Show Job Controls
Bid Cobra

CULBERSON RM 652 (1314-01-014)

Items: 121

County: CULBERSON
Length: N/A
Highway: RM 652
District: EL PASO
Control Number: 1314-01-014
DBE Goal: 0.0%
Project: C 1314-1-14
Guaranty: N/A
Time: 400 WORKING DAYS
Engineer's Estimate: $29,256,807.70
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$29,256,807.70
$29,265,511.83
Over/Under Est: 0.03% $8,704.13
$29,614,264.55
Over/Under Est: 1.22% $357,456.85
Amt Left: 1.19% $348,752.72
$35,240,629.42
Over/Under Est: 20.45% $5,983,821.72
Amt Left: 20.42% $5,975,117.59
Delta: -19.00% -$5,626,364.87
Subcontractor Percentage Amount
NM AC & COMPANY LLC 3.69% $1,079,897.39
BUILT CONCRETE CONSTRUCTION, LLC 1.52% $444,835.78
TRP CONSTRUCTION GROUP, LLC 1.41% $412,643.72
A BROTHERS MILLING, LLC 1.04% $304,361.32
TRI STATE ELECTRIC, LTD. 0.88% $257,536.50
HJC FARMS, INC. 0.66% $193,152.38
SQUARE ROOT SERVICES LLC 0.56% $163,886.87
TITAN MILLING INC. 0.35% $102,429.29
DK CONTRACTING, LLC 0.29% $84,869.98
FC TRAFFIC CONTROL, INC. 0.20% $58,531.02
PROFESSIONAL TRAFFIC CONTROL LLC 0.07% $20,485.86
BARNHART CRANE & RIGGING COMPANY 0.04% $11,706.20
Total: 10.71% $3,134,336.31

