Show Job Controls
Bid Cobra

DALLAS IH0035E (6493-18-001)

Items: 87

County: DALLAS
Length: 0.0100 MILES
Highway: IH0035E
District: DALLAS
Control Number: 6493-18-001
DBE Goal: 0.0%
Project: RMC - A00218278
Guaranty: $59,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,077,247.18
Date: 1:00 PM JULY 01, 2026 (in 20 days)
Contract Number: 7264002
Type: PERFORMANCE BASED CONTRACT MANAGED LANES
Project ID: A00218278
Project Description: PERF BASED OPER & MAINT OF MANAGED LANES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
KARL FREDRICKSON
DAVID MORREN
DALLAS IH0035E (6493-18-001)
Project Name: N/A
Project: RMC - A00218278
Length: 0.0100 MILES
Project Type: MAINTENANCE
Limits From: IH0035E AND US0067 MANAGED LANES
Limits To: IN DALLAS COUNTY
Project Description: PERF BASED OPER & MAINT OF MANAGED LANES
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

87 Total 0 of 87
1 Changed
DALLAS  |  IH0035E  |  DALLAS  |  6493-18-001  |  1:00 PM JULY 01, 2026  |  $3,077,247.18  |  RMC - A00218278  |  PERFORMANCE BASED CONTRACT MANAGED L...  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
OPAQUE SEALER FINISH
SF 33,190.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 12.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000
CONC STR REPAIR (STANDARD)
SF 50.000
CLEANING EXISTING JOINTS
LF 200.000
CLEANING AND SEALING JOINTS (FOAM)
LF 800.000
MOBILIZATION (CALLOUT 1)
EA 5.000
MOBILIZATION (CALLOUT 2)
EA 3.000
MOBILIZATION (CALLOUT 3)
EA 6.000
MOBILIZATION (CALLOUT 4)
EA 6.000
MOBILIZATION (CALLOUT 5)
EA 3.000
MOBILIZATION (CALLOUT 6)
EA 4.000
MOBILIZATION (CALLOUT 7)
EA 10.000
MOBILIZATION (CALLOUT 8)
EA 4.000
MOBILIZATION (CALLOUT 9)
EA 24.000
MOBILIZATION (CALLOUT 10)
EA 3.000
MOBILIZATION (CALLOUT 11)
EA 14.000
MOBILIZATION (CALLOUT 12)
EA 2.000
MOBILIZATION (CALLOUT 13)
EA 39.000
MOBILIZATION (CALLOUT 14)
EA 3.000
TMA (STATIONARY)
DAY 730.000
TMA (MOBILE OPERATION)
DAY 25.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 36.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 36.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 3.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 3.000
REPLACE SRS & S TYS80 (1) (T)
EA 3.000
REPLACE SRS & S TYS80 (1) (T-EXAL)
EA 3.000
REPLACE SRS & S TYS80 (1) (U-EXAL)
EA 3.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 628.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRFHH
EA 85.000
REPLC DEL ASSM (D-DW)SZ 1(WFLX)SRFHH
EA 40.000
RE PM TY III (W)(6")(SLD)
LF 86,255.000
RE PM TY III (W)(6")(BRK)
LF 5,861.000
RE PM TY III (W)(6")(DOT)
LF 473.000
RE PM TY III (W)(8")(SLD)
LF 6,840.000
RE PM TY III (W)(12")(SLD)
LF 1,280.000
RE PM TY III (W)(24")(SLD)
LF 36.000
RE PM TY III (Y)(8")(SLD)
LF 684.000
RE PM TY III (Y)(12")(SLD)
LF 128.000
RE PM TY III (W)(WORD)
EA 5.000
REFL PAV MRKR TY II-C-C
EA 497.000
REFL PAV MRKR TY II-C-R
EA 513.000
ELIM EXT PM & MRKS (6")
LF 86,255.000
ELIM EXT PM & MRKS (8")
LF 684.000
ELIM EXT PM & MRKS (12")
LF 1,408.000
ELIM EXT PM & MRKS (24")
LF 36.000
ELIM EXT PM & MRKS (WORD)
EA 5.000
PAV SURF PREP FOR MRK (6")
LF 86,255.000
PAV SURF PREP FOR MRK (12")
LF 1,408.000
PAV SURF PREP FOR MRK (24")
LF 36.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 10.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 500.000
FULL - WIDTH MOWING
AC 202.000
BROADCAST APPLICATION
MI 6.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 28.800
LITTER REMOVAL
AC 402.960
GRAFFITI REMOVAL (PAINTING)
SF 17.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 49.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 38.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000
REPLACE TIMBER POST W/O CONC FND
EA 10.000
REALIGN POSTS
EA 96.000
REPLACE TERMINAL ANCHOR POSTS
EA 12.000
REM OBSOLETE GET & REPL W/ SGT
EA 3.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 250.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 12.000
REPLACE BLOCKOUT
EA 12.000
RESET SGT IMPACT HEAD
EA 4.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 2.000
REALIGN EXISTING RAIL
LF 100.000
REPLACE (SMTC) NARROW
EA 10.000
REPAIR (SMTC) NARROW
LF 150.000
REPLACE CRASH CUSH ATTEN (L)(N)(TL3)
EA 7.000
BRIDGE JOINT REPAIR (SEJ)
LF 25.000
Qty Changed
PARTIAL ABG REPLACEMENTS
LF 200.000
COMPLETE ABG REPLACEMENTS
EA 6.000
REPLACE VAB SYSTEMS-NETS
EA 4.000
REPLACE VAB SYSTEMS-TAPES
EA 16.000
PERF BASED OPER & MAINT MANAGED LANES
MO 24.000