DALLAS US0080 (6343-27-001)

Items: 100

County: DALLAS
Length: N/A
Highway: US0080
District: DALLAS
Control Number: 6343-27-001
DBE Goal: N/A
Project: RMC - 634327001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,995,035.00
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: GUARD FENCE & CABLE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$3,995,035.00
$3,273,523.00
Over/Under Est: -18.06% -$721,512.00
$4,595,036.24
Over/Under Est: 15.02% $600,001.24
Amt Left: 40.37% $1,321,513.24

Bid Items & Bid Tabulations

100 Total 0 of 100
DALLAS  |  US0080  |  DALLAS  |  6343-27-001  |  07/09/2019  |  $3,995,035.00  |  RMC - 634327001  |  GUARD FENCE & CABLE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
VANN/ELLI, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $440.000 $450.000 $400.000
MOBILIZATION (CALLOUT)
EA 208.000 $600.000 $1.000 $962.530
CONC CURB (DOWEL) (TY II)
LF 500.000 $40.000 $1.000 $35.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,500.000 $25.000 $35.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $30.000 $50.000 $65.000
TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $1.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,500.000 $4,000.000 $2,200.000
MTL BEAM GD FEN TRANS (TL2)
EA 5.000 $100.000 $1,000.000 $1,300.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $16.000 $1.000 $15.000
SHORT RADIUS
LF 600.000 $30.000 $20.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECT (TY IV)
EA 50.000 $1,100.000 $800.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $3.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 18.000 $200.000 $500.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $2,000.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,000.000 $4,800.000 $3,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 20.000 $1,000.000 $50.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $400.000 $100.000 $250.000
CRASH CUSH ATTEN (REMOVE)
EA 20.000 $1,150.000 $500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $17,000.000 $1,000.000 $19,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 18.000 $21,000.000 $1,000.000 $25,010.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 5.000 $25,000.000 $1,000.000 $41,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 2.000 $11,000.000 $1,000.000 $19,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 10.000 $16,000.000 $1,000.000 $25,010.000
CHAIN LINK FENCE (INSTALL) (6')
LF 1,000.000 $19.000 $6.000 $20.000
CHAIN LINK FENCE (REPAIR) (6')
LF 3,000.000 $12.000 $5.000 $15.000
CHAIN LINK FENCE (REMOVE)
LF 1,000.000 $5.000 $2.000 $5.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,200.000 $1,200.000 $4,000.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $1,000.000 $500.000 $2,000.000
CHAIN LINK FENCE (REPAIR) (4')
LF 250.000 $12.000 $4.000 $12.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,400.000 $15.000 $5.000 $12.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 700.000 $15.000 $5.000 $12.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 500.000 $10.000 $15.000 $13.500
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 700.000 $60.000 $10.000 $65.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 500.000 $60.000 $10.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 700.000 $25.000 $25.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 500.000 $9.210 $10.000 $35.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 500.000 $30.000 $5.000 $35.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 500.000 $30.000 $5.000 $35.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 30,000.000 $18.000 $20.000 $11.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 60.000 $25.000 $40.000 $35.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $30.000 $40.000 $35.000
REM / REPL TIMBER POST W / O CONC FND
EA 1,500.000 $50.000 $50.000 $50.000
REM / REPL STEEL POST W / O CONC FND
EA 200.000 $58.000 $20.000 $80.000
REM / REPL TIMBER POST W / CONC FND
EA 100.000 $50.000 $20.000 $60.000
REM / REPL STEEL POST W / CONC FND
EA 25.000 $90.000 $40.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 100.000 $175.000 $25.000 $325.000
REALIGN POSTS
EA 3,000.000 $20.000 $5.000 $10.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 180.000 $15.000 $5.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 1,200.000 $15.000 $5.000 $15.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 15.000 $20.000 $1.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $25.000 $100.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 375.000 $60.000 $1.000 $75.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $100.000 $1.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $50.000 $1.000 $100.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $86.000 $400.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 200.000 $2,500.000 $5,000.000 $2,700.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,250.000 $1,000.000 $800.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $100.000 $1.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 50.000 $100.000 $50.000 $10.000
REPLACE SGT CABLE ANCHOR
EA 50.000 $100.000 $50.000 $100.000
REPLACE SGT STRUT
EA 50.000 $100.000 $50.000 $75.000
REPLACE SGT OBJECT MARKER
EA 50.000 $30.000 $50.000 $25.000
REPLACE POSTS (TL-3)
EA 2,400.000 $113.000 $150.000 $130.000
REPLACE POSTS (TL-4)
EA 500.000 $120.000 $200.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $225.000 $200.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $250.000 $1,000.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 90.000 $60.000 $200.000 $50.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 3.000 $100.000 $100.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 20.000 $500.000 $5,000.000 $1,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 6.000 $600.000 $9,000.000 $1,000.000
REPLACE CABLE (TL-3)
LF 500.000 $3.000 $2.000 $5.000
REPLACE CABLE (TL-4)
LF 200.000 $4.000 $5.000 $5.000
CHECK / RE-TENSION CABLE
EA 15.000 $350.000 $100.000 $1,500.000
POST AND CABLE FENCE (REMOVAL)
LF 250.000 $3.000 $2.000 $1.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 5.000 $1,250.000 $10.000 $20.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 5,000.000 $10.000 $2.000 $5.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 200.000 $50.000 $1.000 $50.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $50.000 $50.000 $50.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 5.000 $100.000 $50.000 $100.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 2,500.000 $4.000 $2.000 $2.500
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 50.000 $350.000 $400.000 $500.000
REPAIR (REACT)
EA 25.000 $1,000.000 $100.000 $1,000.000
REPAIR (QUAD) (W) (BAY)
EA 4.000 $1,500.000 $100.000 $3,500.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 2.000 $2,700.000 $100.000 $3,000.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 3.000 $1,000.000 $100.000 $3,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 5.000 $21,000.000 $5,000.000 $26,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 5.000 $25,000.000 $8,000.000 $40,000.000
REPAIR (TRACC) (BAY)
EA 17.000 $900.000 $100.000 $1,500.000
REPAIR (SMTC) (N)
LF 60.000 $165.000 $150.000 $400.000
REPAIR (SMTC)(W) (BAY)
EA 20.000 $900.000 $400.000 $4,000.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 5.000 $17,000.000 $8,000.000 $22,000.000
REPAIR (QUADGUARD)(MASH)(N)(BAY)
EA 20.000 $900.000 $500.000 $2,000.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 5.000 $17,000.000 $9,000.000 $22,000.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 20.000 $900.000 $500.000 $1,500.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 150.000 $140.000 $20.000 $150.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 150.000 $100.000 $20.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $200.000 $100.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $31,000.000 $3,000.000 $20,000.000
TMA (STATIONARY)
EA 1.000 $100,000.000 $40,000.000 $70,000.000
TMA (STATIONARY)
DAY 130.000 $260.000 $200.000 $400.000
Totals: $3,995,035.000 $3,273,523.000 $4,595,036.240