|
|
PREPARING ROW
|
AC
|
3.500
|
$3,500.000
|
$2,400.000
|
$25,000.000
|
|
|
PREPARING ROW
|
STA
|
361.000
|
$1,500.000
|
$7,000.000
|
$10,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,142.000
|
$20.000
|
$24.000
|
$12.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-19")
|
SY
|
3,635.000
|
$5.000
|
$6.250
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
101,621.000
|
$8.000
|
$5.480
|
$9.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,571.000
|
$15.000
|
$24.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
211,671.000
|
$10.000
|
$10.720
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
97,538.000
|
$5.000
|
$2.930
|
$9.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
361.000
|
$540.000
|
$240.000
|
$185.000
|
|
|
BLADING
|
HR
|
377.000
|
$250.000
|
$198.000
|
$175.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
642,660.000
|
$0.150
|
$0.140
|
$0.550
|
|
|
PROOF ROLLING
|
HR
|
362.000
|
$120.000
|
$120.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
10,343.000
|
$10.000
|
$7.530
|
$14.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
89,315.000
|
$11.000
|
$7.200
|
$17.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(12")
|
SY
|
142,747.000
|
$12.000
|
$10.250
|
$20.000
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
STA
|
361.000
|
$600.000
|
$420.000
|
$175.000
|
|
|
REWORK BS MTL (TY A) (6") (ORD COMP)
|
SY
|
4,510.000
|
$3.000
|
$6.000
|
$3.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
2,069.000
|
$4.000
|
$6.600
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
46,443.000
|
$4.500
|
$5.560
|
$4.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
52,076.000
|
$4.000
|
$5.390
|
$4.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
7,640.000
|
$3.000
|
$5.790
|
$4.500
|
|
|
AGGR(TY-PB GR-5 SAC-A)
|
CY
|
225.000
|
$110.000
|
$165.000
|
$125.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
27,649.000
|
$125.000
|
$159.740
|
$135.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (8"-15")
|
SY
|
200.000
|
$150.000
|
$93.850
|
$125.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
22,428.000
|
$2.000
|
$9.920
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
961.000
|
$190.000
|
$240.000
|
$85.000
|
|
|
CUT & RESTORING PAV
|
SY
|
920.000
|
$40.000
|
$60.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,625.000
|
$10.000
|
$24.000
|
$63.500
|
|
|
CLASS S CONC UTILITY PROTECTION PADDING
|
CY
|
23.000
|
$780.000
|
$1,200.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,663.000
|
$590.000
|
$660.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
2,702.000
|
$380.000
|
$550.000
|
$525.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
2,340.000
|
$60.000
|
$45.600
|
$50.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
232.000
|
$200.000
|
$385.620
|
$400.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
326.000
|
$320.000
|
$518.970
|
$540.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
908.000
|
$330.000
|
$337.630
|
$500.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
630.000
|
$420.000
|
$385.620
|
$515.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
2,193.000
|
$530.000
|
$423.040
|
$532.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
532.000
|
$350.000
|
$414.280
|
$600.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
136.000
|
$450.000
|
$426.660
|
$630.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
80.000
|
$800.000
|
$475.510
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
360.000
|
$780.000
|
$513.260
|
$740.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
743.000
|
$450.000
|
$534.600
|
$650.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
496.000
|
$560.000
|
$596.810
|
$800.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
452.000
|
$700.000
|
$679.310
|
$1,000.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
52.000
|
$800.000
|
$957.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
959.000
|
$70.000
|
$75.730
|
$125.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,211.000
|
$90.000
|
$97.970
|
$130.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
672.000
|
$100.000
|
$122.100
|
$165.000
|
|
|
INLET (COMPL)(TY S)
|
EA
|
16.000
|
$3,600.000
|
$4,400.000
|
$3,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
9.000
|
$5,600.000
|
$5,500.000
|
$2,800.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
7.000
|
$5,500.000
|
$6,600.000
|
$3,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
|
EA
|
3.000
|
$6,150.000
|
$7,150.000
|
$4,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$6,100.000
|
$10,120.000
|
$4,200.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
11.000
|
$7,000.000
|
$10,340.000
|
$4,200.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
21.000
|
$7,100.000
|
$10,450.000
|
$7,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
19.000
|
$7,000.000
|
$11,000.000
|
$4,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$11,550.000
|
$4,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$6,800.000
|
$12,100.000
|
$4,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
1.000
|
$8,300.000
|
$12,100.000
|
$4,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$7,600.000
|
$12,650.000
|
$4,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
10.000
|
$8,600.000
|
$13,200.000
|
$4,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
19.000
|
$7,700.000
|
$13,200.000
|
$5,600.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$7,200.000
|
$13,750.000
|
$5,600.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
4.000
|
$10,000.000
|
$14,850.000
|
$5,600.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
4.000
|
$20,000.000
|
$15,950.000
|
$7,700.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
2.000
|
$25,000.000
|
$15,400.000
|
$9,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$2,000.000
