Show Job Controls
Bid Cobra

DEWITT SH 72 (0270-02-041)

Items: 189

County: DEWITT
Length: N/A
Highway: SH 72
District: YOAKUM
Control Number: 0270-02-041
DBE Goal: N/A
Project: STP 2021(310)
Guaranty: N/A
Time: 441 WORKING DAYS
Engineer's Estimate: $45,426,408.88
Date: 12/03/2020 (5 years ago)
Contract Number: N/A
Type: ADD 2 LANES FOR 4-LANE UNDIVIDED
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$45,426,408.88
$38,442,930.36
Over/Under Est: -15.37% -$6,983,478.52
$38,945,989.40
Over/Under Est: -14.27% -$6,480,419.48
Amt Left: 1.31% $503,059.04
Over/Under Est: -12.57% -$5,712,311.74
Amt Left: 3.31% $1,271,166.78
Delta: -1.97% -$768,107.74
Over/Under Est: -8.57% -$3,891,240.52
Amt Left: 8.04% $3,092,238.00
Delta: -4.59% -$1,821,071.22
$42,812,847.32
Over/Under Est: -5.75% -$2,613,561.56
Amt Left: 11.37% $4,369,916.96
Delta: -3.08% -$1,277,678.96
Subcontractor Percentage Amount
GUERRA UNDERGROUND LLC 3.49% $1,514,282.72
PIPE WHOLESALERS OF TEXAS, INC. 2.31% $1,002,290.28
HIGHWAY BARRICADES AND SERVICES, LLC 0.88% $381,824.87
M & D FOUNDATION DRILLING INDUSTRIES, INC. 0.76% $329,757.84
TEXAS ALTERNATIVE GRASSER INCORPORATED 0.40% $173,556.76
LONE STAR EROSION CONTROL 0.39% $169,217.84
GEOSOURCE, INC. 0.24% $104,134.06
THIRD COAST SERVICES LLC 0.19% $82,439.46
MURRAY CONSTRUCTION 0.11% $47,728.11
DORAN STEEL, INC. 0.11% $47,728.11
DEPENDABLE FENCE 0.11% $47,728.11
BATTERSON, LLP 0.09% $39,050.27
TORO BRAVO CONSTRUCTION, LLC 0.05% $21,694.59
CHEROKEE SERVICES 0.03% $13,016.76
SK CONCRETE SERVICES LLC 0.02% $8,677.84
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.01% $4,338.92
TEXAS MATERIALS GROUP, INC. 0.00% $0.00
Total: 9.19% $3,987,466.54

Bid Items & Bid Tabulations

189 Total 0 of 189
DEWITT  |  SH 72  |  YOAKUM  |  0270-02-041  |  12/03/2020  |  $45,426,408.88  |  STP 2021(310)  |  ADD 2 LANES FOR 4-LANE UNDIVIDED  |  441 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
ZACHRY CONSTRUCTION CORPORATION
COPASA INC
PREPARING ROW
STA 542.000 $5,000.000 $2,127.000 $1,845.020 $900.000 $6,287.110 $4,000.000
REMOVING CONC (DRIVEWAYS)
SY 174.000 $22.000 $12.000 $14.370 $14.000 $9.430 $3.000
REMOVING STAB BASE AND ASPH PAV(8")
SY 2,961.000 $4.000 $5.000 $2.990 $3.000 $3.000 $8.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 6,085.000 $4.100 $5.000 $2.970 $3.000 $5.380 $8.000
REMOVING STAB BASE & ASPH PAV (12"-14")
SY 174,950.000 $4.500 $6.000 $4.660 $6.700 $3.570 $4.940
EXCAVATION (ROADWAY)
CY 320,678.000 $7.500 $5.200 $7.320 $6.000 $4.610 $6.630
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 176,015.000 $7.250 $4.000 $5.610 $8.000 $1.930 $11.430
BLADING
HR 273.000 $95.000 $75.000 $91.200 $140.000 $190.760 $86.140
FURNISHING AND PLACING TOPSOIL (4")
SY 21,305.000 $1.150 $0.900 $1.110 $1.000 $4.500 $1.210
STRAW OR HAY MULCH
SY 803,864.000 $0.200 $0.120 $0.300 $0.200 $0.200 $0.230
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 14,089.000 $0.350 $0.180 $0.160 $0.100 $0.100 $0.140
BROADCAST SEED (TEMP) (WARM)
SY 3,523.000 $0.350 $0.380 $0.160 $0.100 $0.100 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 3,523.000 $0.350 $0.380 $0.160 $0.100 $0.100 $0.100
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 521,817.000 $0.150 $0.090 $0.120 $0.140 $0.140 $0.140
DRILL SEEDING (TEMP) (WARM)
SY 130,456.000 $0.150 $0.080 $0.090 $0.120 $0.120 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 130,456.000 $0.150 $0.080 $0.090 $0.120 $0.120 $0.100
VEGETATIVE WATERING
