|
|
|
PREPARING ROW
|
STA
|
14.000
|
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
2,652.000
|
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
522.000
|
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
64.000
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
3,088.000
|
|
|
|
REMOV CONC (CURB)
|
LF
|
647.000
|
|
|
|
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,745.000
|
|
|
|
RMV (11"-15") TRT/UNTRT BASE & ASPH PAV
|
SY
|
42,839.000
|
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
77,400.000
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
66,699.000
|
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
265,703.000
|
|
|
|
BLADING
|
HR
|
40.000
|
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
315,649.000
|
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
|
|
Qty Changed
|
FL BS (CMP IN PLC)(TY A GR 4)(7")
|
SY
|
197,014.000
|
|
|
Added
|
FL BS (CMP IN PLC)(TY A GR 4)(5")
|
SY
|
2,986.000
|
|
|
Qty Changed
|
PRIME COAT (AE-P)
|
GAL
|
39,409.000
|
|
|
Qty Changed
|
ASPH (AC-20-5TR)
|
GAL
|
36,308.000
|
|
|
Qty Changed
|
ASPH (CRS-2P)
|
GAL
|
36,308.000
|
|
|
Qty Changed
|
AGGR (TY-B, GR-4)(SAC-A)
|
CY
|
873.000
|
|
|
Qty Changed
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
873.000
|
|
|
Qty Changed
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
85,803.000
|
|
|
Qty Changed
|
TACK COAT
|
GAL
|
20,251.000
|
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
6,595.000
|
|
|
Qty Changed
|
CONC PVMT (CRCP) (11")
|
SY
|
19,378.000
|
|
|
Added
|
CONC PVMT(TRANSITION SLAB) (11")
|
SY
|
656.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
22.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
1,482.000
|
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
40.000
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
200.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,280.000
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
878.000
|
|
|
Added
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
28.000
|
|
|
Added
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
98.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
418.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
84.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
116.000
|
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
94.800
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
81.200
|
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
175.400
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
24,000.000
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
122.000
|
|
|
Qty Changed
|
RETAINING WALL (MSE) (ASHLAR STONE FIN)
|
SF
|
91,546.000
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,220.020
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
471.000
|
|
|
Added
|
RIPRAP (CONC)(CL A)
|
CY
|
182.000
|
|
|
Qty Changed
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,107.000
|
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
1,000.000
|
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
4,973.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
160.000
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
418.000
|
|
|
Qty Changed
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,145.000
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
32.000
|
|
|
Qty Changed
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,173.000
|
|
|
Qty Changed
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
3.000
|
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
2.000
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
|
|
Added
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
|
|
Qty Changed
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
1.000
|
|
|
|
INLET(COMPL)(TY MSE1)
|
EA
|
19.000
|
|
|
Added
|
SET (TY I)(S= 3 FT)(HW= 2 FT)(4:1)(C)
|
EA
|
4.000
|
|
|
|
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(P)
|
EA
|
2.000
|
|
|
Qty Changed
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1)(C)
|
EA
|
4.000
|
|
|
Qty Changed
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1)(P)
|
EA
|
8.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
2.000
|
|
|
Added
|
SET (TY II) (18 IN) (TP) (3: 1) (C)
|
EA
|
2.000
|
|
|
Added
|
SET (TY II) (18 IN) (TP) (6: 1) (P)
|
EA
|
24.000
|
|
|
Qty Changed
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
|
|
Qty Changed
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
28.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
|
|
Qty Changed
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
|
|
Added
|
SET (TY II) (24 IN) (TP) (6: 1) (P)
|
EA
|
40.000
|
|
|
Added
|
SET (TY II) (30 IN) (TP) (6: 1) (P)
|
EA
|
2.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
402.000
|
|
|
|
REMOV STR(DRWY CULVERT)
|
EA
|
10.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
88.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
34.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
270.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
270.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,016.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,016.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,510.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,510.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
28,467.000
|
|
|
Qty Changed
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,204.000
|
|
|
Qty Changed
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,063.000
|
|
|
Qty Changed
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
4,204.000
|
|
|
|
LANDSCAPE PAVERS
|
SY
|
2,986.000
|
|
|
|
CONC CURB (TY II)
|
LF
|
6,795.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
4,548.000
|
|
|
Qty Changed
|
DRIVEWAYS (CONC)
|
SY
|
5,667.000
|
|
|
Qty Changed
|
DRIVEWAYS (ACP)
|
SY
|
3,301.000
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,810.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
20.000
|
|
|
|
CURB RAMPS (TY 21)
|
SY
|
41.000
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
54,781.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,656.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
|
|
|
CABLE BARRIER SYS (INSTL)(TL-4)(10'-0")
|
LF
|
10,275.000
|
|
|
Qty Changed
|
CABLE BARRIER TERM SEC (INSTL)(TL-4)
|
EA
|
15.000
|
|
|
Added
|
CABLE BARRIER SYSTEM (RELOCATE)(TL-4)
|
LF
|
6,267.000
|
|
|
Added
|
CABLE BARRIER TERM SEC (RELOC)(TL-4)
|
EA
|
10.000
|
|
|
Qty Changed
|
CABLE BARRIER (REMOVE)
|
LF
|
900.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
|
|
Qty Changed
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
|
|
Qty Changed
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
|
|
Qty Changed
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
10.000
|
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
4,005.000
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
|
|
|
IN RD IL (TY SA) 40T-10 (250W EQ) LED
|
EA
|
36.000
|
|
|
|
IN RD IL (TY SA) 50T-10-10(400W EQ)LED
|
EA
|
13.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
405.000
|
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
60.000
|
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
960.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
10,820.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,890.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
|
LF
|
80.000
|
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
195.000
|
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
470.000
|
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
215.000
|
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
70.000
|
|
|
|
CONDT (RM) (1")
|
LF
|
120.000
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
480.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,230.000
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
