DIMMIT SH 85 (0301-01-087)

Items: 81

County: DIMMIT
Length: N/A
Highway: SH 85
District: LAREDO
Control Number: 0301-01-087
DBE Goal: 300.0%
Project: STP 2B24(042)HES
Guaranty: N/A
Time: 129 WORKING DAYS
Engineer's Estimate: $4,389,001.73
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
DENNICE GARZA
ANGEL MARTINEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$4,389,001.73
$4,036,048.13
Over/Under Est: -8.04% -$352,953.60
Over/Under Est: -6.9% -$302,626.43
Amt Left: 1.25% $50,327.17
Over/Under Est: -5.75% -$252,463.43
Amt Left: 2.49% $100,490.17
Delta: -1.23% -$50,163.00
Over/Under Est: -3.85% -$168,931.74
Amt Left: 4.56% $184,021.86
Delta: -2.02% -$83,531.69
Over/Under Est: 10.11% $443,631.29
Amt Left: 19.74% $796,584.89
Delta: -14.52% -$612,563.03
Over/Under Est: 14.69% $644,880.27
Amt Left: 24.72% $997,833.87
Delta: -4.16% -$201,248.98
$5,820,485.15
Over/Under Est: 32.62% $1,431,483.42
Amt Left: 44.21% $1,784,437.02
Delta: -15.63% -$786,603.15
Subcontractor Percentage Amount
D&G ENERGY CORPORATION 11.29% $458,638.62
BUYERS BARRICADES SAN ANTONIO, LLC 3.13% $127,151.36
A K FUQUAY CONSTRUCTION 2.64% $107,245.88
HIGHWAY BARRICADES AND SERVICES, LLC 1.55% $62,966.33
MURRAY CONSTRUCTION 0.75% $30,467.58
H J HENKE, LLC 0.50% $20,311.72
PROFESSIONAL TRAFFIC CONTROL LLC 0.23% $9,343.39
Total: 20.09% $816,124.88

Bid Items & Bid Tabulations

81 Total 0 of 81
DIMMIT  |  SH 85  |  LAREDO  |  0301-01-087  |  05/03/2024  |  $4,389,001.73  |  STP 2B24(042)HES  |  WIDEN ROAD - ADD SHOULDERS  |  129 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
J. CARROLL WEAVER, INC.
H. L. ZUMWALT CONSTRUCTION, INC.
ANDERSON COLUMBIA CO., INC.
LCR TOTAL TRANSPORT LLC
CK NEWBERRY, LLC
PREPARING ROW
STA 45.000 $10,000.000 $1,850.000 $5,000.000 $504.000 $1,050.000 $4,400.000 $1,600.000 $750.000
EXCAVATION (ROADWAY)
CY 8,286.000 $21.650 $23.250 $21.200 $14.980 $20.000 $30.000 $34.500 $23.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 2,674.000 $30.000 $14.300 $22.300 $11.000 $12.500 $32.000 $46.000 $24.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 28,358.000 $1.000 $0.380 $0.380 $0.430 $0.420 $0.420 $0.450 $0.400
DRILL SEEDING (TEMP) (COOL)
SY 28,358.000 $1.020 $0.280 $0.280 $0.310 $0.420 $0.320 $0.350 $0.400
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 3,311.000 $98.780 $106.000 $79.810 $83.780 $90.000 $100.000 $163.000 $110.000
LIME (HYDRATED LIME (SLURRY))
TON 74.000 $435.000 $399.000 $330.000 $228.180 $500.000 $540.000 $403.000 $400.000
LIME TRT (EXST MATL) (6")
SY 9,932.000 $9.000 $5.300 $4.800 $6.320 $4.000 $10.000 $6.500 $8.000
PRIME COAT (MC-30)
GAL 1,986.000 $7.210 $5.800 $6.440 $5.870 $10.000 $6.500 $6.600 $8.000
PLANE ASPH CONC PAV(0" TO 2")
SY 16,500.000 $3.950 $3.000 $3.230 $5.080 $4.500 $2.500 $4.400 $5.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 304.000 $225.000 $340.000 $230.000 $380.800 $257.600 $300.000 $380.000 $750.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 45.000 $422.750 $380.000 $325.000 $425.600 $364.750 $400.000 $425.000 $750.000
RIPRAP (CONC)(CL B)
CY 13.300 $466.250 $1,870.000 $1,596.250 $1,344.000 $2,250.000 $2,000.000 $1,220.000 $1,200.000
MOBILIZATION