MG 11,457.000 $18.000 $7.000 $13.320 $22.000 $17.380 $22.990
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 5,370.000 $1.200 $0.980 $0.850 $1.000 $0.950 $1.500
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 133,172.000 $59.000 $57.000 $53.360 $55.000 $54.710 $44.940
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 5,853.000 $180.000 $158.000 $147.000 $170.000 $171.650 $160.020
LIME TRT (SUBGRADE)(8")
SY 367,557.000 $2.000 $1.600 $1.710 $3.000 $2.520 $3.220
CEMENT
TON 1,241.000 $150.000 $140.000 $141.750 $150.000 $138.730 $137.730
CEMENT TREAT (SUBGRADE) (8")
SY 129,909.000 $4.100 $1.400 $1.600 $1.800 $2.350 $3.080
SALV,HAUL & STKPL RCL APH PV (2")
SY 199,571.000 $1.150 $1.000 $1.210 $1.500 $1.090 $1.670
PRIME COAT (MC-30)
GAL 92,308.000 $4.100 $3.300 $3.830 $3.400 $3.150 $3.390
AGGR(TY-PB GR-4 SAC-B)
CY 3,549.000 $84.000 $70.000 $71.660 $83.000 $110.000 $99.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 156,922.000 $3.500 $3.000 $2.890 $3.200 $2.600 $3.000
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
TON 782.000 $100.000 $100.000 $71.380 $90.000 $100.000 $109.000
CEM STABIL BKFL
CY 2,742.000 $60.000 $160.000 $100.000 $140.000 $103.940 $47.550
CUT & RESTORING PAV
SY 995.000 $150.000 $100.000 $90.000 $120.000 $59.940 $119.870
TRENCH EXCAVATION PROTECTION
LF 5,602.000 $3.500 $6.000 $5.000 $3.000 $2.880 $10.000
TEMPORARY SPL SHORING
SF 1,113.000 $35.000 $55.000 $30.000 $52.000 $28.140 $15.000
DRILL SHAFT (36 IN)
LF 2,414.000 $195.000 $180.000 $200.000 $230.000 $178.670 $217.720
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $185.000 $400.000 $395.000 $171.000 $171.000 $240.000
CL C CONC (ABUT)
CY 145.800 $1,000.000 $1,000.000 $950.000 $939.000 $831.470 $999.710
CL C CONC (CAP)
CY 170.800 $1,100.000 $860.000 $900.000 $904.000 $1,265.150 $1,016.210
CL C CONC (COLUMN)
CY 81.600 $950.000 $1,100.000 $950.000 $1,283.000 $1,061.830 $939.680
REINF CONC SLAB
SF 34,780.000 $15.000 $17.000 $18.000 $19.400 $16.660 $17.920
PRESTR CONC GIRDER (TX28)
LF 4,198.500 $180.000 $126.000 $110.000 $136.000 $116.970 $133.820
RIPRAP (CONC)(5 IN)
CY 268.000 $450.000 $500.000 $550.000 $477.000 $398.710 $447.410
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 943.600 $150.000 $140.000 $140.000 $194.000 $103.280 $148.660
RAIL (TY T223)
LF 1,004.000 $120.000 $115.000 $100.000 $102.000 $135.620 $102.780
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 372.000 $100.000 $115.000 $100.000 $108.000 $120.300 $108.140
CONC BOX CULV (3 FT X 2 FT)
LF 404.000 $220.000 $250.000 $220.000 $207.000 $157.710 $223.780
CONC BOX CULV (4 FT X 2 FT)
LF 104.000 $270.000 $260.000 $230.000 $221.000 $168.680 $257.010
CONC BOX CULV (4 FT X 3 FT)
LF 356.000 $290.000 $263.000 $220.000 $215.000 $185.500 $254.270
CONC BOX CULV (4 FT X 4 FT)
LF 94.000 $340.000 $304.000 $200.000 $270.000 $205.590 $310.720
CONC BOX CULV (5 FT X 2 FT)
LF 82.000 $375.000 $335.000 $310.000 $288.000 $219.480 $308.010
CONC BOX CULV (5 FT X 5 FT)
LF 87.000 $400.000 $375.000 $460.000 $347.000 $262.980 $384.460
CONC BOX CULV (6 FT X 3 FT)
LF 688.000 $350.000 $390.000 $320.000 $364.000 $275.290 $376.440
CONC BOX CULV (6 FT X 4 FT)
LF 312.000 $425.000 $392.000 $360.000 $396.000 $299.620 $421.620
CONC BOX CULV (6 FT X 5 FT)
LF 552.000 $450.000 $425.000 $400.000 $421.000 $317.070 $424.590
CONC BOX CULV (6 FT X 6 FT)
LF 624.000 $500.000 $438.000 $420.000 $458.000 $345.740 $454.430
CONC BOX CULV (7 FT X 4 FT)
LF 192.000 $510.000 $464.000 $450.000 $480.000 $362.270 $572.820
CONC BOX CULV (8 FT X 4 FT)