15,680.000
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
29,830.000
|
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,650.000
|
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
825.000
|
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
1,160.000
|
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
580.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
31.000
|
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
13.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
6.000
|
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(U)
|
EA
|
3.000
|
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
|
|
|
ELC SRV TY D 120/240 060(SS)SS(E)SP(O)
|
EA
|
1.000
|
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
125.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,150.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
49.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
60.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
7.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
6.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
|
EA
|
2.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
2.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
8.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
3.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-WC)
|
EA
|
4.000
|
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
10.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
64.000
|
|
|
Added
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,926.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
11.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
6.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
|
EA
|
38.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
|
EA
|
6.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
12.000
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
22.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
125.000
|
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
111.000
|
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
36.000
|
|
|
|
INSTL OM LG RD SIGN (2-OM-PW)Y
|
EA
|
11.000
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
28,444.000
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
119,911.000
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
5,251.000
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,373.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
15,573.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
65,519.000
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,596.000
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
809.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
14,888.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,931.000
|
|
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
2.000
|
|
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
2.000
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
14.000
|
|
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
2,028.000
|
|
|
|
PAVEMENT SLER 6"
|
LF
|
6,475.000
|
|
|
|
PAVEMENT SLER 8"
|
LF
|
3,545.000
|
|
|
|
PAVEMENT SLER 24"
|
LF
|
674.000
|
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
9.000
|
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
11.000
|
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
4.000
|
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
2.000
|
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
14.000
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
9,367.000
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
48,680.000
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
53,159.000
|
|
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
438.000
|
|
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
34.000
|
|
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
6.000
|
|
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
8.000
|
|
|
|
PREFAB PM TY C (W)(U-LT ARROW)
|
EA
|
4.000
|
|
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
4.000
|
|
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
43.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
682.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
281.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
800.000
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,475.000
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,545.000
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
674.000
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
9.000
|
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
11.000
|
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
14.000
|
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
20.000
|
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
8.000
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
20.000
|
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
20.000
|
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
16.000
|
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
16.000
|
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
8.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
730.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
470.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
2,250.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
1,690.000
|
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
4,000.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
4.000
|
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
14.000
|
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
2,938.000
|
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
1,044.300
|
|
|
Qty Changed
|
BONDING COURSE
|
GAL
|
23,686.000
|
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
1.000
|
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
6.000
|
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
4.000
|
|
|
|
ITS POLE (50 FT) (90 MPH)
|
EA
|
2.000
|
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
1.000
|
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
|
|
|
CCTV MOUNT (POLE)
|
EA
|
3.000
|
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
570.000
|
|
1
|
Qty Changed
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
16,235.000
|
|
1A
|
Qty Changed
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
16,235.000
|
|
1A
|
Added
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
1,072.000
|
|
2A
|
Added
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
1,144.000
|
|
3A
|
Added
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
36.000
|
|
|
|
Removed
|
STRUCT EXCAV
|
CY
|
860.000
|
|
|
Removed
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,176.000
|
|
|
Removed
|
RC PIPE (CL III)(30 IN)
|
LF
|
72.000
|
|
|
Removed
|
INLET (STAGE II)(PCO)(5FT)(RIGHT)
|
EA
|
2.000
|
|
|
Removed
|
SET (TY I)(S= 3 FT)(HW= 2 FT)(3:1)(C)
|
EA
|
4.000
|
|
|
Removed
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
|
|
Removed
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
|
|
Removed
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
|
|
Removed
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
720.000
|
|
|
Removed
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
|
|
Removed
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,000.000
|
|
|
Removed
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
|
|
Removed
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
720.000
|
|
|
Removed
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
|
|
Removed
|
CABLE BARRIER SYS(INSTL)(TL-4)(20 '-0")
|
LF
|
6,267.000
|
|
|
Removed
|
CABLE BARRIER TERMINAL SECTION (REMOVE)
|
EA
|
12.000
|
|
4
|
Removed
|
RC PIPE (CL III)(36 IN)
|
LF
|
88.000
|
|
4A
|
Removed
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
88.000
|