PREPARING ROW
|
STA
|
38.780
|
$500.000
|
$500.000
|
$900.000
|
$3,000.000
|
$9,000.000
|
$9,950.000
|
$1,575.600
|
$3,300.000
|
$8,500.000
|
$1,630.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,068.000
|
$12.000
|
$10.000
|
$29.000
|
$11.000
|
$13.000
|
$9.500
|
$12.630
|
$30.000
|
$20.000
|
$15.400
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
5.000
|
$9.290
|
$100.000
|
$36.000
|
$100.000
|
$30.000
|
$56.000
|
$31.590
|
$35.000
|
$20.000
|
$15.400
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
481.000
|
$15.000
|
$1.000
|
$9.000
|
$15.000
|
$9.000
|
$8.500
|
$15.340
|
$15.000
|
$20.000
|
$13.200
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
267.000
|
$12.000
|
$10.000
|
$14.000
|
$25.000
|
$12.500
|
$60.000
|
$16.470
|
$16.000
|
$20.000
|
$11.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
499.000
|
$11.000
|
$10.000
|
$24.000
|
$25.000
|
$12.500
|
$8.000
|
$14.780
|
$25.000
|
$20.000
|
$15.400
|
|
|
REMOVING CONC (CURB)
|
LF
|
620.000
|
$5.000
|
$10.000
|
$19.000
|
$5.000
|
$5.000
|
$5.000
|
$9.940
|
$10.000
|
$20.000
|
$3.300
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
158.000
|
$30.000
|
$10.000
|
$29.000
|
$25.000
|
$12.500
|
$25.000
|
$29.440
|
$35.000
|
$20.000
|
$148.500
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
1.000
|
$15.000
|
$100.000
|
$190.000
|
$250.000
|
$200.000
|
$150.000
|
$1,263.470
|
$250.000
|
$1,000.000
|
$55.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
10.000
|
$15.250
|
$100.000
|
$49.000
|
$25.000
|
$30.000
|
$75.000
|
$94.760
|
$20.000
|
$100.000
|
$55.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,411.000
|
$10.000
|
$10.000
|
$9.500
|
$15.000
|
$23.000
|
$6.500
|
$17.880
|
$19.000
|
$15.000
|
$28.600
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,207.000
|
$12.000
|
$10.000
|
$9.500
|
$20.000
|
$2.000
|
$11.000
|
$16.080
|
$11.000
|
$25.000
|
$46.200
|
|
|
BACKFILL (TY A OR B)
|
STA
|
59.400
|
$146.000
|
$150.000
|
$190.000
|
$275.000
|
$88.000
|
$240.000
|
$175.640
|
$400.000
|
$250.000
|
$205.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
59.400
|
$200.000
|
$300.000
|
$90.000
|
$260.000
|
$102.000
|
$150.000
|
$165.220
|
$160.000
|
$250.000
|
$330.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
17,902.000
|
$1.150
|
$0.850
|
$2.000
|
$1.050
|
$0.920
|
$1.850
|
$1.160
|
$1.120
|
$6.000
|
$2.250
|
|
|
BLOCK SODDING
|
SY
|
17,902.000
|
$3.250
|
$3.100
|
$3.100
|
$3.250
|
$4.500
|
$3.150
|
$3.430
|
$3.410
|
$6.000
|
$3.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
17,902.000
|
$0.130
|
$0.050
|
$0.400
|
$0.150
|
$0.180
|
$0.400
|
$0.230
|
$0.150
|
$0.500
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
5,326.000
|
$5.000
|
$1.050
|
$19.000
|
$15.000
|
$1.000
|
$15.000
|
$1.260
|
$5.000
|
$20.000
|
$30.000
|
|
|
PROOF ROLLING
|
HR
|
26.000
|
$100.000
|
$100.000
|
$70.000
|
$87.500
|
$90.000
|
$160.000
|
$107.970
|
$161.700
|
$150.000
|
$165.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
18,303.000
|
$2.130
|
$3.000
|
$5.500
|
$6.000
|
$3.000
|
$4.500
|
$2.270
|
$4.680
|
$4.000
|
$3.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
289.000
|
$160.000
|
$185.000
|
$195.000
|
$195.000
|
$181.000
|
$150.000
|
$251.560
|
$181.500
|
$200.000
|
$209.000
|
|
|
SLV, HAUL & STKPL RCL APH PV(8" TO 14")
|
SY
|
6,744.000
|
$2.500
|
$9.000
|
$9.500
|
$6.500
|
$6.000
|
$9.500
|
$11.070
|
$12.270
|
$15.000
|
$16.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
