Show Job Controls
Bid Cobra

DALLAS SH 66 (0009-03-048)

Items: 122

County: DALLAS
Length: N/A
Highway: SH 66
District: DALLAS
Control Number: 0009-03-048
DBE Goal: N/A
Project: CM 2023(701)
Guaranty: N/A
Time: 130 WORKING DAYS
Engineer's Estimate: $3,668,943.82
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT INTERSECTION IMPROVEMENTS I
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,668,943.82
$4,253,775.70
Over/Under Est: 15.94% $584,831.88
$4,274,492.50
Over/Under Est: 16.5% $605,548.68
Amt Left: 0.49% $20,716.80
$4,583,642.50
Over/Under Est: 24.93% $914,698.68
Amt Left: 7.75% $329,866.80
Delta: -7.23% -$309,150.00
Over/Under Est: 26.71% $979,930.63
Amt Left: 9.29% $395,098.75
Delta: -1.42% -$65,231.95
Subcontractor Percentage Amount
MELS ELECTRIC, L.P. 11.57% $494,819.46
DFW PAVING, L.L.C. 4.54% $194,164.25
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 4.54% $194,164.25
EJT TRUCKING, LLC 3.94% $168,503.78
RELIABLE CONCRETE CUTTING LLC 1.90% $81,258.17
AMERICAN STRIPING INCORPORATED 1.40% $59,874.44
KING GEORGE TRAFFIC SOLUTIONS LLC 1.02% $43,622.80
TSIT ENGINEERING & CONSULTING, LLC 0.94% $40,201.41
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.94% $40,201.41
SYNERGY SIGNS & SERVICES LLC 0.46% $19,673.03
ROAD SOLUTIONS L.L.C. 0.34% $14,540.93
ELITE STRIPING, LLC 0.24% $10,264.19
Total: 31.83% $1,361,288.12

Bid Items & Bid Tabulations

122 Total 0 of 122
DALLAS  |  SH 66  |  DALLAS  |  0009-03-048  |  05/05/2023  |  $3,668,943.82  |  CM 2023(701)  |  CONSTRUCT INTERS IMPRVS I  |  130 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
XIT PAVING AND CONSTRUCTION INC.
FNH CONSTRUCTION, LLC
REBCON, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 19.520 $10,000.000 $8,500.000 $20,000.000 $5,500.000 $11,550.000
REMOVING CONC (PAV)
SY 1,620.000 $20.000 $33.000 $20.000 $50.000 $25.000
REMOVING CONC (MEDIANS)
SY 109.000 $25.000 $25.000 $20.000 $100.000 $35.000
REMOVING CONC (SIDEWALKS)
SY 540.000 $20.000 $10.000 $20.000 $20.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 2,113.000 $20.000 $21.000 $20.000 $30.000 $20.000
REMOVING CONC (CURB)
LF 5,159.000 $8.000 $12.000 $12.000 $1.000 $3.000
EXCAVATION (ROADWAY)
CY 8,492.000 $20.000 $43.000 $12.000 $30.000 $25.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 4,080.000 $40.000 $60.000 $40.000 $40.000 $50.000
COMPOST MANUF TOPSOIL (4")
SY 4,293.000 $1.500 $10.000 $8.000 $8.000 $8.000
BLOCK SODDING
SY 4,433.000 $3.500 $5.000 $8.000 $6.000 $5.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 4,433.000 $1.000 $0.500 $0.500 $1.000 $0.100
VEGETATIVE WATERING
MG 1,319.000 $10.000 $13.000 $2.000 $55.000 $1.000
LIME (HYDRATED LIME (SLURRY))
TON 35.000 $300.000 $424.000 $350.000 $325.000 $350.000
LIME TRT (EXIST MATL)(9")
SY 1,727.000 $7.000 $23.000 $12.000 $40.000 $25.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 1,951.000 $120.000 $141.000 $95.000 $140.000 $133.000
CONC PVMT (JOINTED - CPCD) (8")
SY 2,034.000 $120.000 $118.000 $115.000 $130.000 $125.000
CONC PVMT (JOINTED - CPCD) (10")
SY 2,771.000 $150.000 $124.000 $125.000 $165.000 $140.000
