Show Job Controls
Bid Cobra

DIMMIT FM 186 (0301-04-021)

Items: 120

County: DIMMIT
Length: N/A
Highway: FM 186
District: LAREDO
Control Number: 0301-04-021
DBE Goal: N/A
Project: C 301-4-21
Guaranty: N/A
Time: 459 WORKING DAYS
Engineer's Estimate: $12,378,224.07
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
LUIS URBINA
ANGEL MARTINEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,378,224.07
$13,415,968.60
Over/Under Est: 8.38% $1,037,744.53
$13,633,985.50
Over/Under Est: 10.14% $1,255,761.43
Amt Left: 1.63% $218,016.90
$16,373,213.30
Over/Under Est: 32.27% $3,994,989.23
Amt Left: 22.04% $2,957,244.70
Delta: -20.09% -$2,739,227.80
Subcontractor Percentage Amount
ACEE CONSTRUCTION LLC. 16.33% $2,276,162.34
A K FUQUAY CONSTRUCTION 3.10% $432,094.50
HIGHWAY BARRICADES AND SERVICES, LLC 2.95% $411,186.70
DEPENDABLE FENCE 1.19% $165,868.54
K. L. DURHAM CONSTRUCTION, L.L.C. 1.04% $144,960.74
TRIPLE H FIELD SERVICES, LLC 0.72% $100,357.43
SURFACE PREPARATION TECHNOLOGIES, LLC 0.17% $23,695.51
EGGEMEYER LAND CLEARING, LLC 0.15% $20,907.80
Total: 25.65% $3,575,233.56