|
$2,200.000
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
79.000
|
$2,260.000
|
$3,300.000
|
$2,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$2,400.000
|
$4,400.000
|
$4,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
76.000
|
$1,700.000
|
$1,760.000
|
$1,200.000
|
|
|
REMOV STR (SET)
|
EA
|
44.000
|
$750.000
|
$984.500
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,000.000
|
$1,540.000
|
$1,600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,000.000
|
$2,200.000
|
$1,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
806.000
|
$35.000
|
$22.000
|
$40.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
75.000
|
$55.000
|
$49.500
|
$75.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,973,000.000
|
$3,163,856.250
|
$4,150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$10,000.000
|
$15,441.000
|
$20,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
896.000
|
$20.000
|
$18.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
896.000
|
$8.000
|
$12.000
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,416.000
|
$5.000
|
$8.200
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,176.000
|
$1.000
|
$2.400
|
$3.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,825.000
|
$40.000
|
$43.770
|
$65.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
18,270.000
|
$40.000
|
$9.890
|
$65.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
12,240.000
|
$7.000
|
$5.630
|
$8.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
18,270.000
|
$10.000
|
$7.690
|
$8.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,167.000
|
$21.000
|
$41.250
|
$25.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
120,810.000
|
$0.150
|
$0.230
|
$0.100
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
54,587.000
|
$9.000
|
$10.180
|
$8.000
|
|
|
CABLE BARRIER SYSTEM (TL-4) (10'-0")
|
LF
|
2,438.000
|
$11.500
|
$12.100
|
$9.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
42.000
|
$2,500.000
|
$4,400.000
|
$2,700.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
36.000
|
$2,000.000
|
$1,100.000
|
$740.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
52.000
|
$1,000.000
|
$550.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
52.000
|
$9,000.000
|
$7,150.000
|
$5,700.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
4,731.000
|
$20.000
|
$19.250
|
$12.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
1.000
|
$330.000
|
$390.500
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$740.000
|
$929.500
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
15.000
|
$830.000
|
$1,061.500
|
$635.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
49.000
|
$830.000
|
$1,006.500
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
25.000
|
$900.000
|
$7,601.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
9.000
|
$980.000
|
$1,342.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
60.000
|
$70.000
|
$110.000
|
$80.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
12.000
|
$70.000
|
$148.500
|
$90.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
144.000
|
$80.000
|
$154.000
|
$75.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
59.000
|
$25.000
|
$11.000
|
$23.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,838.000
|
$0.150
|
$0.190
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
106,870.000
|
$0.150
|
$0.190
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,188.000
|
$0.150
|
$0.190
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
134,100.000
|
$0.150
|
$0.190
|
$0.170
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
384.000
|
$1.000
|
$3.630
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,644.000
|
$4.500
|
$3.630
|
$3.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,612.000
|
$1.000
|
$2.400
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
18,780.000
|
$1.000
|
$2.400
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
11,402.000
|
$1.000
|
$0.940
|
$1.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,287.000
|
$3.000
|
$3.300
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
19,859.000
|
$0.400
|
$0.460
|
$0.450
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
78,231.000
|
$0.400
|
$0.460
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,987.000
|
$0.400
|
$0.460
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
80,377.000
|
$0.400
|
$0.460
|
$0.450
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
318.000
|
$13.000
|
$22.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$210.000
|
$330.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$270.000
|
$440.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
144.000
|
$30.000
|
$44.000
|
$40.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
328.000
|
$3.000
|
$3.300
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
302.000
|
$3.000
|
$3.300
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,236.000
|
$3.000
|
$3.300
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
28,370.000
|
$0.500
|
$0.940
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$50.000
|
$55.000
|
$50.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
65,288.000
|
$85.000
|
$87.470
|
$95.000
|
|
|
SP MIXES SP-C PG64-22 (LEVEL-UP)
|
TON
|
10,498.000
|
$80.000
|
$90.550
|
$110.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
1,632.000
|
$100.000
|
$101.830
|
$125.000
|
|
|
BONDING COURSE
|
GAL
|
39,936.000
|
$3.500
|
$6.330
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,500.000
|
$16,280.000
|
$12,500.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$7,000.000
|
$9,295.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,540.000
|
$200.000
|
$240.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,232.000
|
$50.000
|
$104.500
|
$50.000
|
|
Totals: |
$32,697,334.000
|
$36,634,908.090
|
$43,503,377.520
|