CONC PVMT (CONT REINF-CRCP)(HES)(10")
SY 610.000 $160.000 $155.000 $145.000 $260.000 $250.000
FULL - DEPTH REPAIR CRCP (8")
SY 250.000 $290.000 $202.000 $250.000 $400.000 $315.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $550.000 $703.000 $650.000 $715.000 $700.000
RC PIPE (CL III)(18 IN)
LF 652.000 $120.000 $263.000 $95.000 $286.000 $166.000
RC PIPE (CL III)(24 IN)
LF 2.000 $300.000 $897.000 $200.000 $391.000 $610.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 2.000 $4,200.000 $9,046.000 $10,000.000 $10,285.000 $11,550.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 6.000 $7,500.000 $10,025.000 $12,500.000 $11,550.000 $12,600.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 6.000 $7,500.000 $9,897.000 $12,500.000 $11,550.000 $12,600.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $6,000.000 $8,824.000 $15,000.000 $9,350.000 $8,400.000
ADJUSTING INLET (CAP)
EA 11.000 $4,000.000 $3,756.000 $2,500.000 $4,400.000 $4,250.000
REMOV STR (INLET)
EA 8.000 $1,000.000 $1,932.000 $2,500.000 $1,800.000 $1,575.000
REMOV STR (PIPE)
LF 90.000 $15.000 $57.000 $50.000 $33.000 $52.500
REMOV STR (SLOTTED DRAIN INLET)
LF 100.000 $300.000 $73.000 $50.000 $15.000 $120.000
MOBILIZATION
LS 1.000 $340,000.000 $156,000.000 $365,000.000 $420,500.000 $447,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $22,000.000 $14,000.000 $8,500.000 $15,000.000 $42,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 201.000 $2.250 $4.000 $4.000 $14.000 $11.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 201.000 $0.690 $1.000 $2.000 $5.000 $2.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,334.000 $5.000 $5.000 $18.000 $5.000 $13.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,334.000 $1.160 $1.000 $9.000 $2.000 $3.300
CONC CURB (MONO) (TY II)
LF 4,288.000 $6.000 $3.000 $25.000 $2.000 $5.000
CONC CURB (DOWEL) (TY II)
LF 1,728.000 $15.000 $46.000 $40.000 $30.000 $30.000
DRIVEWAYS (CONC) (HES)
SY 1,625.000 $105.000 $119.000 $115.000 $160.000 $133.000
CONC SIDEWALKS (4")
SY 1,477.000 $75.000 $95.000 $65.000 $80.000 $85.000
CURB RAMPS (TY 2)
EA 3.000 $2,500.000 $3,137.000 $2,850.000 $3,500.000 $2,400.000
CURB RAMPS (TY 7)
EA 6.000 $2,000.000 $1,695.000 $2,850.000 $1,700.000 $2,250.000
CURB RAMPS (TY 10)
EA 7.000 $2,000.000 $1,870.000 $2,850.000 $3,000.000 $2,250.000
CURB RAMPS (TY 22)
EA 2.000 $4,000.000 $2,749.000 $2,850.000 $2,510.000 $4,000.000
CONC MEDIAN
SY 522.000 $110.000 $167.000 $125.000 $150.000 $150.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $23.000 $66.000 $50.000 $50.000 $49.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,150.000 $2,127.000 $2,000.000 $2,750.000 $2,750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,000.000 $4,664.000 $3,250.000 $4,125.000 $4,125.000
REMOVE RD IL ASM (SHOE-BASE)
EA 2.000 $450.000 $1,706.000 $1,500.000 $1,320.000 $1,694.000
CONDT (PVC) (SCH 40) (2")
LF 45.000 $9.000 $27.000 $20.000 $16.000 $26.730
CONDT (PVC) (SCH 40) (3")
LF 230.000 $12.800 $37.000 $30.000 $19.000 $36.630
CONDT (PVC) (SCH 40) (4")
LF 75.000 $20.000 $36.000 $40.000 $22.000 $36.080
CONDT (PVC) (SCH 40) (4") (BORE)
