Show Job Controls
Bid Cobra

DEWITT FM 952 (0941-02-019)

Items: 75

County: DEWITT
Length: N/A
Highway: FM 952
District: YOAKUM
Control Number: 0941-02-019
DBE Goal: N/A
Project: BR 2019(638)
Guaranty: N/A
Time: 149 WORKING DAYS
Engineer's Estimate: $1,197,799.25
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,197,799.25
$1,347,305.19
Over/Under Est: 12.48% $149,505.94
Over/Under Est: 15.56% $186,376.87
Amt Left: 2.74% $36,870.93
$1,426,264.30
Over/Under Est: 19.07% $228,465.05
Amt Left: 5.86% $78,959.11
Delta: -3.04% -$42,088.18
Over/Under Est: 35.88% $429,786.88
Amt Left: 20.8% $280,280.94
Delta: -14.12% -$201,321.83
Over/Under Est: 36.11% $432,561.12
Amt Left: 21.01% $283,055.18
Delta: -0.17% -$2,774.24
$2,023,864.00
Over/Under Est: 68.97% $826,064.75
Amt Left: 50.22% $676,558.81
Delta: -24.14% -$393,503.63

Bid Items & Bid Tabulations

75 Total 0 of 75
DEWITT  |  FM 952  |  YOAKUM  |  0941-02-019  |  03/05/2019  |  $1,197,799.25  |  BR 2019(638)  |  REPLACE BRIDGE AND APPROACHES  |  149 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
HILL COUNTRY BRIDGE, INC.
SB CONTRACTORS LLC
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 2.500 $3,000.000 $1,500.000 $6,920.000 $2,400.000 $20,775.000 $10,000.000 $55,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 1.000 $700.000 $646.000 $316.000 $600.000 $3,675.000 $3,000.000 $1,000.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $1,000.000 $1,290.000 $950.000 $800.000 $4,725.000 $3,500.000 $2,000.000
PREP ROW (TREE)(24"-30"DIA)
EA 1.000 $1,000.000 $1,600.000 $1,265.000 $1,200.000 $5,775.000 $3,500.000 $5,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 1.000 $3,000.000 $2,340.000 $2,630.000 $1,500.000 $6,825.000 $5,000.000 $5,000.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 4,181.000 $15.000 $11.000 $14.450 $20.500 $29.970 $18.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,003.000 $15.000 $11.000 $15.000 $8.000 $29.970 $20.000 $35.000
BLADING
HR 20.000 $100.000 $131.000 $90.000 $55.000 $125.400 $100.000 $150.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 8,506.000 $0.500 $0.480 $0.470 $0.450 $0.400 $0.440 $1.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 2,127.000 $0.500 $0.450 $0.440 $0.570 $0.500 $0.440 $1.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 2,127.000 $0.500 $0.450 $0.440 $0.570 $0.500 $0.440 $1.000
VEGETATIVE WATERING
MG 72.000 $50.000 $30.600 $30.000 $45.000 $26.640 $18.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 39.000 $10.000 $10.600 $11.000 $10.000 $6.000 $3.000 $10.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,472.000 $65.000 $72.000 $63.900 $70.000 $72.830 $73.000 $60.000
CEMENT
TON 110.000 $140.000 $209.000 $147.000 $155.000 $157.500 $150.000 $200.000
CEMENT TREAT (SUBGRADE) (8")
SY 6,921.000 $2.500 $2.350 $3.680 $3.000 $4.560 $2.500 $4.500
ASPH (RC-250)
GAL 1,155.000 $4.000 $8.000 $7.900 $8.000 $7.620 $5.750 $10.000
AGGR(TY-E GR-5 SAC-B)
CY 44.000 $100.000 $132.000 $131.600 $130.000 $155.910 $285.000 $300.000
AGGR(TY-PE GR-3 SAC-B)
CY 69.000 $100.000 $132.000 $131.600 $130.000 $179.010 $225.000 $300.000
AGGR(TY-PE GR-4 SAC-B)
CY 55.000 $100.000 $132.000 $131.600 $130.000 $179.010 $275.000 $300.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,674.000 $4.000 $7.400 $7.350 $8.000 $7.620 $4.250 $10.000
CEM STABIL BKFL
CY 27.000 $150.000 $237.000 $275.000 $155.000 $190.000 $300.000 $250.000
TEMPORARY SPL SHORING
SF 100.000 $15.000 $25.000 $57.000 $45.000 $32.000 $43.000 $45.000
DRILL SHAFT (24 IN)
LF 840.000 $120.000 $162.000 $158.750 $225.000 $164.000 $220.000 $250.000
CL C CONC (ABUT)
CY 29.200 $800.000 $1,100.000 $890.000 $1,500.000 $1,300.000 $1,700.000 $1,000.000
CL C CONC (CAP)
CY 21.000 $1,000.000 $1,250.000 $1,135.000 $1,600.000 $1,700.000 $2,300.000 $1,000.000
CL C CONC (COLUMN)
CY 8.400 $1,200.000 $1,250.000 $1,535.000 $1,600.000 $1,600.000 $3,500.000 $1,000.000
REINF CONC SLAB (SLAB BEAM)
SF 5,050.000 $15.000 $16.600 $17.500 $19.000 $25.000 $23.000 $15.000
PRESTR CONC SLAB BEAM (4SB12)
LF 355.500 $145.000 $191.000 $150.000 $155.000 $180.000 $182.000 $145.000
PRESTR CONC SLAB BEAM (5SB12)
LF 711.000 $155.000 $190.000 $150.000 $155.000 $165.000 $182.000 $145.000
RIPRAP (CONC)(5 IN)
CY 6.000 $500.000 $650.000 $610.000 $550.000 $600.000 $575.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 186.000 $100.000 $127.000 $155.500 $135.000 $120.000 $136.000 $185.000
RAIL (TY T223)
LF 264.000 $110.000 $89.400 $95.000 $110.000 $145.000 $110.000 $135.000
ARMOR JOINT (SEALED)
