 $26.000 $26.000 $25.000 $25.470
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 6.000 $91.000 $130.000 $130.000 $125.000 $127.340
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 6.000 $225.000 $550.000 $530.000 $525.000 $534.820
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)
EA 3.000 $600.000 $190.000 $182.000 $180.000 $183.370
REFL PAV MRK TY II (W) (WORD)
EA 34.000 $70.820 $47.000 $46.000 $45.000 $45.840
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 15,635.000 $2.500 $0.350 $0.370 $0.350 $0.360
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 41,769.000 $2.500 $0.350 $0.370 $0.350 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 35,404.000 $2.500 $0.400 $0.370 $0.360 $0.370
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 35,160.000 $2.500 $0.900 $0.900 $0.850 $0.870
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 14.000 $0.600 $33.500 $32.500 $32.000 $32.600
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 15.000 $1,400.000 $1,900.000 $1,900.000 $1,850.000 $1,884.600
REFL PAV MRKR TY I-C
EA 919.000 $3.020 $3.950 $3.800 $3.750 $3.820
REFL PAV MRKR TY II-A-A
EA 21.000 $4.350 $3.950 $3.800 $3.750 $3.820
ELIM EXT PAV MRK & MRKS (4")
LF 21,885.000 $0.560 $0.610 $0.600 $0.580 $0.590
ELIM EXT PAV MRK & MRKS (8")
LF 4,114.000 $1.030 $0.700 $0.670 $0.650 $0.660
ELIM EXT PAV MRK & MRKS (12")
LF 130.000 $1.650 $1.900 $1.850 $1.800 $1.830
ELIM EXT PAV MRK & MRKS (JIGGLE)
EA 2,166.000 $2.500 $1.000 $1.100 $1.000 $1.020
INSTALL HWY TRF SIG (FLASH BEACON)
EA 6.000 $8,000.000 $5,900.000 $5,900.000 $7,076.870 $5,858.590
INSTALL HWY TRF SIG (SYSTEM)
EA 3.000 $32,000.000 $35,000.000 $36,000.000 $36,961.970 $35,353.540
REMOVING TRAFFIC SIGNALS
EA 1.000 $7,478.570 $5,500.000 $5,600.000 $8,221.780 $5,555.560
TEMP TRAF SIGNALS
EA 1.000 $88,400.000 $66,000.000 $66,000.000 $136,308.500 $65,656.570
VEH SIG SEC (12")LED(GRN)
EA 22.000 $456.700 $410.000 $410.000 $547.400 $404.040
VEH SIG SEC (12")LED(GRN ARW)
EA 5.000 $420.880 $410.000 $410.000 $538.740 $404.040
VEH SIG SEC (12")LED(YEL)
EA 27.000 $370.000 $410.000 $410.000 $481.410 $404.040
VEH SIG SEC (12")LED(YEL ARW)
EA 3.000 $398.760 $410.000 $410.000 $466.260 $404.040
VEH SIG SEC (12")LED(RED)
EA 32.000 $395.830 $410.000 $410.000 $490.060 $404.040
PED SIG SEC (LED)(COUNTDOWN)
EA 21.000 $1,102.000 $650.000 $660.000 $1,568.630 $656.570
BACK PLATE (12")(3 SEC)ALUM
EA 22.000 $102.570 $140.000 $150.000 $144.350 $141.410
BACK PLATE (12")(4 SEC)ALUM
EA 2.000 $120.350 $150.000 $155.000 $126.870 $151.520
BACK PLATE (12")(5 SEC)ALUM
EA 3.000 $135.000 $160.000 $165.000 $227.360 $161.620
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,080.000 $3.310 $2.000 $2.050 $3.680 $2.020
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 940.000 $1.220 $3.000 $3.100 $1.430 $3.030
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,985.000 $1.680 $4.000 $4.100 $2.150 $4.040
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 520.000 $1.950 $5.000 $5.200 $2.080 $5.050