LS 1.000 $353,120.610 $390,000.000 $399,200.080 $506,371.120 $450,000.000 $480,000.000 $493,000.000 $575,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,150.000 $6,170.000 $10,000.000 $3,360.000 $7,500.000 $2,500.000 $3,300.000 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 500.000 $50.000 $74.650 $74.650 $16.800 $15.000 $40.000 $83.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $12.400 $23.300 $23.300 $5.600 $10.000 $20.000 $26.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,047.000 $6.950 $3.850 $3.850 $4.310 $2.500 $5.000 $4.300 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,047.000 $2.750 $0.500 $0.500 $0.560 $2.500 $1.000 $0.600 $2.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 220.000 $83.250 $88.000 $96.000 $79.380 $120.000 $85.000 $200.000 $200.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 7,860.000 $55.250 $101.000 $100.000 $106.550 $88.000 $110.000 $100.000 $140.000
PTB (STKPL)(SGL SLP)(TY 1) OR (STL)
LF 7,860.000 $7.000 $12.500 $20.000 $20.700 $55.000 $21.000 $32.000 $40.000
DRIVEWAYS (ACP)
SY 540.000 $84.850 $80.000 $54.200 $70.620 $60.210 $100.000 $126.000 $150.000
TURNOUTS (ACP)
SY 16.000 $105.000 $70.000 $151.800 $72.560 $127.000 $140.000 $100.000 $300.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 8,190.000 $0.600 $0.180 $0.780 $0.560 $1.250 $0.280 $0.400 $0.750
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 7,535.000 $0.100 $0.220 $0.830 $0.670 $1.250 $0.280 $0.400 $0.750
CRASH CUSH ATTEN (STKPL)
EA 20.000 $800.000 $750.000 $3,038.230 $2,208.690 $950.000 $3,200.000 $1,100.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 20.000 $9,360.000 $8,300.000 $8,480.400 $2,208.690 $1,500.000 $10,000.000 $12,200.000 $10,000.000
RELOCATE EXISTING MAILBOX
EA 1.000 $800.000 $250.000 $249.450 $896.000 $500.000 $250.000 $350.000 $300.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 38.000 $4,490.000 $4,560.000 $4,350.000 $5,107.200 $4,872.000 $5,500.000 $5,100.000 $6,000.000
CONDT (PVC) (SCH 40) (2")
LF 8,305.000 $13.000 $11.500 $12.000 $12.880 $13.450 $12.000 $13.000 $22.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 485.000 $33.000 $25.000 $35.000 $28.000 $39.200 $33.000 $28.000 $82.000
ELEC CONDR (NO.8) BARE
LF 8,750.000 $1.480 $1.850 $1.500 $2.070 $1.680 $2.500 $2.000 $3.000
ELEC CONDR (NO.8) INSULATED
LF 17,500.000 $1.570 $1.950 $1.500 $2.180 $1.680 $2.500 $2.200 $3.000
ELEC CONDR (NO.6) BARE
LF 20.000 $1.930 $1.950 $1.500 $2.180 $1.700 $1.500 $2.200 $7.000
ELEC CONDR (NO.6) INSULATED
LF 40.000 $2.140 $2.050 $1.750 $2.300 $2.250 $3.000 $2.300 $7.000
TRAY CABLE (3 CONDR) (12 AWG)
LF 500.000 $2.400 $2.350 $1.750 $2.630 $2.250 $3.000 $2.600 $7.000
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,300.000 $975.000 $1,100.000 $1,092.000 $1,232.000 $1,700.000 $1,085.000 $5,000.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 350.000 $3.000 $4.250 $4.500 $4.760 $5.100 $4.000 $4.700 $8.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $6,600.000 $6,500.000 $6,000.000 $7,280.000 $6,720.000 $10,400.000 $7,225.000 $15,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $828.500 $625.000 $676.940 $728.000 $840.000 $700.000 $725.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $985.250 $800.000 $810.200 $868.000 $1,024.000 $840.000 $861.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $900.000 $950.000 $867.760 $1,008.000 $1,500.000 $900.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $963.500 $975.000 $1,023.400 $1,103.200 $1,400.000 $1,050.000 $1,100.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,042.500 $1,050.000 $1,209.960 $1,288.000 $1,512.000 $1,240.000 $1,280.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $1,120.000 $1,200.000 $1,271.790 $1,736.000 $1,680.000 $1,300.000 $1,722.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 40.000 $133.750 $100.000 $106.600 $95.200 $135.000 $110.000 $95.000 $100.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 10,390.000 $0.850 $2.500 $2.500 $2.800 $0.850 $3.000 $2.800 $0.850