Bid Items & Bid Tabulations

121 Total 0 of 121
CULBERSON  |  RM 652  |  EL PASO  |  1314-01-014  |  05/02/2024  |  $29,256,807.70  |  C 1314-1-14  |  SURF/ROADWAY RESTOR  |  400 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES HAMILTON CONSTRUCTION CO.
DAN WILLIAMS COMPANY
A. L. HELMCAMP, INC.
PREPARING ROW
AC 0.120 $5,000.000 $75,000.000 $40,000.000 $120,000.000
PREPARING ROW
STA 310.000 $800.000 $800.000 $2,800.000 $2,000.000
REMOVING STAB BASE AND ASPH PAV (10")
SY 117,748.000 $6.500 $12.750 $6.000 $19.000
EXCAVATION (ROADWAY)
CY 33,571.000 $28.000 $20.000 $30.000 $44.000
EXCAVATION (SPECIAL)
CY 2.000 $600.000 $4,600.000 $1,050.000 $1,300.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 65,710.000 $45.000 $49.500 $50.000 $47.000
BACKFILL TY A
CY 16,129.000 $38.000 $32.000 $32.000 $56.000
BACKFILL (TY A OR B)
CY 1,171.000 $35.000 $70.000 $65.000 $250.000
BLADING
HR 56.000 $150.000 $500.000 $160.000 $250.000
PROOF ROLLING
HR 56.000 $135.000 $150.000 $87.000 $250.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 156,275.000 $25.000 $13.000 $19.800 $23.500
PRIME COAT (MULTI OPTION)
GAL 31,259.000 $6.500 $5.000 $5.000 $6.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 9,641.000 $6.000 $6.000 $9.000 $6.400
ASPH (MULTI OPTION)
GAL 54,635.000 $6.000 $5.800 $5.000 $5.400
AGGR(TY-PB GR-4 SAC-B)
CY 1,320.000 $230.000 $253.000 $285.000 $250.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 489.000 $12.000 $7.000 $22.000 $65.000
FLOWABLE BACKFILL
CY 569.000 $275.000 $300.000 $525.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 128.000 $10.000 $85.000 $3.500 $20.000
TEMPORARY SPL SHORING
SF 5,574.000 $50.000 $3.000 $65.000 $71.000
DRILL SHAFT (42 IN)
LF 21.000 $300.000 $575.000 $650.000 $720.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 48.000 $320.000 $350.000 $575.000 $610.000
RIPRAP (CONC)(4 IN)
CY 1.500 $550.000 $1,200.000 $3,000.000 $4,800.000
RIPRAP (CONC)(CL B)
CY 2.100 $400.000 $3,000.000 $3,000.000 $6,800.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 98.000 $275.000 $275.000 $350.000 $300.000
RIPRAP (SPECIAL)
CY 57.000 $600.000 $360.000 $300.000 $950.000
GABION (1.5' X 3')(GALV)
CY 12.000 $180.000 $875.000 $700.000 $550.000
GABION MATTRESSES (GALV) (24 IN)
SY 5,243.000 $125.000 $230.000 $150.000 $150.000
CONC BOX CULV (4 FT X 2 FT)
LF 792.000 $500.000 $700.000 $450.000 $620.000
CONC BOX CULV (6 FT X 3 FT)
LF 300.000 $500.000 $850.000 $650.000 $840.000
CONC BOX CULV (8 FT X 6 FT)
LF 116.000 $1,000.000 $1,500.000 $1,200.000 $1,400.000
RC PIPE (CL III)(24 IN)
LF 60.000 $110.000 $265.000 $160.000 $200.000
RC PIPE (CL IV)(24 IN)
LF 422.000 $155.000 $280.000 $150.000 $220.000
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $18,000.000 $20,800.000 $20,000.000 $24,000.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $20,000.000 $21,800.000 $21,500.000 $25,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $20,000.000 $21,000.000 $25,000.000 $35,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $22,000.000 $26,000.000 $45,000.000 $81,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 3.000 $24,000.000 $26,250.000 $35,000.000 $67,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 4.000 $30,000.000 $28,570.000 $35,000.000 $70,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 5.000 $10,000.000 $17,400.000 $12,000.000 $14,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 12.000 $12,000.000 $18,400.000 $10,000.000 $14,000.000
SET (TY I)(S= 4 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $14,000.000 $18,650.000 $15,000.000 $18,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,000.000 $2,850.000 $2,500.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $2,250.000 $3,200.000 $2,500.000 $2,200.000
REMOV STR (BOX CULVERT)
EA 3.000 $6,000.000 $3,200.000 $5,500.000 $11,000.000
REMOV STR (SET)
EA 2.000 $350.000 $2,000.000 $350.000 $1,000.000
REMOV STR (WINGWALL)
EA 4.000 $1,500.000 $980.000 $2,500.000 $4,000.000
REMOV STR (PIPE)
LF 388.000 $24.000 $58.000 $28.000 $40.000
MOBILIZATION
LS 1.000 $2,660,000.000 $2,920,000.000 $1,460,250.000 $3,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $20,000.000 $44,000.000 $15,000.000 $49,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 5,772.000 $30.000 $17.000 $32.500 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 5,772.000 $10.000 $3.000 $9.500 $4.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,440.000 $5.000 $4.500 $4.600 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,440.000 $2.000 $1.000 $2.400 $2.000
CONSTRUCTING DETOURS
SY 2,320.000 $80.000 $95.000 $50.000 $95.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 21.000 $5,000.000 $4,625.000 $3,750.000 $5,800.000
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
DAY 840.000 $150.000 $60.000 $90.000 $270.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 6,840.000 $12.000 $15.000 $8.500 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 49,770.000 $6.000 $15.000 $5.000 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 6,840.000 $10.000 $18.000 $9.500 $30.000
DRIVEWAYS (CONC)
SY 256.000 $115.000 $175.000 $175.000 $200.000
DRIVEWAYS (ACP)