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 3,810.000 $2.750 $6.000 $6.200 $3.300 $6.060
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 260.000 $4.360 $4.000 $4.100 $4.080 $4.040
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,415.000 $4.230 $6.000 $6.200 $5.230 $6.060
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 4,425.000 $1.320 $3.000 $3.100 $1.620 $3.030
INS TRF SIG PL AM(S)1 ARM(36')
EA 2.000 $7,685.710 $3,000.000 $3,100.000 $9,313.790 $3,030.310
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000 $7,530.000 $4,500.000 $4,600.000 $10,592.680 $4,545.460
INS TRF SIG PL AM(S)1 ARM(48')
EA 3.000 $9,000.000 $6,000.000 $6,100.000 $12,495.090 $6,060.610
INS TRF SIG PL AM(S)1 ARM(60')
EA 1.000 $13,010.000 $20,000.000 $21,000.000 $29,003.410 $20,202.020
PED POLE ASSEMBLY
EA 9.000 $3,200.000 $2,500.000 $2,600.000 $3,898.870 $2,525.250
REMOVE PED POLE ASSEMBLY
EA 1.000 $1,000.000 $500.000 $510.000 $1,101.610 $505.050
PED DETECT PUSH BUTTON (APS)
EA 18.000 $1,451.920 $850.000 $860.000 $1,273.670 $858.590
PED DETECT PUSH BUTTON (STANDARD)
EA 6.000 $433.600 $225.000 $230.000 $741.500 $227.270
PED DETECTOR CONTROLLER UNIT
EA 3.000 $5,000.000 $8,000.000 $8,100.000 $12,851.040 $8,080.810
REMOVAL OF CONDUIT
LF 305.000 $5.300 $15.000 $15.500 $33.380 $15.150
REMOVAL OF TIMBER POLES
EA 5.000 $500.000 $1,200.000 $1,250.000 $1,101.610 $1,212.120
INSTALL OF TIMBER POLES
EA 4.000 $1,000.000 $2,200.000 $2,250.000 $1,996.820 $2,222.220
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 3.000 $130.000 $100.000 $102.000 $155.670 $101.010
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 3.000 $171.830 $300.000 $310.000 $172.040 $303.030
REMOVAL OF SIGNAL POLE ASSM
EA 5.000 $2,526.500 $1,500.000 $1,550.000 $4,180.590 $1,515.150
REMOVAL OF CONCRETE FOUNDATIONS
EA 7.000 $2,527.500 $750.000 $755.000 $925.040 $757.580
INSTL DOWN GUY AND ANCHOR W/GUARD
EA 4.000 $300.000 $225.000 $230.000 $636.910 $227.270
REMOVE DOWN GUY AND ANCHOR W/GUARD
EA 4.000 $226.000 $500.000 $510.000 $636.910 $505.050
INSTL VID IMAGE VEH DET SYS (VIVDS)
EA 7.000 $36,132.000 $5,500.000 $5,600.000 $10,222.140 $5,555.560
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 4.000 $1,132.000 $275.000 $280.000 $636.910 $277.780
REMOVE RADAR VEHICLE DETECTION SYSTEM
EA 2.000 $1,800.000 $450.000 $455.000 $1,827.510 $454.550
LITTER REMOVAL
CYC 800.000 $312.000 $30.000 $100.000 $572.560 $215.780
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 90,570.000 $1.000 $0.760 $0.820 $0.740 $0.740
TREE REMOVAL (4" - 12" DIA)
EA 3.000 $990.000 $250.000 $675.000 $163.020 $200.000
TREE REMOVAL (12" - 18" DIA)
EA 6.000 $1,160.000 $240.000 $1,160.000 $296.010 $500.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 115.000 $40.000 $560.000 $580.000 $89.690 $526.410
NO. OF WORKING DAYS
$/D 7,500.000 $1,039.000 $712.000 $1,000.000 $960.000 $931.000
LANDSCAPE AMENITY (TY 2)
EA 17.000 $100.000 $221.000 $220.000 $4,240.000 $218.000