3,661.000
|
$3.520
|
$1.050
|
$5.000
|
$9.000
|
$8.750
|
$9.250
|
$6.950
|
$9.630
|
$8.000
|
$9.650
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
385.000
|
$80.000
|
$133.000
|
$110.000
|
$106.000
|
$112.000
|
$127.000
|
$113.410
|
$247.510
|
$200.000
|
$160.000
|
|
|
CONC PVMT (JOINTED - CPCD) (8")
|
SY
|
16,097.000
|
$80.000
|
$77.000
|
$65.000
|
$65.000
|
$71.000
|
$68.600
|
$77.300
|
$91.660
|
$60.000
|
$78.450
|
|
|
CONC PVMT (JOINTED - CPCD) (14")
|
SY
|
71.000
|
$200.000
|
$149.000
|
$390.000
|
$126.000
|
$130.000
|
$135.000
|
$193.840
|
$150.000
|
$165.000
|
$121.400
|
|
|
FULL - DEPTH REPAIR CPCD (8")
|
SY
|
1,340.000
|
$168.000
|
$201.000
|
$160.000
|
$144.000
|
$150.000
|
$165.000
|
$211.310
|
$225.070
|
$175.000
|
$140.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
265.000
|
$4.000
|
$15.000
|
$3.000
|
$5.000
|
$1.000
|
$8.500
|
$3.640
|
$10.000
|
$10.000
|
$2.200
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
60.000
|
$225.000
|
$413.600
|
$300.000
|
$220.000
|
$388.360
|
$320.000
|
$490.680
|
$427.200
|
$350.000
|
$489.500
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
7.000
|
$500.000
|
$600.000
|
$1,600.000
|
$850.000
|
$900.000
|
$625.000
|
$535.560
|
$550.000
|
$2,000.000
|
$880.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
10.500
|
$400.000
|
$840.000
|
$800.000
|
$450.000
|
$550.000
|
$490.000
|
$528.350
|
$800.000
|
$500.000
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.100
|
$430.000
|
$1,680.000
|
$800.000
|
$725.000
|
$860.000
|
$800.000
|
$668.580
|
$1,250.000
|
$600.000
|
$550.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
101.000
|
$450.000
|
$375.000
|
$400.000
|
$550.000
|
$1.000
|
$460.000
|
$521.860
|
$100.000
|
$550.000
|
$550.000
|
|
|
RAIL (TY SSTR)
|
LF
|
196.000
|
$120.000
|
$150.000
|
$190.000
|
$150.000
|
$95.000
|
$115.000
|
$58.510
|
$140.000
|
$150.000
|
$275.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
118.000
|
$60.000
|
$118.000
|
$190.000
|
$63.000
|
$89.000
|
$72.000
|
$60.580
|
$75.000
|
$85.000
|
$140.800
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
194.000
|
$70.000
|
$194.000
|
$190.000
|
$73.500
|
$112.000
|
$105.000
|
$63.390
|
$89.100
|
$95.000
|
$176.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,200.000
|
$7,500.000
|
$6,600.000
|
$4,500.000
|
$4,500.000
|
$4,400.000
|
$5,647.500
|
$5,775.000
|
$8,500.000
|
$6,765.000
|
|
|
INLET (COMPL)(CURB)(TY 1)
|
EA
|
2.000
|
$2,785.720
|
$6,300.000
|
$6,000.000
|
$6,825.000
|
$4,300.000
|
$5,300.000
|
$3,519.690
|
$6,270.000
|
$8,500.000
|
$6,600.000
|
|
|
INLET (COMPL)(CURB&GRATE)(TY I)
|
EA
|
1.000
|
$700.000
|
$6,300.000
|
$6,700.000
|
$6,500.000
|
$5,800.000
|
$7,000.000
|
$9,476.060
|
$6,600.000
|
$10,000.000
|
$7,480.000
|
|
|
INLET (COMPL) (EXT)(TY I)
|
EA
|
2.000
|
$2,352.340
|
$2,100.000
|
$3,600.000
|
$6,000.000
|
$5,800.000
|
$2,400.000
|
$2,972.120
|
$5,500.000
|
$12,500.000
|
$2,145.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,138.000
|
$2,100.000
|
$2,500.000
|
$1,575.000
|
$1,900.000
|
$1,500.000
|
$2,228.140
|
$1,980.000
|
$2,200.000
|
$5,115.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$2,000.000
|
$4,250.000
|
$4,900.000
|
$1,050.000
|
$1,500.000
|
$3,000.000
|
$3,158.690
|
$3,080.000
|
$1,500.000
|
$4,675.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$720.000
|
$500.000
|
$800.000
|
$1,050.000
|
$500.000
|
$800.000
|
$1,314.650
|
$1,100.000
|
$1,500.000
|