Bid Items & Bid Tabulations

120 Total 0 of 120
DIMMIT  |  FM 186  |  LAREDO  |  0301-04-021  |  06/27/2023  |  $12,378,224.07  |  C 301-4-21  |  REHAB EXIST ROADWAY  |  459 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
PREPARING ROW
STA 254.000 $1,500.000 $600.000 $654.900 $1,000.000
REMOVING CONC (PAV)
SY 281.000 $31.830 $40.000 $28.000 $75.000
REMOVING STAB BASE & ASPH PAV (0-2")
SY 1,976.000 $15.000 $9.000 $3.500 $5.000
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 78,432.000 $9.250 $6.000 $5.400 $10.000
EXCAVATION (ROADWAY)
CY 21,367.000 $10.000 $12.000 $20.800 $16.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 9,297.000 $15.000 $24.000 $17.500 $18.000
FURNISHING AND PLACING TOPSOIL (4")
SY 84,513.000 $1.260 $0.700 $1.380 $1.500
DRILL SEEDING (TEMP) (WARM)
SY 84,513.000 $0.120 $0.300 $0.270 $0.300
PROOF ROLLING
HR 120.000 $90.000 $100.000 $120.000 $100.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 34,778.000 $61.600 $60.000 $67.880 $70.000
CEMENT
TON 1,903.000 $205.000 $280.000 $275.000 $275.000
CEMENT TREAT (NEW BASE)(12")
SY 99,072.000 $2.500 $4.500 $3.120 $4.000
ASPH (AC-15P)
GAL 322.000 $4.000 $9.000 $15.100 $15.000
ASPH (RC-250)
GAL 19,815.000 $5.500 $4.500 $5.360 $6.500
AGGR(TY-PB GR-5 SAC-B)
CY 767.000 $122.500 $127.000 $149.570 $250.000
CUT & RESTORE ASPH PAVING
SY 517.000 $105.000 $90.000 $180.000 $200.000
FLOWABLE BACKFILL
CY 389.000 $160.000 $200.000 $414.790 $300.000
TRENCH EXCAVATION PROTECTION
LF 986.000 $4.770 $8.000 $9.180 $10.000
TEMPORARY SPL SHORING
SF 1,960.000 $20.550 $20.000 $20.400 $25.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 56.000 $360.000 $500.000 $386.250 $450.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 809.000 $152.000 $200.000 $200.040 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 233.600 $544.000 $525.000 $580.000 $600.000
CMP (GAL STL 18 IN)
LF 126.000 $98.000 $75.000 $87.100 $90.000
CMP (GAL STL 24 IN)
LF 613.000 $99.770 $82.000 $96.120 $100.000
CONC BOX CULV (3 FT X 2 FT)
LF 909.000 $294.000 $400.000 $348.850 $500.000
CONC BOX CULV (6 FT X 5 FT)
LF 174.000 $821.000 $900.000 $772.360 $1,200.000
CONC BOX CULV (9 FT X 5 FT)
LF 174.000 $856.390 $1,600.000 $1,261.680 $2,000.000
RC PIPE (CL V)(24 IN)
LF 792.000 $110.000 $115.000 $143.680 $150.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 12.000 $9,000.000 $7,500.000 $17,999.840 $10,000.000
WINGWALL (PW - 2) (HW=12 FT)
EA 1.000 $75,800.000 $82,000.000 $80,276.220 $100,000.000
WINGWALL (PW - 2) (HW=13 FT)
EA 1.000 $77,000.000 $95,000.000 $98,838.960 $115,000.000
WINGWALL (PW - 2) (HW=3 FT)
EA 7.000 $11,819.540 $8,500.000 $14,726.030 $10,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 7.000 $8,510.000 $11,000.000 $16,638.760 $13,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 5.000 $10,200.000 $14,000.000 $25,690.430 $16,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $16,191.000 $15,000.000 $35,145.050 $17,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $21,217.000 $16,000.000 $41,217.850 $19,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $916.000 $1,800.000 $2,241.160 $2,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 20.000 $2,126.000 $1,600.000 $2,922.230 $1,900.000
REMOV STR (HEADWALL)
EA 36.000 $1,506.000 $900.000 $1,753.670 $1,100.000
REMOV STR (PIPE)
EA 22.000 $400.000 $250.000 $548.020 $500.000
REMOV STR (SMALL FENCE)
LF 100.000 $3.500 $7.000 $25.720 $10.000
MOBILIZATION
LS 1.000 $777,537.070 $1,328,000.000 $1,199,182.000 $1,625,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $6,000.000 $1,250.000 $3,800.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,530.000 $33.000 $50.000 $46.350 $45.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $33.000 $56.000 $52.400 $75.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000 $63.000 $146.000 $135.600 $105.000
ROCK FILTER DAMS (REMOVE)
LF 1,790.000 $10.360 $16.000 $14.800 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 933.000 $30.000 $22.000 $19.860 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 933.000 $8.500 $9.000 $7.890 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 27,209.000 $3.500 $4.000 $3.850 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 27,209.000 $1.000 $1.000 $0.850 $2.000
CONSTRUCTING DETOURS
SY 3,450.000 $60.000 $88.000 $60.650 $80.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 152.000 $80.000 $150.000 $132.000 $250.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 19.000 $3,000.000 $5,500.000 $5,247.750 $15,000.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 2,880.000 $60.000 $24.000 $45.000 $40.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,550.000 $7.900 $13.000 $24.000 $20.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,880.000 $15.000 $12.000 $22.000 $18.000
DRIVEWAYS (CONC)
SY 278.000 $87.000 $125.000 $126.700 $150.000
DRIVEWAYS (ACP)
SY 1,703.000 $50.000 $77.000 $50.600 $50.000
DRIVEWAYS (SURF TREAT)
SY 1,617.000 $34.000 $44.000 $41.400 $45.000