LANDSCAPE AMENITY (TY 3)
EA 24.000 $150.000 $170.000 $170.000 $3,106.800 $168.000
LANDSCAPE AMENITY (TY 4)
EA 25.000 $200.000 $111.000 $110.000 $3,774.000 $109.750
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 386.000 $75.000 $95.000 $95.000 $164.200 $93.750
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 381.000 $75.000 $95.000 $95.000 $176.850 $93.750
LOOSE AGGR FOR GROUNDCOVER (TYPE III)
CY 5,991.000 $75.000 $90.000 $90.000 $150.860 $89.170
EMBEDDED GALVANIC ANODES
EA 2,263.600 $34.650 $31.000 $22.600 $56.630 $65.000
CONCRETE OBELISK STRUCTURE
EA 2.000 $30,000.000 $31,000.000 $24,000.000 $26,418.540 $27,485.660
BARRIER GATE
EA 5.000 $11,467.000 $27,000.000 $12,000.000 $7,500.000 $10,000.000
AESTHETIC FENCE (CRIMPED)
LF 511.100 $185.000 $250.000 $815.000 $115.000 $50.000
BIRD EXCLUSION METHOD
SF 68,355.800 $5.000 $1.000 $3.350 $2.000 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $45.820 $180.000 $16.000 $85.130 $95.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $10,500.000 $27,700.000 $17,500.000 $8,733.710 $16,000.000
VIVDS PROCESSOR SYSTEM
EA 3.000 $8,780.650 $7,600.000 $7,600.000 $10,267.560 $7,575.760
VIVDS CAMERA ASSEMBLY
EA 10.000 $2,675.640 $2,000.000 $2,100.000 $3,359.380 $2,020.200
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 2,699.000 $3.610 $3.000 $3.100 $7.140 $3.030
ITS SYSTEM SUPPORT EQUIPMENT
LS 1.000 $130,121.200 $307,000.000 $310,000.000 $158,645.840 $303,030.300
ITS COM CBL (ETHERNET)
LF 315.000 $4.250 $19.000 $19.500 $24.180 $19.190
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
LF 385.000 $2.920 $12.500 $13.000 $1.680 $12.630
FO CBL (12 SMF)
LF 57,557.000 $6.250 $6.000 $6.100 $0.960 $6.060
FO CBL (144 SMF)
LF 35,263.000 $6.250 $7.000 $7.000 $2.320 $7.050
FO SPLICE ENCLOSURE (TYPE 1)
EA 9.000 $2,300.000 $4,250.000 $4,200.000 $4,056.800 $4,196.970
FO SPLICE ENCLOSURE (TYPE 2)
EA 2.000 $2,000.000 $5,700.000 $5,600.000 $4,056.800 $5,621.210
FIBER OPTIC FUSION SPLICE
EA 944.000 $35.000 $22.000 $21.500 $81.140 $21.690
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 39.000 $3,800.000 $2,500.000 $2,550.000 $621.170 $2,525.250
FIBER OPTIC PATCH PANEL (72 POSITION)
EA 8.000 $4,200.000 $4,500.000 $4,600.000 $2,704.700 $4,545.460
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 6.000 $26,000.000 $12,500.000 $12,600.000 $19,556.960 $12,626.260
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
EA 7.000 $2,000.000 $2,500.000 $2,600.000 $7,408.620 $2,525.250
CCTV FIELD EQUIPMENT (DIGITAL)
EA 20.000 $10,200.000 $8,500.000 $8,600.000 $8,857.670 $8,585.860
REMOVE CCTV FIELD EQUIPMENT
EA 8.000 $1,765.000 $1,500.000 $1,550.000 $1,986.440 $1,515.150
ITS MULTI-DUCT CND (PVC-40)
LF 13,135.000 $28.000 $18.000 $18.500 $16.940 $18.180
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 9,633.000 $35.000 $30.000 $31.000 $37.460 $30.300
ITS MULTI-DUCT CND (RMC)
LF 660.000 $85.000 $100.000 $99.000 $76.930 $98.990
FIBER OPTIC CABLE ROAD MARKER
