Show Job Controls
Bid Cobra

DALLAS IH 345 (0092-14-092)

Items: 83

County: DALLAS
Length: N/A
Highway: IH 345
District: DALLAS
Control Number: 0092-14-092
DBE Goal: N/A
Project: C 92-14-92
Guaranty: N/A
Time: 125 WORKING DAYS
Engineer's Estimate: $3,132,828.76
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,132,828.76
Over/Under Est: 10.84% $339,723.91
Over/Under Est: 25.82% $809,024.48
Amt Left: 13.51% $469,300.57
$4,099,363.30
Over/Under Est: 30.85% $966,534.54
Amt Left: 18.05% $626,810.63
Delta: -4.00% -$157,510.06
$4,226,549.62
Over/Under Est: 34.91% $1,093,720.86
Amt Left: 21.71% $753,996.95
Delta: -3.10% -$127,186.32
Over/Under Est: 45.21% $1,416,317.44
Amt Left: 31% $1,076,593.53
Delta: -7.63% -$322,596.58
$4,597,314.46
Over/Under Est: 46.75% $1,464,485.70
Amt Left: 32.39% $1,124,761.79
Delta: -1.06% -$48,168.26

Bid Items & Bid Tabulations

83 Total 0 of 83
DALLAS  |  IH 345  |  DALLAS  |  0092-14-092  |  02/05/2019  |  $3,132,828.76  |  C 92-14-92  |  FULL DEPTH CONC REPAIR ON FRONTAGE R...  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NEW WORLD CONTRACTING, LLC
GIBSON & ASSOCIATES, INC.
FNH CONSTRUCTION, LLC
REBCON, INC.
ED BELL CONSTRUCTION COMPANY
TISEO PAVING CO.
REMOVING CONC (PAV)
SY 8,178.000 $10.350 $11.000 $10.290 $17.500 $12.000 $14.700 $10.290
REMOVING CONC (DRIVEWAYS)
SY 802.230 $11.450 $12.000 $11.440 $20.000 $15.000 $14.700 $11.440
REMOVING CONC (CURB)
LF 840.000 $5.000 $4.000 $3.740 $20.000 $15.000 $10.500 $3.740
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 9,214.000 $5.250 $5.000 $7.040 $10.000 $5.500 $10.500 $10.780
EXCAVATION (ROADWAY)
CY 2,474.000 $7.450 $22.000 $21.340 $20.000 $33.000 $21.000 $21.340
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 215.000 $11.100 $44.000 $42.460 $30.000 $25.000 $21.000 $42.460
COMPOST MANUF TOPSOIL (4")
SY 3,395.000 $1.130 $3.000 $2.500 $6.000 $7.000 $2.520 $3.000
BLOCK SODDING
SY 3,395.000 $3.150 $7.000 $6.840 $6.000 $7.000 $7.350 $7.000
VEGETATIVE WATERING
MG 505.000 $12.000 $60.000 $57.670 $50.000 $60.000 $3.150 $57.670
LIME (HYD, COM, OR QK(SLURRY))
TON 210.000 $172.000 $211.000 $202.400 $185.000 $187.000 $189.000 $180.000
LIME TRT (EXST MATL)(8")
SY 12,746.000 $4.000 $6.000 $5.390 $6.000 $3.500 $3.150 $4.600
SUPERPAVE MIXTURES SP-B PG64-22
TON 2,804.000 $80.000 $46.000 $85.090 $95.000 $110.000 $105.000 $90.970
CONC PVMT (CONT REINF - CRCP) (12")
SY 8,039.000 $72.000 $48.000 $91.500 $80.000 $105.000 $84.000 $99.250
CONC PVMT (CONT REINF-CRCP) (HES)(12")
SY 2,608.000 $90.000 $355.000 $102.000 $95.000 $125.000 $126.000 $148.250
FULL - DEPTH REPAIR CPCD (9")
SY 4,511.300 $150.000 $46.000 $210.000 $205.000 $175.000 $235.350 $199.950
FULL - DEPTH REPAIR CPJR (9")
SY 1,588.000 $155.000 $48.000 $305.000 $225.000 $380.000 $337.900 $479.850
CLEANING AND SEALING EXISTING JOINTS
LF 2,600.000 $5.000 $53.000 $17.000 $10.000 $2.000 $18.530 $2.700
ADJUSTING INLETS
EA 2.000 $1,580.000 $401.000 $5,000.000 $1,500.000 $2,000.000 $3,150.000 $11,000.000
MOBILIZATION
LS 1.000 $273,893.520 $180,000.000 $186,000.000 $300,000.000 $252,000.000 $482,000.000 $250,350.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $1,719.000 $6,800.000 $8,500.000 $13,500.000 $21,000.000 $17,550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 24.000 $28.750 $57.000 $80.500 $30.000 $81.000 $31.500 $33.000
