Show Job Controls
Bid Cobra

DALLAS IH 45 (0092-02-125)

Items: 130

County: DALLAS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-02-125
DBE Goal: N/A
Project: CM 2022(004)
Guaranty: N/A
Time: 132 WORKING DAYS
Engineer's Estimate: $3,302,612.51
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (9)
E
Engineer's Estimate
$3,302,612.51
$3,359,266.23
Over/Under Est: 1.72% $56,653.72
Over/Under Est: 4.8% $158,490.59
Amt Left: 3.03% $101,836.87
Over/Under Est: 8.76% $289,387.49
Amt Left: 6.93% $232,733.77
Delta: -3.78% -$130,896.90
Over/Under Est: 8.78% $290,090.69
Amt Left: 6.95% $233,436.97
Delta: -0.02% -$703.20
Over/Under Est: 16.88% $557,516.50
Amt Left: 14.91% $500,862.78
Delta: -7.44% -$267,425.81
$3,870,239.47
Over/Under Est: 17.19% $567,626.96
Amt Left: 15.21% $510,973.24
Delta: -0.26% -$10,110.46
$3,990,828.23
Over/Under Est: 20.84% $688,215.72
Amt Left: 18.8% $631,562.00
Delta: -3.12% -$120,588.76
$4,201,515.50
Over/Under Est: 27.22% $898,902.99
Amt Left: 25.07% $842,249.27
Delta: -5.28% -$210,687.27
$4,225,492.63
Over/Under Est: 27.94% $922,880.12
Amt Left: 25.79% $866,226.40
Delta: -0.57% -$23,977.13

Bid Items & Bid Tabulations

130 Total 0 of 130
DALLAS  |  IH 45  |  DALLAS  |  0092-02-125  |  09/01/2021  |  $3,302,612.51  |  CM 2022(004)  |  INTERS IMPRV  |  132 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
ACCELERATED CRITICAL PATH, INC.
NEW WORLD CONTRACTING, LLC
RAGLE CONSTRUCTION, INC.
SEMA CONSTRUCTION, INC.
ALTUS CONSTRUCTION LLC
REBCON, INC.
FNH CONSTRUCTION, LLC
TISEO PAVING CO.
PREPARING ROW
STA 38.780 $500.000 $500.000 $900.000 $3,000.000 $9,000.000 $9,950.000 $1,575.600 $3,300.000 $8,500.000 $1,630.000
REMOVING CONC (PAV)
SY 1,068.000 $12.000 $10.000 $29.000 $11.000 $13.000 $9.500 $12.630 $30.000 $20.000 $15.400
REMOVING CONC (RIPRAP)
SY 5.000 $9.290 $100.000 $36.000 $100.000 $30.000 $56.000 $31.590 $35.000 $20.000 $15.400
REMOVING CONC (MEDIANS)
SY 481.000 $15.000 $1.000 $9.000 $15.000 $9.000 $8.500 $15.340 $15.000 $20.000 $13.200
REMOVING CONC (SIDEWALKS)
SY 267.000 $12.000 $10.000 $14.000 $25.000 $12.500 $60.000 $16.470 $16.000 $20.000 $11.000
REMOVING CONC (DRIVEWAYS)
SY 499.000 $11.000 $10.000 $24.000 $25.000 $12.500 $8.000 $14.780 $25.000 $20.000 $15.400
REMOVING CONC (CURB)
LF 620.000 $5.000 $10.000 $19.000 $5.000 $5.000 $5.000 $9.940 $10.000 $20.000 $3.300
REMOVING CONC (RETAINING WALLS)
SY 158.000 $30.000 $10.000 $29.000 $25.000 $12.500 $25.000 $29.440 $35.000 $20.000 $148.500
REMOVING CONC (WHEELCHAIR RAMP)
SY 1.000 $15.000 $100.000 $190.000 $250.000 $200.000 $150.000 $1,263.470 $250.000 $1,000.000 $55.000
REMOVING CONC (FLUME)
SY 10.000 $15.250 $100.000 $49.000 $25.000 $30.000 $75.000 $94.760 $20.000 $100.000 $55.000
EXCAVATION (ROADWAY)
CY 5,411.000 $10.000 $10.000 $9.500 $15.000 $23.000 $6.500 $17.880 $19.000 $15.000 $28.600
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,207.000 $12.000 $10.000 $9.500 $20.000 $2.000 $11.000 $16.080 $11.000 $25.000 $46.200
BACKFILL (TY A OR B)