EA 54.000 $200.000 $250.000 $255.000 $164.610 $252.530
CABLE RACK ASSEMBLY (INSTALL)
EA 15.000 $150.000 $975.000 $955.000 $50.650 $959.600
CONDUIT (PREPARE)
LF 12,595.000 $8.090 $2.300 $2.300 $22.110 $2.270
GROUND BOX (PREPARE)
EA 59.000 $1,482.860 $540.000 $545.000 $1,227.520 $545.450
ITS RADIO (SNGL)(5 GHZ)-I-S
EA 11.000 $7,735.000 $7,000.000 $7,000.000 $1,966.080 $6,969.700
RELOCATE ITS RADIO
EA 7.000 $2,250.000 $2,700.000 $2,700.000 $2,445.580 $2,681.820
REMOVE ITS RADIO
EA 7.000 $500.000 $1,250.000 $1,300.000 $1,487.870 $1,262.630
ITS POLE (55 FT)(90 MPH)
EA 14.000 $14,750.000 $15,000.000 $15,000.000 $17,038.470 $15,147.480
ITS POLE (55 FT)(REM)
EA 8.000 $3,500.000 $1,685.000 $1,700.000 $1,651.920 $1,702.020
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 3.000 $6,275.000 $8,000.000 $8,100.000 $7,202.670 $8,080.810
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 14.000 $7,750.000 $7,000.000 $7,100.000 $7,154.480 $7,070.710
REMOVE CAMERA POLE STRUCTURE
EA 3.000 $1,000.000 $1,200.000 $1,250.000 $2,163.630 $1,212.120
REMOVE DRUM SIGN ASSEMBLY
EA 15.000 $1,500.000 $1,850.000 $1,900.000 $329.220 $1,868.690
INSTALLATION OF VE
EA 21.000 $1,500.000 $1,250.000 $1,300.000 $1,614.730 $1,262.630
INSTALLATION OF VD
EA 1.000 $1,500.000 $1,250.000 $1,300.000 $3,381.200 $1,262.630
INSTALLATION OF TS
EA 2.000 $500.000 $1,280.930 $1,300.000 $3,381.200 $1,262.630
INSTALLATION OF FES (FIELD CABINET)
EA 38.000 $1,750.000 $1,250.000 $1,300.000 $633.110 $1,262.630
INSTALLATION OF FES (HUB CABINET)
EA 10.000 $2,500.000 $1,250.000 $1,300.000 $633.110 $1,262.630
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $15,000.000 $5,000.000 $5,100.000 $15,000.000 $5,050.510
ADD/DROP MULTIPLEXOR CHASSIS
EA 3.000 $5,500.000 $5,500.000 $5,600.000 $5,599.150 $5,555.560
ADD/DROP MULTIPLEXOR CHASSIS LICENSE
EA 3.000 $7,500.000 $7,500.000 $7,600.000 $8,151.550 $7,575.760
ADD/DROP MULTIPLEXOR CHASSIS POWER SUPP
EA 3.000 $5,600.000 $7,988.000 $8,000.000 $3,519.820 $8,068.690
BORA WITH ULM
EA 3.000 $6,000.000 $39,000.000 $40,000.000 $44,083.840 $39,393.940
T1 INTERFACE CARD
EA 3.000 $3,600.000 $5,500.000 $5,600.000 $9,431.530 $5,555.560
RS-232 INTERFACE CARD
EA 3.000 $4,600.000 $3,000.000 $3,100.000 $4,061.440 $3,030.300
ETHERNET INTERFACE CARD
EA 3.000 $6,500.000 $5,000.000 $5,100.000 $6,078.120 $5,050.510
TMA (STATIONARY)
DAY 534.000 $340.000 $286.000 $128.000 $150.000 $644.660
ITS GND BOX (POLY) TY 1 (243648)
EA 1.000 $4,275.000 $1,900.000 $2,000.000 $2,198.090 $1,919.190
ITS GND BOX (POLY) TY 1 (243648)W/APRN
EA 113.000 $5,600.000 $2,200.000 $2,200.000 $2,300.660 $2,171.720
ITS GND BOX (POLY) TY 2 (366048)W/APRN
EA 3.000 $7,700.000 $3,900.000 $4,000.000 $5,630.260 $3,939.390
HIGH MAST ASSEMBLY FOR ITS
EA 3.000 $35,000.000 $72,000.000 $71,000.000 $32,486.040 $70,707.070
DECORATIVE MEDALLION W/ LED BACKLIGHT
EA 74.000 $3,750.000 $2,600.000 $2,600.000 $4,334.700 $2,575.760
ITS RVSD (DATA COLLECT ONLY) SYS