ROCK FILTER DAMS (REMOVE)
LF 24.000 $9.770 $29.000 $46.280 $15.000 $46.000 $15.750 $16.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 155.560 $21.000 $19.000 $30.610 $45.000 $31.000 $21.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 155.560 $8.900 $10.000 $9.680 $20.000 $10.000 $10.500 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,600.000 $1.670 $2.000 $3.750 $4.000 $4.000 $1.520 $1.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,600.000 $0.550 $0.500 $0.530 $2.000 $1.000 $0.110 $0.110
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 430.000 $3.930 $4.000 $5.040 $15.000 $5.000 $3.680 $3.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 430.000 $0.660 $1.000 $0.430 $9.000 $1.000 $1.050 $1.100
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,560.000 $40.000 $70.000 $28.600 $72.000 $52.000 $21.000 $28.600
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 60.000 $60.000 $70.000 $57.200 $72.000 $52.000 $31.500 $57.200
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,680.000 $6.000 $57.000 $5.500 $20.000 $10.000 $3.150 $5.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $8.500 $57.000 $11.000 $20.000 $10.000 $21.000 $11.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,560.000 $10.000 $57.000 $7.700 $20.000 $9.000 $5.250 $7.700
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 60.000 $10.000 $69.000 $15.400 $20.000 $9.000 $13.650 $15.400
CONC CURB (TY I)
LF 840.000 $28.000 $45.000 $64.000 $18.000 $60.000 $69.760 $35.000
CONC CURB (MONO) (TY II)
LF 2,994.000 $6.000 $46.000 $5.000 $12.000 $2.000 $3.150 $4.000
DRIVEWAYS (CONC) (HES)
SY 802.230 $88.000 $84.000 $100.000 $110.000 $80.000 $126.000 $69.000
CONC SIDEWALKS (5")
SY 657.000 $50.000 $69.000 $80.000 $60.000 $57.000 $84.000 $68.810
CURB RAMPS (TY 1)
EA 1.000 $1,900.000 $2,062.000 $2,000.000 $2,000.000 $850.000 $2,100.000 $1,672.000
CURB RAMPS (TY 7)
EA 7.000 $1,450.000 $2,062.000 $1,750.000 $2,000.000 $1,365.000 $2,100.000 $1,672.000
CONDT (PVC) (SCH 40) (2")
LF 292.000 $7.500 $32.000 $16.500 $15.000 $12.000 $15.750 $16.500
CONDT (PVC) (SCH 40) (2") (BORE)
LF 78.000 $26.000 $28.000 $37.400 $40.000 $27.000 $35.700 $37.400
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,050.000 $903.000 $1,485.000 $850.000 $864.000 $1,417.500 $1,485.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,581.000 $0.260 $2.000 $2.200 $1.000 $2.200 $2.100 $1.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,933.000 $0.780 $1.000 $1.100 $1.000 $1.100 $1.050 $2.750
WK ZN PAV MRK REMOV (W)(ARROW)
EA 4.000 $135.000 $229.000 $220.000 $250.000 $220.000 $210.000 $259.600
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 4.000 $125.000 $344.000 $330.000 $250.000 $330.000 $315.000 $481.800
WK ZN PAV MRK REMOV (W)(UTURN ARROW)
EA 1.000 $99.000 $344.000 $330.000 $250.000 $330.000 $315.000 $533.500
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $160.000 $286.000 $275.000 $250.000 $275.000 $262.500 $294.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,322.000 $0.800 $1.000 $1.100 $1.000 $1.100 $1.050 $2.810
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 835.000 $1.050 $1.000 $1.100 $6.000 $1.100 $1.050 $2.370