STA 59.400 $146.000 $150.000 $190.000 $275.000 $88.000 $240.000 $175.640 $400.000 $250.000 $205.000
ROAD GRADER WORK (ORD COMP)
STA 59.400 $200.000 $300.000 $90.000 $260.000 $102.000 $150.000 $165.220 $160.000 $250.000 $330.000
COMPOST MANUF TOPSOIL (4")
SY 17,902.000 $1.150 $0.850 $2.000 $1.050 $0.920 $1.850 $1.160 $1.120 $6.000 $2.250
BLOCK SODDING
SY 17,902.000 $3.250 $3.100 $3.100 $3.250 $4.500 $3.150 $3.430 $3.410 $6.000 $3.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 17,902.000 $0.130 $0.050 $0.400 $0.150 $0.180 $0.400 $0.230 $0.150 $0.500 $0.150
VEGETATIVE WATERING
MG 5,326.000 $5.000 $1.050 $19.000 $15.000 $1.000 $15.000 $1.260 $5.000 $20.000 $30.000
PROOF ROLLING
HR 26.000 $100.000 $100.000 $70.000 $87.500 $90.000 $160.000 $107.970 $161.700 $150.000 $165.000
LIME TRT (EXST MATL) (6")
SY 18,303.000 $2.130 $3.000 $5.500 $6.000 $3.000 $4.500 $2.270 $4.680 $4.000 $3.000
LIME (HYD, COM, OR QK(SLURRY))
TON 289.000 $160.000 $185.000 $195.000 $195.000 $181.000 $150.000 $251.560 $181.500 $200.000 $209.000
SLV, HAUL & STKPL RCL APH PV(8" TO 14")
SY 6,744.000 $2.500 $9.000 $9.500 $6.500 $6.000 $9.500 $11.070 $12.270 $15.000 $16.500
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 3,661.000 $3.520 $1.050 $5.000 $9.000 $8.750 $9.250 $6.950 $9.630 $8.000 $9.650
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 385.000 $80.000 $133.000 $110.000 $106.000 $112.000 $127.000 $113.410 $247.510 $200.000 $160.000
CONC PVMT (JOINTED - CPCD) (8")
SY 16,097.000 $80.000 $77.000 $65.000 $65.000 $71.000 $68.600 $77.300 $91.660 $60.000 $78.450
CONC PVMT (JOINTED - CPCD) (14")
SY 71.000 $200.000 $149.000 $390.000 $126.000 $130.000 $135.000 $193.840 $150.000 $165.000 $121.400
FULL - DEPTH REPAIR CPCD (8")
SY 1,340.000 $168.000 $201.000 $160.000 $144.000 $150.000 $165.000 $211.310 $225.070 $175.000 $140.000
TRENCH EXCAVATION PROTECTION
LF 265.000 $4.000 $15.000 $3.000 $5.000 $1.000 $8.500 $3.640 $10.000 $10.000 $2.200
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 60.000 $225.000 $413.600 $300.000 $220.000 $388.360 $320.000 $490.680 $427.200 $350.000 $489.500
CL C CONC (RAIL FOUNDATION)
CY 7.000 $500.000 $600.000 $1,600.000 $850.000 $900.000 $625.000 $535.560 $550.000 $2,000.000 $880.000
RIPRAP (CONC)(4 IN)
CY 10.500 $400.000 $840.000 $800.000 $450.000 $550.000 $490.000 $528.350 $800.000 $500.000 $550.000
RIPRAP (CONC)(CL B)
CY 2.100 $430.000 $1,680.000 $800.000 $725.000 $860.000 $800.000 $668.580 $1,250.000 $600.000 $550.000
RIPRAP (CONC)(FLUME)
CY 101.000 $450.000 $375.000 $400.000 $550.000 $1.000 $460.000 $521.860 $100.000 $550.000 $550.000
RAIL (TY SSTR)
LF 196.000 $120.000 $150.000 $190.000 $150.000 $95.000 $115.000 $58.510 $140.000 $150.000 $275.000
RC PIPE (CL III)(18 IN)
LF 118.000 $60.000 $118.000 $190.000 $63.000 $89.000 $72.000 $60.580 $75.000 $85.000 $140.800
RC PIPE (CL III)(24 IN)
LF 194.000 $70.000 $194.000 $190.000 $73.500 $112.000 $105.000 $63.390 $89.100 $95.000 $176.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 1.000 $5,200.000 $7,500.000 $6,600.000 $4,500.000 $4,500.000 $4,400.000 $5,647.500 $5,775.000 $8,500.000 $6,765.000
