CROCKETT SH 137 (1643-01-016)

Items: 83

County: CROCKETT
Length: N/A
Highway: SH 137
District: SAN ANGELO
Control Number: 1643-01-016
DBE Goal: N/A
Project: STP 1902(153)
Guaranty: N/A
Time: 421 WORKING DAYS
Engineer's Estimate: $14,208,777.50
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: RESTORATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$14,208,777.50
$16,675,319.97
Over/Under Est: 17.36% $2,466,542.47
Over/Under Est: 27.95% $3,971,930.33
Amt Left: 9.03% $1,505,387.86
$18,476,731.45
Over/Under Est: 30.04% $4,267,953.95
Amt Left: 10.8% $1,801,411.48
Delta: -1.63% -$296,023.62
Over/Under Est: 81.91% $11,638,236.27
Amt Left: 55% $9,171,693.80
Delta: -39.89% -$7,370,282.32

Bid Items & Bid Tabulations

83 Total 0 of 83
CROCKETT  |  SH 137  |  SAN ANGELO  |  1643-01-016  |  07/10/2019  |  $14,208,777.50  |  STP 1902(153)  |  RESTOR OF EXIST ROAD  |  421 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
FNF CONSTRUCTION, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 906.000 $100.000 $153.170 $69.780 $45.000 $572.840
REMOVING CONC (RIPRAP)
SY 166.000 $25.000 $10.300 $63.520 $42.000 $26.040
SUBGRADE WIDENING (ORD COMP)
STA 906.000 $250.000 $893.430 $313.880 $600.000 $1,169.510
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 2,124.000 $30.000 $16.140 $21.480 $16.000 $38.700
BLADING
HR 458.000 $150.000 $220.920 $299.790 $180.000 $251.790
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 120,760.000 $0.250 $0.130 $0.170 $0.130 $0.200
BROADCAST SEED (TEMP) (WARM)
SY 60,380.000 $0.150 $0.100 $0.140 $0.130 $0.170
BROADCAST SEED (TEMP) (COOL)
SY 60,380.000 $0.150 $0.110 $0.140 $0.130 $0.170
PROOF ROLLING
HR 165.000 $100.000 $75.190 $209.660 $123.000 $121.900
FL BS (RDWY DEL)(TY A GR 5)(FNAL POS)
CY 99,860.000 $30.000 $36.430 $42.410 $45.150 $85.700
CEMENT
TON 12,634.000 $175.000 $221.660 $179.230 $235.000 $180.280
CEMENT TREAT (NEW BASE) (8")
SY 487,389.000 $2.500 $2.400 $1.500 $1.500 $2.860
CEMENT TREAT(EXIST MATL)(8")
SY 487,389.000 $2.500 $1.960 $1.860 $3.250 $2.670
ASPH (MULTI OPTION)
GAL 164,560.000 $4.000 $3.830 $4.140 $3.800 $4.420
ASPH (A-R TYPE II)
GAL 246,845.000 $3.500 $4.240 $5.790 $3.800 $5.060
ASPH (RC-250)
GAL 111,800.000 $5.000 $4.980 $4.610 $5.000 $5.410
AGGR(TY-PB GR-3 SAC-A)
CY 4,839.000 $120.000 $132.130 $160.010 $144.000 $208.400
AGGR(TY-B GR-5 SAC-B)
CY 3,729.000 $75.000 $85.750 $160.260 $81.500 $170.180
AGGR(TY-PD GR-3 SAC-B)
CY 4,333.000 $80.000 $131.770 $188.850 $188.000 $162.920
TEMPORARY SPL SHORING
SF 3,198.000 $15.000 $15.450 $50.810 $53.000 $78.080
RIPRAP (CONC)(CL C)
CY 48.100 $750.000 $566.630 $698.680 $880.000 $953.720
CMP AR (GAL STL DES 4)
LF 43.000 $110.000 $77.270 $158.540 $352.000 $189.380
CMP AR (GAL STL DES 5)
LF 10.000 $150.000 $103.020 $158.540 $518.000 $542.340
CMP AR (GAL STL DES 7)
LF 4.000 $150.000 $154.540 $181.000 $690.000 $1,219.520
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 38.500 $500.000 $772.670 $1,048.650 $935.000 $858.270
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 39.500 $550.000 $824.190 $1,048.650 $1,000.000 $917.960
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 31.000 $615.000 $978.720 $1,081.680 $1,100.000 $1,250.150
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
LF 56.250 $640.000 $1,236.280 $1,136.170 $1,800.000 $1,449.310
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 18.500 $1,015.000 $1,545.350 $1,603.530 $2,800.000 $2,085.520
WINGWALL (FW - 0) (HW=7 FT)
EA 2.000 $14,000.000 $37,088.330 $16,198.740 $12,000.000 $37,807.170
WINGWALL (FW - 0) (HW=9 FT)
EA 2.000 $14,000.000 $43,269.720 $18,832.750 $19,000.000 $34,239.140
SET (TY I)(S=10 FT)(HW=7FT)(3:1)(C)
EA 6.000 $8,500.000 $12,877.890 $12,686.180 $13,000.000 $21,763.690
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 8.000 $6,000.000 $9,272.080 $9,114.170 $7,600.000 $11,877.570
SET (TY II) (DES 4) (CMP) (3: 1) (C)
EA 8.000 $2,000.000 $3,090.690 $2,221.160 $2,600.000 $6,019.420
SET (TY II) (DES 5) (CMP) (3: 1) (C)
EA 2.000 $2,500.000 $3,605.810 $2,673.640 $3,200.000 $7,861.640
SET (TY II) (DES 7) (CMP) (6: 1) (C)
EA 2.000 $4,000.000 $4,326.970 $4,568.540 $5,600.000 $8,122.780
REMOV STR (WINGWALL)
EA 10.000 $1,100.000 $1,802.910 $1,733.990 $3,000.000 $3,187.150
MOBILIZATION
