DONLEY FM 291 (0795-05-010)

Items: 77

County: DONLEY
Length: N/A
Highway: FM 291
District: CHILDRESS
Control Number: 0795-05-010
DBE Goal: N/A
Project: BR 2023(281)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $3,586,776.30
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ZACHARY MAYER
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,586,776.30
$3,892,082.00
Over/Under Est: 8.51% $305,305.70
Over/Under Est: 12.48% $447,494.49
Amt Left: 3.65% $142,188.79
$4,464,646.75
Over/Under Est: 24.48% $877,870.45
Amt Left: 14.71% $572,564.75
Delta: -10.67% -$430,375.96
$4,675,665.20
Over/Under Est: 30.36% $1,088,888.90
Amt Left: 20.13% $783,583.20
Delta: -4.73% -$211,018.45
Subcontractor Percentage Amount
M & D FOUNDATION DRILLING INDUSTRIES, INC. 5.00% $194,604.10
L A FULLER & SONS CONSTRUCTION, LTD. 1.71% $66,554.60
TRP CONSTRUCTION GROUP, LLC 1.04% $40,477.65
FC TRAFFIC CONTROL, INC. 0.47% $18,292.79
LANCO TURF & SEEDING, INC. 0.37% $14,400.70
G & L REBAR 0.30% $11,676.25
A-CORE CONCRETE CUTTING, INC. 0.18% $7,005.75
TEX OP CONSTRUCTION, LP 0.00% $0.00
Total: 9.07% $353,011.84