EA 30.000 $6,300.000 $7,500.000 $7,600.000 $7,037.620 $7,575.760
ITS RVSD (DC ONLY) (REMOVE)
EA 21.000 $3,600.000 $1,250.000 $1,300.000 $2,856.000 $1,263.000
COLOR DMS (POLE MNT CABINET)
EA 11.000 $155,000.000 $164,000.000 $162,000.000 $196,656.500 $161,617.000
COLOR DMS (FOUNDATION MNT CABINET)
EA 1.000 $155,000.000 $169,000.000 $167,000.000 $230,896.150 $166,667.000
SYSTEM INTEGRATION
LS 1.000 $225,000.000 $333,000.000 $330,000.000 $29,122.910 $328,283.000
SMART WORK ZONE ITS SYSTEM
LS 1.000 $1,250,000.000 $540,000.000 $530,000.000 $20,000.000 $400,000.000
REMOVE EXISTING LANE CONTROL SIG SYS
EA 13.000 $4,500.000 $750.000 $755.000 $7,408.620 $758.000
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 10.000 $28,080.000 $4,500.000 $4,600.000 $4,451.480 $4,599.000
ENVIRONMENTALLY CONTROLLED COMM BLDG
EA 2.000 $80,000.000 $100,000.000 $96,000.000 $78,630.260 $95,960.000
BLUETOOTH DETECTION SYSTEM
EA 17.000 $2,000.000 $12,300.000 $12,500.000 $3,925.260 $12,456.000
BLUETOOTH DETECTION SYSTEM (REMOVE)
EA 9.000 $1,000.000 $1,200.000 $1,250.000 $633.110 $1,213.000
LANE MGMT SYS(4 UNITS)(GRD MNT CABINET)
EA 3.000 $80,000.000 $46,000.000 $47,000.000 $122,949.310 $44,455.000
LANE MGMT SYS(5 UNITS)(GRD MNT CABINET)
EA 2.000 $90,000.000 $66,000.000 $66,000.000 $148,594.470 $66,567.000
LANE MGMT SYS(6 UNITS)(GRD MNT CABINET)
EA 1.000 $100,000.000 $92,000.000 $91,000.000 $173,961.980 $90,910.000
REMOVE MULTIPLEXOR EQUIPMENT
EA 7.000 $4,600.000 $1,200.000 $1,250.000 $633.110 $1,212.120
REMOVE HUB BUILDING
EA 4.000 $10,000.000 $8,000.000 $7,900.000 $8,043.620 $7,929.290
WATER MAIN(DIP)(PC 350)(16")
LF 940.000 $250.000 $540.000 $172.000 $190.000 $100.000
REMOVE EXIST WATER PIPE (8")
LF 115.000 $30.000 $40.000 $29.000 $22.000 $10.000
REMOVE EXIST WATER PIPE (12")
LF 315.000 $40.000 $41.000 $12.500 $24.000 $12.000
REMOVE EXIST WATER PIPE (16")
LF 846.000 $50.000 $41.000 $27.000 $30.000 $15.000
ADDITIONAL FITTINGS
LB 9,250.000 $50.000 $3.900 $3.000 $12.000 $1.000
SAN SEWER PIPE (PVC)(SDR-35)(15")
LF 114.000 $200.000 $355.000 $43.000 $150.000 $100.000
SAN SEWER MANHOLE (48 IN)(6 FT)
EA 4.000 $8,000.000 $9,200.000 $3,350.000 $5,000.000 $5,000.000
SAN SEWER MANHOLE (48 IN)(EXTRA DEPTH)
LF 6.000 $1,200.000 $614.000 $365.000 $550.000 $200.000
ABAND/FILL EXIST SAN SEWER PIPE (21")
LF 40.000 $3,000.000 $723.000 $190.000 $90.000 $15.000
REMOVE EXIST SAN SEWER PIPE (15")
LF 75.000 $45.000 $20.000 $17.500 $25.000 $10.000
CASING (STEEL) (24 IN) (BORED)
LF 110.000 $380.000 $450.000 $320.000 $400.000 $300.000
CASING (STEEL) (30 IN) (BORED)
LF 180.000 $500.000 $550.000 $395.000 $410.000 $400.000
RECLAIMED WATER MAIN (PVC)(C-200)(8IN)
LF 115.000 $200.000 $240.000 $78.000 $432.940 $60.000
RECLAIMED WATER MAIN (PVC)(C-200)(12IN)
LF 315.000 $240.000 $200.000 $90.000 $150.000 $75.000
AUTOMATIC PUMPING STATION
LS 1.000 $950,000.000 $900,000.000 $1,250,000.000 $800,000.000 $960,000.000
Totals: $97,716,669.992 $96,506,598.400 $103,860,382.040 $108,559,158.674 $114,246,713.814