INLET (COMPL)(CURB)(TY 1)
EA 2.000 $2,785.720 $6,300.000 $6,000.000 $6,825.000 $4,300.000 $5,300.000 $3,519.690 $6,270.000 $8,500.000 $6,600.000
INLET (COMPL)(CURB&GRATE)(TY I)
EA 1.000 $700.000 $6,300.000 $6,700.000 $6,500.000 $5,800.000 $7,000.000 $9,476.060 $6,600.000 $10,000.000 $7,480.000
INLET (COMPL) (EXT)(TY I)
EA 2.000 $2,352.340 $2,100.000 $3,600.000 $6,000.000 $5,800.000 $2,400.000 $2,972.120 $5,500.000 $12,500.000 $2,145.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,138.000 $2,100.000 $2,500.000 $1,575.000 $1,900.000 $1,500.000 $2,228.140 $1,980.000 $2,200.000 $5,115.000
ADJUSTING INLETS
EA 1.000 $2,000.000 $4,250.000 $4,900.000 $1,050.000 $1,500.000 $3,000.000 $3,158.690 $3,080.000 $1,500.000 $4,675.000
REMOV STR (INLET)
EA 1.000 $720.000 $500.000 $800.000 $1,050.000 $500.000 $800.000 $1,314.650 $1,100.000 $1,500.000 $2,145.000
REMOV STR (SET)
EA 2.000 $300.000 $500.000 $300.000 $800.000 $500.000 $450.000 $1,170.460 $440.000 $500.000 $2,145.000
REMOV STR (PIPE)
EA 4.000 $350.000 $500.000 $300.000 $1,050.000 $250.000 $1,100.000 $1,030.430 $357.500 $500.000 $16.500
MOBILIZATION
LS 1.000 $289,328.410 $236,000.000 $360,000.000 $253,005.530 $350,000.000 $385,000.000 $379,042.250 $230,500.000 $350,000.000 $326,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $13,000.000 $6,900.000 $7,500.000 $15,000.000 $16,000.000 $25,269.480 $12,000.000 $8,500.000 $4,650.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 111.000 $29.000 $24.000 $50.000 $30.000 $22.000 $30.000 $29.370 $32.020 $30.000 $25.000
ROCK FILTER DAMS (REMOVE)
LF 111.000 $8.000 $10.000 $10.000 $12.000 $8.000 $11.750 $9.490 $12.770 $15.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 466.800 $21.000 $10.000 $40.000 $28.000 $21.000 $27.000 $23.470 $29.550 $30.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 466.800 $7.000 $5.000 $8.000 $8.500 $7.000 $8.880 $8.010 $8.920 $15.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 105.000 $2.330 $1.750 $6.000 $6.250 $4.000 $4.500 $3.690 $6.530 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 105.000 $0.630 $0.150 $3.000 $2.000 $2.000 $1.000 $0.810 $2.200 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,919.000 $4.000 $3.500 $4.000 $4.600 $3.960 $3.200 $4.980 $4.800 $12.000 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,919.000 $1.250 $1.000 $1.000 $0.600 $0.850 $0.810 $1.260 $0.620 $5.000 $2.000
CONSTRUCTING DETOURS
SY 324.000 $80.000 $125.000 $100.000 $120.000 $100.000 $115.000 $74.350 $192.180 $42.000 $147.400
CONC CURB (MONO) (TY II)
LF 3,070.000 $22.000 $4.000 $5.000 $5.000 $7.000 $5.100 $15.190 $2.000 $7.000 $4.000
DRIVEWAYS (CONC)
SY 478.000 $72.000 $100.000 $89.000 $115.000 $75.000 $76.000 $64.010 $93.500 $85.000 $101.200
CONC SIDEWALKS (4")
SY 206.000 $52.550 $100.000 $65.000 $65.000 $52.000 $55.000 $55.960 $90.000 $60.000 $68.200
CURB RAMPS (TY 1)
EA 1.000 $1,600.000 $2,000.000 $1,800.000 $1,300.000 $1,500.000 $1,800.000 $1,811.620 $1,650.000 $1,850.000 $2,200.000
CONC MEDIAN
