CULBERSON US 90 (0020-01-021)

Items: 124

County: CULBERSON
Length: N/A
Highway: US 90
District: EL PASO
Control Number: 0020-01-021
DBE Goal: N/A
Project: C 20-1-21
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $5,996,118.44
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$5,996,118.44
$5,952,638.25
Over/Under Est: -0.73% -$43,480.19
Over/Under Est: 3.68% $220,640.01
Amt Left: 4.44% $264,120.20
Subcontractor Percentage Amount
APOLLO CONSTRUCTORS, INC. 6.18% $367,873.04
PMI PAVEMENT MARKING, LLC 1.47% $87,503.78
NATIONWIDE REBAR INC. 1.19% $70,836.40
TRI STATE ELECTRIC, LTD. 0.36% $21,429.50
ANTIGO CONSTRUCTION, INC. 0.34% $20,238.97
MAJOR MOTION LOGISTICS, LLC 0.00% $0.00
Total: 9.54% $567,881.69

Bid Items & Bid Tabulations

124 Total 0 of 124
CULBERSON  |  US 90  |  EL PASO  |  0020-01-021  |  06/02/2023  |  $5,996,118.44  |  C 20-1-21  |  PREVENT MAINT  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
INTERNATIONAL EAGLE ENTERPRISES, INC.
PREPARING ROW
STA 59.000 $350.000 $500.000 $200.000
REMOVING CONC (PAV)
CY 716.000 $180.000 $90.000 $500.000
REMOVING CONC (RIPRAP)
SY 27.000 $62.500 $25.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 1,115.000 $20.000 $14.000 $30.000
REMOVING CONC (CURB)
LF 8,724.000 $7.500 $4.000 $8.000
REMOV STAB BASE AND ASPH PAV (4"-5")
SY 3,189.000 $4.000 $6.000 $7.000
REMOV STAB BASE AND ASPH PAV (3"-9")
SY 16,277.000 $6.000 $6.250 $12.000
EXCAVATION (ROADWAY)
CY 204.000 $30.000 $200.000 $75.000
EXCAVATION (SPECIAL)
CY 1.000 $400.000 $500.000 $1,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 1,379.000 $70.000 $35.000 $18.000
BACKFILL (TY B)
STA 66.000 $220.000 $325.000 $200.000
PRIME COAT (MULTI OPTION)
GAL 5,363.000 $7.000 $8.000 $10.000
PLANE ASPH CONC PAV (2" TO 4 1/2")
SY 20,604.000 $5.000 $4.000 $4.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 19,693.000 $130.000 $130.000 $105.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 795.000 $210.000 $200.000 $130.000
DRILL SHAFT (42 IN)
LF 42.000 $370.000 $530.000 $700.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $375.000 $415.000 $550.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 9.000 $300.000 $300.000 $1,000.000
RIPRAP (CONC)(4 IN)
CY 4.000 $520.000 $1,200.000 $800.000
RIPRAP (CONC)(5 IN)
CY 12.000 $500.000 $800.000 $800.000
ADJUSTING MANHOLES & INLETS
EA 1.000 $3,000.000 $2,000.000 $2,000.000
MOBILIZATION
LS 1.000 $400,000.000 $525,000.000 $525,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $15,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 24.000 $33.000 $80.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 24.000 $6.000 $20.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $25.000 $35.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $11.000 $13.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 160.000 $3.500 $6.750 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 160.000 $1.000 $2.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 120.000 $6.000 $12.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $6.700 $2.000 $1.000
CONSTRUCTING DETOURS
SY 1,918.000 $93.000 $45.000 $75.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 1,160.000 $50.000 $18.000 $25.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 140.000 $55.000 $20.000 $25.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,680.000 $9.000 $5.500 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 140.000 $9.000 $7.500 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 1,160.000 $50.000 $12.000 $25.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 140.000 $55.000 $15.000 $25.000
CONC CURB (TY II)
LF 8,275.000 $13.000 $22.000 $15.000
CONC CURB & GUTTER (TY II)
LF 192.000 $27.000 $40.000 $25.000
DRIVEWAYS (CONC)
SY 1,145.000 $85.000 $105.000 $80.000
CONC SIDEWALKS (5")
SY 559.000 $75.000 $92.000 $50.000
CURB RAMPS (TY 1)
EA 1.000 $2,044.000 $1,950.000 $1,500.000
CURB RAMPS (TY 2)
EA 1.000 $2,660.000 $2,500.000 $1,500.000
CURB RAMPS (TY 7)
EA 12.000 $2,000.000 $1,600.000 $1,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $1,600.000 $1,200.000 $3,200.000
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 2.000 $6,780.000 $6,800.000 $8,500.000
CONDT (PVC) (SCH 40) (2")
LF 1,295.000 $30.000 $22.000 $35.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 385.000 $40.000 $32.000 $50.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 410.000 $45.000 $38.000 $50.000
ELEC CONDR (NO.6) INSULATED
LF 6,720.000 $4.000 $2.650 $5.000
GROUND BOX TY A (122311)W/APRON
EA 17.000 $1,650.000 $1,740.000 $2,200.000
REMOVE GROUND BOX
EA 8.000 $185.000 $450.000 $525.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $2,300.000 $1,200.000 $15,000.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 2.000 $15,000.000 $10,000.000 $10,500.000
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