TURNOUTS (SURF TREAT)
SY 141.000 $37.000 $103.000 $46.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000 $25.000 $27.000 $25.400 $30.000
SHORT RADIUS
LF 37.500 $40.520 $36.000 $33.530 $80.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $933.420 $1,080.000 $1,015.050 $2,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 10.000 $1,540.000 $1,200.000 $1,141.300 $2,600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 35.000 $3,240.000 $3,450.000 $3,237.050 $2,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $1,000.000 $780.000 $1,045.350 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 12.000 $700.000 $260.000 $959.500 $750.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 12.000 $10,000.000 $9,500.000 $23,911.750 $10,000.000
WIRE FENCE (TY C)
LF 100.000 $12.000 $12.000 $24.750 $15.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 9.000 $335.000 $300.000 $285.000 $400.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $810.000 $670.000 $625.000 $700.000
CONDT (PVC) (SCH 40) (2")
LF 71.000 $11.500 $16.000 $20.600 $25.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 95.000 $26.000 $37.000 $51.500 $60.000
ELEC CONDR (NO.6) BARE
LF 60.000 $1.800 $2.500 $1.800 $2.000
ELEC CONDR (NO.6) INSULATED
LF 120.000 $1.940 $2.700 $2.010 $2.500
TRAY CABLE (3 CONDR) (12 AWG)
LF 392.000 $1.800 $3.000 $4.630 $5.500
GROUND BOX TY C (162911)W/APRON
EA 3.000 $1,435.700 $1,370.000 $1,442.000 $1,700.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 245.000 $2.980 $3.000 $3.710 $4.500
ELC SRV TY T 120/240 000(NS)GS(L)SP(O)
EA 2.000 $4,000.000 $5,050.000 $4,326.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 31.000 $689.210 $640.000 $595.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $724.550 $920.000 $850.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 20.000 $846.220 $780.000 $725.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,059.090 $935.000 $870.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,228.540 $1,180.000 $1,100.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 53.000 $115.000 $80.000 $75.000 $125.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 55.000 $33.970 $60.000 $55.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 25.000 $86.730 $92.000 $85.000 $75.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 110,644.000 $0.400 $0.500 $0.480 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 60,140.000 $0.380 $0.500 $0.480 $0.750
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 600.000 $3.100 $5.500 $5.000 $6.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 62,254.000 $0.700 $0.500 $0.470 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 288.000 $6.500 $13.000 $12.000 $12.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 24,000.000 $0.600 $0.500 $0.470 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,263.000 $1.100 $2.000 $1.630 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,263.000 $1.400 $2.000 $1.630 $1.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 120.000 $8.400 $17.000 $16.000 $18.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 52,471.000 $0.550 $0.700 $0.680 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 5,674.000 $0.650 $0.700 $0.680 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 33,881.000 $0.550 $0.700 $0.680 $1.000
REFL PAV MRKR TY II-A-A
EA 729.000 $3.670 $5.000 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 11,852.000 $0.380 $1.200 $1.100 $1.250
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $7,042.580 $4,800.000 $3,605.000 $5,000.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $221.900 $290.000 $283.250 $400.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $225.180 $290.000 $283.250 $400.000
VEH SIG SEC (12")LED(HOUSING ONLY)
EA 6.000 $330.000 $102.000 $104.030 $200.000
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 127.000 $2.480 $2.500 $4.630 $6.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $7,940.560 $5,900.000 $6,695.000 $8,000.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 4.000 $11,895.690 $10,210.000 $11,845.000 $15,000.000
D-GR HMA TY-B SAC-B PG70-22
TON 16,886.000 $120.000 $115.000 $103.200 $135.000
D-GR HMA TY-C PG64-22 (LEVEL-UP)
TON 488.000 $120.000 $250.000 $121.200 $225.000
SP MIXES SP-C SAC-A PG76-22
TON 10,436.000 $125.000 $144.000 $117.500 $165.000
BONDING COURSE
GAL 9,122.000 $4.000 $5.000 $4.640 $6.000
STEEL FENCE (REMOVE)
LF 250.000 $10.000 $15.000 $10.000 $20.000
STEEL FENCE (INSTALL)
LF 250.000 $45.000 $125.000 $40.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $25,400.000 $10,000.000 $35,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 864.000 $10.000 $10.000 $9.000 $16.000
TMA (STATIONARY)
DAY 51.000 $185.000 $370.000 $500.000 $400.000
TMA (MOBILE OPERATION)
HR 376.000 $65.000 $80.000 $150.000 $25.000
SOLAR POWERED LED ROADSIDE SIGN
EA 2.000 $3,580.000 $3,000.000 $2,229.950 $3,000.000
Totals: $12,378,224.070 $13,415,968.600 $13,633,985.505 $16,373,213.300