DONLEY FM 1260 (0795-02-017)

Items: 53

County: DONLEY
Length: N/A
Highway: FM 1260
District: CHILDRESS
Control Number: 0795-02-017
DBE Goal: 600.0%
Project: BR 2B24(268)
Guaranty: N/A
Time: 270 WORKING DAYS
Engineer's Estimate: $7,119,726.35
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$7,119,726.35
$6,672,833.23
Over/Under Est: -6.28% -$446,893.12
Over/Under Est: -1.18% -$83,816.85
Amt Left: 5.44% $363,076.27
$7,774,096.80
Over/Under Est: 9.19% $654,370.45
Amt Left: 16.5% $1,101,263.57
Delta: -10.49% -$738,187.30
$7,969,149.18
Over/Under Est: 11.93% $849,422.83
Amt Left: 19.43% $1,296,315.95
Delta: -2.51% -$195,052.38
$8,264,693.00
Over/Under Est: 16.08% $1,144,966.65
Amt Left: 23.86% $1,591,859.77
Delta: -3.71% -$295,543.82
Subcontractor Percentage Amount
HB FARMER FOUNDATION, LLC 15.89% $1,068,325.69
BLACKSMITH VENTURES LLC 3.58% $240,692.63
LINDAMOOD, INC. 2.96% $199,008.44
HJC FARMS, INC. 2.25% $151,273.30
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 2.02% $135,809.81
JB PINNACLE GROUP, LLC 2.01% $135,137.48
TORO BRAVO CONSTRUCTION, LLC 1.77% $119,001.67
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.83% $55,803.04
TRP CONSTRUCTION GROUP, LLC 0.67% $45,045.83
FC TRAFFIC CONTROL, INC. 0.24% $16,135.82
PROFESSIONAL TRAFFIC CONTROL LLC 0.20% $13,446.52
AWP SAFETY 0.12% $8,067.91
Total: 32.54% $2,187,748.14