SY 2,247.000 $140.000 $45.000 $110.000 $100.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 102,915.000 $0.250 $0.100 $0.180 $0.350
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 52,173.000 $0.250 $0.160 $0.250 $0.450
MTL W-BEAM GD FEN (TIM POST)
LF 2,737.500 $35.000 $30.000 $30.500 $36.000
MTL W-BEAM GD FEN (STEEL POST)
LF 62.500 $40.000 $90.000 $90.000 $110.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 8.000 $1,450.000 $1,800.000 $2,000.000 $2,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $3,500.000 $3,700.000 $3,400.000 $4,400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 94.000 $2,000.000 $1,000.000 $850.000 $4,400.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $1,000.000 $950.000 $800.000 $4,400.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 10.000 $10,000.000 $15,000.000 $9,500.000 $9,000.000
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 6.000 $4,000.000 $7,200.000 $7,000.000 $8,100.000
CONDT (PVC) (SCH 40) (2")
LF 900.000 $20.000 $42.000 $40.000 $45.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 390.000 $30.000 $65.000 $60.000 $70.000
ELEC CONDR (NO.8) INSULATED
LF 4,275.000 $2.000 $4.400 $4.000 $5.000
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,500.000 $2,370.000 $2,155.000 $2,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $1,100.000 $925.000 $1,370.000 $1,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 25.000 $1,100.000 $1,090.000 $1,425.000 $1,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,100.000 $1,370.000 $1,505.000 $1,700.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,200.000 $1,520.000 $3,520.000 $4,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 8.000 $1,500.000 $1,770.000 $4,215.000 $4,900.000
REMOVE SM RD SN SUP&AM
EA 43.000 $150.000 $265.000 $295.000 $340.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 74.000 $75.000 $72.000 $90.000 $150.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 36.000 $100.000 $72.000 $120.000 $150.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 163.000 $36.000 $50.000 $30.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $45.000 $45.000 $50.000 $60.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 113,600.000 $0.500 $1.050 $0.950 $0.350
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 570.000 $6.000 $9.000 $8.000 $5.500
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 13,309.000 $2.000 $1.400 $1.250 $1.600
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 520.000 $20.000 $22.000 $20.000 $13.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 47,515.000 $2.000 $1.400 $1.250 $1.600
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,842.000 $1.750 $2.200 $2.250 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,842.000 $1.750 $2.200 $2.250 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,185.000 $2.000 $1.300 $1.200 $1.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 139.000 $12.000 $16.500 $15.000 $12.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 106,883.000 $0.500 $0.300 $0.250 $0.280
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,185.000 $1.000 $0.550 $0.500 $0.600
REFL PAV MRK TY II (W) 24" (SLD)
LF 139.000 $10.000 $5.500 $5.000 $6.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 6,410.000 $0.500 $0.300 $0.250 $0.260
REFL PAV MRK TY II (Y) 6" (SLD)
LF 66,618.000 $0.500 $0.300 $0.250 $0.260
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 106,883.000 $1.200 $0.800 $0.700 $0.900
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 6,410.000 $1.200 $1.100 $1.000 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 66,618.000 $1.200 $0.800 $0.750 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $300.000 $275.000 $250.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $350.000 $385.000 $350.000 $440.000
REFL PAV MRKR TY II-A-A
EA 1,155.000 $6.000 $1,270.000 $6.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 28,300.000 $1.000 $0.950 $0.850 $1.200
POTHOLE REPAIR (STANDARD)
SY 250.000 $100.000 $6.000 $105.000 $190.000
FILTER FABRIC (TY 2)
SY 75.000 $43.000 $16.500 $13.000 $25.000
GEOGRID BASE REINFORCEMENT
SY 79,993.000 $3.000 $1.750 $2.000 $1.300
D-GR HMA TY-B PG70-22
TON 20,598.000 $195.000 $135.000 $220.000 $187.000
TACK COAT
GAL 22,469.000 $6.500 $5.650 $6.500 $6.000
SP MIXES SP-C SAC-A PG70-22
TON 28,163.000 $200.000 $170.000 $235.000 $183.000
TACK COAT
GAL 38,383.000 $6.500 $5.600 $6.500 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,000.000 $21,600.000 $15,000.000 $28,000.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $1,500.000 $2,313.000 $1,950.000 $2,300.000
ITS POLE (55 FT)(90 MPH)
EA 1.000 $20,000.000 $38,385.000 $35,000.000 $38,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $6,500.000 $8,378.000 $7,000.000 $8,000.000
TMA (STATIONARY)
DAY 840.000 $200.000 $400.000 $195.000 $250.000
TMA (MOBILE OPERATION)
DAY 50.000 $400.000 $1,100.000 $635.000 $400.000
SYSTEM INTEGRATION
LS 1.000 $20,000.000 $42,135.000 $45,000.000 $41,000.000
INSTALLATION OF CELLULAR MODEM
EA 1.000 $4,000.000 $1,875.000 $1,600.000 $1,800.000
Totals: $29,256,807.700 $29,265,511.830 $29,614,264.550 $35,240,629.420