LF 92.000 $600.000 $505.000 $520.000 $518.000 $391.300 $635.370
CONC BOX CULV (8 FT X 6 FT)
LF 384.000 $720.000 $543.000 $550.000 $616.000 $466.530 $731.680
RC PIPE (CL III)(24 IN)
LF 3,299.000 $90.000 $54.000 $65.000 $63.000 $48.910 $76.200
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $3,300.000 $5,500.000 $8,000.000 $7,068.000 $5,959.580 $6,342.020
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $5,000.000 $5,800.000 $6,000.000 $9,756.000 $8,028.690 $6,842.530
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 7.000 $5,500.000 $8,000.000 $6,000.000 $9,738.000 $8,096.840 $9,873.140
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $6,000.000 $8,300.000 $5,500.000 $10,423.000 $8,656.010 $9,580.680
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $6,100.000 $8,500.000 $6,500.000 $9,106.000 $7,734.050 $9,899.810
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $6,500.000 $17,000.000 $12,000.000 $13,240.000 $11,439.240 $11,684.860
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 1.000 $6,500.000 $6,100.000 $9,000.000 $8,822.000 $7,378.000 $6,452.330
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $6,600.000 $8,200.000 $8,000.000 $8,943.000 $7,470.340 $8,136.160
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $7,200.000 $23,000.000 $17,000.000 $14,770.000 $13,068.880 $14,580.680
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 14.000 $7,300.000 $4,300.000 $3,500.000 $8,950.000 $7,328.610 $9,999.100
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $8,000.000 $10,800.000 $9,000.000 $9,490.000 $8,268.510 $12,392.890
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 12.000 $7,300.000 $5,500.000 $4,200.000 $7,900.000 $6,655.140 $13,251.180
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 12.000 $8,000.000 $7,200.000 $5,500.000 $8,770.000 $7,476.810 $13,047.790
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $11,000.000 $10,200.000 $7,000.000 $9,500.000 $8,040.820 $13,505.420
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $13,850.000 $14,800.000 $10,000.000 $11,200.000 $9,481.030 $18,150.000
SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)
EA 8.000 $13,850.000 $9,500.000 $7,500.000 $11,400.000 $9,624.650 $17,318.340
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 127.000 $1,600.000 $1,400.000 $2,500.000 $1,540.000 $1,338.880 $1,055.970
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $96,000.000 $40,000.000 $50,000.000 $55,000.000 $81,535.000 $49,995.000
REMOV STR (LARGE)
EA 3.000 $6,000.000 $12,000.000 $3,500.000 $2,840.000 $4,582.780 $5,135.440
REMOV STR (SMALL)
EA 59.000 $1,500.000 $1,900.000 $1,300.000 $1,270.000 $1,420.920 $2,689.890
MOBILIZATION
LS 1.000 $3,400,000.000 $2,520,000.000 $3,005,000.000 $3,054,000.000 $4,200,000.000 $3,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $5,500.000 $5,000.000 $5,000.000 $1,330.000 $7,612.900 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,174.000 $30.000 $23.000 $22.000 $34.000 $22.000 $26.960
ROCK FILTER DAMS (REMOVE)
LF 1,174.000 $10.000 $6.000 $7.000 $7.000 $7.000 $8.780
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,333.000 $35.000 $12.000 $12.000 $20.000 $12.000 $30.450
CONSTRUCTION EXITS (REMOVE)
SY 1,333.000 $12.000 $2.000 $2.000 $4.500 $2.000 $9.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,125.000 $3.000 $4.000 $1.780 $3.500 $1.780 $5.460
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,125.000 $1.000 $0.400 $0.600 $0.500 $0.600 $0.820
