DONLEY US 287 (0042-07-066)

Items: 39

County: DONLEY
Length: N/A
Highway: US 287
District: CHILDRESS
Control Number: 0042-07-066
DBE Goal: N/A
Project: NH 2019(592)
Guaranty: N/A
Time: 55 WORKING DAYS
Engineer's Estimate: $4,779,818.02
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: ASPHALTIC CONCRETE OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,779,818.02
$4,527,707.02
Over/Under Est: -5.27% -$252,111.00
$4,795,164.84
Over/Under Est: 0.32% $15,346.82
Amt Left: 5.91% $267,457.82
$6,042,219.55
Over/Under Est: 26.41% $1,262,401.53
Amt Left: 33.45% $1,514,512.53
Delta: -26.01% -$1,247,054.71

Bid Items & Bid Tabulations

39 Total 0 of 39
DONLEY  |  US 287  |  CHILDRESS  |  0042-07-066  |  02/06/2019  |  $4,779,818.02  |  NH 2019(592)  |  ASPHIC CONC OVERLAY  |  55 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
DUININCK, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 2.000 $2,300.000 $3,040.000 $6,000.000 $1,600.000
BACKFILL (TY A OR B)
STA 643.550 $250.000 $135.000 $265.000 $130.000
BLADING
HR 24.000 $110.000 $175.000 $390.000 $200.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 28.650 $320.000 $336.080 $345.000 $320.000
DRILL SEEDING (TEMP) (WARM)
AC 14.330 $350.000 $315.000 $325.000 $300.000
DRILL SEEDING (TEMP) (COOL)
AC 14.330 $350.000 $335.000 $345.000 $320.000
VEGETATIVE WATERING
MG 1,117.350 $23.000 $31.000 $24.500 $30.000
D-GR HMA TY-D SAC-A PG 76-28
TON 34,215.000 $111.000 $102.000 $110.000 $132.000
PLANE ASPH CONC PAV(0" TO 2")
SY 8,450.000 $1.100 $2.750 $3.000 $2.000
PLANE ASPH CONC PAV (2")
SY 28,415.000 $1.500 $2.350 $2.600 $2.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $800.000 $735.000 $810.000 $700.000
RETROFIT RAIL (TY T631)
LF 350.000 $110.000 $89.550 $75.500 $85.000
HEADER TYPE EXPANSION JOINT
CF 104.000 $550.000 $479.000 $490.000 $550.000
JOINT SEALANT
LF 616.000 $19.000 $10.550 $11.000 $200.000
MOBILIZATION
LS 1.000 $370,178.000 $385,500.000 $300,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $8,500.000 $18,100.000 $27,000.000 $62,705.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 250.000 $24.000 $50.850 $38.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 250.000 $8.000 $7.550 $11.000 $30.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $4.100 $9.400 $4.100 $6.000
RUMBLE STRIPS (SHOULDER)
LF 126,396.000 $0.120 $0.120 $0.170 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 1,525.000 $25.000 $30.600 $24.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,200.000 $1,365.000 $1,100.000 $1,300.000
REMOVE METAL BEAM GUARD FENCE
LF 1,525.000 $3.150 $4.200 $1.900 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 9.000 $270.000 $370.000 $160.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,900.000 $3,160.000 $2,800.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $300.000 $370.000 $215.000 $350.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,385.000 $0.810 $1.150 $1.100 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 685.000 $1.110 $1.200 $1.100 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,400.000 $0.750 $0.790 $0.810 $0.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 204.000 $2.500 $26.340 $5.400 $25.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 290.000 $50.000 $15.800 $25.000 $15.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 17,689.000 $0.280 $0.410 $0.380 $0.390
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 68,651.000 $0.280 $0.410 $0.380 $0.390
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 77,185.000 $0.280 $0.410 $0.380 $0.390
REFL PAV MRKR TY I-C
EA 92.000 $3.000 $4.200 $3.250 $4.000
REFL PAV MRKR TY II-A-A
EA 172.000 $4.500 $4.200 $3.250 $4.000
REFL PAV MRKR TY II-C-R
EA 795.000 $3.500 $4.200 $3.250 $4.000
TMA (STATIONARY)
DAY 30.000 $270.000 $665.000 $260.000 $2,000.000
TMA (MOBILE OPERATION)
DAY 3.000 $950.000 $665.000 $920.000 $950.000
Totals: $4,779,818.020 $4,527,707.022 $4,795,164.845 $6,042,219.550