LF 78.000 $75.000 $80.800 $75.000 $80.000 $95.000 $125.000 $15.000
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
EA 6.000 $1,300.000 $1,270.000 $1,495.000 $0.000 $0.000 $0.000 $0.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $45,000.000 $27,000.000 $24,000.000 $20,000.000 $20,000.000 $50,000.000 $200,000.000
MOBILIZATION
LS 1.000 $98,000.000 $109,000.000 $138,400.000 $120,000.000 $161,311.790 $160,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,000.000 $4,000.000 $2,230.000 $2,200.000 $1,080.070 $2,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $50.000 $31.800 $25.500 $45.000 $35.000 $35.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $10.000 $10.600 $16.500 $21.000 $11.400 $10.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 280.000 $3.000 $5.300 $3.600 $6.000 $3.800 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 280.000 $1.000 $2.100 $1.300 $3.000 $1.000 $1.000 $2.000
CONSTRUCTING DETOURS
SY 599.000 $30.000 $50.600 $96.200 $36.000 $59.730 $76.000 $50.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $5,500.000 $3,180.000 $5,900.000 $4,800.000 $5,910.470 $5,500.000 $5,000.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 990.000 $30.000 $39.500 $43.400 $38.000 $37.260 $25.000 $65.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 510.000 $10.000 $31.200 $9.250 $30.000 $29.410 $13.000 $20.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 990.000 $14.000 $12.100 $15.800 $15.000 $11.420 $15.000 $20.000
DRIVEWAYS (SURF TREAT)
SY 53.000 $20.500 $36.100 $42.000 $36.000 $48.180 $100.000 $42.000
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $30.000 $18.000 $20.500 $26.000 $17.000 $19.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,910.000 $2,500.000 $1,700.000 $1,800.000 $2,400.000 $1,850.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $2,330.000 $2,500.000 $2,800.000 $2,200.000 $2,400.000 $2,850.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $1,100.000 $1,700.000 $1,000.000 $1,033.800 $850.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $750.000 $1,100.000 $775.000 $1,000.000 $1,033.080 $150.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,500.000 $8,760.000 $9,000.000 $8,500.000 $8,270.320 $8,000.000 $15,000.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $150.000 $196.000 $250.000 $200.000 $300.000 $190.000 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $400.000 $477.000 $525.000 $500.000 $550.000 $450.000 $450.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $20.000 $14.800 $25.000 $14.000 $12.000 $14.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $22.000 $20.100 $25.000 $19.000 $16.000 $19.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,145.000 $0.250 $0.420 $0.420 $0.450 $0.400 $0.400 $1.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 22.000 $8.000 $6.400 $6.300 $7.000 $6.000 $6.000 $20.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 180.000 $4.500 $5.300 $5.250 $6.000 $5.000 $5.000 $15.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,200.000 $0.600 $0.710 $1.000 $0.750 $0.670 $0.670 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 213.000 $1.000 $1.550 $3.250 $0.750 $1.760 $1.000 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,963.000 $0.500 $0.710 $0.710 $0.370 $0.670 $0.670 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 140.000 $0.500 $0.710 $0.710 $0.670 $0.670 $0.670 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,413.000 $0.500 $0.710 $0.710 $0.670 $0.670 $0.670 $1.000
REFL PAV MRKR TY II-A-A
EA 49.000 $5.000 $23.300 $25.000 $22.000 $22.000 $22.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 970.000 $0.350 $3.200 $5.800 $4.000 $5.000 $3.000 $1.000
TREE TRIMMING / BRUSH REMOVAL
MI 0.330 $16,000.000 $19,576.820 $16,730.000 $12,000.000 $52,500.000 $12,000.000 $5,000.000
THERMO PIPE(18")(HDPE)(TY S)(CSB)
LF 252.000 $65.000 $30.300 $22.000 $0.000 $0.000 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $8,480.000 $9,100.000 $9,000.000 $7,500.000 $8,500.000 $12,500.000
TMA (STATIONARY)
EA 1.000 $8,000.000 $19,100.000 $14,200.000 $7,000.000 $7,500.000 $12,500.000 $15,000.000
TMA (MOBILE OPERATION)
DAY 10.000 $500.000 $159.000 $725.000 $420.000 $250.000 $400.000 $850.000
1
RC PIPE (CL III)(18 IN)
LF 252.000 $65.000 $0.000 $0.000 $60.000 $70.000 $69.000 $85.000
1
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,300.000 $0.000 $0.000 $1,200.000 $1,700.000 $1,800.000 $2,000.000
Totals: $1,221,979.250 $1,347,305.191 $1,384,176.120 $1,426,264.300 $1,627,586.130 $1,630,360.370 $2,023,864.000