Bid Items & Bid Tabulations

53 Total 0 of 53
DONLEY  |  FM 1260  |  CHILDRESS  |  0795-02-017  |  07/10/2024  |  $7,119,726.35  |  BR 2B24(268)  |  BRIDGE REPL  |  270 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
C. E. BARKER, LTD.
COPPELL CONSTRUCTION CO., INC.
EARTH BUILDERS, L.P.
ALTUS CONSTRUCTION LLC
GILVIN-TERRILL, LTD.
OBLITERATING ABANDONED ROAD
STA 22.000 $2,500.000 $14,750.000 $2,500.000 $2,000.000 $3,120.770 $1,000.000
EXCAVATION (ROADWAY)
CY 5,746.000 $25.000 $30.850 $23.000 $25.000 $24.960 $25.000
EXCAVATION (CHANNEL)
CY 3,827.000 $20.000 $34.550 $30.000 $25.000 $19.340 $25.000
SUBGRADE WIDENING (DENS CONT)
STA 6.000 $4,200.000 $4,139.490 $15,000.000 $4,500.000 $1,728.430 $4,000.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 3,291.000 $52.000 $21.030 $33.000 $30.000 $32.500 $25.000
BACKFILL (TY A OR B)
STA 6.000 $600.000 $827.900 $3,000.000 $300.000 $288.070 $2,000.000
BLADING
HR 14.000 $250.000 $147.840 $250.000 $150.000 $124.830 $175.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 2.690 $1,500.000 $8,574.650 $1,950.000 $2,200.000 $1,920.470 $1,500.000
DRILL SEEDING (TEMP) (WARM)
AC 1.350 $1,500.000 $1,507.960 $1,800.000 $2,000.000 $1,920.470 $1,500.000
DRILL SEEDING (TEMP) (COOL)
AC 1.350 $1,500.000 $1,951.470 $1,800.000 $2,000.000 $1,920.470 $1,500.000
VEGETATIVE WATERING
MG 105.000 $50.000 $59.140 $50.000 $50.000 $24.010 $55.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 8,963.000 $30.000 $19.510 $45.000 $55.000 $30.810 $30.000
PRIME COAT (MC-30)
GAL 1,793.000 $24.000 $17.740 $15.000 $10.000 $12.480 $7.000
ASPH (CRS-2P)
GAL 6,491.000 $12.000 $23.650 $20.000 $15.000 $21.770 $7.500
AGGR(TY-B GR-5 SAC-A)
CY 130.000 $250.000 $674.140 $250.000 $500.000 $133.510 $210.000
FLOWABLE BACKFILL
CY 144.000 $320.000 $231.810 $390.000 $450.000 $281.960 $800.000
DRILL SHAFT (36 IN)
LF 3,060.000 $350.000 $461.670 $370.000 $450.000 $483.430 $400.000
CL C CONC (ABUT)
CY 75.700 $2,400.000 $1,487.220 $1,750.000 $2,500.000 $2,277.580 $2,000.000
CL C CONC (CAP)
CY 163.900 $2,500.000 $1,521.430 $1,500.000 $2,500.000 $3,006.140 $2,000.000
CL C CONC (COLUMN)
CY 49.000 $5,200.000 $1,571.660 $2,500.000 $2,500.000 $2,761.310 $2,000.000
REINF CONC SLAB
SF 25,840.000 $50.000 $34.610 $45.000 $46.000 $52.220 $40.000
APPROACH SLAB
CY 107.100 $1,300.000 $955.420 $1,500.000 $2,000.000 $1,240.490 $2,000.000
PRESTR CONC GIRDER (TX28)
LF 2,380.000 $200.000 $249.890 $250.000 $260.000 $272.220 $250.000
PRESTR CONC GIRDER (TX34)
LF 634.000 $200.000 $252.950 $315.000 $290.000 $352.840 $250.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 524.000 $280.000 $270.750 $365.000 $240.000 $314.510 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 60.000 $750.000 $610.140 $750.000 $650.000 $755.310 $800.000
RAIL (TY SSTR)
LF 1,588.000 $150.000 $140.320 $225.000 $160.000 $112.330 $160.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 198.000 $250.000 $254.280 $285.000 $230.000 $317.760 $350.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $205,000.000 $43,944.770 $70,000.000 $100,000.000 $69,336.760 $200,000.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $570,000.000 $191,539.880 $175,000.000 $550,000.000 $420,775.620 $900,000.000
MOBILIZATION
LS 1.000 $502,823.350 $630,000.000 $650,000.000 $800,000.000 $788,946.690 $810,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $3,500.000 $5,377.100 $13,015.000 $2,000.000 $20,294.280 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 400.000 $75.000 $59.140 $47.500 $75.000 $57.610 $45.000
ROCK FILTER DAMS (REMOVE)
LF 400.000 $20.000 $29.570 $13.000 $15.000 $19.200 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 700.000 $9.000 $5.910 $7.500 $12.000 $10.240 $8.000
RUMBLE STRIPS (SHOULDER)
LF 5,220.000 $2.500 $2.370 $2.450 $0.010 $0.380 $1.450
RUMBLE STRIPS (CENTERLINE)
LF 2,610.000 $2.500 $2.370 $1.500 $0.010 $0.510 $1.450
MTL W-BEAM GD FEN (STEEL POST)
LF 1,000.000 $30.000 $39.030 $35.000 $40.000 $42.250 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,800.000 $3,607.270 $2,500.000 $2,600.000 $3,904.960 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,200.000 $3,873.380 $3,500.000 $4,000.000 $4,193.030 $4,000.000
WIRE FENCE (TY C)
LF 1,876.000 $25.000 $8.280 $35.000 $20.000 $34.570 $27.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000 $30.000 $41.390 $25.000 $35.000 $44.810 $35.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 250.000 $5.000 $1.180 $1.000 $1.000 $1.880 $1.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 24.000 $25.000 $5.910 $5.000 $5.000 $5.630 $5.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 11,200.000 $0.800 $0.890 $0.750 $0.750 $0.900 $0.750
PAVEMENT SEALER 6"
LF 2,160.000 $3.500 $2.370 $2.000 $2.500 $1.550 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 6,820.000 $2.250 $3.550 $3.000 $3.500 $1.330 $3.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 853.000 $4.000 $3.550 $3.000 $3.500 $1.340 $3.000
REFL PAV MRKR TY II-A-A
EA 468.000 $23.000 $11.830 $10.000 $15.000 $5.120 $10.000
PAV SURF PREP FOR MRK (6")
LF 2,160.000 $1.350 $2.370 $2.000 $2.500 $0.420 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $22,000.000 $16,557.940 $15,000.000 $18,000.000 $20,485.040 $18,500.000
TMA (STATIONARY)
DAY 69.000 $320.000 $1,182.710 $300.000 $250.000 $216.050 $800.000
TMA (MOBILE OPERATION)
HR 27.000 $130.000 $473.080 $250.000 $120.000 $108.030 $95.000
Totals: $7,119,726.350 $6,672,833.262 $7,035,909.500 $7,774,096.800 $7,969,149.214 $8,264,693.000