DICKENS US 82 (0132-01-055)

Items: 40

County: DICKENS
Length: N/A
Highway: US 82
District: CHILDRESS
Control Number: 0132-01-055
DBE Goal: 0.0%
Project: C 132-1-55
Guaranty: N/A
Time: 99 WORKING DAYS
Engineer's Estimate: $9,731,074.43
Date: 12/05/2023 (2 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$9,731,074.43
$11,319,017.73
Over/Under Est: 16.32% $1,587,943.30
$11,454,345.55
Over/Under Est: 17.71% $1,723,271.12
Amt Left: 1.2% $135,327.82
$11,799,347.40
Over/Under Est: 21.25% $2,068,272.97
Amt Left: 4.24% $480,329.67
Delta: -3.01% -$345,001.85
$12,147,264.45
Over/Under Est: 24.83% $2,416,190.02
Amt Left: 7.32% $828,246.72
Delta: -2.95% -$347,917.05
Over/Under Est: 30.54% $2,971,504.77
Amt Left: 12.22% $1,383,561.47
Delta: -4.57% -$555,314.75
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 1.90% $215,061.34
DUSTIN ALLEN, INC. 1.86% $210,533.73
FLAT LINE, INC. 1.16% $131,300.61
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.24% $27,165.64
SURFACE PREPARATION TECHNOLOGIES, LLC 0.23% $26,033.74
FC TRAFFIC CONTROL, INC. 0.22% $24,901.84
Total: 5.61% $634,996.90

Bid Items & Bid Tabulations

40 Total 0 of 40
DICKENS  |  US 82  |  CHILDRESS  |  0132-01-055  |  12/05/2023  |  $9,731,074.43  |  C 132-1-55  |  OVERLAY  |  99 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
KIEWIT INFRASTRUCTURE SOUTH CO.
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 122.000 $50.000 $100.000 $130.000 $50.000 $10.000 $171.980
BACKFILL (TY A)
STA 935.000 $240.000 $200.000 $450.000 $410.000 $200.000 $400.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 43.000 $800.000 $500.000 $505.000 $480.000 $500.000 $923.480
VEGETATIVE WATERING
MG 1,677.000 $44.000 $1.000 $28.000 $57.000 $40.000 $73.680
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 41,268.000 $4.250 $5.000 $3.900 $5.000 $5.000 $4.150
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 1,000.000 $50.000 $85.000 $77.500 $60.000 $100.000 $86.640
PLANE ASPH CONC PAV(0" TO 2")
SY 8,446.000 $9.000 $11.000 $8.850 $8.000 $10.000 $7.810
RIPRAP (MOW STRIP)(4 IN)
CY 244.000 $560.000 $970.000 $675.000 $650.000 $650.000 $707.130
MOBILIZATION
LS 1.000 $878,097.680 $1,100,000.000 $1,000,000.000 $1,171,465.000 $1,200,000.000 $1,291,725.320
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,000.000 $20,000.000 $32,000.000 $50,000.000 $50,000.000 $35,097.860
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,600.000 $6.000 $5.450 $5.500 $10.000 $5.000 $10.100
RUMBLE STRIPS (SHOULDER)
LF 183,225.000 $0.270 $0.170 $0.120 $0.250 $0.250 $0.160
MTL W-BEAM GD FEN (STEEL POST)
LF 4,075.000 $25.000 $31.460 $34.000 $32.250 $32.500 $35.360
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,700.000 $2,684.930 $2,900.000 $2,735.000 $2,600.000 $3,002.420
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $2,000.000 $1,572.760 $1,700.000 $1,600.000 $1,550.000 $1,756.240
MTL BM GD FEN TRANS (NON - SYM)
EA 6.000 $1,200.000 $1,235.740 $1,300.000 $1,215.000 $1,150.000 $1,333.120
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 6.000 $800.000 $1,112.170 $1,300.000 $1,255.000 $1,200.000 $1,379.490
REMOVE METAL BEAM GUARD FENCE
LF 4,375.000 $2.600 $4.490 $3.300 $3.200 $3.000 $3.480
REMOVE TERMINAL ANCHOR SECTION
EA 9.000 $350.000 $449.360 $275.000 $264.000 $250.000 $289.810
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $300.000 $449.360 $275.000 $264.000 $250.000 $289.810
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,800.000 $3,594.880 $3,800.000 $3,800.000 $3,450.000 $3,958.790
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $300.000 $449.360 $275.000 $264.000 $250.000 $289.810
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 48.000 $37.000 $34.830 $44.500 $42.250 $40.000 $46.370
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 18.000 $23.000 $34.830 $44.500 $42.250 $40.000 $46.370
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,142.000 $3.000 $0.720 $1.600 $1.700 $1.500 $2.320
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 164.000 $1.150 $2.300 $1.400 $1.350 $1.000 $1.160
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 220.000 $4.500 $3.450 $8.850 $8.450 $7.500 $8.690
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 1.000 $2,000.000 $1,150.370 $1,700.000 $1,585.000 $1,000.000 $1,159.240
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 1.000 $2,000.000 $1,035.330 $1,700.000 $1,585.000 $500.000 $579.620
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 456.000 $57.000 $41.410 $24.500 $23.250 $45.000 $52.170
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 23,380.000 $0.530 $0.700 $0.580 $0.550 $0.700 $0.810
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 93,524.000 $0.650 $0.690 $0.580 $0.550 $0.640 $0.740
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 97,236.000 $0.650 $0.690 $0.580 $0.550 $0.690 $0.800
REFL PAV MRKR TY II-C-R
EA 1,231.000 $5.000 $4.210 $4.700 $4.500 $4.500 $5.220
ELIM EXT PAV MRK & MRKS (4")
LF 180.000 $4.000 $2.300 $1.100 $1.050 $5.000 $5.800
D-GR HMA TY-D SAC-A PG70-28
TON 47,117.000 $135.000 $155.000 $157.250 $157.800 $167.000 $171.950
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 7,221.000 $135.000 $175.000 $170.000 $160.000 $167.000 $174.000
TACK COAT
GAL 40,724.000 $4.500 $5.000 $4.450 $6.000 $6.000 $5.180
TMA (STATIONARY)
DAY 93.000 $260.000 $250.000 $220.000 $450.000 $355.000 $556.500
TMA (MOBILE OPERATION)
DAY 6.000 $460.000 $600.000 $1,100.000 $900.000 $375.000 $1,090.610
Totals: $9,731,074.430 $11,319,017.730 $11,454,345.550 $11,799,347.400 $12,147,264.450 $12,702,579.200