SY 102.000 $61.000 $100.000 $75.000 $75.000 $60.000 $66.000 $63.210 $86.000 $125.000 $79.200
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $252.000 $240.750 $230.000 $240.000 $250.000 $240.000 $290.840 $250.000 $850.000 $250.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 6.000 $3,000.000 $2,040.510 $2,200.000 $2,215.000 $1,907.020 $1,725.000 $2,409.470 $2,097.720 $1,500.000 $2,775.300
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 6.000 $1,320.000 $1,089.930 $2,200.000 $2,315.000 $1,018.630 $1,500.000 $1,287.010 $1,120.490 $4,500.000 $2,365.000
CONDT (PVC) (SCH 40) (2")
LF 1,300.000 $7.500 $13.690 $13.000 $26.250 $12.790 $13.000 $16.160 $14.070 $15.000 $17.330
CONDT (PVC) (SCH 40) (2") (BORE)
LF 156.000 $20.000 $20.240 $30.000 $38.850 $18.920 $27.000 $23.900 $20.810 $40.000 $27.060
CONDT (PVC) (SCH 40) (3")
LF 25.000 $10.000 $20.360 $20.000 $38.850 $19.030 $14.000 $24.040 $20.930 $20.000 $34.100
CONDT (PVC) (SCH 40) (4")
LF 372.000 $12.000 $22.450 $22.000 $42.000 $20.980 $16.000 $26.510 $23.080 $20.000 $32.450
CONDT (PVC) (SCH 40) (4") (BORE)
LF 368.000 $30.000 $31.060 $40.000 $72.000 $29.030 $32.000 $36.680 $31.930 $40.000 $42.790
CONDT (RM) (1")
LF 208.000 $45.000 $22.160 $30.000 $53.000 $20.710 $20.000 $26.170 $22.780 $85.000 $42.130
ELEC CONDR (NO.8) BARE
LF 347.000 $1.280 $1.200 $2.800 $2.200 $1.120 $2.000 $1.420 $1.230 $3.000 $1.650
ELEC CONDR (NO.8) INSULATED
LF 3,206.000 $2.950 $1.520 $2.800 $3.400 $1.420 $2.000 $1.790 $1.560 $3.000 $2.200
ELEC CONDR (NO.6) BARE
LF 1,221.000 $1.250 $1.590 $2.000 $3.300 $1.490 $2.000 $1.880 $1.640 $3.000 $1.820
ELEC CONDR (NO.4) BARE
LF 2,388.000 $1.600 $2.110 $2.200 $3.500 $1.970 $2.600 $2.460 $2.170 $3.000 $2.860
ELEC CONDR (NO.4) INSULATED
LF 4,776.000 $2.000 $2.660 $2.500 $3.400 $2.490 $2.850 $3.150 $2.740 $3.000 $3.300
TRAY CABLE (3 CONDR) (12 AWG)
LF 2,651.000 $2.150 $1.750 $2.500 $4.400 $1.640 $2.300 $2.070 $1.800 $3.000 $3.410
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,200.000 $1,051.250 $1,300.000 $2,300.000 $982.470 $880.000 $1,241.330 $1,080.720 $1,100.000 $1,166.000
REMOVE GROUND BOX
EA 1.000 $200.000 $152.240 $250.000 $410.000 $142.280 $255.000 $179.770 $156.510 $250.000 $231.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $600.000 $208.930 $650.000 $615.000 $195.260 $875.000 $246.710 $214.790 $2,500.000 $836.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 15.000 $20.000 $31.670 $30.000 $30.000 $29.600 $29.000 $37.400 $30.800 $30.000 $30.800
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 32.000 $500.000 $548.910 $650.000 $540.000 $675.000 $730.000 $991.830 $564.300 $850.000 $564.300
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 35.000 $680.000 $775.750 $850.000 $760.000 $700.000 $885.000 $1,244.520 $797.500 $850.000 $797.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $750.000 $839.950 $800.000 $825.000 $950.000 $956.000 $1,478.260 $863.500 $850.000 $863.500