Bid Items & Bid Tabulations

77 Total 0 of 77
DONLEY  |  FM 291  |  CHILDRESS  |  0795-05-010  |  12/01/2022  |  $3,586,776.30  |  BR 2023(281)  |  BRIDGE REPL  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
COPPELL CONSTRUCTION CO., INC.
GILVIN-TERRILL, LTD.
J. LEE MILLIGAN, INC.
PREPARING ROW
AC 2.430 $13,500.000 $40,000.000 $35,119.340 $75,000.000 $46,000.000
REMOVING CONC (FLUME)
SY 170.000 $25.000 $5.000 $33.000 $20.000 $45.000
EXCAVATION (ROADWAY)
CY 3,597.000 $21.000 $20.000 $28.000 $25.000 $19.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 3,306.000 $29.000 $20.000 $25.000 $25.000 $35.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 417.000 $80.000 $30.000 $165.000 $150.000 $175.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 3.000 $845.000 $2,000.000 $890.000 $1,000.000 $930.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 3.000 $630.000 $2,000.000 $748.000 $800.000 $780.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 1,848.000 $2.650 $3.000 $1.300 $2.000 $1.500
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 2,698.000 $40.000 $50.000 $63.000 $40.000 $48.500
CEMENT
TON 28.000 $250.000 $250.000 $250.000 $300.000 $320.000
CEMENT TREAT (SUBGRADE) (8")
SY 2,698.000 $9.250 $20.000 $18.000 $15.000 $13.150
PRIME COAT (MC-30)
GAL 676.000 $9.000 $15.000 $20.000 $8.500 $11.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 1,281.000 $7.600 $10.000 $6.000 $7.000 $8.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,027.000 $8.000 $20.000 $13.000 $30.000 $13.600
TEMPORARY SPL SHORING
SF 1,103.000 $40.000 $30.000 $75.000 $70.000 $85.000
DRILL SHAFT (18 IN)
LF 360.000 $250.000 $150.000 $96.000 $90.000 $110.000
DRILL SHAFT (36 IN)
LF 720.000 $450.000 $390.000 $303.000 $300.000 $360.000
CL C CONC (ABUT)(HPC)
CY 91.200 $1,500.000 $1,800.000 $2,000.000 $1,500.000 $1,800.000
CL C CONC (CAP)(HPC)
CY 41.000 $1,800.000 $1,800.000 $2,400.000 $1,500.000 $2,540.000
CL C CONC (COLUMN)(HPC)
CY 19.800 $1,700.000 $1,800.000 $2,750.000 $1,500.000 $1,950.000
CL C CONC (RAIL FOUNDATION)(SRC)
CY 4.400 $850.000 $2,000.000 $3,341.000 $4,500.000 $1,600.000
REINF CONC SLAB (HPC)
SF 12,994.000 $35.000 $40.000 $39.000 $45.000 $42.000
APPROACH SLAB (HPC)
CY 99.500 $800.000 $1,000.000 $1,061.000 $1,500.000 $1,100.000
INTEGRAL ABUT BKWL (HPC)
CY 18.800 $1,800.000 $2,250.000 $2,660.000 $1,500.000 $3,300.000
PRESTR CONC GIRDER (TX46)
LF 1,681.000 $260.000 $300.000 $252.000 $300.000 $325.000
RIPRAP (CONC)(5 IN)
CY 147.000 $700.000 $750.000 $1,203.000 $800.000 $815.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 329.000 $175.000 $250.000 $376.000 $300.000 $250.000
RAIL (TY SSTR)(HPC)
LF 688.000 $98.000 $150.000 $212.000 $135.000 $315.000
CMP (GAL STL 24 IN)
LF 25.000 $120.000 $250.000 $386.000 $200.000 $155.000
CMP (GAL STL 54 IN)
LF 8.000 $260.000 $1,000.000 $1,076.000 $1,200.000 $265.000
SET (TY I) (54 IN) (4: 1) (C)
EA 2.000 $5,600.000 $15,000.000 $39,717.000 $25,000.000 $21,500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $2,850.000 $2,500.000 $6,901.210 $2,500.000 $4,700.000
REMOV STR (HEADWALL)
EA 2.000 $2,000.000 $2,500.000 $1,824.000 $1,000.000 $3,000.000
REMOV STR (PIPE)
LF 29.000 $40.000 $10.000 $146.000 $50.000 $100.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $120,000.000 $200,000.000 $60,000.000 $350,000.000 $160,000.000
MOBILIZATION
LS 1.000 $297,000.000 $400,000.000 $379,000.000 $445,000.000 $460,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $14,000.000 $3,000.000 $1,400.000 $20,000.000 $25,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 675.000 $7.000 $8.000 $3.290 $6.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 675.000 $2.500 $2.000 $1.000 $3.000 $3.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 12.000 $7,000.000 $4,000.000 $6,407.090 $2,100.000 $8,900.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 900.000 $30.000 $50.000 $20.000 $20.000 $22.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 900.000 $12.000 $10.000 $8.000 $5.000 $15.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 900.000 $30.000 $20.000 $14.000 $20.000 $22.000
DRIVEWAYS (BASE)
SY 125.000 $15.000 $50.000 $35.000 $25.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 900.000 $38.000 $50.000 $30.000 $40.000 $36.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $2,000.000 $2,428.000 $3,000.000 $2,900.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.160 $5.000 $3.000 $5.000 $3.250
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $320.000 $100.000 $202.000 $300.000 $320.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,600.000 $2,500.000 $3,035.000 $3,500.000 $3,600.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,300.000 $2,500.000 $2,529.000 $1,500.000 $2,700.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,700.000 $2,500.000 $1,011.000 $1,500.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,600.000 $10,000.000 $11,027.000 $8,500.000 $8,000.000
WIRE FENCE (TY C)
LF 1,141.000 $23.000 $20.000 $20.000 $25.000 $120.000
GATE (TY 1)
EA 2.000 $2,000.000 $15,000.000 $1,500.000 $1,750.000 $1,900.000
WIRE FENCE (WATER GAP)
LF 33.000 $65.000 $50.000 $40.000 $50.000 $53.000
CORNER OR PULL POST AM(REM/REP)(METAL)
EA 6.000 $2,600.000 $250.000 $750.000 $750.000 $800.000
T-POST (REM/REP) (METAL)
EA 2.000 $2,600.000 $100.000 $10.000 $250.000 $265.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $30.000 $25.000 $15.000 $19.000 $20.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 19.000 $35.000 $50.000 $10.000 $10.000 $11.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $45.000 $50.000 $45.000 $47.500 $50.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 12.000 $150.000 $100.000 $151.000 $150.000 $160.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 2.000 $150.000 $100.000 $151.000 $150.000 $160.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 5,600.000 $0.900 $0.500 $0.250 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 33.000 $20.000 $20.000 $15.000 $15.000 $16.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 3,660.000 $0.900 $0.500 $0.250 $0.250 $0.260
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 184.000 $6.000 $10.000 $7.500 $7.500 $8.000
PAVEMENT SEALER 4"
LF 1,120.000 $1.000 $1.250 $1.000 $1.000 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,702.000 $1.000 $1.250 $1.000 $1.000 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 10,560.000 $1.000 $1.250 $1.000 $1.000 $1.100
REFL PAV MRKR TY II-A-A
EA 66.000 $8.000 $15.000 $10.000 $10.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 9,937.000 $1.000 $1.500 $1.250 $1.250 $1.500
ELIM EXT PAV MRK & MRKS (24")
LF 33.000 $6.500 $15.000 $10.000 $10.000 $11.000
SP MIXES SP-D SAC-A PG70-28
TON 1,031.000 $230.000 $200.000 $303.000 $270.000 $210.000
TACK COAT
GAL 1,371.000 $8.000 $10.000 $15.000 $5.000 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $10,000.000 $10,000.000 $20,000.000 $8,500.000
TMA (STATIONARY)
DAY 10.000 $160.000 $500.000 $325.000 $950.000 $525.000
TMA (MOBILE OPERATION)
HR 40.000 $180.000 $250.000 $150.000 $95.000 $95.000
Totals: $3,586,776.300 $3,892,082.000 $4,034,270.796 $4,464,646.750 $4,675,665.200