CONSTRUCTING DETOURS
SY 12,521.000 $70.000 $53.000 $43.800 $43.000 $70.000 $63.990
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 4,270.000 $45.000 $60.000 $25.000 $36.000 $70.000 $31.770
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 2,100.000 $6.000 $12.000 $12.410 $11.000 $7.450 $7.120
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 15,680.000 $2.900 $7.000 $10.150 $8.000 $3.400 $4.660
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 6,370.000 $10.000 $1.000 $11.500 $15.000 $9.050 $9.860
INTERSECTIONS (ACP)
SY 5,708.000 $42.500 $40.000 $30.660 $37.000 $30.610 $52.000
DRIVEWAYS (CONC)
SY 294.000 $70.000 $83.000 $99.970 $101.000 $69.190 $110.000
DRIVEWAYS (ACP)
SY 4,224.000 $40.000 $38.000 $30.660 $37.000 $31.340 $52.000
DRIVEWAYS (SURF TREAT)
SY 2,386.000 $35.000 $25.000 $30.660 $28.000 $12.000 $24.800
RUMBLE STRIPS (SHOULDER)
LF 106,140.000 $0.250 $0.150 $0.140 $0.120 $0.110 $0.110
RUMBLE STRIPS (CENTERLINE)
LF 53,070.000 $0.250 $0.160 $0.140 $0.120 $0.110 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $22.000 $20.000 $19.250 $20.000 $20.250 $21.130
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,800.000 $1,900.000 $1,825.000 $1,820.000 $1,285.000 $1,778.740
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.000 $1.400 $1.350 $1.300 $1.250 $2.070
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $250.000 $200.000 $200.000 $168.000 $165.000 $233.890
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,650.000 $2,500.000 $2,430.000 $2,325.000 $2,279.000 $2,608.420
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $120.000 $115.000 $175.000 $171.000 $302.840
CRASH CUSH ATTEN (MOVE & RESET)
EA 36.000 $1,300.000 $800.000 $795.000 $2,360.000 $515.000 $1,459.040
CRASH CUSH ATTEN (REMOVE)
EA 20.000 $800.000 $350.000 $350.000 $712.000 $515.000 $642.600
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 20.000 $8,000.000 $6,700.000 $6,700.000 $8,620.000 $6,565.000 $7,900.510
MAILBOX INSTALL-S (WC-POST) TY 3
EA 13.000 $175.000 $115.000 $250.000 $255.000 $165.000 $133.000
CONDT (PVC) (SCH 80) (2")
LF 50.000 $8.100 $18.000 $18.000 $15.000 $14.850 $8.000
ELEC CONDR (NO.4) BARE
LF 50.000 $1.700 $2.000 $2.000 $1.500 $1.500 $1.650
ELEC CONDR (NO.4) INSULATED
LF 100.000 $1.900 $2.100 $2.100 $1.700 $1.650 $1.850
TRAY CABLE (4 CONDR) (12 AWG)
LF 410.000 $2.100 $2.250 $2.250 $2.400 $2.300 $2.050
GROUND BOX TY D (162922)W/APRON
EA 1.000 $880.000 $1,200.000 $1,200.000 $645.000 $632.000 $990.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 610.000 $4.500 $5.000 $5.000 $1.400 $1.400 $1.230
ZINC-COAT STL WIRE STRAND (5/16")
LF 610.000 $3.000 $5.500 $5.500 $1.600 $1.550 $2.450
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $4,700.000 $4,800.000 $4,800.000 $3,770.000 $3,700.000 $4,700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 12.000 $610.000 $430.000 $475.000 $485.000 $507.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 19.000 $600.000 $470.000 $475.000 $485.000 $589.000 $515.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $710.000 $515.000 $550.000 $560.000 $652.000 $495.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $670.000 $645.000 $705.000 $720.000 $693.000 $560.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 44.000 $380.000 $275.000 $300.000 $305.000 $358.000 $325.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 26.000 $395.000 $345.000 $385.000 $390.000 $412.000 $320.000
REMOVE SM RD SN SUP&AM