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 470.000 $1.410 $2.250 $1.630 $1.120 $2.000 $2.000 $3.300 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 470.000 $1.310 $2.250 $1.630 $1.120 $2.000 $2.000 $3.300 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 375.000 $0.850 $0.660 $0.660 $0.740 $2.010 $0.750 $0.750 $2.200
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 75.000 $2.850 $0.880 $0.880 $0.990 $2.910 $1.000 $1.000 $2.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,705.000 $1.800 $0.880 $0.880 $0.990 $1.960 $1.000 $1.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 120.000 $12.650 $9.000 $9.000 $10.080 $14.000 $10.000 $10.000 $13.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $183.000 $150.000 $150.000 $168.000 $229.600 $165.000 $167.000 $230.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $234.500 $250.000 $250.000 $280.000 $263.200 $275.000 $278.000 $250.000
PAVEMENT SEALER 6"
LF 26,965.000 $0.280 $0.320 $0.320 $0.360 $0.390 $0.400 $0.400 $0.500
PAVEMENT SEALER 8"
LF 1,780.000 $0.450 $0.440 $0.440 $0.490 $0.450 $0.500 $0.500 $1.000
PAVEMENT SEALER 24"
LF 120.000 $2.150 $0.880 $0.880 $0.990 $3.360 $1.000 $1.000 $3.500
PAVEMENT SEALER (ARROW)
EA 6.000 $41.000 $100.000 $100.000 $112.000 $61.600 $110.000 $111.000 $45.000
PAVEMENT SEALER (WORD)
EA 4.000 $51.250 $100.000 $100.000 $112.000 $75.040 $110.000 $111.000 $65.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 11,185.000 $1.000 $0.660 $0.660 $0.740 $1.340 $0.700 $0.700 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 15,405.000 $1.000 $0.660 $0.660 $0.740 $1.340 $0.700 $0.700 $0.750
REFL PAV MRKR TY I-C
EA 85.000 $5.200 $5.000 $5.000 $5.600 $8.120 $5.500 $5.600 $7.000
REFL PAV MRKR TY II-A-A
EA 463.000 $5.550 $5.000 $5.000 $5.600 $8.120 $5.500 $5.600 $5.000
PAV SURF PREP FOR MRK (6")
LF 26,965.000 $0.070 $0.040 $0.040 $0.040 $0.390 $0.050 $0.050 $0.100
PAV SURF PREP FOR MRK (8")
LF 1,780.000 $0.220 $0.080 $0.080 $0.090 $0.450 $0.100 $0.100 $0.200
PAV SURF PREP FOR MRK (24")
LF 120.000 $0.450 $0.300 $0.300 $0.340 $2.500 $0.330 $0.300 $0.600
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $21.750 $20.000 $20.000 $22.400 $28.000 $22.000 $22.000 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $21.750 $20.000 $20.000 $22.400 $28.000 $22.000 $22.000 $5.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $4,800.000 $10,500.000 $6,000.000 $11,760.000 $6,720.000 $25,000.000 $11,700.000 $10,000.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $283.000 $175.000 $315.000 $196.000 $352.000 $300.000 $194.000 $575.000
VEH SIG SEC (12")LED(RED)
EA 6.000 $282.000 $175.000 $315.000 $196.000 $352.000 $300.000 $194.000 $575.000
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 380.000 $2.250 $2.250 $1.750 $2.520 $2.000 $2.500 $2.500 $6.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $6,850.000 $5,800.000 $5,500.000 $6,496.000 $6,160.000 $6,600.000 $6,450.000 $12,000.000
D-GR HMA TY-B SAC-B PG70-22
TON 2,389.000 $132.750 $125.000 $115.800 $144.480 $138.000 $134.000 $135.000 $180.000
D-GR HMA TY-C SAC-A PG76-22
TON 3,520.000 $223.000 $158.000 $119.400 $174.720 $145.000 $172.000 $172.000 $200.000
BONDING COURSE
GAL 6,114.000 $4.800 $2.500 $3.540 $5.600 $5.250 $5.000 $7.600 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,700.000 $2,200.000 $12,500.000 $7,280.000 $700.000 $16,000.000 $12,940.000 $20,000.000
TMA (STATIONARY)
DAY 256.000 $258.700 $165.000 $250.000 $140.000 $500.000 $200.000 $209.000 $300.000
TMA (MOBILE OPERATION)
DAY 14.000 $216.350 $500.000 $900.000 $196.000 $750.000 $650.000 $576.000 $200.000
Totals: $4,389,001.735 $4,036,048.130 $4,086,375.305 $4,136,538.300 $4,220,069.990 $4,832,633.020 $5,033,882.000 $5,820,485.150