$2,145.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$300.000
|
$500.000
|
$300.000
|
$800.000
|
$500.000
|
$450.000
|
$1,170.460
|
$440.000
|
$500.000
|
$2,145.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$350.000
|
$500.000
|
$300.000
|
$1,050.000
|
$250.000
|
$1,100.000
|
$1,030.430
|
$357.500
|
$500.000
|
$16.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$289,328.410
|
$236,000.000
|
$360,000.000
|
$253,005.530
|
$350,000.000
|
$385,000.000
|
$379,042.250
|
$230,500.000
|
$350,000.000
|
$326,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$15,000.000
|
$13,000.000
|
$6,900.000
|
$7,500.000
|
$15,000.000
|
$16,000.000
|
$25,269.480
|
$12,000.000
|
$8,500.000
|
$4,650.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
111.000
|
$29.000
|
$24.000
|
$50.000
|
$30.000
|
$22.000
|
$30.000
|
$29.370
|
$32.020
|
$30.000
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
111.000
|
$8.000
|
$10.000
|
$10.000
|
$12.000
|
$8.000
|
$11.750
|
$9.490
|
$12.770
|
$15.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
466.800
|
$21.000
|
$10.000
|
$40.000
|
$28.000
|
$21.000
|
$27.000
|
$23.470
|
$29.550
|
$30.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
466.800
|
$7.000
|
$5.000
|
$8.000
|
$8.500
|
$7.000
|
$8.880
|
$8.010
|
$8.920
|
$15.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
105.000
|
$2.330
|
$1.750
|
$6.000
|
$6.250
|
$4.000
|
$4.500
|
$3.690
|
$6.530
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
105.000
|
$0.630
|
$0.150
|
$3.000
|
$2.000
|
$2.000
|
$1.000
|
$0.810
|
$2.200
|
$2.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,919.000
|
$4.000
|
$3.500
|
$4.000
|
$4.600
|
$3.960
|
$3.200
|
$4.980
|
$4.800
|
$12.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,919.000
|
$1.250
|
$1.000
|
$1.000
|
$0.600
|
$0.850
|
$0.810
|
$1.260
|
$0.620
|
$5.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
324.000
|
$80.000
|
$125.000
|
$100.000
|
$120.000
|
$100.000
|
$115.000
|
$74.350
|
$192.180
|
$42.000
|
$147.400
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
3,070.000
|
$22.000
|
$4.000
|
$5.000
|
$5.000
|
$7.000
|
$5.100
|
$15.190
|
$2.000
|
$7.000
|
$4.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
478.000
|
$72.000
|
$100.000
|
$89.000
|
$115.000
|
$75.000
|
$76.000
|
$64.010
|
$93.500
|
$85.000
|
$101.200
|
|
|
CONC SIDEWALKS (4")
|
SY
|
206.000
|
$52.550
|
$100.000
|
$65.000
|
$65.000
|
$52.000
|
$55.000
|
$55.960
|
$90.000
|
$60.000
|
$68.200
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,600.000
|
$2,000.000
|
$1,800.000
|
$1,300.000
|
$1,500.000
|
$1,800.000
|
$1,811.620
|
$1,650.000
|
$1,850.000
|
$2,200.000
|
|
|
CONC MEDIAN
|
SY
|
102.000
|
$61.000
|
$100.000
|
$75.000
|
$75.000
|
$60.000
|
$66.000
|
$63.210
|
$86.000
|
$125.000
|
$79.200
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
10.000
|
$252.000
|
$240.750
|
$230.000
|
$240.000
|
$250.000
|
$240.000
|
$290.840
|
$250.000
|
$850.000
|
$250.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
6.000
|
$3,000.000
|
$2,040.510
|
$2,200.000
|
$2,215.000
|
$1,907.020
|
$1,725.000
|
$2,409.470
|
$2,097.720
|
$1,500.000
|
$2,775.300
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
6.000
|
$1,320.000
|
$1,089.930
|
$2,200.000
|
$2,315.000
|
$1,018.630
|
$1,500.000
|
$1,287.010
|
$1,120.490
|
$4,500.000
|
$2,365.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,300.000
|
$7.500
|
$13.690
|
$13.000
|
$26.250
|
$12.790
|
$13.000
|