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $925.000 $1,230.500 $1,200.000 $1,205.000 $1,350.000 $1,280.000 $2,280.570 $1,265.000 $850.000 $1,265.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,000.000 $1,926.000 $1,900.000 $1,890.000 $3,500.000 $2,270.000 $4,207.370 $1,980.000 $5,000.000 $1,980.000
REMOVE LRSA
EA 1.000 $1,000.000 $879.860 $1,600.000 $1,575.000 $822.300 $1,350.000 $1,038.950 $1,650.000 $2,500.000 $1,650.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000 $60.000 $53.500 $55.000 $52.000 $95.000 $52.000 $66.290 $55.000 $100.000 $55.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 400.000 $0.450 $0.540 $0.550 $0.550 $3.000 $0.620 $0.690 $0.610 $1.000 $2.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 5,500.000 $0.310 $0.540 $0.550 $0.550 $1.000 $0.500 $0.570 $0.500 $1.000 $2.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 5,000.000 $0.320 $0.540 $0.550 $0.550 $1.000 $0.500 $0.570 $0.500 $1.000 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,290.000 $1.000 $2.000 $1.100 $2.000 $1.250 $3.550 $1.120 $2.000 $5.000 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 400.000 $1.000 $2.000 $1.500 $2.000 $1.250 $3.800 $1.250 $2.500 $5.000 $2.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,754.000 $1.000 $0.850 $0.800 $0.830 $1.500 $1.340 $1.520 $1.320 $6.000 $1.010
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 155.000 $5.750 $6.420 $6.500 $6.300 $8.000 $8.800 $10.110 $8.800 $20.000 $6.600
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 13.000 $200.000 $123.050 $120.000 $121.000 $190.000 $138.000 $157.930 $137.500 $250.000 $154.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $161.000 $149.800 $150.000 $147.000 $210.000 $170.000 $195.840 $170.500 $250.000 $187.000
PAVEMENT SEALER 4"
LF 19,343.000 $0.170 $0.160 $0.150 $0.150 $0.340 $0.290 $0.320 $0.280 $0.500 $0.170
PAVEMENT SEALER 8"
LF 3,754.000 $0.450 $0.210 $0.200 $0.200 $0.420 $0.290 $0.320 $0.280 $4.000 $0.390
PAVEMENT SEALER 24"
LF 155.000 $2.210 $1.610 $1.600 $1.600 $3.490 $2.200 $2.530 $2.200 $20.000 $2.750
PAVEMENT SEALER (ARROW)
EA 13.000 $35.000 $21.400 $21.000 $21.000 $50.000 $44.000 $49.280 $42.900 $50.000 $60.500
PAVEMENT SEALER (WORD)
EA 13.000 $40.000 $26.750 $26.000 $26.000 $50.000 $66.000 $74.540 $64.900 $50.000 $82.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,150.000 $0.450 $0.540 $0.500 $0.550 $0.650 $0.550 $0.620 $0.540 $1.000 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,279.000 $0.350 $0.480 $0.450 $0.500 $0.650 $0.500 $0.570 $0.500 $1.000 $0.720
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,914.000 $0.360 $0.480 $0.450 $0.500 $0.650 $0.500 $0.570 $0.500 $1.000 $0.720
REFL PAV MRKR TY II-C-R
EA 202.000 $4.000 $5.350 $5.500 $5.250 $6.000 $5.500 $6.320 $5.500 $5.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 7,759.000 $0.500 $0.540 $0.600 $0.550 $0.550 $0.450 $0.510 $0.440 $1.000 $1.100
ELIM EXT PAV MRK & MRKS (8")
LF 1,097.000 $0.750 $1.070 $1.100 $1.050 $0.800 $0.850 $0.950 $0.830 $6.000 $1.100
ELIM EXT PAV MRK & MRKS (24")
LF 155.000 $4.000 $3.210 $3.200 $3.150 $4.500 $3.300 $3.790 $3.300 $20.000 $4.400