LF 820.000 $42.000 $44.000 $60.000 $44.000 $44.000
CONDT (PVC) (SCH 80) (2")
LF 45.000 $8.000 $27.000 $25.000 $19.000 $26.730
ELEC CONDR (NO.8) INSULATED
LF 2,530.000 $1.400 $2.000 $3.000 $2.000 $2.370
ELEC CONDR (NO.6) BARE
LF 1,170.000 $1.300 $2.000 $3.000 $2.000 $2.420
ELEC CONDR (NO.6) INSULATED
LF 225.000 $1.600 $3.000 $3.000 $2.000 $2.860
GROUND BOX TY D (162922)
EA 2.000 $1,000.000 $1,828.000 $1,150.000 $1,210.000 $1,815.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,500.000 $2,005.000 $1,300.000 $1,430.000 $1,991.000
REMOVE GROUND BOX
EA 8.000 $300.000 $432.000 $500.000 $385.000 $429.000
ELC SRV TY D 120/240 070(NS)AL(E)PS(U)
EA 1.000 $5,000.000 $9,156.000 $9,500.000 $9,350.000 $9,091.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $495.000 $886.000 $1,150.000 $798.500 $698.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $578.000 $1,019.000 $1,150.000 $1,018.500 $918.500
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 3,837.000 $1.000 $1.000 $1.000 $2.000 $1.800
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,091.000 $0.600 $1.000 $1.000 $1.000 $0.920
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 168.000 $2.000 $1.000 $1.000 $3.000 $2.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,292.000 $1.300 $2.000 $2.000 $1.000 $1.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,005.000 $4.500 $3.000 $6.000 $4.000 $3.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 557.000 $8.000 $6.000 $12.000 $8.000 $7.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $150.000 $144.000 $250.000 $143.000 $130.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $450.000 $155.000 $250.000 $402.000 $365.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $170.000 $155.000 $250.000 $193.000 $175.000
PAVEMENT SEALER 4"
LF 6,116.000 $0.200 $0.500 $1.000 $0.500 $0.200
PAVEMENT SEALER 8"
LF 2,292.000 $0.450 $0.500 $1.000 $0.500 $0.450
PAVEMENT SEALER 12"
LF 1,005.000 $0.800 $0.500 $6.000 $1.000 $0.800
PAVEMENT SEALER 24"
LF 557.000 $2.000 $1.000 $6.000 $2.000 $1.600
PAVEMENT SEALER (ARROW)
EA 20.000 $50.000 $28.000 $250.000 $31.000 $28.000
PAVEMENT SEALER (WORD)
EA 16.000 $60.000 $44.000 $250.000 $41.000 $37.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,720.000 $0.580 $1.000 $1.000 $1.000 $1.050
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,376.000 $0.540 $1.000 $1.000 $1.000 $0.950
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,020.000 $0.200 $1.000 $1.000 $1.000 $0.950
REFL PAV MRKR TY II-C-R
EA 74.000 $3.950 $6.000 $6.000 $12.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 5,516.000 $0.300 $0.500 $1.000 $1.000 $0.640
ELIM EXT PAV MRK & MRKS (8")
LF 555.000 $0.900 $1.000 $1.000 $2.000 $1.400
ELIM EXT PAV MRK & MRKS (12")
LF 834.000 $1.900 $2.000 $1.000 $2.000 $1.800
ELIM EXT PAV MRK & MRKS (24")
LF 406.000 $3.500 $4.000 $20.000 $5.000 $4.100
ELIM EXT PAV MRK & MRKS (ARROW)
EA 7.000 $55.000 $61.000 $250.000 $60.500 $55.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $60.000 $78.000 $250.000 $69.000 $63.000
PAV SURF PREP FOR MRK (4")
LF 6,116.000 $0.100 $0.200 $1.000 $0.250 $0.160