EA 110.000 $75.000 $90.000 $60.000 $60.000 $84.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 32.000 $20.000 $25.000 $18.000 $19.000 $22.000 $16.450
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $25.000 $30.000 $34.000 $35.000 $22.000 $23.250
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 48.000 $70.000 $55.000 $50.000 $50.000 $74.000 $67.240
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 59,000.000 $0.220 $0.250 $0.110 $0.250 $0.110 $4.170
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 361,200.000 $0.220 $0.230 $0.100 $0.250 $0.100 $0.190
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 477,200.000 $0.220 $0.230 $0.100 $0.250 $0.100 $0.220
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,000.000 $0.750 $0.500 $1.380 $0.500 $1.350 $0.690
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 4.000 $4.300 $20.000 $3.380 $20.000 $3.300 $4.280
WK ZN PAV MRK REMOV (W)(ARROW)
EA 12.000 $150.000 $175.000 $230.230 $180.000 $225.000 $176.720
WK ZN PAV MRK REMOV (W)(WORD)
EA 12.000 $200.000 $225.000 $260.920 $230.000 $255.000 $225.890
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 10,000.000 $0.750 $0.500 $1.380 $0.500 $1.350 $0.650
WK ZN PAV MRK REMOV (Y)(MED NOSE)
EA 2.000 $310.000 $265.000 $102.320 $270.000 $100.000 $308.800
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,700.000 $1.400 $0.750 $1.410 $1.300 $1.360 $1.620
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 23,300.000 $1.400 $0.750 $1.410 $1.300 $0.990 $0.690
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 411.000 $0.350 $1.500 $1.280 $1.500 $1.250 $0.170
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,732.000 $1.000 $1.000 $2.150 $1.000 $2.100 $0.830
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 149.000 $15.000 $14.000 $18.420 $15.000 $18.000 $12.620
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $260.000 $175.000 $230.230 $180.000 $225.000 $200.220
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $430.000 $425.000 $537.190 $430.000 $525.000 $456.820
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $350.000 $225.000 $274.220 $230.000 $268.000 $256.620
PREFAB PAV MRK TY C (Y) (MED NOSE)
EA 2.000 $400.000 $250.000 $818.580 $255.000 $800.000 $92.190
REFL PAV MRKR TY I-C
EA 1,345.000 $4.000 $3.250 $4.040 $3.000 $3.950 $3.510
REFL PAV MRKR TY II-A-A
EA 4,005.000 $4.000 $3.000 $4.040 $3.000 $3.950 $2.830
ELIM EXT PAV MRK & MRKS (4")
LF 164,000.000 $0.400 $0.600 $0.460 $0.400 $0.450 $0.350
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 160,000.000 $0.250 $2.000 $0.150 $0.600 $0.250 $0.260
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $8,000.000 $7,800.000 $7,750.000 $11,800.000 $11,605.000 $6,300.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $250.000 $275.000 $275.000 $200.000 $195.000 $200.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $250.000 $275.000 $275.000 $200.000 $195.000 $200.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $90.000 $150.000 $150.000 $125.000 $123.000 $98.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 712.000 $1.750 $2.500 $2.500 $1.700 $1.650 $1.600
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 3.000 $4,000.000 $3,300.000 $3,285.000 $3,770.000 $3,697.000 $4,300.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 3.000 $800.000 $650.000 $650.000 $350.000 $342.000 $795.000
INS TRF SIG PL AM (S)STR(TY B)
EA 2.000 $4,800.000 $5,200.000 $5,200.000 $2,570.000 $2,519.000 $3,450.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 2.000 $5,700.000 $6,300.000 $6,275.000 $2,880.000 $2,830.000 $5,000.000