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $45.000 $53.500 $55.000 $52.500 $100.000 $50.000 $56.860 $49.500 $50.000 $110.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $58.000 $53.500 $55.000 $52.500 $100.000 $84.000 $94.760 $82.500 $50.000 $110.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $230.000 $252.560 $300.000 $882.000 $236.040 $300.000 $298.230 $259.640 $285.000 $412.500
VEH SIG SEC (12")LED(GRN ARW)
EA 7.000 $240.000 $252.560 $300.000 $882.000 $236.040 $300.000 $298.230 $259.640 $285.000 $412.500
VEH SIG SEC (12")LED(YEL)
EA 12.000 $250.000 $252.560 $300.000 $882.000 $236.040 $300.000 $298.230 $259.640 $285.000 $412.500
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $250.000 $252.560 $300.000 $882.000 $236.040 $300.000 $298.230 $259.640 $285.000 $412.500
VEH SIG SEC (12")LED(RED)
EA 12.000 $250.000 $252.560 $300.000 $882.000 $236.040 $300.000 $298.230 $259.640 $285.000 $412.500
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $250.000 $252.560 $300.000 $882.000 $236.040 $300.000 $298.230 $259.640 $285.000 $412.500
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 14.000 $200.000 $182.690 $130.000 $378.000 $170.740 $105.000 $215.730 $187.810 $125.000 $126.500
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 1.000 $300.000 $237.060 $130.000 $410.000 $221.550 $116.000 $279.920 $243.710 $10.000 $192.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 257.000 $1.500 $1.680 $3.600 $4.500 $1.570 $2.300 $1.980 $1.730 $3.000 $2.090
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 2,454.000 $1.700 $2.170 $3.500 $4.500 $2.030 $2.600 $2.560 $2.230 $3.000 $2.860
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 1,796.000 $4.500 $3.180 $4.500 $6.650 $2.970 $3.350 $3.750 $3.270 $3.000 $6.600
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 3,627.000 $1.500 $1.320 $2.000 $3.300 $1.230 $2.300 $1.550 $1.350 $3.000 $2.640
REMOVAL OF SIGNAL HEAD ASSM
EA 14.000 $75.000 $134.250 $160.000 $310.000 $125.470 $270.000 $158.530 $138.020 $500.000 $302.500
SP MIXES SP-B SAC-B PG64-22
TON 4,027.000 $68.000 $88.000 $89.000 $90.000 $81.500 $85.000 $104.360 $94.200 $85.000 $93.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,250.000 $10,000.000 $4,500.000 $15,000.000 $4,500.000 $12,500.000 $2,526.950 $8,000.000 $12,500.000 $19,000.000
CONDUIT (PREPARE)
LF 1,763.000 $2.000 $1.670 $4.000 $3.650 $1.560 $2.050 $1.970 $1.720 $10.000 $3.030
GROUND BOX (PREPARE)
EA 10.000 $750.000 $237.360 $600.000 $485.000 $221.830 $260.000 $280.280 $244.010 $250.000 $396.000
RADAR COMMUNICATION CABLE
LF 2,583.000 $5.000 $0.640 $3.200 $3.500 $0.600 $4.500 $0.760 $0.660 $3.000 $3.080
TMA (STATIONARY)
DAY 132.000 $280.000 $157.500 $90.000 $285.000 $366.000 $250.000 $157.930 $200.000 $250.000 $200.000
TMA (MOBILE OPERATION)
HR 70.000 $77.000 $73.500 $70.000 $200.000 $72.000 $60.000 $63.170 $85.000 $85.000 $150.000
Totals: $3,302,612.510 $3,359,266.230 $3,461,103.100 $3,592,000.000 $3,592,703.200 $3,860,129.014 $3,870,239.519 $3,990,828.236 $4,201,515.500 $4,225,492.630