PAV SURF PREP FOR MRK (8")
LF 2,292.000 $0.100 $0.500 $1.000 $0.500 $0.400
PAV SURF PREP FOR MRK (12")
LF 1,005.000 $0.400 $0.500 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (24")
LF 557.000 $1.000 $1.000 $1.000 $2.000 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 20.000 $14.000 $17.000 $250.000 $33.000 $30.000
PAV SURF PREP FOR MRK (WORD)
EA 32.000 $19.000 $28.000 $250.000 $44.000 $40.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $2,300.000 $17,060.000 $8,500.000 $7,700.000 $18,000.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 1.000 $20,000.000 $36,834.000 $35,000.000 $37,950.000 $40,000.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $400.000 $438.000 $325.000 $363.000 $434.500
VEH SIG SEC (12")LED(GRN ARW)
EA 8.000 $400.000 $438.000 $325.000 $363.000 $434.500
VEH SIG SEC (12")LED(YEL)
EA 12.000 $400.000 $438.000 $325.000 $363.000 $434.500
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $400.000 $438.000 $325.000 $363.000 $434.500
VEH SIG SEC (12")LED(RED)
EA 12.000 $400.000 $438.000 $325.000 $363.000 $434.500
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $400.000 $438.000 $325.000 $363.000 $434.500
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $800.000 $1,008.000 $8,500.000 $770.000 $1,001.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 20.000 $180.000 $194.000 $150.000 $275.000 $192.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,312.000 $3.000 $3.000 $3.000 $3.000 $2.640
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 2,010.000 $4.300 $3.000 $3.000 $4.000 $3.190
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 885.000 $7.500 $11.000 $3.000 $7.000 $11.280
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,050.000 $2.500 $3.000 $3.000 $2.000 $2.970
INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN
EA 1.000 $30,000.000 $51,956.000 $50,000.000 $46,750.000 $51,590.000
INS TRF SIG PL AM(S)1 ARM(65')ILSN
EA 2.000 $23,000.000 $51,734.000 $50,000.000 $46,200.000 $51,370.000
INS TRF SIG PL AM(S)1 ARM(65')LUM&ILSN
EA 1.000 $24,000.000 $53,728.000 $50,000.000 $48,950.000 $53,350.000
PED POLE ASSEMBLY
EA 8.000 $2,700.000 $3,656.000 $8,500.000 $3,300.000 $3,630.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $900.000 $1,219.000 $1,850.000 $880.000 $1,210.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,200.000 $4,741.000 $6,500.000 $3,850.000 $4,708.000
TREE REMOVAL (4" - 12" DIA)
EA 39.000 $1,000.000 $419.000 $2,000.000 $365.000 $420.000
SP MIXES SP-B SAC-B PG64-22
TON 1,195.000 $130.000 $180.000 $130.000 $190.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $14,623.000 $12,500.000 $13,500.000 $8,400.000
CONDUIT (PREPARE)
LF 1,015.000 $2.000 $7.000 $10.000 $2.000 $7.040
GROUND BOX (PREPARE)
EA 5.000 $275.000 $847.000 $650.000 $275.000 $841.500
TMA (STATIONARY)
DAY 50.000 $150.000 $695.000 $250.000 $300.000 $315.000
TMA (MOBILE OPERATION)
HR 32.000 $150.000 $184.000 $55.000 $75.000 $126.000
RELOCATE RVDS
EA 8.000 $1,500.000 $1,806.000 $6,500.000 $1,100.000 $1,793.000
Totals: $3,668,943.820 $4,253,775.700 $4,274,492.500 $4,583,642.500 $4,648,874.450