REMOVAL OF CONCRETE FOUNDATIONS
EA 12.000 $500.000 $400.000 $750.000 $1,430.000 $545.770 $333.690
FULL - WIDTH MOWING
CYC 6.000 $3,200.000 $2,800.000 $18,200.000 $21,210.000 $1,794.000 $2,800.000
D-GR HMA TY-B PG70-22
TON 75,134.000 $80.000 $60.000 $66.090 $56.000 $64.500 $69.000
D-GR HMA TY-D SAC-B PG70-22
TON 73,148.000 $82.000 $73.000 $70.880 $65.000 $71.250 $84.000
TACK COAT
GAL 89,187.000 $3.200 $2.400 $2.850 $3.000 $2.500 $2.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $8,000.000 $7,500.000 $33,330.000 $14,646.130 $9,327.550
HPPM W/RET REQ TY I(W)4"(BRK)(100MIL)
LF 24,140.000 $0.410 $0.360 $0.390 $0.370 $0.380 $0.390
HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)
LF 106,140.000 $0.410 $0.330 $0.350 $0.340 $0.340 $0.350
HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL)
LF 208,818.000 $0.410 $0.330 $0.350 $0.340 $0.340 $0.360
TMA (STATIONARY)
DAY 50.000 $270.000 $250.000 $205.700 $155.000 $208.000 $276.520
TMA (MOBILE OPERATION)
DAY 50.000 $450.000 $250.000 $257.130 $540.000 $1,191.830 $364.110
SANITARY SEWER (4 IN) (PVC) (SDR 26)
LF 92.000 $70.000 $84.000 $81.000 $23.000 $83.000 $44.000
SANITARY SEWER (6 IN) (PVC) (SDR 26)
LF 54.000 $75.000 $92.000 $92.000 $40.000 $91.000 $45.000
SANITARY SEWER (8 IN) (PVC) (SDR 26)
LF 4,805.000 $85.000 $118.000 $128.000 $50.000 $132.000 $53.520
CASING (STEEL) (SANITARY SEWER) (16 IN)
LF 127.000 $140.000 $220.000 $221.000 $148.000 $220.000 $136.720
MANHOLE (SAN SEWER) ( 4' DIA)
EA 12.000 $8,250.000 $11,500.000 $13,050.000 $4,590.000 $13,101.000 $4,312.280
JCK BOR OR TUN SAN SWR(PVC)(8IN)(SDR26)
LF 590.000 $120.000 $285.000 $280.000 $610.000 $283.000 $400.000
SERVICE CONNECTION (SANITARY SEWER)
EA 7.000 $1,500.000 $510.000 $514.000 $9,696.000 $505.000 $1,363.000
REMOVE EXISTING MANHOLE(SANITARY SEWER)
EA 17.000 $330.000 $1,900.000 $1,920.000 $660.000 $1,867.000 $428.560
TIE EXIST SANITARY SEWER TO PROP MH
EA 13.000 $645.000 $510.000 $501.000 $1,250.000 $506.000 $898.000
MANHOLE DROP (SAN SWR)(6IN)
EA 2.000 $2,000.000 $1,550.000 $1,535.000 $1,500.000 $1,525.000 $1,678.900
MANHOLE DROP (SAN SWR)(8IN)
EA 4.000 $2,200.000 $1,800.000 $1,801.000 $2,000.000 $1,781.000 $2,127.000
REMOVE EXIST SAN SWR PIPE (6IN)
LF 76.000 $11.000 $23.000 $23.000 $12.000 $22.500 $12.440
REMOVE EXIST SAN SWR PIPE (8IN)
LF 170.000 $11.000 $23.000 $23.100 $13.000 $22.500 $7.830
ABAND/FILL EXIST SAN SWR PIPE (8IN)
LF 5,204.000 $7.000 $22.000 $34.000 $23.000 $33.750 $26.000
PRE-CONSTRUCTION TELEVISION INSPECTION
LF 5,106.000 $4.000 $6.500 $6.800 $12.000 $6.500 $5.300
SANITARY SEWER CLEANOUT
EA 1.000 $1,526.000 $1,300.000 $1,325.000 $620.000 $1,251.000 $7,000.000
REMOVE EXIST SAN SWR PIPE (4 IN)
LF 24.000 $11.000 $23.000 $23.700 $16.000 $22.500 $17.200
BYPASS PUMPING
LS 1.000 $37,500.000 $15,000.000 $15,325.000 $127,600.000 $15,000.000 $38,797.000
MANHOLE(SAN SWR)(4' DIA)(SEALED W/VENT)
EA 13.000 $12,000.000 $12,600.000 $15,000.000 $16,300.000 $14,542.000 $5,000.000
JCK TUN BOR OR AUG CSG (STL) (12IN)
LF 211.000 $350.000 $270.000 $268.000 $710.000 $265.000 $92.680
CUT AND PLUG WATER MAIN (6IN)
EA 6.000 $1,079.000 $760.000 $800.000 $305.000 $753.000 $466.930
WET CONNECTION (6IN)
EA 2.000 $1,568.000 $13,000.000 $13,000.000 $3,460.000 $12,793.000 $843.470
WTR MAIN PIPE (PVC) (RESTRAINED JT) 6IN
LF 266.000 $40.000 $122.000 $130.000 $240.000 $121.000 $300.000
Totals: $45,426,408.880 $38,442,930.360 $38,945,989.400 $39,714,097.140 $41,535,168.387 $42,812,847.350