$16.160
|
$14.070
|
$15.000
|
$17.330
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
156.000
|
$20.000
|
$20.240
|
$30.000
|
$38.850
|
$18.920
|
$27.000
|
$23.900
|
$20.810
|
$40.000
|
$27.060
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
25.000
|
$10.000
|
$20.360
|
$20.000
|
$38.850
|
$19.030
|
$14.000
|
$24.040
|
$20.930
|
$20.000
|
$34.100
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
372.000
|
$12.000
|
$22.450
|
$22.000
|
$42.000
|
$20.980
|
$16.000
|
$26.510
|
$23.080
|
$20.000
|
$32.450
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
368.000
|
$30.000
|
$31.060
|
$40.000
|
$72.000
|
$29.030
|
$32.000
|
$36.680
|
$31.930
|
$40.000
|
$42.790
|
|
|
CONDT (RM) (1")
|
LF
|
208.000
|
$45.000
|
$22.160
|
$30.000
|
$53.000
|
$20.710
|
$20.000
|
$26.170
|
$22.780
|
$85.000
|
$42.130
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
347.000
|
$1.280
|
$1.200
|
$2.800
|
$2.200
|
$1.120
|
$2.000
|
$1.420
|
$1.230
|
$3.000
|
$1.650
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,206.000
|
$2.950
|
$1.520
|
$2.800
|
$3.400
|
$1.420
|
$2.000
|
$1.790
|
$1.560
|
$3.000
|
$2.200
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,221.000
|
$1.250
|
$1.590
|
$2.000
|
$3.300
|
$1.490
|
$2.000
|
$1.880
|
$1.640
|
$3.000
|
$1.820
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
2,388.000
|
$1.600
|
$2.110
|
$2.200
|
$3.500
|
$1.970
|
$2.600
|
$2.460
|
$2.170
|
$3.000
|
$2.860
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
4,776.000
|
$2.000
|
$2.660
|
$2.500
|
$3.400
|
$2.490
|
$2.850
|
$3.150
|
$2.740
|
$3.000
|
$3.300
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
2,651.000
|
$2.150
|
$1.750
|
$2.500
|
$4.400
|
$1.640
|
$2.300
|
$2.070
|
$1.800
|
$3.000
|
$3.410
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,200.000
|
$1,051.250
|
$1,300.000
|
$2,300.000
|
$982.470
|
$880.000
|
$1,241.330
|
$1,080.720
|
$1,100.000
|
$1,166.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$200.000
|
$152.240
|
$250.000
|
$410.000
|
$142.280
|
$255.000
|
$179.770
|
$156.510
|
$250.000
|
$231.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$600.000
|
$208.930
|
$650.000
|
$615.000
|
$195.260
|
$875.000
|
$246.710
|
$214.790
|
$2,500.000
|
$836.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
15.000
|
$20.000
|
$31.670
|
$30.000
|
$30.000
|
$29.600
|
$29.000
|
$37.400
|
$30.800
|
$30.000
|
$30.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$500.000
|
$548.910
|
$650.000
|
$540.000
|
$675.000
|
$730.000
|
$991.830
|
$564.300
|
$850.000
|
$564.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
35.000
|
$680.000
|
$775.750
|
$850.000
|
$760.000
|
$700.000
|
$885.000
|
$1,244.520
|
$797.500
|
$850.000
|
$797.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$750.000
|
$839.950
|
$800.000
|
$825.000
|
$950.000
|
$956.000
|
$1,478.260
|
$863.500
|
$850.000
|
$863.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$925.000
|
$1,230.500
|
$1,200.000
|
$1,205.000
|
$1,350.000
|
$1,280.000
|
$2,280.570
|
$1,265.000
|
$850.000
|
$1,265.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,000.000
|
$1,926.000
|
$1,900.000
|
$1,890.000
|
$3,500.000
|
$2,270.000
|
$4,207.370
|
$1,980.000
|
$5,000.000
|
$1,980.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$1,000.000
|
$879.860
|
$1,600.000
|
$1,575.000
|
$822.300
|
$1,350.000
|
$1,038.950
|
$1,650.000
|
$2,500.000
|
$1,650.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