LS 1.000 $1,225,754.450 $1,492,433.180 $2,026,748.000 $1,800,000.000 $3,305,063.530
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $20,000.000 $5,081.980 $30,000.000 $5,000.000 $4,945.510
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $25.000 $46.360 $57.160 $61.000 $51.540
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $10.000 $10.300 $12.700 $25.000 $13.040
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $5.000 $4.120 $5.080 $10.000 $4.720
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $2.000 $1.030 $1.270 $5.000 $1.420
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 900.000 $5.000 $6.180 $7.620 $8.000 $6.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 900.000 $2.000 $1.030 $1.270 $1.500 $1.280
PTB (FUR & INST)(STEEL)
LF 200.000 $75.000 $231.800 $317.580 $250.000 $77.670
PTB (MOVE)(STEEL)
LF 800.000 $7.000 $10.300 $31.760 $5.500 $19.260
PTB (STKPL)(STEEL)
LF 200.000 $20.000 $15.450 $25.410 $13.000 $38.510
INTERSECTIONS (SURF TREAT)
SY 695.000 $15.000 $87.310 $40.830 $108.000 $50.690
DRIVEWAYS (SURF TREAT)
SY 2,733.000 $15.000 $66.340 $29.260 $120.000 $45.160
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $25.000 $30.390 $41.030 $40.000 $55.320
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,500.000 $1,365.060 $1,841.960 $1,800.000 $1,689.830
REMOVE METAL BEAM GUARD FENCE
LF 1,650.000 $3.000 $3.610 $4.830 $5.000 $3.950
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $215.000 $412.090 $587.520 $536.000 $294.910
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,600.000 $3,090.690 $4,049.150 $4,026.000 $3,649.910
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $360.580 $524.010 $470.000 $624.910
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $1,500.000 $2,060.460 $889.220 $520.000 $969.620
CRASH CUSH ATTEN (STKPL)
EA 4.000 $1,200.000 $2,060.460 $762.190 $650.000 $1,689.830
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $7,000.000 $9,272.080 $12,068.040 $9,600.000 $13,239.830
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 36.000 $415.000 $643.890 $875.110 $850.000 $457.700
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 20.000 $100.000 $66.970 $82.570 $88.000 $76.430
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $30.000 $41.210 $61.390 $54.000 $576.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 188.000 $1.000 $3.010 $2.540 $2.800 $2.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,640.000 $1.000 $2.920 $2.540 $2.400 $1.230
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 460.000 $1.000 $1.030 $1.160 $2.000 $1.350
REFL PAV MRK TY II (W) 4" (BRK)
LF 1,880.000 $0.200 $0.210 $0.240 $0.300 $0.290
REFL PAV MRK TY II (W) 4" (SLD)
LF 365,774.000 $0.150 $0.130 $0.240 $0.200 $0.220
REFL PAV MRK TY II (Y) 4" (BRK)
LF 39,220.000 $0.150 $0.300 $0.240 $0.200 $0.230
REFL PAV MRK TY II (Y) 4" (SLD)
LF 80,372.000 $0.150 $0.290 $0.240 $0.200 $0.220
REFL PAV MRK TY II (Y) 8" (SLD)
LF 920.000 $0.400 $0.520 $0.470 $1.000 $0.580
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 182,887.000 $0.450 $0.690 $1.220 $1.000 $1.070
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 40,186.000 $0.500 $0.690 $1.220 $1.000 $1.070
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 19,610.000 $0.600 $0.840 $1.220 $1.000 $1.090
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 940.000 $0.400 $0.820 $0.520 $1.000 $0.620
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 99.000 $3.000 $14.940 $18.310 $18.500 $17.460
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 4.000 $50.000 $61.820 $35.310 $74.000 $70.410
REFL PAV MRKR TY I-C
EA 97.000 $5.000 $5.670 $2.350 $6.000 $3.680
REFL PAV MRKR TY II-A-A
EA 1,508.000 $3.000 $3.760 $2.350 $5.000 $2.140
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,234.000 $100.000 $12.820 $37.060 $60.000 $74.430
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $4.000 $18.540 $12.560 $40.000 $11.870
PREFORMED CENTERLINE RUMBLE STRIP
LF 8,008.000 $4.000 $5.670 $20.170 $8.000 $17.490
TMA (STATIONARY)
DAY 544.000 $150.000 $246.730 $238.810 $240.000 $95.890
TMA (MOBILE OPERATION)
DAY 24.000 $200.000 $618.140 $737.080 $800.000 $1,477.980
Totals: $14,208,777.500 $16,675,319.988 $18,180,707.856 $18,476,731.450 $25,847,013.784