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 427.000 $4.500 $4.000 $3.850 $6.000 $3.850 $3.680 $5.280
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 60.000 $6.250 $7.000 $6.600 $20.000 $6.600 $6.300 $9.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 63.000 $140.000 $160.000 $154.000 $250.000 $154.000 $147.000 $140.800
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 3.000 $1,000.000 $401.000 $385.000 $500.000 $385.000 $367.500 $870.100
PAVEMENT SEALER 4"
LF 54,327.000 $0.170 $0.150 $0.130 $0.500 $0.130 $0.130 $0.280
PAVEMENT SEALER 8"
LF 985.000 $0.350 $0.300 $0.280 $1.000 $0.280 $0.260 $1.490
PAVEMENT SEALER 12"
LF 427.000 $1.000 $1.000 $1.050 $1.000 $1.050 $1.000 $1.930
PAVEMENT SEALER 24"
LF 60.000 $2.640 $3.000 $3.300 $1.000 $3.300 $3.150 $2.530
PAVEMENT SEALER (ARROW)
EA 15.000 $30.000 $40.000 $38.500 $150.000 $38.500 $36.750 $25.300
PAVEMENT SEALER (EXIT GORE)
EA 3.000 $370.000 $229.000 $220.000 $150.000 $220.000 $210.000 $301.400
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,212.000 $0.500 $1.000 $0.770 $0.500 $0.770 $0.740 $0.880
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 24,049.000 $0.450 $1.000 $0.660 $0.500 $0.660 $0.630 $0.660
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,065.000 $0.450 $1.000 $0.660 $0.500 $0.660 $0.630 $0.660
REFL PAV MRKR TY II-C-R
EA 392.000 $5.000 $6.000 $5.500 $15.000 $5.500 $5.250 $9.080
ELIM EXT PAV MRK & MRKS (4")
LF 54,327.000 $0.500 $1.000 $0.500 $0.500 $0.500 $0.470 $0.610
ELIM EXT PAV MRK & MRKS (8")
LF 835.000 $0.750 $1.000 $0.880 $6.000 $0.880 $0.840 $1.870
ELIM EXT PAV MRK & MRKS (12")
LF 427.000 $1.750 $2.000 $2.200 $6.000 $2.200 $2.100 $2.700
ELIM EXT PAV MRK & MRKS (ARROW)
EA 15.000 $45.000 $63.000 $60.500 $150.000 $60.500 $57.750 $62.700
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 3.000 $350.000 $200.000 $192.500 $150.000 $192.500 $183.750 $605.000
PAV SURF PREP FOR MRK (4")
LF 54,327.000 $0.100 $0.500 $0.030 $0.500 $0.030 $0.030 $0.170
PAV SURF PREP FOR MRK (8")
LF 835.000 $0.170 $0.500 $0.060 $0.500 $0.060 $0.050 $1.320
PAV SURF PREP FOR MRK (12")
LF 427.000 $0.500 $1.000 $0.830 $0.500 $0.830 $0.790 $1.100
PAV SURF PREP FOR MRK (24")
LF 60.000 $1.150 $2.000 $2.200 $0.500 $2.200 $2.100 $2.420
PAV SURF PREP FOR MRK (ARROW)
EA 15.000 $20.000 $34.000 $33.000 $150.000 $33.000 $31.500 $24.200
PAV SURF PREP FOR MRK (EXIT GORE)
EA 3.000 $316.000 $172.000 $165.000 $150.000 $165.000 $157.500 $214.500
TRF SIG CBL (TY C)(18 AWG)(2 CONDR)
LF 589.000 $2.000 $7.000 $4.400 $3.000 $1.500 $4.200 $4.400
VEH LP DETECT (SAWCUT)
LF 271.000 $12.000 $17.000 $49.500 $11.000 $13.000 $47.250 $49.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $1,375.000 $20,000.000 $12,500.000 $15,000.000 $14,700.000 $19,500.000
CONDUIT (PREPARE)
LF 72.000 $1.250 $7.000 $5.500 $6.000 $6.000 $5.250 $5.500
GROUND BOX (PREPARE)
EA 4.000 $300.000 $286.000 $440.000 $150.000 $275.000 $420.000 $440.000
TMA (STATIONARY)
EA 2.000 $15,000.000 $16,040.000 $26,000.000 $12,500.000 $15,000.000 $22,050.000 $77,000.000
TMA (MOBILE OPERATION)
DAY 21.000 $290.000 $1,350.000 $250.000 $850.000 $550.000 $250.000 $625.000
Totals: $3,132,828.758 $3,472,552.670 $3,941,853.244 $4,099,363.300 $4,226,549.620 $4,549,146.206 $4,597,314.466