8.000
|
$60.000
|
$53.500
|
$55.000
|
$52.000
|
$95.000
|
$52.000
|
$66.290
|
$55.000
|
$100.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
400.000
|
$0.450
|
$0.540
|
$0.550
|
$0.550
|
$3.000
|
$0.620
|
$0.690
|
$0.610
|
$1.000
|
$2.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
5,500.000
|
$0.310
|
$0.540
|
$0.550
|
$0.550
|
$1.000
|
$0.500
|
$0.570
|
$0.500
|
$1.000
|
$2.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
5,000.000
|
$0.320
|
$0.540
|
$0.550
|
$0.550
|
$1.000
|
$0.500
|
$0.570
|
$0.500
|
$1.000
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,290.000
|
$1.000
|
$2.000
|
$1.100
|
$2.000
|
$1.250
|
$3.550
|
$1.120
|
$2.000
|
$5.000
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
400.000
|
$1.000
|
$2.000
|
$1.500
|
$2.000
|
$1.250
|
$3.800
|
$1.250
|
$2.500
|
$5.000
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,754.000
|
$1.000
|
$0.850
|
$0.800
|
$0.830
|
$1.500
|
$1.340
|
$1.520
|
$1.320
|
$6.000
|
$1.010
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
155.000
|
$5.750
|
$6.420
|
$6.500
|
$6.300
|
$8.000
|
$8.800
|
$10.110
|
$8.800
|
$20.000
|
$6.600
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
13.000
|
$200.000
|
$123.050
|
$120.000
|
$121.000
|
$190.000
|
$138.000
|
$157.930
|
$137.500
|
$250.000
|
$154.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
13.000
|
$161.000
|
$149.800
|
$150.000
|
$147.000
|
$210.000
|
$170.000
|
$195.840
|
$170.500
|
$250.000
|
$187.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
19,343.000
|
$0.170
|
$0.160
|
$0.150
|
$0.150
|
$0.340
|
$0.290
|
$0.320
|
$0.280
|
$0.500
|
$0.170
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,754.000
|
$0.450
|
$0.210
|
$0.200
|
$0.200
|
$0.420
|
$0.290
|
$0.320
|
$0.280
|
$4.000
|
$0.390
|
|
|
PAVEMENT SEALER 24"
|
LF
|
155.000
|
$2.210
|
$1.610
|
$1.600
|
$1.600
|
$3.490
|
$2.200
|
$2.530
|
$2.200
|
$20.000
|
$2.750
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
13.000
|
$35.000
|
$21.400
|
$21.000
|
$21.000
|
$50.000
|
$44.000
|
$49.280
|
$42.900
|
$50.000
|
$60.500
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
13.000
|
$40.000
|
$26.750
|
$26.000
|
$26.000
|
$50.000
|
$66.000
|
$74.540
|
$64.900
|
$50.000
|
$82.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,150.000
|
$0.450
|
$0.540
|
$0.500
|
$0.550
|
$0.650
|
$0.550
|
$0.620
|
$0.540
|
$1.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,279.000
|
$0.350
|
$0.480
|
$0.450
|
$0.500
|
$0.650
|
$0.500
|
$0.570
|
$0.500
|
$1.000
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,914.000
|
$0.360
|
$0.480
|
$0.450
|
$0.500
|
$0.650
|
$0.500
|
$0.570
|
$0.500
|
$1.000
|
$0.720
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
202.000
|
$4.000
|
$5.350
|
$5.500
|
$5.250
|
$6.000
|
$5.500
|
$6.320
|
$5.500
|
$5.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,759.000
|
$0.500
|
$0.540
|
$0.600
|
$0.550
|
$0.550
|
$0.450
|
$0.510
|
$0.440
|
$1.000
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,097.000
|
$0.750
|
$1.070
|
$1.100
|
$1.050
|
$0.800
|
$0.850
|
$0.950
|
$0.830
|
$6.000
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
155.000
|
$4.000
|
$3.210
|
$3.200
|
$3.150
|
$4.500
|
$3.300
|
$3.790
|
$3.300
|
$20.000
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$45.000
|
$53.500
|
$55.000
|
$52.500
|
$100.000
|
$50.000
|
$56.860
|
$49.500
|
$50.000
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$58.000
|
$53.500
|
$55.000
|