EA 2.000 $8,600.000 $9,000.000 $10,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 25.000 $890.000 $925.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 41.000 $905.000 $1,025.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 11.000 $1,000.000 $1,025.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,400.000 $1,095.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $2,200.000 $1,195.000 $2,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,320.000 $1,125.000 $2,000.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $2,300.000 $1,250.000 $2,000.000
IN SM RD SN SUP&AM TYS80(2)SA(T-2EXT)
EA 2.000 $2,650.000 $1,365.000 $3,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $3,050.000 $2,050.000 $5,000.000
REMOVE SM RD SN SUP&AM
EA 70.000 $145.000 $100.000 $100.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 4.000 $1,154.000 $900.000 $500.000
ISRSA TY10BWG(1)SA(P) (EXCLUDING SIGN)
EA 1.000 $1,000.000 $825.000 $5,000.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 990.000 $1.650 $0.550 $1.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 42.000 $7.500 $5.000 $7.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,900.000 $0.350 $0.550 $1.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,238.000 $1.850 $3.450 $5.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 26.000 $8.500 $18.000 $25.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 15.000 $40.000 $82.000 $120.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 2,720.000 $2.000 $3.500 $5.000
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
LF 152.000 $2.500 $4.450 $7.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,415.000 $1.500 $1.900 $3.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 458.000 $7.500 $8.850 $12.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 14.000 $160.000 $165.000 $220.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 8.000 $300.000 $200.000 $250.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 16.000 $240.000 $205.000 $255.000
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 12.000 $37.000 $45.000 $35.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 957.000 $0.350 $0.500 $1.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 6,382.000 $0.350 $0.350 $1.000
REFL PAV MRK TY II (W) 8" (LNDP)
LF 202.000 $0.750 $1.900 $2.600
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,415.000 $0.700 $0.600 $1.200
REFL PAV MRK TY II (W) 24" (SLD)
LF 458.000 $4.700 $4.050 $7.000
REFL PAV MRK TY II (W) (ARROW)
EA 14.000 $100.000 $107.000 $180.000
REFL PAV MRK TY II (W) (DBL ARROW)
EA 8.000 $120.000 $135.000 $200.000
REFL PAV MRK TY II (W) (WORD)
EA 16.000 $140.000 $120.000 $190.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 12.000 $26.500 $44.000 $60.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 484.000 $0.350 $0.500 $1.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 6,635.000 $0.350 $0.350 $0.550
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
LF 484.000 $1.500 $4.900 $7.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 957.000 $0.850 $1.750 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 6,472.000 $0.700 $1.200 $3.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 6,635.000 $0.600 $1.200 $1.600
REFL PAV MRKR TY I-C
EA 77.000 $4.000 $7.150 $30.000
REFL PAV MRKR TY II-A-A
EA 199.000 $4.000 $7.150 $30.000
ELIM EXT PAV MRK & MRKS (4")
LF 260.000 $1.100 $1.300 $2.000
ELIM EXT PAV MRK & MRKS (6")
LF 805.000 $1.350 $1.550 $2.500
ELIM EXT PAV MRK & MRKS (8")
LF 240.000 $1.500 $1.900 $3.000
ELIM EXT PAV MRK & MRKS (24")
LF 42.000 $5.000 $12.000 $20.000
PAV SURF PREP FOR MRK (6")
LF 13,908.000 $0.050 $0.500 $1.000
PAV SURF PREP FOR MRK (8")
LF 1,277.000 $0.170 $1.050 $1.500
PAV SURF PREP FOR MRK (24")
LF 458.000 $0.800 $3.850 $6.000
PAV SURF PREP FOR MRK (ARROW)
EA 14.000 $36.250 $115.000 $200.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 8.000 $45.000 $115.000 $200.000
PAV SURF PREP FOR MRK (WORD)
EA 16.000 $35.000 $115.000 $200.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 12.000 $4.250 $70.000 $120.000
PAV SURF PREP FOR MRK (RPM)
EA 276.000 $0.500 $5.250 $8.000
POST AND CABLE FENCE (REMOVAL)
LF 567.000 $2.000 $5.000 $4.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 566.000 $10.000 $25.000 $75.000
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 154.000 $100.000 $175.000 $220.000
D-GR HMA TY-D PG64-22
TON 4,535.000 $190.000 $190.000 $220.000
TACK COAT
GAL 3,096.000 $10.000 $11.000 $10.000
REMOVE CONDUCTOR
LF 1,665.000 $1.750 $1.000 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $10,000.000 $12,000.000 $14,000.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 2.000 $5,400.000 $1,880.000 $3,500.000
ITS POLE (55 FT)(90 MPH)
EA 2.000 $26,000.000 $25,000.000 $34,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 2.000 $8,400.000 $7,000.000 $9,600.000
TMA (STATIONARY)
DAY 38.000 $410.000 $300.000 $300.000
TMA (MOBILE OPERATION)
DAY 19.000 $350.000 $500.000 $500.000
INSTALLATION OF CELLULAR MODEM
EA 2.000 $3,620.000 $1,980.000 $1,850.000
Totals: $5,996,118.440 $5,952,638.250 $6,216,758.450