$52.500
|
$100.000
|
$84.000
|
$94.760
|
$82.500
|
$50.000
|
$110.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$230.000
|
$252.560
|
$300.000
|
$882.000
|
$236.040
|
$300.000
|
$298.230
|
$259.640
|
$285.000
|
$412.500
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
7.000
|
$240.000
|
$252.560
|
$300.000
|
$882.000
|
$236.040
|
$300.000
|
$298.230
|
$259.640
|
$285.000
|
$412.500
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$250.000
|
$252.560
|
$300.000
|
$882.000
|
$236.040
|
$300.000
|
$298.230
|
$259.640
|
$285.000
|
$412.500
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$250.000
|
$252.560
|
$300.000
|
$882.000
|
$236.040
|
$300.000
|
$298.230
|
$259.640
|
$285.000
|
$412.500
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
12.000
|
$250.000
|
$252.560
|
$300.000
|
$882.000
|
$236.040
|
$300.000
|
$298.230
|
$259.640
|
$285.000
|
$412.500
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$250.000
|
$252.560
|
$300.000
|
$882.000
|
$236.040
|
$300.000
|
$298.230
|
$259.640
|
$285.000
|
$412.500
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
14.000
|
$200.000
|
$182.690
|
$130.000
|
$378.000
|
$170.740
|
$105.000
|
$215.730
|
$187.810
|
$125.000
|
$126.500
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
1.000
|
$300.000
|
$237.060
|
$130.000
|
$410.000
|
$221.550
|
$116.000
|
$279.920
|
$243.710
|
$10.000
|
$192.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
257.000
|
$1.500
|
$1.680
|
$3.600
|
$4.500
|
$1.570
|
$2.300
|
$1.980
|
$1.730
|
$3.000
|
$2.090
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
2,454.000
|
$1.700
|
$2.170
|
$3.500
|
$4.500
|
$2.030
|
$2.600
|
$2.560
|
$2.230
|
$3.000
|
$2.860
|
|
|
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
|
LF
|
1,796.000
|
$4.500
|
$3.180
|
$4.500
|
$6.650
|
$2.970
|
$3.350
|
$3.750
|
$3.270
|
$3.000
|
$6.600
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
3,627.000
|
$1.500
|
$1.320
|
$2.000
|
$3.300
|
$1.230
|
$2.300
|
$1.550
|
$1.350
|
$3.000
|
$2.640
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
14.000
|
$75.000
|
$134.250
|
$160.000
|
$310.000
|
$125.470
|
$270.000
|
$158.530
|
$138.020
|
$500.000
|
$302.500
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
4,027.000
|
$68.000
|
$88.000
|
$89.000
|
$90.000
|
$81.500
|
$85.000
|
$104.360
|
$94.200
|
$85.000
|
$93.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,250.000
|
$10,000.000
|
$4,500.000
|
$15,000.000
|
$4,500.000
|
$12,500.000
|
$2,526.950
|
$8,000.000
|
$12,500.000
|
$19,000.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,763.000
|
$2.000
|
$1.670
|
$4.000
|
$3.650
|
$1.560
|
$2.050
|
$1.970
|
$1.720
|
$10.000
|
$3.030
|
|
|
GROUND BOX (PREPARE)
|
EA
|
10.000
|
$750.000
|
$237.360
|
$600.000
|
$485.000
|
$221.830
|
$260.000
|
$280.280
|
$244.010
|
$250.000
|
$396.000
|
|
|
RADAR COMMUNICATION CABLE
|
LF
|
2,583.000
|
$5.000
|
$0.640
|
$3.200
|
$3.500
|
$0.600
|
$4.500
|
$0.760
|
$0.660
|
$3.000
|
$3.080
|
|
|
TMA (STATIONARY)
|
DAY
|
132.000
|
$280.000
|
$157.500
|
$90.000
|
$285.000
|
$366.000
|
$250.000
|
$157.930
|
$200.000
|
$250.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
70.000
|
$77.000
|
$73.500
|
$70.000
|
$200.000
|
$72.000
|
$60.000
|
$63.170
|
$85.000
|
$85.000
|
$150.000
|
|
Totals: |
$3,302,612.510
|
$3,359,266.230
|
$3,461,103.100
|
$3,592,000.000
|
$3,592,703.200
|
$3,860,129.014
|
$3,870,239.519
|
$3,990,828.236
|
$4,201,515.500
|
$4,225,492.630
|